Associated controllers Controller selection

Similar documents
DATA SHEET LC-D CONTACTORS

HEATING & CHILLED SYSTEM PRESSURISATION UNITS AQUAPACK ET SERIES

Nickel Cadmium Battery

VQE: 2-way flanged valve, PN 16

ELECTRONIC TRANSFORMERS SWITCHING POWER SUPPLIES

www. ElectricalPartManuals. com Westinghouse

Characteristics TeSys contactors 0 Model d

Product manual. Tdriver LCA PRE / LC EXC

VQD: 2-way flanged valve, PN 6

The House of Gate Automation

VUP: Pressure-relieved 2-way flanged valve, PN 25 (el.)

BUG: 3-way flanged valve, PN 25/16 (el.)

Low-watt Type Solenoid Valve

KD LV Motor Protection Relay

ELECTRONICS TRANSFORMERS SWITCHING POWER SUPPLIES

Product Campaign Bulletin

Symbol indicating an action that must not be done. Symbol indicating an action that should be done. Symbol indicating related or useful information

76.126/1. BUS: Flanged three-way valve, PN 40. Sauter Components

MCS58 barrier. Your safe partner in access. Length 2m to 10,20m Opening speed 1,5 to 8,5 sec. Mechanism. Parts. Security. Options. Column.

Product description. EM converterled

Electric Fail-Safe. Actuators. Spring Return. Electric Fail-Safe. Battery Backup. Mechanical failure torques up to 2300 in-lbs.

DEEP SEA ELECTRONICS PLC

PCU CORE FIRE PROTECTION ELECTRICAL DETAIL

www. ElectricalPartManuals. com l Basler Electric DGC-1000 DIGITAL GENSET CONTROLLER DESCRIPTION and SPECIFICATIONS pages 2 and 3

Z SLIDERS. Introducing a low profile actuator installing a circulating type linear guide!

Diaphragm Seals NEW! For Pressure Products For Pressure Products

Vario Compact ABS 2nd generation Part 2: Installation instructions

Load Capacity (inertia vs. time) 2 Stop

Full Port Ball Valves

GEH-230W StPersetles GEH-230V INSTRUCTIONS. f:. l I ' INSTRUMENT TRANSFORMERS DRY AND COMPOUND-FILLED TYPES. GENERAL. E,LECTRIC

Three Way Ball Valves

HGM1780. Automatic Genset Controller USER MANUAL. Smartgen Technology

ENGINE CONTROL SYSTEM SECTIONEC CONTENTS

DEEP SEA ELECTRONICS PLC

MANUAL. MiniMax V / VK

MODEL 520 REMOTE START ENGINE MANAGEMENT SYSTEM

M Point & 3-Point Electric Damper-Actuator

E5AN-H/E5EN-H(96 x 96 mm and 48 x 96 mm)

EXPLOSION-PROOF MOTOR DRIVEN CABLE REELS MCR

BOOK 4 ELECTRICAL RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 4:

Technical Design-in Guide. Tengine STARK SLE GEN2

Access Rectangular In-Line Fans (ARH)

ENGINE CONTROL SYSTEM SECTIONEC CONTENTS

POWERING THE WAY Rental Power Planner

01 Spectra Plus - Introduction

Designed for ease of integration with automation systems

SIEMENS. Series Medium Voltage Controllers Pricing Guide. www. ElectricalPartManuals. com. rv'lvc-9012

Data. Energy. Product Range Catalogue. Switching and Installation System Rapid Link. For Immediate Delivery call KMParts.com at (866)

SCHEDULE DISTRIBUTION USE OF SYSTEM CHARGES

SCHEDULE DISTRIBUTION USE OF SYSTEM CHARGES

GJL 100 A Molded Case Circuit Breaker GJL 75 A Motor Circuit Protector

DEEP SEA ELECTRONICS PLC

C 1. SPECTRONIC SP - Air circuit breakers. Summary. C2. General characteristics. C3. Fixed circuit breaker. C4. Withdrawable circuit breakers

Emergency lighting units EM converterled. EM converterled ST 50 V SELFTEST series

Valcom Failsafe Unit. 1620ESv2 SERIES. Operation and Maintenance Manual

1333 (SERIES B & C) TROUBLESHOOTING GUIDE

DEEP SEA ELECTRONICS PLC

cor Long Run Experience

Hydronic Accessories H YDRONIC C OMPONENTS & S YSTEMS. Taco Catalog # Supersedes: Dated: 02/1/01

IGNITION SYSTEM IGNITION SYSTEM

V6R: 2-way valve with female thread, PN 16 (el.)

