Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

Similar documents
Customer Charge or Minimum Bill. Total Average Annual Bill (9 Dth) Total Volumetric Rate*

PUBLIC INFRASTRUCTURE PROJECTS

Westland No. 1 Mine (Bob Ciminel 2012)

Gillette Lost the Most Residents in 2017

II. PROJECT DESCRIPTION

Wyoming Cost of Living Index for the Second Quarter of 2012

GUIDE TO COAL MINES Mines Served by BNSF Railway

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Port Terminal Railroad Association. Committed to Safety and Service

APPENDIX C. Existing Utilities

3. Site Information: Address: TBD Location: Southeast corner of Meridian Rd and Old Meridian Rd Size: 2.48 acres Zoning: CR Commercial Regional

Food and Transportation Drive Inflation for the Second Quarter of 2011

Steeplechase Builder Package Builder Permit-Ready Lots

The Dash 9 Locomotive Pack

CECO BUILDING SYSTEMS

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

June 27, WHEREAS, the City recognizes the importance of its role in local economic development; and

CECO BUILDING SYSTEMS

the importance of its role in local economic business operations that these business operations pursuant

Livingston County Hazardous Material Flow Study August 2018

FINAL UTILITY REPORT Eastcreek Farm Thornton, CO

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

PADUCAH TRIPLE RAIL SPEC BUILDING. Paducah, McCracken County, Kentucky N W. Paducah Triple Rail Spec Building

2015 CITY/TOWN PDO CRASHES WITH COLLISION TYPE

Adams County, Iowa ~ always creative

INDUSTRIAL DEVELOPMENT SITE DLH PARCEL #34 +/ GROSS ACRES DLH PARCELS #114 & #115 +/ GROSS ACRES

Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014

Offering Memorandum. 4333, 4375 and 4415 Bandini Boulevard Vernon, CA June Prepared by: Cresa

For Sale or Lease Produce Processing/Cooler Facility Yuma, Arizona

1.3 OVERVIEW OF THE CORRIDOR

Passenger Rail Solar Electrification: A Primer. Oregon Department of Transportation Rail Division. June 2009

ELKO JUNCTION SOUTH EXCLUSIVELY MARKETED BY STRATA REALTY GROUP DEVELOPED & MANAGED BY MERIDIAN PACIFIC

Project Home - Sites in Central Pennsylvania

ES44DC BNSF Heritage 2 Locomotive

Your gateway to economical rail shipping. Shreveport. Galena Park. Loup Transload

2005 City of Santa Paula Potable Water System Master Plan Amendment

We photographed it as well as a UP eastbound doublestack lead by UP #8638 (SD70ACe).

HSR Vancouver WA to Camas Commuter Des, by R.N.

IH 35 FEASIBILITY STUDY

Table of Contents PRIME INDUSTRIAL LAND. Arrowhead Drive /- acres Carson City, Nevada. For Sale $3.95 / SF

City of Ironton WWTP. General Information County: Lawrence Counties Served: Lawrence. Type of System: Public: X Private: Year Established: 1953

Partridge Mine (Bob Ciminel 2012)

Montour No. 10 (Bob Ciminel 2012)

EXCEPTION TO STANDARDS REPORT

TITLE. Planning and Design for Commuter Rail on a Busy Branchline. By Train to Perris, Not Paris

David W. Salter Collection

Market Activity Report Southeast Minnesota Wabasha, Winona, Fillmore, & Houston Counties Raw Land 1 st Qtr 2018

REGIONAL RAIL RIGHT OF WAY ACTION PLAN TECHNICAL MEMORANDUM #1 RIGHT OF WAY INVENTORY

Colorado Central Railroad (MSS 802)

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

FOR SALE - REDUCED $196, FOREST LAKE LOTS. 12 individual lots available Will sell separately Call for pricing on individual lots.

Cedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401

Property details Harrison st. batesville, ar ROPERTY SUMMARY

Soldier Summit + Salt Lake City Route Extension Scenario Pack 01

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Industrial/Business Parks Weatherford, Texas

Cleary Rd and Belvedere Rd West Palm Beach, FL Great Centralized PB County location. Easy access to I-95 and Fl. Turnpike

Food Prices Propel Inflation for the Fourth Quarter of 2011

A13 AVILA RANCH DEVELOPMENT PLAN SITE PLAN. Typical 58 R-1 Residential Street Section STREET SECTION. July 19, 2016 #

Taylor s Falls Business Park

NICTI Alternatives Analysis

VACANT LAND FOR SALE: 20.4 Acres

Tri-State December 2013 Board Meeting

ANDERSON PROPERTY SITE ANALYSIS

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

UPPER GREEN RIVER OZONE INVESTIGATION (O3i) LUMAN AND PARADISE ROAD TRAFFIC COUNT STUDY 03/05/2009 AND 06/09/2009. Study Summary.

