Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Similar documents
Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

DFO STATEMENT OF NEED REPORT

Generator Interconnection System Impact Study For

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Engineering Study Report: FortisAlberta Inc. Plamondon 353S Capacity Increase. Contents

100 MW Wind Generation Project

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Interconnection Feasibility Study Report GIP-226-FEAS-R3

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Executive Summary. Project Overview. Existing System. Study Summary

15 Nelson-Marlborough Regional Plan

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Interconnection System Impact Study Report Request # GI

APPENDIX F: Project Need and Description

ATTACHMENT - DFO STATEMENT OF NEED

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

MILLIGAN SOLAR PROJECT

CUSTOMER/ TWIN ARROWS PROJECT

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

Kettle River Transmission Project

Bohn to Kettle River Transmission Project

15 Nelson-Marlborough Regional Plan

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

SPS Planning Criteria and Study Methodology

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

Project #148. Generation Interconnection System Impact Study Report

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Functional Specification Revision History

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Central East Region Transmission Development Needs Identification Document

Appendix D Black Hills Project Summary

Midway/Monument Area TTC Study

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station.

Supplemental Report on the NCTPC Collaborative Transmission Plan

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

XXXX. Kokish River Hydroelectric Project. Interconnection System Impact Study

XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study

Currant Lake Transmission Project

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Seabrook Substation Reliability Improvement Project

INTERCONNECTION FACILITIES STUDY REPORT

Stability Study for the Mt. Olive Hartburg 500 kv Line

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

Southwest Power Pool, Inc TPL Stability Study. MAINTAINED BY SOUTHWEST POWER POOL ENIGINEERING GROUP Modeling Group

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

Reliability Analysis Update

North Oregon Coast Area Study. Adam Lint

Sub-Regional RTEP Committee PJM South

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Feasibility Study Report

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TRANSMISSION PLANNING CRITERIA

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning.

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

The Energy Queensland Group Notice of no non-network options

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017

Interconnection Feasibility Study Report GIP-046-FEAS-R2

Project #94. Generation Interconnection System Impact Study Report Revision

ABB POWER SYSTEMS CONSULTING

The Grid Link Project. Summary of the Report for the Independent Expert Panel

PES Cook Islands KEMA Grid Study Final Report

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study

Q0044 interconnection at

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company

System Impact Study Report

Gateway South Transmission Project

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado

Interconnection Feasibility Study

Black Hills Project Summary

Small Generator Interconnection Program Interconnection Technical Requirements

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities

Facilities Study for Alberta to US Available Transfer Capability

Feasibility Study Report

Western Area Power Administration Sierra Nevada Region

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

The Long-Range Transmission Plan

ATTACHMENT Y STUDY REPORT

Transcription:

` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004

Table of Contents Table of Contents... i 1.0 PROJECT DESCRIPTION...1 2.0 EXECUTIVE SUMMARY...1 3.0 PROPOSED INTERCONNECTION...2 3.1 Existing System... 2 3.2 Option 1 In And Out Configuration... 3 3.3 Option 2 - Dunvegan Switching Station... 4 3.4 Option 3 T-Tap On 7L73-1... 4 3.5 Interconnection Recommendation... 4 4.0 SYSTEM IMPACT ASSESSMENT...5 APPENDIX A Area and Single Line Drawings... 7 APPENDIX B Load Flow and Contingency Analysis... 12 File No. RP-05-445 i September 24, 2004

1.0 PROJECT DESCRIPTION Glacier Power Ltd., a wholly owned subsidiary of Canadian Hydro Developers Inc, is proposing to develop a run of river hydroelectric generating facility (the Project) located on the Peace River near NE ¼ 12-80-5-W6. Glacier Power has requested that the AESO conduct a preliminary interconnection assessment for the Project. It is the AESO s understanding that the Project would include the interconnection of 40 synchronous turbine/generating units, each with a capacity of 2.5 MW @ 25kV, for a total net output of 100 MW. The Project is expected to operate with a capacity factor of 70%. Glacier Power plans to commission the powerhouse and interconnect to the transmission system during the 3Q of 2008. 2.0 EXECUTIVE SUMMARY The AESO has determined that the Alberta Interconnected Electric System (AIES) can accommodate the export of approximately 100 MW from the Project. The recommended interconnection should be an in/out line configuration taping 7L73-1 with point of supply to the AIES at the new Dunvegan substation. The proposed interconnection cost has an estimated order of magnitude capital cost of $3.1 million ( + 30%, 2004$). The AESO s preliminary review indicated that all of this cost will be allocated to Glacier Power. An overview of the existing transmission system in the Grand Prairie and Peace River areas is shown in Figure A - 1, Appendix A. A simplified single line diagram of the proposed interconnection configuration is shown in SLD 445 1, Appendix A. This report is a preliminary interconnection study that addresses steady-state performance in two primary domains; transmission line loading and system voltage deviation using typical N-1 transmission planning criteria. According to the EUB s Directive 028, any generation over 70 MW would require a dynamic study as part of generating facility application. Since the Project would have at least 100 MW of generation, a system stability study will be required. File No. RP-05-445 1 September 24, 2004

