UNCLASSIFIED. Total Prior to FY 2008 Cost. FY 2008 Cost. FY 2008 Award Date. Subtotal Product Development Continuing TBD TBD

Similar documents
Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

PE BB Cont. Cont. S400B, Predator MALET Cont. Cont.

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED UNCLASSIFIED

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Aircraft Engine Component Improvement Program

UNCLASSIFIED CLASSIFICATION: EXHIBIT

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SURFACE SHIP TORPEDO DEFENSE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Airborne SIGINT Enterprise (JMIP) FY 2012 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-5. FY-10 FY-11 FY-12 FY-12 OCO FY-12 Total FY-13 FY-14 FY-15 FY-16

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Integrated Surveillance System FY 2012 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-12

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

PM Light Tactical Vehicles

Selected Acquisition Report (SAR)

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #30

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

NDIA Tactical Wheeled Vehicles (TWV) Conference 8 February 2010 COL Mark Barbosa, G-8

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-135

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: RQ-4

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Qty (Each)

Selected Acquisition Report (SAR)

Gaining Ground. Michael Fabey/AW&ST

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

CLASSIFICATION: UNCLASSIFIED. Exhibit P-40, BUDGET ITEM JUSTIFICATION CLASSIFICATION: UNCLASSIFIED. P-1 Item No. 46. Page 1 of 17. DATE: February 2011

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Selected Acquisition Report (SAR)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Selected Acquisition Report (SAR)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

CLASSIFICATION: UNCLASSIFIED. DATE February 2008 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/INTEGRATED SURVEILLANCE SYSTEM

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

DDG 51 Program. Sea, Air, Space Exposition Washington, DC 04 April Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D

City of Palo Alto (ID # 6416) City Council Staff Report

OFFICE OF FLEET MANAGEMENT FISCAL YEAR 2015 BUDGET TESTIMONY APRIL 7, 2014 EXECUTIVE SUMMARY

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 P-1 Line #51

UNCLASSIFIED 3/29/02. xxxgr.xx.02 46PMSW.1.02

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

From: Tito R. Nagrampa Jr, P.E. Approved by: /s/ General Manager Juan M. Ulloa, P.E. Engineering Supervisor

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: End Item Industrial Preparedness Activities FY 2012 OCO

Air Force Operational Energy

LtCol Tom Atkinson Program Manager

Fighter/EW/Helo/Patrol Arc Fault Circuit Breaker Development. April 2007

Transcription:

Exhibit R-3, RDT&E Project Analysis 07 Operational System Development 0302015F E-4B NATIONAL AIRBORNE 4777 E-4B Aircraft Modernization Categories (Tailor to WBS, or System/Item Requirements) ($ in Millions) Contract Method & Type Performing Activity & Location Product Development Executive Support Study CPIF Booz Allen Hamilton, McLean, VA STU III replacement integration and testing CPIF Raytheon, St. Petersburg, FL SHF MUX Upgrade Development and Integration CPIF Boeing, Wichita Development & Modification Center, Wichita, KS CNS/ATM Development and Integration CPIF Boeing, Wichita Development & Modification Center, Wichita, KS EMP Testing FFP Naval Air Warfare Center, Patuxent River, MD Total Prior to FY 2008 Project 4777 Page-6 of 13 Exhibit R-3 (PE 0302015F) 440 to Complete Total Target Value of Contract 0.000 1.000 Mar-08 0.000 1.000 1.000 0.000 14.459 Jun-08 0.000 14.459 14.027 0.000 1.054 Mar-10 0.000 1.054 1.304 0.000 9.816 Jun-10 Continuing TBD TBD 6.000 Feb-10 0.000 6.000 8.000 Subtotal Product Development 0.000 15.459 0.000 16.870 Continuing TBD TBD Contracting Method and Type may be altered at time of contract. Test and Evaluation Modification test plan development and test execution Boeing, Wichita Development & Modification Center, Wichita, KS 0.097 Jun-08 0.108 Jun-09 0.089 Jun-10 Continuing TBD TBD Subtotal Test and Evaluation 0.000 0.097 0.108 0.089 Continuing TBD TBD Management E-4B Program Office contractor support Small Chickasaw 0.220 May-08 0.000 0.245 Continuing TBD TBD

Exhibit R-3, RDT&E Project Analysis 07 Operational System Development 0302015F E-4B NATIONAL AIRBORNE 4777 E-4B Aircraft Modernization Business T&M Nation Industries, Inc., Oklahoma City, OK E-4B Program Office Govt TDY/PMA 2.800 3.950 0.055 Continuing TBD TBD Subtotal Management 0.000 3.020 3.950 0.300 Continuing TBD TBD $2.8M of FY08 and $3.9M of FY09 funds were reprogrammed out of the PE for higher priorities, but this is not reflected in the totals. For purposes of this exhibit, these funds are included in the E-4B Program Office Govt TDY/ PMA line. Total 0.000 18.576 4.058 17.259 Continuing TBD TBD Project 4777 Page-7 of 13 Exhibit R-3 (PE 0302015F) 441

