IEEE T&D FACTS Panel Session Part II (08TD0140) Wednesday, April 23, 2008

Similar documents
Electric Power Research Institute, USA 2 ABB, USA

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

SPS Planning Criteria and Study Methodology

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

Designing and Maintaining a Pollution-Resilient Electric Power System. Managing Pollution Issues

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION

Dynamic Control of Grid Assets

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

Generator Interconnection System Impact Study For

Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations

Dynamic Control of Grid Assets

Statcom Operation for Wind Power Generator with Improved Transient Stability

TRANSMISSION PLANNING CRITERIA

Supplemental Report on the NCTPC Collaborative Transmission Plan

100 MW Wind Generation Project

The Development of Competitive Renewable Energy Zones in Texas

GE Energy. Variable Frequency Transformers Grid Inter-tie

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant

Renewable and Distributed Energy Resource Technologies

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE

American Electric Power s Energy Storage Deployments

VFT Response to a Breaker Trip and Runback Event

Voltage Control Strategies for Distributed Generation

PES Cook Islands KEMA Grid Study Final Report

Islanding of 24-bus IEEE Reliability Test System

INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT

2015 WDC Disturbance and Protection Standards Overview

Distributed Energy Resources

Variable frequency transformer for asynchronous power transfer

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

CIGRE US National Committee 2013 Grid of the Future Symposium. Facilitating Bulk Wind Power Integration Using LCC HVDC

Cascading Fault in AC/DC Hybrid Power Grid Xinzhou Dong

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Ancillary Services & Essential Reliability Services

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

Intentional Islanding Operation to Improve the Service Reliability of Thailand Electric Power System

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Experiences with Wind Power Plants with Low SCR

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

PMU-based Wide Area Protection System Concept and application in a large longitudinal system

THE IMPORTANCE OF INTEGRATING SYNCHRONOUS COMPENSATOR STATCOM IN WIND POWER PLANT CONNECTED INTO THE MEDIUM VOLTAGE GRID

Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances

ABB Wind Power Solution

Essential Reliability Services From PV Plants

Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience

Gateway South Transmission Project

Generating Unit Model Validation Policy

Islanding of 24-bus IEEE Reliability Test System

Guidelines for connection of generators:

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM

Falcon-Midway 115 kv Line Uprate Project Report

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC

ENHANCEMENT OF TRANSIENT STABILITY OF SMART GRID

Workshop on Grid Integration of Variable Renewable Energy: Part 1

Cargill Power Markets LLC Transmission Service Study (OASIS # TSR and )

Overview of State Distributed Generation Interconnection Rules

STATCOM Application to Address Grid Stability and Reliability: Part II. D.J. SHOUP, N.W. TENZA Mitsubishi Electric Power Products, Inc.

Transient Stability Improvement of Squirrel Cage Induction Wind Turbine Generator using Plugging Mode

A Case Study on Aggregate Load Modeling in Transient Stability Studies

Session 10 NERC Interconnection Requirements

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

Comments on the Solar Alliance Proposal for Changes to New Jersey Interconnection Rules

Feasibility Study Report

OBJECTIVES LCC HVDC SYSTEMS VSC HVDC SYSTEMS COMMON EQUIPMENT DIFFERENT OPTIONS ECONOMIC IMPACTS CONCLUSIONS

Feasibility Study Report

Transient Stability Analysis Tool (TSAT) Update April 11, Hongming Zhang EMS Network Applications Manager

Enabling the power of wind. Competence and expertise for wind power customers

Power Quality and Power Interruption Enhancement by Universal Power Quality Conditioning System with Storage Device

Relative Power Factor Correction costs

Implementation of FC-TCR for Reactive Power Control

ECEN 667 Power System Stability Lecture 19: Load Models

Georgia Transmission Corporation Georgia Systems Operations Corporation

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS

NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1

C PER. Center for Advanced Power Engineering Research C PER

Targeted Application of STATCOM Technology in the Distribution Zone

Essential Reliability Services Engineering the Changing Grid

Project #148. Generation Interconnection System Impact Study Report

Refurbishment and Life Extension of Existing Facilities in Vermont

Benefits of HVDC and FACTS Devices Applied in Power Systems

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

Published by: PIONEER RESEARCH & DEVELOPMENT GROUP ( 201

Case No. 5 Sequential Motor Dynamic Acceleration Simulation ETAP TS V&V Case Number TCS-TS-181

