SECTION XI. Subject Interpretation File No. Code Case N XI Code Cases N-729 Through N

Similar documents
SECTION XI. Subject Interpretation File No. Cases N and N-729-2, -3141(c)...XI

SECTION XI. Subject Interpretation File No.

ASME B31.8 INTERPRETATIONS VOLUME 13

ASME B31.3 INTERPRETATIONS NO. 16

Aoý. 0Constellation Nuclear. Calvert Cliffs Nuclear Power Plant. February 27, U. S. Nuclear Regulatory Commission Washington, DC 20555

Metallic Gaskets for Pipe Flanges

COMMISSION REGULATION (EU) / of XXX

Bioprocessing Equipment

SYLLABUS. EASA 748/2012 Part-21 SUBPART F/G POA - ADVANCED (FLY Course code: 004-C-P) Issue of FLY EN

The Used Petroleum and Antifreeze Products Stewardship Regulations

Bioprocessing Equipment

Large Diameter Steel Flanges

Kansas Motor Carriers Association

QUALITY REQUIREMENTS FOR JUST IN TIME SERVICE PROVIDER (JIT S.P.) PROGRAM: ALL

National Board Update

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b)

China Regulatory Update

Gas Turbine Aircraft Engines

RESOLUTION MEPC.181(59) Adopted on 17 July GUIDELINES FOR PORT STATE CONTROL UNDER THE REVISED MARPOL ANNEX VI

Evaporative Emission Standards for Boats

Pipe Flanges and Flanged Fittings

Volume 1 Series 2200 Specification for Road Works. Clause Title Page

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board

10 Load restraints Load anchorages. Reasons for rejection. Mandatory requirements. Mandatory equipment. Condition. Modification and repair

COMMISSION REGULATION (EU) / of XXX

WIRELESS STEERING INSTALLATION MANUAL

Annex II Requirements. What are noxious liquid substances?

DIRECTIVE 2006/40/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

When registering a vehicle on the Satellic Road User Portal (RUP) or at a Service Point you will be asked to:

RULES PUBLICATION NO. 98/P

Schedule SP SOLAR PURCHASE (Experimental)

5.0 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS

COMMISSION REGULATION (EU) / of XXX

F5 565 Rear-view mirrors (ENTR/2004/1340)

Wegmans Fairfax Joseph B. Lookup Electrical System Existing Conditions Report & Building Load Summary Report. Appendix Tech Assignment # 2

PLS Boiler Inspection Standard Introduction

CONTENTS Duct Jet Propulsion / Rocket Propulsion / Applications of Rocket Propulsion / 15 References / 25

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL

FACTORIES ACT (CHAPTER 104, SECTION 102 (1)) FACTORIES (REGISTRATION AND OTHER SERVICES FEES AND FORMS) REGULATIONS*

DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) REGULATORY AMENDMENTS ENTERING INTO FORCE DURING JANUARY 2017

13917/18 CB/AP/add 1 ECOMP.3.A

COMMISSION REGULATION (EU) No /.. of XXX

APPENDIX B CERTIFICATION OF TANK CAR FACILITIES CONTENTS

Approved for use as fixed fire extinguishing system for machinery spaces and cargo pump rooms.

type r remote drive for auxiliary

2004 ASME BOILER & PRESSURE VESSEL CODE

CASES OF THE B16 VALVE, FLANGES, FITTINGS AND GASKETS STANDARDS. Approval Date: December 16, 2013

RULES PUBLICATION NO. 4/P IC ENGINES AND ENGINE COMPONENTS SURVEY AND CERTIFICATION July

E/ECE/324/Rev.2/Add.109/Rev.3/Amend.4 E/ECE/TRANS/505/Rev.2/Add.109/Rev.3/Amend.4

Transport Canada Marine Safety Emission Control Area North America

Subject: ACEA proposal for Euro 6 OBD and Euro 6 PN limit for gasoline direct injection engines.

ULTRASONIC EXAMINATION

Navigating Safety and Compliance in Registration is now open online for the 2018 Idealease/NPTC Safety Seminars!

