DISTRICT PROFILE ERODE

Similar documents
DISTRICT PROFILE Villupuram

RAMANATHAPURAM 1. D IS T R CT P R OF I IL E Ba s i ic D Da t a Details In the District

Summary of Key Issues

PROJECT PROFILE ON COAL BRIQUETTES MANUFACTURING UNIT

Dairy Cum Powder Plant

MANUFACTURING OF PUMP SETS FOR AGRICULTURAL (SUBMERSIBLE)

Need Assessment Document (NAD) DDUGJY

Project Proposal Lok Seva Kendra, Badachatrang. A Solar Powered Laptop-Printer Center

HOSE CLIPS A. INTRODUCTION B. PRODUCT USES & SPECIFICATION C. MARKET POTENTIAL

TEXTILE INDUSTRY OF INDONESIA. By Indonesian Consul General in Mumbai

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

Prospects for EU agricultural markets and income

Export Oriented Enterprises (EOE) 3 rd Quarter Introduction This issue of Economic and Social Indicators (ESI) presents the results of the

ECONOMIC SURVEY STATISTICAL APPENDIX

Name of the Industrial Area

MADURAI CORPORATION. The various sources of waste generation in Madurai are detailed below: Source of Solid Waste Generation. Quantity Tones per day

Answers to Your Questions

Export Oriented Enterprises (EOE) 1st Quarter Introduction This issue of Economic and Social Indicators (ESI) presents the results of the

Detailed Statement of Advances as at 30 June 2006

Following are the growth rates of each sub segment of the auto sector over the last 5 years:

By: Muhammad Usman Arshad Khan Head of Projects and Policy

Local Production & Local Consumption Model of Energy, Food and Finance in Mozambique.

Export Oriented Enterprises (EOE) 2nd Quarter 2018

MASALA PEANUTS Introduction Market Packaging Production capacity

Item

Indian engineering TRANSFORMING TRANSMISSION

Total Surface Area DEVELOPING MEMBER COUNTRY (DMC) ( 000 sq. km) (Mn) (%)

Bengaluru Commuter Rail Service. Sanjeev V Dyamannavar Praja-RAAG

Biofuel Potential for Transport Sector in Sudan

STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION

A PROJECT PROFILE ON ROLLING SHUTTERS

Investment Opportunities at POIC Lahad Datu

Setting up a Multiskilling & Certification Centre for Automotive Sector. Skill Development Government of Gujarat

LIST OF MOUs SIGNED BY GOVERNMENT OF TAMIL NADU

ATS CHEM EQUIPMENTS PVT. LTD.,

ICEF renewable energy projects- some learnings. Bhaskar Natarajan, M.Satyanarayana India Canada Environment Facility

Contents 1. Country Background 2. Lao Power Sector 3. Power Sector Policy 4. Current Electric Power Situation (statistics) 5. Demand Forecasting 6. Ex

NOTIFICATION RURAL ELECTRIFICATION PLAN

Table A1 - Queensland Mean Population (Male & Female)

Monoset Water Pumps INTRODUCTION

Mining and quarrying 13,503 19,062 26,170 35,190 38,511 53,515 74,386 85,792 99, ,422

Total Surface Area DEVELOPING MEMBER ECONOMY. ( 000 km 2 ) (million) (%)

Sunflower Oil Imports Increase for Ration Card Program

VEGETABLE OIL REFINERY

RUBBER FOOTWEAR. Introduction :

Farm Pride Foods Ltd. Annual General Meeting 2012 Managing Director s Update

Appendix B STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION

Implementation Status & Results Uzbekistan Alat and Karakul Water Supply Project (P118197)

Total Surface Area DEVELOPING MEMBER ECONOMY. ( 000 km 2 ) (million) (%)

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Auto Shredding Facilities : A need under Indian Context K. K. MEHROTRA

A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka

Dealership Application form

Jiya Eco-Products Limited

Yukon Resource Gateway Project

Green Line LRT: Beltline Segment Update April 19, 2017

Investment Promotion Direction

Introduction of tractor based rural road maintenance approaches in Zambia

China Sugar Manufacturing Industry Report, Apr. 2011

Market & Country brief on Germany

LegalCrystal Indian Law Search Engine ( Source : [See Section 2(n)(vi)]

APPENDIX I LIST OF WARD-WISE HOUSEHOLD AND POPULATION IN MYSORE CITY CORPORATION, Page 213

An Economic Analysis of Legislation for a Renewable Fuels Requirement for Highway Motor Fuels

Overview of Solar Energy in the Mekong Region

Global Energy Network for Urban Settlements

Challenges and solutions for transport in Norway

CHAPTER 4 Motor Load factor Survey

TARIFF STRUCTURE OF TNEB

Success Story Scaling Up Energy Efficiency An Indian Experience

REGIONAL MEETING ON SUSTAINABLE ENERGY

CHARTS AND PRICE PROJECTIONS

Rural Electrification Workshop International Best Practices and Options for Policy Makers 4 5 April 2013, Yangoon, Union of Myanmar

Table 8. Gross Domestic Product by Industrial Origin at Current Market Prices, (Rp. Billion)

Biofuels: crime against humanity!?