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

EMD SD45 for Train Simulator 2013 Owner s Manual

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

121 S. C St, Fayetteville, NC RETAIL/WAREHOUSE FOR LEASE IN DOWNTOWN FORMER SOUTHERN GIN & GRAIN CO. BUILDING

STAFF REPORT # CHANGE OF ZONING

Buda September Background Description. 1.1 What went on at Buda. 1.2 Layout. View of the area modeled.

2.44 $40,000 per acre. Dillon Cir, Spartanburg, SC. ±2.44 Total Acres Prime Commercial Land

VIII. INFORMATION ABOUT BROKERAGE SERVICES

BIGHORN INDUSTRIAL PARK LOTS AVAILABLE

LAND FOR SALE. LIVE OAK RAILROAD RAIL SPUR 10 Acres & 1 Mile of Track East Basse Road, Suite 100 San Antonio, TX

Transitways. Chapter 4

O-Train Light Rail Transit Stage 2 Look Ahead

Commercial Industrial Land Available

Design of the High Speed Rail System in California. Orange County to Los Angeles Segment

Pier B On-Dock Rail Support Facility Project Rail Grade Crossings Analysis

City of Grand Forks Staff Report

Directions to Rocky Mountain National Park 1000 Us-36, Estes Park, CO (970) mi about 10 hours 32 mins

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT

Status of PNM s Completed Transmission Construction Projects 11/30/2017

STH 60 Northern Reliever Route Feasibility Study Report

CHAPTER 5 CAPITAL ASSETS

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas

This corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.

TRAFFIC PARKING ANALYSIS

LIGHT RAIL EXTENSION MOVES FORWARD Governor Corzine supports multimodal regional initiative to boost mobility and economic development

3.14 Parks and Community Facilities

CHAPTER 9 PARKING REGULATIONS (SEE CHAPTER 7 FOR DEFINITIONS, SCOPE AND APPLICATION RELATING TO THIS CHAPTER)

Arizona-Sonora Border Master Plan. Plan Maestro para la Frontera Arizona-Sonora

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

WYOMING COST OF LIVING FOR THE SECOND QUARTER 2010

Transcription:

High Plains ECONOMIC DEVELOPMENT D i s t r i c t Rail Transportation Southeast Wyoming Southeast Wyoming is served by both the Burlington Northern Santa Fe Railroad (BNSF) and the Union Pacific Railroad (UPRR). There are numerous opportunities, from using existing facilities with transload capabilities, to upgrading existing spurs to meet your specific needs. Existing Facilities 1. Wendover 2. Guernsey 3. Dwyer 4. Lingle 5. Mobe Jct 6. Torrington 7. Wheatland Basin Transload 8. Yoder 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17. Islay 18. South Laramie Transload Site 19. Federal 20. Silver Crown 21. Egbert 22. Cheyenne Logistics Hub at Swan Ranch NOTE: These numbers correspond to the numbering on the map Rail Transportation. Italicized entries indicate minimum assets. 1. Wendover Note: This is the junction of two BNSF Railway lines north of Wheatland. 2. Guernsey Hwy Access: >.25 mile from US Hwy 26 Length of Siding: ~1,100 ft Yes, until 2016 Industrial / Commercial Water, sewer, electricity, phone Available Lots: 20 lots total, each 2-3 acres. Can combine two or more lots Transload Facility: No Storage Capacity: Can be built to suit owner 1