RESOLUTION MEPC.198(62) Adopted on 15 July GUIDELINES ADDRESSING ADDITIONAL ASPECTS TO THE NOx TECHNICAL CODE 2008 WITH REGARD TO

Economic and Social Council

MMP Investigation of Arthur Kill 2 and 3

Economic and Social Council

COMMISSION DELEGATED REGULATION (EU) /... of XXX

TITLE DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

Performance Rating of Airto-Air Heat Exchangers for Energy Recovery Ventilation Equipment

NRC Non-Destructive Examination Research

GUIDANCE ON THE SUPPLEMENT TO THE IAPP CERTIFICATE

ANNEX MOTOR VEHICLES AND EQUIPMENT AND PARTS THEREOF. Article 1. Definitions

Health and Safety at Work (Hazardous Substances Thermoplastic Stationary Tanks) Safe Work Instrument 2017

STATUTORY INSTRUMENTS. S.I. No. 48 of 2017 SEA POLLUTION (PREVENTION OF AIR POLLUTION FROM SHIPS) (AMENDMENT) REGULATIONS 2017

BOMBARDIER, INC.

OPERATOR'S MANUAL COMPONENT OF CRUSHING AND SCREENING PLANT: DIESEL AND ELECTRIC DRIVEN, WHEEL MOUNTED, 75 TON PER HOUR


Technical Circular. No.: 025 Date: 6 th November 2014

This document details the vehicle documents that Satellic accepts as proof for the vehicle data that you should provide.

International maritime registration procedures and related regulations as they will apply to Refrigerated Vessels

IMO REQUIREMENTS JULY 2018 TO MAY 2021

GUIDELINES FOR PORT STATE CONTROL UNDER MARPOL ANNEX VI

TEK Brief July Is there a difference in installation requirements between communications cables with and without the LP designation?

Certificate of Compliance

EU RO Mutual Recognition Technical Requirements

BERMUDA LIQUEFIED PETROLEUM GASES (HANDLING, STORAGE, SUPPLY AND TRANSPORT) REGULATIONS 1988 BR 54 / 1988

(Text with EEA relevance)

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

Towing Administration Introduction Towing Operations Weak Links Aerotow Pilot (ATP) Certification

Overhead transmission lines Spacers

OGRR DIRECTIVE

Plugs and Socket-Outlets in Brazil

TAM International, Inc. QI Visible Magnetic Particle Inspection

EXAMINATION OF NOZZLE INNER RADIUS AND PIPING FROM THE OUTER SURFACE

GUIDANCE ON THE DEVELOPMENT OF A SHIP IMPLEMENTATION PLAN FOR THE CONSISTENT IMPLEMENTATION OF THE 0.50% SULPHUR LIMIT UNDER MARPOL ANNEX VI

M-11 MARINE DIESEL ENGINE FUEL INJECTOR

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

(Non-legislative acts) REGULATIONS

INFORMATION BULLETIN No. 84

Contents INTRODUCTION...

Specification for Sealless Horizontal End Suction Centrifugal Pumps for Chemical Process

AHRI Standard 1371 (SI) 2017 Standard for Performance Rating of Electronic Expansion Valves

COMMISSION REGULATION (EU) / of XXX

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

POST-WELD TREATMENT OF A WELDED BRIDGE GIRDER BY ULTRASONIC IMPACT TREATMENT

APPLICATION OF MARPOL 73/78 ANNEX VI TO EXISTING SHIPS

Guidelines for PSCOs on the Inspection Campaign on MARPOL ANNEX VI

CETOP POSITION PAPER PP 07

Transcription:

SECTION XI Subject Interpretation File No. Code Case N-606-1....XI-1-13-19 13-56 Code Cases N-729 Through N-729-3....XI-1-13-16 12-2059 IWA-2323; Mandatory Appendix VI, VI-4300; and Mandatory Appendix VII, VII-4340 (2001 Edition With the 2003 Addenda Through the 2010 Edition With the 2011 Addenda)....XI-1-13-12 12-1905 IWA-4132 and IWA-4540 (2004 Edition)....XI-1-13-14 12-827 IWA-4132 and IWA-4540(c) (1998 Edition)....XI-1-13-15 12-1585 IWB-3522.1 (1998 Edition With the 2000 Addenda Through the 2007 Edition) and IWA-5300 (1998 Edition With the 2000 Addenda Through the 2013 Edition)....XI-1-13-17 12-2273 IWF-1300(e) (2004 Edition)....XI-1-13-20 13-114 Mandatory Appendix VII, VII-4310(a) (1998 Edition Through the 2013 Edition)....XI-1-13-18 13-888 Table IWD-2500-1, Category D-A (2004 Edition Through the 2010 Edition With the 2011 Addenda)....XI-1-13-13 11-1126