3.0 PROPOSED INTERCONNECTION In the following subsections, an overview of the existing transmission network near the Dunvegan site is discussed as well as options to interconnect the Dunvegan Hydro Plant with the AIES. Given the size of the generating facility, the AESO is recommending a more robust interconnection than the one suggested by the Generator and is outlined in Section 3.2. 3.1 EXISTING SYSTEM The transmission system in the northwest area is operated in accordance with the AESO s 501 Northwest Area Operating Policy. The proposed Dunvegan Hydro Project will be located on Peace River in the Grande Prairie area which is part of the northwest area. The transmission network near the proposed site mainly consists of 144 kv. The project site is approximately 4 km from ATCO s existing 7L73-1 144 kv line. The 7L73-1 Rycroft 730S to Boucher Creek 829S and 7L73-2 Boucher Creek 829S to Friedenstal 800S line sections are built with 266.8 kcmil conductor and the total length is 54 km. Friedenstal 800S is connected to West Peace River 793S through 7L75. Similarly Rycroft 730S is connected in the south with Clairmont Lake 811S through 7L68. Clairmont Lake 811S is also part of a 144 kv loop which also consists of generation at Poplar Hill and Elmworth. There is also a radial 144 kv feed from Rycroft 730S to Ksituan River 754S. According to ATCO the capacity of 7L73 Rycroft 730S to Friedenstal 800S 144 kv line is 100 MVA during summer and winter under normal conditions. This load limit has been determined by the CT limitation and can be increased with relative ease. The emergency loading limit during both the seasons is 130 MVA. The line outage statistics for 7L73 in comparison with ATCO s totals for 144 kv lines as well as CEA published data for 110 149 kv lines are shown in Tables 3.1-1 and 3.1-2. Table 3.1 1: Sustained Forced Outage Statistics for 7L73, ATCO s 144 kv Lines & CEA (110 149 kv Lines) 5 Year Average Line Length (km) km-yr No. of Outages Total Duration (hrs) Freq./100 km-yr Mean Duration (hrs) ATCO s 7L73 ATCO s 144 kv Totals CEA Average* (110-149 kv) 54 270 0 0 - - 4,868.7 24,190.08 87 448.09 0.36 5.15-228,646 2,581 80,521 1.1288 31.2 * From Table 2 of Section 2.2, Forced Outage Performance of Transmission Equipment, CEA Report, May 2003 File No. RP-05-445 2 September 24, 2004

Table 3.1 2: Transient Forced Outage Statistics for 7L73, ATCO s 144 kv Lines & CEA (110 149 kv Lines) 5 Year Average Line Length (km) km-yrs No. of Outages Freq./100 km-yr ATCO s 7L73 ATCO s 144 kv Totals CEA Average* (110-149 kv) 54 270 10 2.95 4,868.7 24,190.08 192 0.79-228,646 2,498 1.0925 * From Table 3 of Section 2.2, Forced Outage Performance of Transmission Equipment, CEA Report, May 2003 3.2 OPTION 1 - IN AND OUT CONFIGURATION One of the possible interconnection configurations is to make an in-and-out arrangement of the 7L73-1 Rycroft Boucher Creek line at the Dunvegan generating station. The key transmission components will include the following: Transmission construct two (or a double circuit) 144 kv transmission line of approximately 4 km length from the Dunvegan Hydro generating facility to 7L73-1 line using single 266.8 kcmil conductor per phase with an overall summer/winter capacity of 115/145 MVA; connect the newly constructed 144 kv line with the existing 7L73-1 to make an in-and-out arrangement; install fiber optic cable or any suitable measure for protection & control and telecommunication; replace the CTs that limit the line loading on 7L73-1; Dunvegan Generating Station Install two 144 kv breakers on the two outgoing circuits from the generating station along with the related protection and control equipment; This configuration will have an estimated order of magnitude capital cost of $3.1 million ( + 30%, 2004$). A simplified single line diagram of this interconnection configuration is shown in SLD 445 1 in Appendix A. File No. RP-05-445 3 September 24, 2004