Town of Guernsey, (307) 836-2689 Notes: There is opportunity for a customer to build out new siding on additional lots The Town of Guernsey owns a light industrial park with rail siding served by the BNSF Railway that is approximately 1,100 feet long. The existing siding is leased until 2016, however there is opportunity for a customer to build out new siding on additional lots. Zoning varies between Commercial and Industrial, and the lots have water, sewer, electricity, and phone. There are twenty lots, each 2-3 acres in size and multiple lots can be joined into one larger lot. Access to US Hwy 26 is less than a quarter mile. For more information contact Guernsey Community Development, (307) 836-2689. 3. Dwyer Hwy Access: >.25 mile from US Hwy 26 Length of Siding: 60 ft This site north of Wheatland has one track with 60 feet of rail siding. It is served by the BNSF Railway and is less than a quarter mile from US Hwy 26. 4. Lingle Hwy Access: >.25 mile from US Hwy 26/85 Length of Siding: 15 cars without switch N/A water, sewer, electricity Storage Capacity: 350,000 bushel grain storage Lamphier, Inc. (307) 715-3332, Gary Lamphier or Shane Shimic Lingle, 10 miles west of Torrington, has a site served by the BNSF Railway that can accommodate 15 rail cars. The owner, Lamphier, Inc. also owns land immediately to the west and could extend the track to accommodate 25 cars. Available utilities are water, sewer, and electricity, and grain storage is available for up to 350,000 bushels. The site is within a quarter mile of US Hwy 26/85. For more information contact Gary Lamphier, (307) 715-3332 or Shane Shimic, (307) 575-3333. 5. Mobe Junction Mobe Junction, served by the BNSF Railway, is the branch to bring coal to the Laramie River Station power plant. 6. Torrington Hwy Access: >.25 mile from US Hwy 85 Length of Siding: 1,500 ft of rail siding 2

N/A Water, electricity Miller Cattle & Feed Yard LLC The spur is within 1 mile of the southern city limits. The 1,500 feet of rail siding, with access to the spur, is served by the Union Pacific Railroad. There are some issues with the condition of the track between Torrington and Yoder, to the south. Water and electricity are available on site. For more information contact Paul Miller of Miller Cattle & Feed Yard LLC, (307) 532-6508. 7. Wheatland Basin Transload Hwy Access: >1 mile from I-25 Number of Tracks: 2 Type of Track: 110 lb and 90 lb Length of Siding: ~4,600 ft Spur Yes Heavy Industrial Transload Facility: Yes Basin Transload, Aaron Sheldon (406) 690-2698 This site served by the BNSF is on the north side of Wheatland, less than a mile away access to I-25. Zoned Heavy Industrial, there are two spurs available, with a combined length of 4,600 feet of track. Basin Transload, owns the site and operates a transload facility, focusing on needs for the oil and gas industry. For more information contact Aaron Sheldon of Basin Transload, (406) 690-2698. 8. Yoder Hwy Access: 2 miles from U.S. Hwy 85 Length of Siding: 50 car load-out capacity Spur leased?: yes N/A Water, sewer, electricity Storage Capacity: 260,000 bushel grain storage Wyoming Grain The spur is on the north side of the Town of Yoder, approximately 15 miles south of Torrington. The siding has a 50 car load-out capacity and is served by the Union Pacific Railroad. Grain Storage is available for up to 260,000 bushels. The site is approximately two miles from US Hwy 85. For more information contact Wyoming Grain. 9. Bordeaux Hwy Access: 6 miles from I-25 3

Length of Siding: 5,300 ft of rail siding This site south of Wheatland has one track with 5,300 feet of rail siding. It is served by the BNSF Railway and is approximately 6 miles from I-25. 10. Slater Hwy Access: ~3 miles from I-25 This site is approximately 15 miles south of Wheatland in Platte County. It is served by the BNSF Railway and is approximately 3 miles from access to I-25. 11. Chugwater Hwy Access: I-25, WY Hwy 313 Number of Tracks: 3 Length of Siding: ~2000 ft No Heavy Industrial, Light Industrial All lots water and sewer, some lots electricity and phone Available Lots: ½ - 2 acre lots Chugwater Economic Development, John Voight Notes: Under contract The properties with rail access are located on the north side of town and are primarily owned by a private owner, John Voight. Chugwater Economic Development owns two light industrial lots adjacent to the Voight properties with rail a total of 500 feet of rail spur. These properties are served by the BNSF Railway and the 3 spurs are combined approximately 2,000 feet length. Zoning varies between Heavy and Light Industrial. There are 4-6 lots, ranging from ½ - 2 acres in size and some lots can be joined into one larger lot. Access to State Highway 313 is adjacent, and I-25 is less than a half mile. For more information contact Chugwater Economic Development, (307) 331-0012. 12. LaGrange Hwy Access: WY Hwy 151 Length of Siding: 10 cars Water, sewer, electricity Storage Capacity: 250,000 bushels LaGrange Grain, Curtis Grandstaff (307) 834-2228 The spur is on the northeast side of the Town of LaGrange, approximately 40 miles south of Torrington. The siding has a 10 car load-out capacity and is served by the Union Pacific Railroad. Grain Storage is available for up to 20,000 bushels. The site is less than a quarter mile from WY Hwy 151, which 4

