International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

Similar documents
Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Use of Manbox. To identify and formalise the risks and control processes involved in use of personnel in workboxes.

CICA HOIST SECTOR FAQs - RELEVANT STANDARDS / REGULATIONS. A. How do I find Australian Standards for cranes?

Position Paper. Telehandler Use: Lifting Suspended Loads

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

Title: Lifting Operations Involving Crane or Gantry Offshore

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

Recover Light Vehicles Using Advanced Winching Techniques

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

SECTION 14: AERIAL LIFT PROGRAM

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

Translation of the Original operating instructions Lifting device Z 70 /...

FEM PG CLE EOT POSITION ON WEEE & RoHS (Recast)

CRANE & HOIST SAFETY PROGRAM

A brief guide for identification of non-compliant construction machinery. Is this. Compactor / Roller compliant with European legislation?

Work Experience Form Boom Truck Hoist Operator

AERIAL LIFTS/MAN-LIFTS

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

SAFETYFIRSTTRAINING.CA

SAFETY GUIDANCE MATERIAL

CPCS renewal test factsheet

Health, Safety, Security and Environment

America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings!

Consumer, Environmental and Health Technologies Biotechnology and Food Supply Chain. GUIDANCE DOCUMENT No. 1

Technical Test Theory Lorry Loader A36

Cranes and Derricks. Objectives. Construction Safety Lecture 18

ARTICULATED MOBILE CRANE Annual Report

40' ' POWERED BOOM: MODE 1 40' - 126' POWERED BOOM: MODE 2

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

CRANE, HOIST AND SLING SAFETY PROGRAM

SBRL-SERIES SPREADER BEAMS INSTRUCTION MANUAL

Regulatory update on implementation of the 0.50% sulphur limit for international shipping

PROCEDURE. Revision: 1. Author: D Steel CONTENTS

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Doc #: 2100-AD Revision: - 4 Meter White Spot Panel Replacement. Author(s): David Sprayberry, Larry Reddell, Tammie Lavoie, Miranda Saucedo

INSPECTIONS TESTING TRAINING & REPAIRS

General Instructions and Inspection Instructions for Crane

GUIDELINES FOR THE USE OF SCISSOR LIFTS (ELEVATING WORK PLATFORMS) AND AERIAL BOOM LIFTS (EXTENSIBLE BOOM PLATFORMS)

COMMISSION REGULATION (EU)

Crane & Hoist Safety Guidelines

METHOD 303A-DETERMINATION OF VISIBLE EMISSIONS FROM NONRECOVERY COKE OVEN BATTERIES. NOTE: This method does not include all of the

Cranes. OSHA Office of Training & Education 1

CMEIG ADVISORY NOTICE RATED LOADS FOR WHEEL LOADERS

RATED CAPACITY PC - D28 TIDD PC25 RATED CAPACITY MANUAL PC - D28 OCTOBER 2013 REV A PC25

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

Heavy Equipment & Rigging Specialist Training

Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations 1998 Regulation 9

Reliance Industries, LLC. Installation, Operation, Inspection and Maintenance Instructions for the Slider Traveling Beam Anchor Clamp

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping

Portable Ladder Safety

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Element C7.2 Lifting Work Equipment

Crane Safety Resource Guide P AGE 1

Responsible Unit: Facilities Management

ARTICULATED MOBILE CRANE Annual Report

The Sanford Underground Research Facility Revised: (07/31/2018) CRANES AND HOISTS Supersedes: (03/23/11)

EUnited Municipal Equipment

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...

Planning Advisory Notice

NRCT NATIONAL RIGGING & CRANE TRAINING LLC. Contact : CONSTRUCTION-INDUSTRIAL-SAFETY SERVICES

Below the Hook Lifting

ABSTRACT. Federal Program Change, Notice of Intent and Equivalency Required. See Section VI. National, Regional, and Area Offices.