Onix Structure Private Limited. Solar PV Power Generation System Detailed Project Report

Study on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY.

Mid-term Outlook for World Agricultural Markets

How to manage large scale infrastructures? Infrastructure planning within Toulouse s SUMP. Alexandre Blaquière. 1st December 2016

SECTION M: Agriculture

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

DISTRICT PROFILE OF ANGUL

USDA Agricultural Outlook Forum 2007

Bioenergy Development in Southeast Asia. Fabby Tumiwa Institute for Essential Services Reform Kathmandu, 19 April 2011

Back to the Future? Land Use, Mobility & Accessibility in Metropolitan China Day 23 C. Zegras. Contents

Rice Outlook U.S. and World February 9, 2017

European Bank for Reconstruction and Development

Parking Policy as a counter measure to promote public transport Case Study of Nehru Place, Delhi

Yukon s Independent Power Production Policy

FED ER AL RESERVE statistical release

Viable City bus in Small Cities

BRUNEI DARUSSALAM. Copies of this report are available to the public from

Agriculture Exemptions

BRAZILIAN PERSPECTIVES ON BIOENERGY TRADE AND SUSTAINABLE DEVELOPMENT

COPPER IN POWER CABLES

Rwanda Biofuels Limited. Powering Rwanda s Development

Operating Results Q Asian Insulators Public Company Limited

GDP. Total Domestic demand External balance 1)

Tata Steel and Odisha: A Partnership Stronger Than Steel. Arun Misra, Vice President (Gopalpur Project) Date: 30/10/2017

INDIAN AUTOGAS COMPANY LIMITED AUTOLPG BHAVAN #3/88, Mount Poonamallee Road, Ramapuram, Chennai

ROLE OF HAREDA IN NET METERING. By : P.C. Sharma Project Officer

Transcription:

DISTRICT PROFILE ERODE

ADMINISTRATIVE PROFILE REVENUE DIVISION 3 TAULKS 7 PANCHAYAT UNIONS CORPORATION MUNICIPALITIES VILLAGE PANCHAYATS TOWN PANCHAYATS 20 1 8 343 53 DEMOGRAPHIC PROFILE TOTAL AREA FOREST CULTIVABLE AREA 8162 SQ. KM 2.28 LAKHS HEC 5.15 LAKHS HEC MALE FEMALE TOAL POPULATION 13.09 LAKHS 12.72 LAKHS 25.81 LAKHS LITERATE 10.01 LAKHS 5.71 LAKHS 15.72 LAKHS SC / ST 2.5 LAKHS 2.0 LAKHS 4.5 LAKHS LABOUR: 1) Cultivators : 2.8 Lakhs 2) Agriculture : 4.0 Lakhs 3) Industries : 1.2 Lakhs 4) Others : 4.2 Lakhs Animal Husbandry Sl.No. Classification Nos. 1. Cattle 398572 2. Buffaloes 230004 3. Sheep 506015 4. Goat 562270 5. Poultry 5270334 Dairy Development Sl.No. Particulars Nos. 1. Dairies 1 2. Milk Chilling Plants 3 3. No. of Milk Co operative Societies 724

Banking Facilities No. Of Nationalized bank branches 163 No. Of Private bank branches 73 No. Of Co-operative bank branches 28 No. Of Land Dev bank branches 12 No. Of Gramin bank branches 2 ACP 2007 2008 Sector Target Achievement % Of Achievement Agriculture 1152.42 1158.30 101 SSI 741.53 760.22 103 Other Priority Sector 446.05 467.02 105 Total 2340.00 2385.53 102 ACP 2007 2008 Sector Target Achievement % Of Achievement Agriculture & Allied 1222.45 306.00 25.00 SSI 922.19 294.00 31.80 Other Priority Sector 558.66 140.00 25.00 Total 2703.30 740.00 27.37 Overview of Industrial Scenario Major Industries : 27 Medium : 16 Micro and Small : 15278 Cottage : 4310 Handicraft : 1060 Major Sectoral Concentration of Industries 1.Textiles 2.Coir 3.Rice Mill 4.Edible Oil 5.Engineering Industrial Infrastructure No. Of SIDCO Estate : 3 No. Of SIPCOT Estate : 1