SOLAR PV standard Plan-Simplified Central/String Inverter Systems for One and Two Family Dwellings

GE 8000-Line Motor Control Centers Mains, Feeders, Incoming Lines C-1

DPX moulded case circuit breakers

HGM1750 Genset Security Module USER MANUAL Smartgen Technology

ATyS d M Remotely operated Transfer Switching Equipment from 40 to 160 A

HIGH CAPACITY COILS UNIT CONNECTION SIZES CONNECTION SIZES B C CONNECTION SIZES

Internet For latest information, PDF catalogs and operation manuals

HIGH CAPACITY COILS UNIT CONNECTION SIZES CONNECTION SIZES B C CONNECTION SIZES

DEEP SEA ELECTRONICS PLC

DIRECTIONAL GROUND RELAY. Type CFPC16A. G E N E R A L ELECTRIC

Analysis of Distribution Substation Topologies for Energy Exchanging between EV and Utility Networks

Pulsar EXtreme 2200C / 3200C

SECTION 2 - PROCEDURES. Features. 2.6 MOTOR CONTROLLER. Modes of Operation JLG Lift 2-5

Job Address: Permit #: Contractor/Engineer Name: License # and Class: Signature: Date: Phone Number:

Phoenix Inverter

AUTOMATIC STAND-BY AND PEAK-LOAD CONTROL

Flight Systems. Replacement for KASSEC DESCRIPTION

Emergency lighting units EM converterled. EM converterled ST 90 V SELFTEST series

3 - Protection components Motor circuit-breakers

Electronic Ballast EVG 2000-T

VEGETABLE CUTTING MACHINE OPERATION MANUAL TT-F60 / TT-F65 TT-F60 TT-F65

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

V6R: 2-way valve with female thread, PN 16 (pn.)

Axial fans Product-specific information

OWNER S MANUAL MODEL T INDUSTRIAL DUTY DOOR OPERATOR

A Low-Cost Efficient Hardware-in-the-Loop Testbed for Distributed Generation Penetration Analysis

HGM501 Gen-set Controller USER MANUAL. Smartgen Technology

Pulsar EXtreme CLA 1500C

F-Series General Specifications

Equipment model: auxiliary control. Pack Cat.Nos 10/16 A V± P + T shuttered module module

Emergency lighting units EM converterled. EM converterled BASIC 200 V BASIC series

B6R: 3-way valve with female thread, PN 16 (pn.)

RE-PR3-E-86&105 3-Phase Panel Mount 86 and 105kW

Emergency lighting units EM converterled. EM converterled BASIC 90 V BASIC series

Industrial Generator Set Accessories. Standard Features. Line Circuit Breakers kw

Nova UAC (NV-UAC-M) Modified Sine Wave 650W 800W 1000W

New DMX 3. Efficient protection up to A AIR CIRCUIT BREAKERS PRODUCT GUIDE

OWNER'S MANUAL MODEL GT INDUSTRIAL DUTY DOOR OPERATOR 2 YEAR WARRANTY NOT FOR RESIDENTIAL USE. Serial # (located on electrical box cover)

GE Consumer & Industrial. M-PACT New Air Circuit Breaker A

Transcription:

Assoiated ontrollers Controller seletion 053058 053058 By ombining a remote-operated sourehangeover system with an integrated BA or UA automati ontroller, it is possible to automatially ontrol soure transfer aording to user-seleted sequenes. These ontrollers an be used on sourehangeover systems omprising 2 iruit breakers. For soure-hangeover systems omprising 3 iruit breakers, the automati ontrol diagram must be prepared by the installer as a omplement to to diagrams provided in the eletrial diagrams setion of this atalogue. BA ontroller UA ontroller Controller BA UA ompatible iruit breakers All Compat S and Masterpat iruit breakers 4-position swith Automati operation Fored operation on ormal soure Fored operation on eplaement soure Stop (both ormal and eplaement soures off) Automati operation Monitoring of the ormal soure and automati transfer Generator set startup ontrol Delayed shutdown (adjustable) of generator set Load shedding and reonnetion of non-priority iruits Transfer to the eplaement soure if one of the phases of the ormal phase is absent Test By opening the P25M iruit breaker supplying the ontroller By pressing the test button on the front of the ontroller ndiations Ciruit breaker status indiation on the front of the ontroller: on, off, fault trip Automati mode indiating ontat ther funtions Seletion of type of ormal soure (single-phase or three-phase) () Voluntary transfer to eplaement soure (e.g. energy management ommands) During peak-tariff periods (energy management ommands), fored operation on ormal soure if eplaement soure not operational Additional ontat (not part of ontroller). Transfer to eplaement soure only if ontat is losed. (e.g. used to test the frequeny of U). Setting of maximum startup time for the replaement soure ptions ommuniation option Power supply ontrol voltages (2) 220 to 240 V 50/60 Hz 380 to 45 V 50/60 Hz 440 V 60 Hz perating thresholds undervoltage 0.35 Un i voltage i 0.7 Un phase failure 0.5 Un i voltage i 0.7 Un voltage presene voltage u 0.85 Un Charateristis of output ontats (3) rated thermal urrent (A) 8 minimum load 0 ma at 2 V AC DC utilisation ategory (EC 947-5-) AC2 AC3 AC4 AC5 DC2 DC3 operational urrent (A) 24 V 8 7 5 6 8 2 48 V 8 7 5 5 2-0 V 8 6 4 4 0.6-220/240 V 8 6 4 3 - - 250 V - - - - 0.4-380/45 V 5 - - - - - 440 V 4 - - - - - 660/690 V - - - - - - () For example, 220 V single-phase or 220 V three-phase. (2) The ontroller is powered by the ACP auxiliaries ontrol plate. The same voltage must be used for the ACP plate, the VE unit and the iruit-breaker operating mehanisms. f this voltage is the same as the soure voltage, then the ormal and eplaement soures an be used diretly for the power supply. f not, a BC type or equivalent isolation transformer must be used. (3) utput ontats (dry, volt-free ontats): b position of the Auto/Stop swith b load shedding and reonnetion order b generator set start order. 20 Shneider Eletri

Assoiated ontrollers Controller installation E72579 E72578 053060 ACP auxiliaries ontrol plate The auxiliaries ontrol plate provides in a single unit: protetion for the BA or UA ontroller with two highly limiting P25M iruit breakers (infinite breaking apaity) for power drawn from the AC soure ontrol of iruit-breaker and FF funtions via two relay ontators onnetion of the iruit breakers to the BA or UA ontroller via a built-in terminal blok. Control voltages 220 to 240 V 50/60 Hz 380 to 45 V 50/60 Hz 440 V 60 Hz. The same voltage must be used for the ACP plate, the ontroller and the iruitbreaker operating mehanisms. nstallation Connetion between the ACP auxiliaries ontrol plate and the VE eletrialinterloking unit may use: wiring done by the installer prefabriated wiring (optional). ACP auxiliaries ontrol plate. nstallation of the BA and UA ontrollers The BA and UA ontrollers may be installed in one of two manners: diretly mounted on the ACP auxiliaries ontrol plate mounted on the front panel of the swithboard. The length of the onnetion between the ACP plate and the ontroller must not exeed two metres. Wiring is done by the installer. Mounting on the ACP plate. Mounting on the front panel of the swithboard. Shneider Eletri 2

Assoiated ontrollers BA ontroller E3084 053059 The BA ontroller is used to reate simple soure-hangeover systems that swith from one soure to another depending on the presene of voltage U on the ormal soure. t is generally used to manage two permanent soures and an ontrol Compat S and Masterpat T/W iruit breakers and swith-disonnetors. MEL GE ompat / masterpat BA automatism 220/240 V 50/60 Hz U U 2 4 t 8 s U = 0 0.5 5 0. 30 perating modes A four-position swith may be used to selet: automati operation fored operation on the ormal soure fored operation on the eplaement soure stop (both ormal and eplaement soures off). Setting the time delays Time delays are set on the front of the ontroller. t. delay between detetion that the ormal soure has failed and the transmission of the order to open the ormal soure iruit breaker (adjustable from 0. to 30 seonds). t2. delay between detetion that the ormal soure has returned and the transmission of the order to open the eplaement soure iruit breaker (adjustable from 0. to 240 seonds). Ciruit breaker ommands and status indiations The status of the iruit breakers is indiated on the front of the ontroller., FF, fault. A built-in terminal blok may be used to onnet the following input/output signals: inputs: v voluntary order to transfer to soure (e.g. for speial tariffs, et.) v additional ontrol ontat (not part of the ontroller). Transfer to the eplaement soure takes plae only if the ontat is losed (e.g. used to test the frequeny of U, et.) outputs: indiation of operation in automati or stop mode via hangeover ontats. Test t is possible to test the operation of the BA ontroller by turning FF (opening) the P25M iruit breaker for the ormal soure and thus simulating a failure of voltage U. / FF/ / FF/ 0.5s 0.5s stop manu fault reset auto fault t2 s 5 30 60 20 240 8 4 0. U = Front of the BA ontroller. 22 Shneider Eletri