Wind Power Plants with VSC Based STATCOM in PSCAD/EMTDC Environment

Comparative Analysis of Integrating WECS with PMSG and DFIG Models connected to Power Grid Pertaining to Different Faults

S C ELECTRIC EUROPE LTD. Excellence Through Innovation. Harnessing the Wind. November 2011 Descriptive Bulletin E

MEPPI Power Systems Engineering Division (PSED)

EPE97 OPTIMIZED DESIGN OF VARIABLE-SPEED DRIVES BASED ON NUMERICAL SIMULATION

Electric Power System Under-Voltage Load Shedding Protection Can Become a Trap

Power Flow Simulation of a 6-Bus Wind Connected System and Voltage Stability Analysis by Using STATCOM

J.-J.Simond*, A.Sapin**, B.Kawkabani*, D.Schafer***, M.Tu Xuan*, B.Willy***

The Application of Power Electronics to the Alberta Grid

Impact of Islanding and Resynchroniza?on on Distribu?on Systems

New 115 kv Disconnect Switches at Bloomsburg MTS

Transcription:

IEEE T&D FACTS Panel Session Part II (08TD0140) Wednesday, April 23, 2008 Improving Power System Dynamic Performance in Laredo, TX Prepared by Paul Hassink (AEP) Paul Marken (GE) Rob O Keefe (AEP) Gerardo R. Trevino (AEP) Prepared for NATD June 2006 - Montreal Laredo, Texas and surrounding area Roughly 450 MW load peak in 2006 Served by four long 138 kv lines High load growth, up to 5% annually Requires local generation at 350 MW Non-economic local generation (under RMR) up to 179 MW 1

South Texas Transmission System Laredo area Texas (ERCOT) Mexico (CFE) Prepared for NATD June 2006 - Montreal Justification for the Laredo VFT Laredo Plant units contracted for RMR service due to voltage collapse potential at load level of 350 MW. In 2007, with the largest generating unit unavailable and remaining units (70 MW) operating, voltage collapse is probable at a load level of 450 MW. By 2010, a new 345 kv line will be completed in order to remove the need for RMR generation. Variable Frequency Transformer (VFT) asynchronous tie was found to maintain stability in 2007 through 2010 and augment capacity of the new 345 kv line, deferring the need for the next line. 2

Application of ERCOT Planning Criteria VOLTAGE COLLAPSE WITH 150 MW CFE TIE AND 345 kv LINE VOLTAGE COLLAPSE WITH 345 kv LINE VOLTAGE COLLAPSE WITH 150 MW CFE TIE TRANSACTION LAREDO 1 & 2 ON-LINE VOLTAGE COLLAPSE WITH LAREDO 1 & 2 ON-LINE LAREDO 3 OFF-LINE LAREDO AREA PEAK DEMAND PROJECTION OPERATING LIMITS INCLUDE 5% MARGIN VOLTAGE COLLAPSE LIMIT WITHOUT GENERATION Imports Required to Sustain Transient Stability Transient Stabilty Limits 160 140 Asynch. Device MW Injection 120 100 80 60 40 20 0 469.0 504.0 539.0 Laredo Load in MW VFT VSC BTB HV DC BTB VFT VSC BTB HV DC BTB 3

What is a VFT? The Variable Frequency Transformer (VFT) is a bidirectional transmission device that can transfer power between asynchronous or synchronous networks. The VFT is a rotating phase-angle regulator with continuous controllability enabling power transfer from one grid to another from 0 to 100 MW. VFT Asynchronous Operation 60 Hz N 1 u SB + I SB + U I RB RB ~ + u RC I RC I SA I RA + u RA + u SA u α 1,2 α 1,2 61 Hz N 2 u SC + I SC Any frequency difference is accommodated by rotation of the rotor 4 pole machine => 1Hz = 30 rpm Up to 3 Hz difference 4