MATERIALS HANDLING MATERIALS HANDLING

MAINTENANCE WORK INSTRUCTION. Mech OFF Replace Head Pulley CVXXX

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

Offshore manufacturing and fabrication: guidelines for heavy trailers (class TC and TD)

Chicago Crane Operators Examination Study Guide

SAFETY ALERT - # TOWING INCIDENT

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

E-Z LIFT 2000 BMC/TMC OPERATORS MANUAL EZ90018-EZ90538 EZ90549-EZ90689

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook

LINK-BELT MODEL HTC-8675LB - 75 TON CAPACITY 48 7" (.80m) 41 0" /8" (3.52m) /16" (2.02m) /4" (.34m) 25" 11 0" (.

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

OVERHEAD & GANTRY CRANE / RIGGING

WIELAND-DAVCO CORPORATION CRITICAL LIFT PERMIT. Subcontractor: Subcontractor Lift Supervisor: (This individual must be present during the lift)

EROAD Ehubo Installation Guide

CRANE OPERATION INSTRUCTION AND GUIDELINES

CPCS renewal test factsheet

Series 1300 Hydraulic Crane 30 Ton Load Ratings

TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT

Installation of parts and appliances without an EASA Form 1 in European Light Aircraft

Series 1400 Hydraulic Crane 33 Ton Load Ratings

CRANE RATING MANUAL HTC

Series 1400A Hydraulic Crane 33 Ton

northernstrands.com Suspended Access Systems and Equipment

Rig Move Hazard Mitigation Procedure

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330)

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal

Australian Standard. Cranes, hoists and winches Safe use. Part 10: Mobile elevating work platforms AS AS

LIFTING DEVICES AND LIFTING EQUIPMENT - USE AT INOVYN

HOISTING APPARATUS Inspection Guidelines

ESSENTIAL SAFETY RESOURCES

Revised proposal to amend UN Global Technical Regulation No. 3 (Motorcycle brake systems) I. Statement of technical rationale and justification

Operation of Fork Lift Trucks

CPCS renewal test factsheet

Transcription:

ICSA N003 International Crane Stakeholder Assembly - Guidance - Lifting of Persons with Mobile Cranes Members are: Association of Equipment Manufacturers [AEM] The Crane Industry Council of Australia [CICA] The European Association of abnormal road transport and mobile cranes [ESTA] European Materials Handling Federation [FEM] Specialized Carriers & Rigging Association [SC&RA] Legal Note: This publication is only for guidance and gives an overview regarding in the assessment of risks related to lifting persons with cranes. It neither claims to cover any aspect of the matter, nor does it reflect all legal aspects in detail. It is not meant to, and cannot, replace own knowledge of the pertaining directives, laws and regulations. Furthermore the specific characteristics of the individual products and the various possible applications have to be taken into account. This is why, apart from the assessments and procedures addressed in this guide, many other scenarios may apply. 1

CONTENT Page 1. INTRODUCTION...3 2. SCOPE...3 3. DEFINITION...3 4. STANDARDS AND LEGAL FRAMEWORK...3 5. GUIDELINE...4 ANNEX 1 Pre-Operational Checklist (INFORMATIVE)...7 6. REFERENCES...9 2

1. INTRODUCTION Mobile cranes are generally designed for the use of lifting loads and are not normally designed for the purpose of lifting persons. If a piece of equipment designed for personnel handling is available to complete the task it should be used. However, mobile cranes may be used to hoist persons in suspended platforms for working at height when it is the least hazardous way to complete the job. 2. SCOPE This document provides guidance for the risk assessment of using a mobile crane to hoist persons in a suspended platform. This does not pertain to a platform fixed to a boom tip (not suspended). The document is considered as complementary information to the machine operator s manual. It applies to mobile cranes as defined in ISO 4306. 3. DEFINITION The term platform used throughout this document is intended to describe a suspended personnelcarrying device that has been designed for the purpose of personnel working at height from the platform. Other common terms for a platform are work box, man box, personnel box, personnel handling basket, man basket, dog box, and suspended basket. Examples of platforms are shown (Section 5.2.1). A rescue box is different from a platform and should not to be used as a platform. It should only be used for dedicated rescue operations. 4. STANDARDS AND LEGAL FRAMEWORK There are various standards and regulations from different countries that address the complexity of using cranes for lifting persons and provide amongst others manufacturers and users with information and/or requirements for such operations: a) 2006/42/EC Machinery Directive b) United States OSHA Regulation 29CFR1926.1431 c) ISO 12480-1: Cranes Safe Use Part 1: General d) European Standard EN 14502-1: Cranes Equipment for lifting persons. e) ASME B30.23-2011 Personnel Lifting Systems f) Australian Standard 1418.1-2002 General Requirements g) Australian Standard 1418.17-1996 Design and construction of workboxes h) Australian Standard 2550.1-2011 Safe Use General Requirements i) FEM CLE MC N 0284, 16 May 2011 Further applicable national operational regulation may exist and shall be observed. 3