Interpretation: XI-1-13-12 Subject: IWA-2323; Mandatory Appendix VI, VI-4300; and Mandatory Appendix VII, VII-4340 (2001 Edition With the 2003 Addenda Through the 2010 Edition With the 2011 Addenda) Date Issued: January 16, 2013 File: 12-1905 Question: When administering multiple-choice written examinations in accordance with IWA-2323, VI-4300, or VII-4340, is it the intent that the certified Level III may delegate a noncertified proctor to administer and monitor the testing process of the Level III candidate? Reply: Yes, as long as the certified Level III has a valid certification in the applicable test method. Interpretations: XI-1-13-13 Subject: Table IWD-2500-1, Category D-A (2004 Edition Through the 2010 Edition With the 2011 Addenda) Date Issued: January 22, 2013 File: 11-1126 Question: Is it the intent of Table IWD-2500-1, Category D-A, Note (3) [Note (4) in the 2007 Edition with the 2009 Addenda through the 2010 Edition with the 2011 Addenda] to select only one welded attachment of only one of the multiple vessels for examination? Reply: Yes. Interpretation: XI-1-13-14 Subject: IWA-4132 and IWA-4540 (2004 Edition) File: 12-827 Question (1): If new bolting is installed as part of rotating an item from stock in accordance with IWA-4132, are an R/R plan and NIS-2 data report required for the replacement bolting? Question (2): Is it a requirement of IWA-4540 for the replacement bolting included in Question (1) to be pressure tested? Reply (2): No.

Interpretation: XI-1-13-15 Subject: IWA-4132 and IWA-4540(c) (1998 Edition) File: 12-1585 Question (1): Is it a requirement of the 1998 Edition of IWA-4540(c) to perform a pressure test following installation of a pressure relief valve rotated from stock in accordance with IWA-4132 that does not include replacement of pressure-retaining bolting? Reply (1): Yes, from the 1996 Addenda to the 1998 Edition, IWA-4132(e) and IWA-4540(c) required pressure testing of mechanical connections made during the rotation of pressure relief valves from stock whether or not bolting was replaced. Question (2): Is it a requirement of the 1998 Edition of IWA-4540(c) to perform a pressure test following installation of a pressure relief valve rotated from stock in accordance with IWA-4132 that includes replacement of pressure-retaining bolting? Reply (2): Yes, from the 1996 Addenda to the 1998 Edition, IWA-4132(e) and IWA-4540(c) required pressure testing of mechanical connections made during the rotation of pressure relief valves from stock whether or not bolting was replaced. Interpretation: XI-1-13-16 Subject: Code Cases N-729 Through N-729-3 File: 12-2059 Question: Is it a requirement of -3132.1(b) that a rounded indication of any size be subject to the provisions of -3232.2 if there are no relevant conditions indicating nozzle leakage? Reply: No.

Interpretation: XI-1-13-17 Subject: IWB-3522.1 (1998 Edition With the 2000 Addenda Through the 2007 Edition) and IWA-5300 (1998 Edition With the 2000 Addenda Through the 2013 Edition) Date Issued: May 15, 2013 File: 12-2273 Question (1): Is it a requirement of IWB-3522.1 to consider as relevant any identified leakage from mechanical connections? Question (2): Is it a requirement of IWA-5300 to record all leakage? Reply (2): Yes. Interpretation: XI-1-13-18 Subject: Mandatory Appendix VII, VII-4310(a) (1998 Edition Through the 2013 Edition) Date Issued: May 15, 2013 File: 13-888 Question (1): Do the requirements of VII-4310(a) requiring a question bank containing at least twice the minimum number of questions and examinations assembled using a random selection process apply only to the ultrasonic examination method? Question (2): Is it a requirement of VII-4310(a) that examinations be assembled from a question bank using a random selection process without consideration to the requirements of VII-4321 and VII-4322? Reply (2): No. All applicable paragraphs of VII-4300 are required.

Interpretation: XI-1-13-19 Subject: Code Case N-606-1 Date Issued: June 21, 2013 File: 13-56 Question: Is it the intent that the application of peening to the initial or final weld layer for the purpose of surface stress mitigation be prohibited by Code Case N-606-1, 1(f)? Reply: No. The prohibition against peening was intended to prevent the use of high-impact peening methods used to control distortion. It was not intended to prohibit peening methods used only for the purpose of surface stress mitigation, such as rotary peening. Interpretation: XI-1-13-20 Subject: IWF-1300(e) (2004 Edition) Date Issued: June 21, 2013 File: 13-114 Question (1): Is it the intent of IWF-1300(e) to allow insulation to remain in place during examination of those supports under continuous compression or tension load, regardless of orientation (i.e., horizontal, vertical, or anywhere in between) when examination is required in accordance with Table IWF-2500-1? Question (2): Is it the intent of IWF-1300(e) to remove insulation during examination of those supports that normally carry no load (such as snubbers) when examination is required in accordance with Table IWF-2500-1? Reply (2): Yes.