Assoiated ontrollers BA ontroller perating sequenes Swith set to Auto (automati operation and speial-tariff mode) Swith set to the position (fored operation on the ormal soure) E87486 E87487 BA energised opens FF end of delay loses WATG Swith set to the position (fored operation on the eplaement soure) Swith set to the Stop position E87489 E87488 BA energised STP opens FF opens and U absent FF WATG U : ormal soure voltage U : eplaement soure voltage : ormal soure iruit breaker : eplaement soure iruit breaker The number sends to the indiated step when the ondition is true. WATG The system exits this mode when the operating mode is modified or when an external event ours (e.g. failure or return of U).). Shneider Eletri 23

Assoiated ontrollers UA ontroller 053059 The UA ontroller is used to reate a soure-hangeover system integrating the following automati funtions: b transfer from one soure to another depending on the presene of voltage U on the ormal soure b startup of an engine generator set b shedding and reonnetion of nonpriority iruits b transfer to the eplaement soure if one of the phases on the ormal soure fails. The UA ontroller an ontrol Compat S and Masterpat T/W devies. perating modes A four-position swith may be used to selet: b automati operation b fored operation on the ormal soure b fored operation on the eplaement soure b stop (both ormal and eplaement soures off, then manual operation). Setting the time delays Time delays are set on the front of the ontroller. t. delay between detetion that the ormal soure has failed and the transmission of the order to open the ormal soure iruit breaker (adjustable from 0. to 30 seonds). t2. delay between detetion that the ormal soure has returned and the transmission of the order to open the eplaement soure iruit breaker (adjustable from 0. to 240 seonds). t3. delay following opening of Q with load shedding and before losing of Q (adjustable from 0.5 to 30 seonds). t4. delay following opening of Q with load reonnetion and before losing of Q (adjustable from 0.5 to 30 seonds). t5. delay for onfirmation that U is present before shutting down the engine generator set (adjustable from 60 to 600 seonds). t6. delay before startup of the engine generator set (20 or 80 seonds). E3083 MEL GE ompat / masterpat UA automatism 220/240 V 50/60 Hz stop manu U / FF/ fault reset auto test U / FF/ fault t4 s t2 s 5 0 5 20 30 2 0.5 5 30 60 20 240 8 4 0. STP U = 0 240 300 t5 60 360 s 20 480 60 600 U = generator 2 4 t 8 s 0.5 5 0. 30 5 0 t3 2 5 s 20 0.5 30 Commands and indiations Ciruit-breaker status indiations on the front of the ontroller:, FF, fault. A built-in terminal blok may be used to onnet the following input/output signals: b inputs: v voluntary order to transfer to soure (e.g. for speial tariffs, et.) v additional ontrol ontat (not part of the ontroller). Transfer to the eplaement soure takes plae only if the ontat is losed (e.g. used to test the frequeny of U, et.) b outputs: v ontrol of an engine generator set ( / FF) v shedding of non-priority iruits v indiation of operation in automati mode via hangeover ontats. Distribution-system settings Three swithes are used to: b selet the type of ormal soure, whether single-phase or three-phase (e.g. 240 V single-phase or 240 V three-phase) b selet whether to remain (or not) on the ormal soure if the eplaement soure is not operational during operation on speial tariffs b selet the maximum permissible startup time for the engine generator set during operation on speial tariffs (20 or 80 seonds). Test A pushbutton on the front of the ontroller may be used to test transfer from the ormal soure to the eplaement soure, then the return to the ormal soure. The test lasts approximately three minutes. CM ommuniations option Using the internal bus protool, this option may be used to remote the following information: b iruit-breaker status (, FF, fault trip) b presene of the ormal and eplaement voltages b presene of an order for fored operation (e.g. speial tariffs) b settings and onfiguration information b status of non-priority iruits (loads shed or not) b position of the swith (stop, auto, fored operation on the ormal soure, fored operation on the eplaement soure). Front of the UA ontroller. 24 Shneider Eletri