Laredo VFT Installation 100 MW tie connecting the U.S. and Mexico Formal AEP bid processes April 04 Laredo project awarded to GE March 05 GE breaks ground at Laredo site Nov 05 Rotating machine installation 2H06 Commence commissioning\testing 1Q07 Commercial Operation May 18, 2007 GE Proprietary Laredo Application of VFT Voltage depression resulting from a fault on any of the four 138 kv lines supporting Laredo increases slip on induction load such as air conditioning, causing reactive power consumption to escalate. Without relief from reactive power demand, under voltage load shed (UVLS) is necessary for recovery. VFT provides: Injection of real power, offsetting power flow on heavily loaded 138 kv lines that consume reactive power Injection of reactive power providing voltage support in Laredo This transient response, which is passive, offsets the need for active power imports and reduces the need to operate RMR generation. 5

Voltage Response to Disturbance in Laredo V Voltage at the source, north of Laredo UVLS in the Laredo Area Real and Reactive Power Response of VFT to Disturbance 200.0 200.0 150.0 150.0 100.0 VFT P Flow 100.0 MW MVAR 50.0 50.0 VFT Q Flow 0.0 0.0-50.0 0.0 0.8 1.6 2.4 3.2 4.0 Time (seconds) Fig. 1. Injection of Real Power through VFT during and immediately after a fault. -50.0 0.0 0.8 1.6 2.4 3.2 4.0 Time (seconds) Fig. 2. Injection of Reactive Power through VFT during and immediately after a fault. 6

Voltage at VFT Terminals through Disturbance 1.10 V - Laredo 17 kv 1.00 V - CFE 230 kv Per Unit Voltage 0.90 0.80 0.70 0.60 0.0 0.8 1.6 2.4 3.2 4.0 Time (seconds) Nuevo Laredo / Laredo Rio Escondido Asherton Tamauulipas Texas Dilley Sw. St. Nuevo Laredo Area 3/ Laredo Nuevo Asynchronous Laredo/Laredo Interconnection Area between CFE and ERCOT HVDC Tie Locations North Laredo Under Construction San Miguel Freer Fault Location County Line Future Substation 69 138 230 345 OR 400 Generation Anahuac Double Circuit Capable Arroyo Del Coyote CD INDUSTRIAL Laredo PP Campestre Falcon NUEVO Laredo Wormser Falcon Highway 59 Falfurrias On July 16/2007, the Laredo VFT to Falfurrias 138kV line tripped due to a Phase C to Ground fault approximately 8.07 miles from VFT 7

Actual VFT fault response Fig. 3. Real power through the VFT during an actual 138kV transmission line fault. Fig. 4. Reactive power through the VFT during an actual 138kV transmission line fault. On July 16, 2007, two months after the VFT entered commercial operation, a fault occurred on one of the ERCOT 138kV transmission lines terminating at the VFT. The event was a temporary phase to ground fault 8 miles away from the VFT. The fault was cleared in 4 cycles by the breakers protecting the faulted line and the line was successfully reclosed in about 18 cycles. The demonstrated performance of the VFT matches earlier simulations. VFT is a Comprehensive Solution Passive response to post-fault disturbance can produce a 200% real power injection Supplies reactive power during and after faults Provides complementary support to RMR Generation, existing STATCOM and 345 kv line 8

South Texas Transmission System Texas (ERCOT) San Antonio to Laredo 345 kv line to be completed 1Q2008 Mexico (CFE) VFT compatibility with future enhancements 200 100 160 60 120 20 MW MVAR 80-20 40-60 0.0 0.0 0.8 1.6 2.4 3.2 4.0 Time (seconds) Fig. 5. Real power through the VFT with loss of 345kV line and future load levels. -100 0.0 0.8 1.6 2.4 3.2 4.0 Time (seconds) Fig. 6. Reactive power through the VFT with loss of 345kV line and future load levels. While the benefits provided by the addition of this line are substantial, an unfortunate side affect is that with this improvement alone to the Laredo area system, the 345 kv lines become the greatest liability for dynamic stability. Because the majority of power flowing into Laredo is diverted to the 345 kv line, the event of its outage becomes the worst contingency for that area. Real and reactive power injection across the VFT offsets the interrupted flows of the 345 kv line. 9

Conclusions The VFT has a natural beneficial stabilizing characteristic. The VFT s passive response in the transient time frame plays an important role in maintaining acceptable post-fault dynamic performance in the Laredo area. Actual experience has confirmed predictions of the simulation model. 10