SIPCOT Industrial Growth Center, Perundurai I Extent 2600 Acres II Developed Area (Phase I) 1820 Acres III Saleable Area (Phase I) 1820 Acres IV Infrastructure Facilities: 18 MLD water from River Cauvery a) Water Supply System with Distribution System b) Road Wide Black Topped Road c) Trade Effluent d) CETP Underground HDPE Pipe line for Collection of wash water for Textile Processing Units 1 No. Of CETP with capacity of 36.00 Lakhs / Lts for Textile Processing units is functioning. More number of CETPs proposed according to the demand. e) Power 110/3/11 KV TNEB Sub Station is Functioning V Number of Units Allotted 163 Units 1203 Acres VI Workers 15, 000 Workers (Male & Female) SIDCO Location Area Erode 25.13 Acre Dharapuram 1.61 Acre Nanjai 13.05 Uthukuli Acre No. of Sheds available Allotted Functioning No. Of D.P. Workers SSI TINY SSI TINY SSI TINY Available Allotted 15 8 15 8 15 8 4 4 500 32 32 32 50 14 14 12 500 SEZ (Engineering & Auto) Promoted by SIPCOT at Perundurai. Acquired Land 263.19 areas. No. of Plots / units Proposed : 74 Scheme cost Rs.5496 Lakhs Size of plots (1 acre, 2 acres, 5 acres, 10 acres)

Large Industries Block wise Sl. No. Name of the Block No. of Units Investme nt (in Lakhs) Employme nt Turn Over Rs. in Lakhs Installed capacity 1 Ammapetai 2 Anthiyur 1 1710.10 66 5226.29 16.33 Million ltrs. 3 Bhavani 1 9086.77 70 10800.00 37560 Kls. 4 Bhavani Sagar 1 2137.00 200 2301.00 2301.23 mtrs. 5 Chennimalai 1 1123.00 300 8830.74 66000 m.t. 6 Dharapuram 2 5352.51 599 10500.00 11200 tones 7 Erode 1 1420.50 185 1757.00 36000 mtrs. 8 Gobi 2 3899.44 600 5822.00 86000 M.t. 9 Kanagayam 3 12212.90 1180 10500.00 120.60 lakhs Kgs. 10 Kodumudi 11 Kundadam 12 Modakurichi 4 27046.42 1815 25300.00 789120 m.t. 13 Mulanur 1 3146.46 127 2500.00 2400 tones 14 Nambiyur 15 Perundurai 7 14070.50 1075 12072.56 96580.48 m.t. 16 Sathy 3 14549.87 777 9017.12 6762.84 17 T. N. Palayam 18 Thalavadi 19 Uthukluli 20 Vellakoil Total 27 95755.47 6994 104626.71 Medium Industries Block wise Sl. No. Name of the Block No. of Units Investment (in Lakhs) Employment Turn Over Rs. in Lakhs Installed capacity 1 Ammapetai 2 Anthiyur 3 Bhavani 4 Bhavani 2 1351.51 246 2420.00 1200 M.t. Sagar 5 Chennimalai 6 Dharapuram 7 Erode 1 860.00 70 2000.00 13248 8 Gobi 2 2009.00 449 4500.00 35480

9 Kanagayam 2 1361.90 325 4017.00 77940 M.t. 10 Kodumudi 11 Kundadam 1 883.81 192 1000.00 10968 12 Modakurichi 13 Mulanur 14 Nambiyur 15 Perundurai 6 5767.52 648 5652.38 20958 M.t 16 Sathy 17 T. N. Palayam 18 Thalavadi 19 Uthukluli 2 1896.26 416 8400.00 2281 20 Vellakoil Total 16 14130.00 2346 27989.38 Micro, Small and Medium Enterprises as on 31.03.2007 Sl. No. Name of the Block No. of Units Investment (in Lakhs) Employment Turn Over Rs. in Lakhs 1 Ammapetai 264 2212 1240 55300 2 Anthiyur 474 1886 2240 47150 3 Bhavani 742 12111 2820 302775 4 Bhavani Sagar 93 1100 222 27500 5 Chennimalai 524 14720 2820 368000 6 Dharapuram 630 2940 2390 58800 7 Erode 5282 22168 18384 554200 8 Gobi 1320 23437 7500 585925 9 Kanagayam 794 29814 3440 745350 10 Kodumudi 276 3804 808 95100 11 Kundadam 178 1251 1116 31275 12 Modakurichi 576 1331 1884 33275 13 Mulanur 318 658 640 16450 14 Nambiyur 232 826 1480 20650 15 Perundurai 1662 42873 14240 1071825 16 Sathy 1057 39742 7112 993550 17 T. N. Palayam 208 642 590 1600 18 Thalavadi 36 64 100 16050 19 Uthukluli 139 1068 1008 26700 20 Vellakoil 473 5095 1914 127375 Total 15278 207742 71948 5178850