Assoiated ontrollers UA ontroller perating sequenes Swith set to the position (fored operation on the eplaement soure) Swith set to the position (fored operation on the ormal soure) E72565 UA energised E72566 UA energised genset startup and U absent delay t6 (swith C) and U present opens end of t6 U failure t < t6 and U present opens FF t3 and load shedding end of t3 FF t4 and load reonnetion end of t4 loses WATG Swith set to the Stop position loses E72580 UA energised STP WATG and U absent and U present WATG The system exits this mode when the operating mode is modified or when an external event ours (e.g. failure or return of U). opens FF opens FF When the UA ontroller is not energised, the output for generator set startup is ativated). load reonnetion WATG U : ormal soure voltage U : "eplaement soure voltage : ormal soure iruit breaker : eplaement soure iruit breaker Shneider Eletri 25

Assoiated ontrollers UA ontroller perating sequenes Swith set to the Auto position (speial-tariff mode) WATG The system exits this mode when the operating mode is modified or when an external event ours (e.g. failure or return of U). E7258 UA energised AUT MDE speial tariff order When the UA ontroller is not energised, the output for generator set startup is ativated. speial-tariff mode genset startup 2 delay t6 (swith C) t < t6 and U present opens FF t3 and load shedding end of t3 loses loses WATG opens hoie (swith B) end of t6 and U absent B = 0 B = FF load shedding order load shedding = U absent and U present and B = opens U absent and U present and B = 0 WATG speial tariff order WATG speial tariff order FF speial tariff order loses load reonnetion order and speial tariff order load reonnetion 5 delay t5 end of t5 U : ormal soure voltage U : "eplaement soure voltage : ormal soure iruit breaker : eplaement soure iruit breaker B : Penalties aepted ( ), i.e. B = The number sends to the indiated step when the ondition is true. 26 Shneider Eletri

Assoiated ontrollers UA ontroller perating sequenes Swith set to the Auto position (automati operation and test mode). E72582 UA energised AUT MDE TEST U present U absent and U present TEST mode (*) LEDs flashing 4 delay t2 opens 3 genset startup end of t2 opens FF t3 and load shedding and U absent and U present FF end of t3 delay t6 (swith C) t4 and load reonnetion loses t < t6 and U present end of t4 loses WATG end of t6 opens FF t3 and load shedding delay t5 end of t3 end of t5 U failure and 80 seonds elapsed loses WATG Main step 5 U absent U present U absent or 80 seonds elapsed TEST speial tariff order delay t end of t genset startup U present 5 4 2 3 WATG The system exits this mode when the operating mode is modified or when an external event ours (e.g. failure or return of U). When the UA ontroller is not energised, the output for generator set startup is ativated. U : ormal soure voltage U : "eplaement soure voltage : ormal soure iruit breaker : eplaement soure iruit breaker B : Penalties aepted ( ), i.e. B = (*) The test lasts 80 seonds. The number sends to the indiated step when the ondition is true. Shneider Eletri 27

perating sequenes VE unit E72583 >50 ms >50 ms Q Q s 500 ms VE delay 250 ms 500 ms VE delay 250 ms Symbols Q : ormal Compat C iruit breaker equipped for remote operation (motor mehanism) Q : eplaement Compat C iruit breaker equipped for remote operation (motor mehanism) : Ciruit breaker Q opening order : Ciruit breaker Q opening order : Ciruit breaker Q losing order : Ciruit breaker Q losing order L : Faulty ormal indiation LED L2 : Faulty eplaement indiation LED FF (iruit open) (iruit losed : either or FF. ote: Following all trips (overload, short-iruit, earth-leakage fault, voluntary trip), a manual reset on the front of the motor mehanism is required. 28 Shneider Eletri

perating sequenes BA ontroller E72584 U or KT U K T 0. 30 s 500 ms VE delay 250 ms T2 0. 240 s 500 ms VE delay 250 ms nputs U : ormal soure voltage U : eplaement soure voltage KT : order for fored-operation on K : additional hek before transfer utputs Q : ormal soure iruit breaker Q : eplaement soure iruit breaker UA ontroller E72585 U or KT U K KG SH Q Q T 0...30 s genset startup time VE ( T6) T3 0.5...30 s VE time delay 250 ms T2 0...240 s T4 0,5...30 s VE time delay 250 ms T2 0...240 s nputs U : ormal soure voltage U : eplaement soure voltage KT : order for fored-operation on K : additional hek before transfer utputs KG : order to the genset SH : load-shedding order Q : ormal soure iruit breaker Q : eplaement soure iruit breaker FF (iruit open) (iruit losed : either or FF. mportant f U is not when the transfer order is issued (KT or U), the sequene is not arried out. f K status is not when the transfer order is issued (KT or U), the transfer sequene is arried out later when K status beomes. Shneider Eletri 29