Exhibit R-4, RDT&E Schedule Profile 07 Operational System Development 0302015F E-4B NATIONAL AIRBORNE 4777 E-4B Aircraft Modernization Project 4777 Page-8 of 13 Exhibit R-4 (PE 0302015F) 442

Exhibit R-4a, RDT&E Schedule Detail 07 Operational System Development 0302015F E-4B NATIONAL AIRBORNE 4777 E-4B Aircraft Modernization Schedule Profile Executive Support Study 2-4Q 1-2Q STU III Replacement 2-4Q SHF Mux Upgrade 1-4Q CNS/ATM 1-4Q EMP Testing 4Q 1-4Q 3-4Q Project 4777 Page-9 of 13 Exhibit R-4a (PE 0302015F) 443

Exhibit R-2a, RDT&E Project Justification 07 Operational System Development 0302015F E-4B NATIONAL AIRBORNE 5301 Next Generation NAOC ($ in Millions) FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 to Total Actual Complete 5301 Next Generation NAOC 0.000 0.000 8.848 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 A. Mission Description and Budget Item Justification The E-4B NAOC fleet satisfies the military need for an airborne operations center with communications capabilities that permit military and civilian leadership to monitor and control military and civil national assets during all phases of nuclear and non-nuclear conflict or natural disaster. The E-4B NAOC fleet also satisfies the military requirement to provide a highly survivable alternate operations center to the National Military Command Center (NMCC). The Air Force does not expect E-4B NAOC requirements to substantively change during the next two decades. Additionally, lifecycle costs, particularly O&M, will increase substantially as the fleet ages and support for the Boeing 747-200 class diminishes. Thus, it is imperative to further analyze recapitalization of the E-4B NAOC fleet. Based on the recommendations of the E-4B NAOC Aircraft Replacement AoA, the Air Force is requesting RDT&E funds in FY10 to continue analysis for a replacement fleet. Funds will be utilized to develop a Technology Development Strategy, Test and Evaluation Strategy, Systems Engineering Plan, Lifecycle Management Plan, draft Capabilities Development Document, and other required documents leading up to a Milestone A decision in 2011. B. Accomplishments/Planned Program ($ in Millions) Technology Development Strategy, Test and Evaluation Strategy, Systems Engineering Plan, Lifecycle Management 8.848 Plan, draft Capabilities Development Document, and other required documents leading up to a Milestone A decision in second fiscal quarter 2010 Total 0.000 0.000 8.848 C. Other Program Funding Summary ($ in Millions) Operations & Maintenance, Air Force, PE 0302015F Actual FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 to Total Complete 0.917 0.000 0.917 D. Acquisition Strategy Post-AoA activities are currently being funded through DISA to Booz Allen Hamilton from E-4B FY08 O&M funds ($.917M FY08); however, ESC/XR will be the contracting authority for the $8.8M FY10 RDT&E. A contracting strategy for this effort is being developed and will be further defined upon Air Force direction. Project 5301 Page-10 of 13 Exhibit R-2a (PE 0302015F) 444

Exhibit R-3, RDT&E Project Analysis 07 Operational System Development 0302015F E-4B NATIONAL AIRBORNE 5301 Next Generation NAOC Categories (Tailor to WBS, or System/Item Requirements) ($ in Millions) Contract Method & Type Performing Activity & Location Total Prior to FY 2008 to Complete Total Target Value of Contract Product Development 0.000 Subtotal Product Development 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Support Project Management Support FFP Booz Allen Hamilton, McLean, VA 8.348 Feb-10 8.348 Subtotal Support 0.000 0.000 0.000 8.348 0.000 8.348 0.000 Contracting Method and Type may be altered at time of contract Test & Evaluation 0.000 Subtotal Test & Evaluation 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Management Govt TDY 0.500 0.500 Subtotal Management 0.000 0.000 0.000 0.500 0.000 0.500 0.000 Total 0.000 0.000 0.000 8.848 0.000 8.848 0.000 Project 5301 Page-11 of 13 Exhibit R-3 (PE 0302015F) 445

Exhibit R-4, RDT&E Schedule Profile 07 Operational System Development 0302015F E-4B NATIONAL AIRBORNE 5301 Next Generation NAOC Project 5301 Page-12 of 13 Exhibit R-4 (PE 0302015F) 446

Exhibit R-4a, RDT&E Schedule Detail 07 Operational System Development 0302015F E-4B NATIONAL AIRBORNE 5301 Next Generation NAOC Schedule Profile Material Solutions Analysis 1-4Q 1-4Q Project 5301 Page-13 of 13 Exhibit R-4a (PE 0302015F) 447

THIS PAGE INTENTIONALLY LEFT BLANK 448