3.3 OPTION 2 - DUNVEGAN SWITCHING STATION An alternative interconnection arrangement is to connect the Dunvegan Hydro Plant with the AIES using a switching station at the tap point on 7L73-1. The key transmission components in this interconnection option will include the following: Transmission construct approximately 4 km of 144 kv transmission line from the Dunvegan generating plant to 7L73-1 using single 266.8 kcmil conductor per phase with an overall summer/winter capacity of 115/145 MVA; install fiber optic cable or any suitable measure for protection & control and telecommunication; Switching Station construct a new switching station, 4 km from the proposed generating station on 7L73-1; Install two 144 kv breakers to terminate 7L73 line; Install one MOD switch for sectionalizing faulty line and for providing a visual isolation point of the tapped line; The above development have an estimated order of magnitude capital cost of $3.2 million ( + 30%, 2004$). A simplified single line diagram of this interconnection configuration is shown in SLD 445 2 in Appendix A. 3.4 OPTION 3 T - TAP ON 7L73-1 In this option a three terminal configuration is proposed as shown in SLD 445-3 in Appendix A. It involves a 4 km long 144 kv line connecting Dunvegan generating station to the 7L73 line through a simple T-tap. As there are only line sectionalizers installed at Boucher Creek, therefore an additional circuit breaker along with all the associated protection and control equipment will have to be installed at Boucher Creek substation. Boucher Creek Friedenstal line section in this case will still be in zone 2 clearance for line faults. Under these conditions it is uncertain if Dunvegan generators will remain stable in case of a fault. If transient stability studies indicate a stability problem then another breaker will have to be installed at Boucher Creek along with the associated teleprotection. The total cost for this option (with one proposed breaker) is 2.4 million ( + 30%, 2004$). The addition of the second breaker (0.5-0.75 M$) if required, will make the cost of this option approximately equal to the cost of Option 1. 3.5 INTERCONNECTION RECOMMENDATION After reviewing all the interconnection options, it is recommended that Option 1, i.e. an in-and-out connection on the existing 7L73 to connect the proposed Dunvegan hydro plant, will be the most suitable option. The total peak capacity of the Dunvegan Hydroelectric plant will be 100 MW which is significant and requires a reliable interconnection configuration. The in-and-out arrangement provides the required reliability and is robust. File No. RP-05-445 4 September 24, 2004

Please note that Glacier Power Ltd will be responsible to provide adequate space for a 144 kv substation and for the installation of their 144/25 kv step up transformation and accompany 144 kv breaker. ATCO Electric will be responsible for the construction of the 144 kv bus work and associated 144 kv circuit breakers and other communication facilities. The point of ownership for Glacier Power Ltd. is shown in SLD 445 1 in Appendix A. Option 3 (with one proposed circuit breaker) offers a least cost solution for interconnection. However, apart from being the least reliable of the three options, the validity of this scheme has to be verified through transient stability studies in the second stage. If further transmission upgrades is established (i.e. installation of a second breaker at Boucher Creek 829S) then the total cost of this option will be approximately equal to that of Option 1. In this case Option 1 will have a technical and economic advantage over Option 3. 4.0 SYSTEM IMPACT ASSESSMENT The steady state performance of the system with the proposed Dunvegan generation in place was analyzed for the 2008 summer light load period. This scenario was selected to simulate the worst case condition which would consist of peak generation dispatch from Dunvegan hydro plant during summer light load conditions. The Dunvegan hydro plant was connected to the system by making an in-and-out connection on the 7L73-1 Rycroft - Boucher Creek 144 kv line. Glacier Power Ltd. has informed that there will be 40 small units of 2.5 MW each. However for this study, all the generation was lumped at the 25 kv bus into one generator and dispatched at the full capacity of 100 MW. After reviewing the base case and contingency load flow cases, AESO determined that the addition of the Dunvegan hydro plant will not have any problems in the system. Following is a list of cases studied and a brief description of the resulting system performance; drawings showing load flow plots are included in Appendix B. Figure B - 1: Without Dunvegan Hydro Power Plant - All Elements in Service All bus voltages are within an acceptable operating range and there are no overloaded elements. Figure B - 2: With Dunvegan Hydro Power Plant - All Elements in Service Dunvegan power plant is dispatched at 100 MW. All bus voltages are within an acceptable operating range and there are no overloaded elements. Dunvegan Rycroft section is loaded at 58 MW while Dunvegan Boucher Creek section carries 42 MW. File No. RP-05-445 5 September 24, 2004

Figure B - 3: Dunvegan Rycroft 144 kv Out of Service All bus voltages are within an acceptable operating range and there are no overloaded elements. In this case Dunvegan Boucher Creek section carries 100 MW which is the existing loading limit. Figure B - 4: Dunvegan Boucher Creek Friedenstal 144 kv Out of Service All bus voltages are within an acceptable operating range and there are no overloaded elements. Dunvegan Rycroft section is loaded at its existing limit of 100 MW. Figure B - 5: Clairmont Lake 811 S to South Bezanson 862 S 144 kv Out of Service All bus voltages are within an acceptable operating range and there are no overloaded elements. Figure B - 6: 7L75, Friedenstal 800 S to West Peace River 793 S 144 kv Out of Service All bus voltages are within an acceptable operating range and there are no overloaded elements. File No. RP-05-445 6 September 24, 2004