provides access to US Hwy 85. For more information contact Curtis Grandstaff with LaGrange Grain, at (307) 834-2228. 13. Lambert Hwy Access: ~20 miles to I-25 Type of Track: Length of Siding: 4,000 ft of rail siding no none This site is in the northwest corner of Laramie County. It is served by the BNSF Railway and its siding is approximately 4,000 feet long. It is approximately 20 miles along the county road, Iron Mountain/ Horsecreek Road, from I-25 and the town of Chugwater. 14. Farthing Hwy Access: ~30 miles to I-25 This site is also in the northwest corner of Laramie County along Iron Mountain/Horsecreek Road. It is served by the BNSF Railway. It is approximately 30 miles along the county road from I-25 and the town of Chugwater. 15. Altus Hwy Access: ~32 miles to I-25 This site is also in the northwest corner of Laramie County along Iron Mountain/Horsecreek Road. It is served by the BNSF Railway. It is approximately 32 miles along the county road from I-25 and the town of Chugwater. 16. Horse Creek Hwy Access: ~35 miles to I-25 Length of Siding: 3,000 ft of siding This site is near the western border of Laramie County. It is served by the BNSF Railway and its siding is approximately 3,000 feet long. It is approximately halfway between Chugwater and Cheyenne and access to I-25, each approximately 35 miles away along the county road, Iron Mountain/ Horsecreek Road. 5

17. Islay Hwy Access: ~25 miles to I-25 This site is also near the western border of Laramie County along Horsecreek Road. It is served by the BNSF Railway. It is approximately 25 miles along the county road from I-25 and the city of Cheyenne. 18. South Laramie Transload Site (UPRR) Hwy Access: 1-80 and US Hwy 287 Number of Tracks: 2, with future potential for more Type of Track: 115# Length of Siding: Approximately 1,600 track feet with access on all sides (10 cars with sliding derail could accommodate additional 10 cars) 25 year lease with UPRR Industrial / Commercial Electricity Available Lots: Through Union Pacific Railroad Transload Facility: Yes The LEDC, LLC Notes: This site will be in full operation in 2012 This site served by the Union Pacific Railroad (UPRR) is being improved into a transmodal site to be operated by the LEDC, LLC, supported by the Laramie Economic Development Corporation. Construction is scheduled to be completed by 2012 when the site will have two tracks with approximately 1,600 feet to accommodate up to 20 cars. Zoning for lots available through UPRR are Industrial and Commercial, with electricity available on location. For more information contact the LEDC, LLC, (307) 742-2212. 19. Federal Hwy Access: ~14 miles to I-25 Length of Siding: 1,400 ft of siding This site is approximately 20 miles northwest of Cheyenne in Laramie County along a county road. It is served by the BNSF Railway and its siding is approximately 1,400 feet long. 20. Silver Crown Hwy Access: ~6 miles to I-25 6

This site is approximately 10 miles northwest of Cheyenne in Laramie County along a county road. It is served by the BNSF Railway and is approximately 6 miles from access to I-25. 21. Egbert Hwy Access: I-80 Length of Siding: ~4,000 ft Electricity, propane, well and septic Available lots: Space available on a case by case basis through Union Pacific Transload facility: Yes Union Pacific Railroad Notes: This project is being constructed by Union Pacific. Located along I-80 east of Cheyenne, the closest town is Pine Bluffs, only 7 miles away. Currently there is one existing track ¾ mile long (~4,000 ft) which is transloading one commodity. It is projected to grow in scope and provide increased transload services. 22. Cheyenne Logistics Hub at Swan Ranch and Union Pacific Railroad Hwy Access: I-25 and I-80 0+ feeder tracks Type of Track: 10 line center track Length of Siding: at least 2 miles no Heavy Industrial, Light Industrial, Hwy Commercial electricity, natural gas, phone/data, water, sewer Available Lots: 5-50 acre lots for purchase Transload Facility: Yes W.N. McMurry Construction Co., Rich Fairservis (307) 472-2908 The Cheyenne Logistics Hub is located in the new Swan Ranch business park. Currently under construction, it will have service from both the BNSF and the Union Pacific Railroads, and has access to the both I-25 and I-80. With plans for more than 10 feeder tracks, there will be at least 2 miles of siding available. Different sizes of lots are available from 5 to 50 acres, with zoning ranging from heavy industrial, to light industrial and Highway Commercial. All utilities, namely electricity, natural gas, phone and data, water, and sewer will be available at the sites. For more information contact Rich Fairservis with W.N. McMurry Construction Company at (307) 472-2908. 7