Proposed Large Scale Industries Steel Industry at SIPCOT Perundurai Textile Spinning Mills in Kunnathur and Uthukuli Block. Textile processing units at SIPCOT Perundurai. SAKTHI Auto component Expansion plan Rs.200.00 Crores MAJOR INDUSTRIAL CLUSTER Readymade Garments.Coir.Rice Mill Clusters Name of the Cluster Ready Made Garments Cluster Name of the SPV Textile & Garments Exporter s Association Location Erode, Bhavani & Chennimalai No. of Stake Holders 103 Common Facility Centre Proposed (Training Centre, Design Centre, Testing Centre and SCX / Information Cell) Total Cost of the CFC 483.00 Lakhs Financial Assistant under MSMECDP 343.20 Lakhs Promoters Contribution 139.8 Lakhs Present Stage ITCOT is the implemented Agency and the Diagnostic study report had already been submitted to GOI for approval. Name of the Cluster COIR CLUSTER, ERODE Name of the SPV Indian Coir Products (Erode) Private Ltd., Location Natha Kadaiyur No. of Stake Holders 49 Common Facility Centre Coir fiber composite panel manufacturing Unit Total Cost of the Cluster Rs.486.51 Lakhs Financial Assistant under MEMECDP Rs.303.85 Lakhs Promoters Contribution Rs.49.70 Lakhs Bank Loan Rs.132.96 Lakhs Present Stage Study report since submitted to the Industries Commissioner and Director of Industries and Commerce for recommendation.

Name of the Cluster Rice Mill Cluster, Kanagayam Name of the SPV Yet to form. Location Kanagayam No. of Stake Holders 100 Common Facility Centre 1. Common Weigh Bridge, Testing Centre, Training Centre, 2. Common Storage and mechanized drying. Total Cost of the Cluster First Stage: Rs.25 Lakhs 2nd Stage: Rs.10.00 Crore Financial Assistant under MSME Promoters Contribution 1st Stage: Rs.7.00 Lakhs 2nd Stage: Rs.25 Lakhs Present Stage Diagnostic study report had been submitted to GOI vide Industries Commissioner and Director of Industries and Commerce letter No.8129/PDK 5/2007, dated: 13.12.2007 Export 2007 2008 Sl. No. Name of the Product Quantity Exported Value 1 Egg Powder 2902.48 Mts. 7304.06 2 Sugar 559290.51 Mts. 5902.24 3 Albumins 1046 Mts. 2816.46 4 Plastics 5421591 Kgs. 485.88 5 Reclaimed Rubber 320000 Kgs. 44.96 6 Paper 2363670.4 Kgs. 752.19 7 Cotton Yarn 8111926.63 Kgs. 4963.45 8 Woven Fabrics 112500 Kgs. 22.78 9 Blankets 57131.084 Kgs. 121.71 10 Iron & Steel 1369298.16 Mts. 2066.35 11 Compressor 1251 No. 34.79 12 Motor Vehicle parts 876349 No. 2976.23

Export 2008 2009 (up to 31.07.2008) Sl.No. Name of the Product Quantity Exported Value Rs. In Lakhs 1 Egg Powder 2362.894 Kgs. 3223.53 2 Sugar 484236.50 Q. 3743.24 3 Plastics 2038548 Kgs. 136.56 4 Reclaimed Rubber 228000 Kgs. 34.86 5 Paper 3619541.20 Kgs. 1171.61 6 Cotton Yarn 1623300.88 Kgs. 807.11 7 Woven Fabrics 363210.59 Kgs. 460.62 8 Iron & Steel 278076.8129 Mts. 943.90 9 Motor Vehicle Parts 487531 No. 1853.13 Potential non farm Sector Industries Raw Material Based: Coir Coconut Oil Readymade Garments Silk Reeling & Twisting Milk and Milk Products Sago and Starch Masala Products Floral Extraction Poultry and Cattle Feed Demand Based Iron & Steel Engineering Food Processing Industries Skill Based Blankets Export Oriented Coir Pitch Woven Garments Hosiery Garments Rural Artisan Based 1.Cotton Foot Mat 2.Home Furnishing 3.Moon Stone

SKILL DEVELOPMENT (Training Initiative) 1. CNC Programming and Operation EEDISSIA and DMW CNC Centre are discussing to take up Course Module finalised Proposed likely before Sep 09 2. Garment Making Skill Training Initiated action with Readymade Garments manufacturer Association