5. GUIDELINE When determining the suitability of using a mobile crane to hoist persons the following risk assessment should be performed: Identification of the hazards that could be encountered; The likelihood of the hazard identified might be encountered; The degree of harm that would result if the hazard is encountered; The ability to detect and avoid the hazard; The availability and suitability of ways to eliminate the hazard or reduce the risk; When a crane is to be used to hoist persons in a platform the guidelines for the operation of the crane outlined in this document should be followed. Annex 1, at the end of this document, is a checklist that should be used to assist all parties involved in review of the sub clauses of Section 5 prior to hoisting persons in a platform. 5.1. Planning Before Work Commences: The use of cranes for hoisting persons requires preparation to ensure safe operation when the lift occurs. This preparation includes the: 5.1.1 Agreed method of communication between personnel in the platform and the crane operator, including backup system where applicable. 5.1.2 Location of crane on site to prevent or minimize the need for traveling (travel on rubber or tracks is prohibited with personnel in a platform) and allowance for operation within the crane s rated capacity. 5.1.3 Assessment of ground conditions should be verified or performed. 5.1.4 Agreed weather conditions for use of the crane and platform. Platforms should not be used in electrical storms, snow, ice, sleet or other adverse weather conditions that could affect safety. Platforms shall not be used if wind speed exceeds national regulations (AUS: 7 m/s, EU: 13.8 m/s, USA: 20 mph) or manufacturer s allowable crane wind speed capacities, if less than national regulations. 5.2. Lifting Gear: Appropriately designed and rated lifting gear, including the platform, is critical to the safe operation of a crane while hoisting persons. Consideration includes: 5.2.1 The platform used meets any regulatory requirements for design and inspection for the region where used. If regional design requirements do not exist, refer to relevant standards of section 4. 5.2.2 Appropriate anchor points are provided for connecting the platform to the crane and securing personnel to the platform. 5.2.3 Shackles and Slings, i.e. chain or wire slings, have been inspected prior to use and found to be fit for purpose. 5.2.4 The platform shall not be used for bulk material transportation. 4

5.3. Personnel: It is critical that personnel involved in the hoisting of persons in a platform meet a minimum set of guidelines. This applies to the crane operator and those in the platform. The following are recommended: 5.3.1 The crane operator shall be appropriately trained, as well as certified or licensed, where required, and familiar with the crane to be operated. 5.3.2 Personnel in the platform shall be trained to effectively communicate with the crane operator to provide direction for the movement of the platform. Where applicable, a backup communication method should be determined before the lift commences. NOTE: If the platform is not continuously visible to the crane operator additional communication methods or personnel should be considered. 5.3.3 The crane operator and personnel in the platform shall communicate in the same language. 5.3.4 Workers shall wear appropriate personal protective equipment (PPE) for the task. NOTE: Personal fall arrest system should not be used to secure personnel to the platform when operating over water. Life vests should be worn. 5.3.5 The crane operator shall remain at the crane controls while the platform is suspended. 5.3.6 Additional safety considerations may be required based on the task or environment where a platform is used, e.g. use in confined space or use of flammable liquids. 5.3.7 All national and regional requirements shall be met. 5.4. Crane: Mobile cranes used for hoisting persons in platforms should be well maintained and assessed to be in good working order. In addition to general maintenance requirements specific operational requirements shall be fulfilled. These include: 5.4.1 Crane hooks shall be fitted with a positive locking safety latch (catch) 5.4.2 Return to neutral controls shall be fitted 5.4.3 Power lowering capability (any freefall features shall be made inoperable.) 5.4.4 Anti-two-blocking (vertical hoist limit) and all other limiters shall be functioning, 5.4.5 The crane shall have a minimum capacity at the working radius of 1000kg (2200lbs), regardless of the mass of the platform and contents. 5.4.6 The crane capacity in all areas of the platform travel path shall exceed 200% of the overall mass of the platform and contents, e.g. a 700kg overall mass requires at least a 1400kg crane capacity (1500lbs overall mass required at least a 3000lbs crane capacity). NOTE: The mass of the hook block and any other lifting attachment shall be considered as part of the load. 5.4.7 The load in the hoist rope shall not exceed 50% of the hoist rated line pull. Minimum overall weight required for proper spooling during hoisting should be considered. 5.4.8 Additional loads (except a hook block) shall not be lifted by the crane when a platform is suspended. 5