APPENDIX A Area and Single Line Drawings File No. RP-05-445 7 September 24, 2004

Figure A-1 Northeast Alberta 2005 Transmission System Fort Nelson 852S 17 7L72 Rainbow Lake 18 Rainbow Lake 7L81 791S Zama Lake 795S Sulphur Point 828S High Level 786S 7L76 High Level Blumenort 832S Existing NW System 7L64 7L59 Chinchaga 779S Keg River 789S Ring Creek 853S Hamburg 855S 7L62/7L58 Kemp River 797S 7L82 Hotchkiss 788S Cadotte River 783S 878S 19 Peace River 7L51 7L63 Norcen 812S Ksituan River 754S Goodfare 815S Elmworth 731S Eureka River 861S 20 Grande Prairie Saddlehills 865S Poplar Hill 790S Wapiti 823S HR Milner 740S 7L10 722S 749S 758S 7L20 810S 6L16 Boucher Creek 829S Dunvegan Hydro Mercer Hill 728S 845S 857S Hines Creek 724S 6L37 7L73 Rycroft 730S 7L68 Clairmont Lake 811S 808S 798S Friedenstal 800S South Bezanson 862S 7L80 West Peace 793S 7L75 7L45/ 7L46 22 Grande Cache 733S Daishowa 839S Donnelly 784S 7L32 794S 736S 7L27 7L48 23 Valleview 7L40 Carmon 830S 7L12 Wesley Creek 834S 882S 6L68 9L11 Little Smoky 813S 7L90 24 Fox Creek 725S 741S 787S 7L56 9L02, 9L05 7L199 347S 720L Seal Lake 869S 738S 6L91 26 Swan Hills 199L 780S 21 High Prairie 122S 854S 742S 809S 9L938 Lubicon 727S 6L57 739S 236S 9L939 735S 744S 743S 6L99 745S 851S 824S Cranberry Lake 827S 7L61 796S ATCO TAU 7L23 858S 9L40 9L913 7L230 Mitsue 844S 732S 729S 234S 69S 9L56 720S 854L 397S To Bickerdike 39S 268S 77S 701S To Sundance 310P 72kV 144kV New 144kV 240kV New 240kV File No. RP-05-445 8 September 24, 2004

To Hotchkiss To Diashowa 7L51 7L04 To Wesley Creek Dunvegan Hydro Project Boucher Creek 829S Friedenstal 800S 7L75 West Peace River 793S Glacier Power Ltd Ownership 7L73-2 ATCO Ownership 7L48 Rycroft 730S 7L73-1 7L10 To Valleyview LEGEND: 7L68 Circuit Breaker Circuit Switcher Ganged Air-switch (Motor-operated) Hookstick operated 1ph. disconnect switch (fused) Hookstick operated 1ph. disconnect switch (solid) Ganged Air-switch (Manual Operation) aeso Boucher Creek Area Option 1 LTC Transformer Proposed Generator SLD 445-1 Rev. 0 2004/09/15 File No. RP-05-445 9 September 24, 2004

1 To Hotchkiss To Diashowa 7L51 7L04 To Wesley Creek Dunvegan Hydro Project Boucher Creek 829S Friedenstal 800S 7L75 West Peace River 793S Glacier Power Ltd Ownership 7L73-2 ATCO Ownership 7L48 Rycroft 730S 7L73-1 Proposed Switching Station 7L10 To Valleyview LEGEND: 7L68 Circuit Breaker Circuit Switcher Ganged Air-switch (Motor-operated) Hookstick operated 1ph. disconnect switch (fused) Hookstick operated 1ph. disconnect switch (solid) Ganged Air-switch (Manual Operation) aeso Boucher Creek Area Option 2 LTC Transformer Proposed Generator SLD 445-2 Rev. 0 2004/09/15 File No. RP-05-445 10 September 24, 2004

To Hotchkiss To Diashowa 7L51 7L04 To Wesley Creek Dunvegan Hydro Project Boucher Creek 829S Friedenstal 800S 7L75 West Peace River 793S Glacier Power Ltd Ownership 7L73-2 ATCO Ownership 7L48 Rycroft 730S 7L73-1 7L10 To Valleyview LEGEND: 7L68 Circuit Breaker Circuit Switcher Ganged Air-switch (Motor-operated) Hookstick operated 1ph. disconnect switch (fused) Hookstick operated 1ph. disconnect switch (solid) Ganged Air-switch (Manual Operation) aeso Boucher Creek Area Option 3 LTC Transformer Proposed Generator SLD 445-3 Rev. 0 2004/09/23 File No. RP-05-445 11 September 24, 2004

APPENDIX B Load Flow and Contingency Analysis File No. RP-05-445 12 September 24, 2004