5.5. Operations: Where a test lift can be performed without the guidance of personnel in the platform, a test lift shall be performed before personnel are hoisted and suspended in a platform. The test lift conditions include: 5.5.1 Platform and rigging proof test of 125% of the platform rated capacity should be performed before first use of platform on site. Load should be evenly distributed in workbox and suspended for 5 minutes. Visual inspection should be performed on platform and rigging after each proof test. NOTE: Where local regulations do not allow for greater than 100% rated capacity load testing, local regulations shall be followed for the test weight. 5.5.2 Unoccupied test weight of 100% of the anticipated platform capacity including personnel, materials, and tools to simulate the travel path of the platform. The trial lift shall occur before lifting personnel if the crane has been relocated, configuration change, or operator change. Workers should not enter or exit the platform except when the platform is firmly supported and secured from movement. 6

ANNEX 1 Pre-Operational Checklist (INFORMATIVE) All Parties involved should discuss and agree on the operational procedures before work commences. 5.1 Planning Before Work Commences Pass Comments Communication method determined Method: Backup(where applicable): Crane will remain stationary Crane rated capacity will not be exceeded (with appropriate reductions accounted for) Maximum permitted wind speed during platform Wind Speed: operation determined Overhead obstructions have been considered Ground conditions have been verified rescue plan determined as additional item 5.2 Lifting Gear Pass Comments Platform designed to accepted standard e.g. AS1418.17 Platform condition found to be fit for purpose Anchor points are fit for purpose Shackles have been inspected and found to be fit for purpose Slings have been inspected and found to be fit for purpose 5.3 Personnel Pass Comments Crane operator appropriately trained for crane Crane operator certified or licensed for crane, where License: applicable Crane operator familiar with crane Communication method determined Language: Crane operator to remain in crane during operation Appropriate PPE Platform personnel appropriately trained 7

5.4 Crane Pass Comments Maintenance and Service Completed Crane hooks shall be fitted with a positively locking safety latch (catch) Anti-two-blocking (vertical hoist limit) and all other travel limits shall be functioning The crane shall have a minimum capacity of 1000kg (2200lbs) The crane capacity in all areas of the platform travel path shall exceed 200% of the overall mass of the platform and contents. The load on the crane hoist rope shall not exceed 50% of the hoist rope capacity The crane shall be equipped with power lowering Return to neutral controls shall be fitted in the crane No other loads shall be lifted by the crane when a platform is suspended 5.5 Operations Pass Comments Proof Test Load: Trial Lift Load: Time: Radius: Sign-off Name Signature Role (examples shown) Crane Operator Date Rigger Site Safety Officer Lift Supervisor/Director Occupant(s) 8

6. REFERENCES This document has been reviewed and jointly adopted by the following member associations of the ICSA: Association of Equipment Manufacturers [AEM] The Crane Industry Council of Australia [CICA] The European Association of abnormal road transport and mobile cranes [ESTA] European Materials Handling Federation [FEM] Specialized Carriers & Rigging Association [SC&RA] This document is maintained by The Crane Industry Council of Australia (CICA). Secretariat: Secretariat of CICA The Crane Industry Council of Australia c/o CICA PO Box 136 Mount Waverley, VIC Australia 3149 admin@cica.com.au Available on website of: ICSA AEM CICA ESTA FEM SC&RA 9