Cross Hare Installation Guide

Similar documents
Tri-Spark Ignition System Installation Triple Cylinder TRI-0001

Installing LED courtesy lights in Mustang.

General Purpose Flasher Circuit

Sequential Turn Signals TCSF-03 Installation Instructions FOR ONLINE INSTRUCTIONS VISIT OUR WEBSITE AT

RR Concepts. The StationMaster can control DC trains or DCC equipped trains set to linear mode.

Sensors W2 and E2 are optional. Installation guide, 'Pickle Fork' Back-and-Forth Model Train Controller

Operation and Installation Manual

Azatrax MRX3 Grade Crossing Signal Controller Installation Guide

Step #1 From your spool of 18 gauge primary wire, cut between 11 and 21 three inch strips of wire. You will only need 11 for the ROV, but it is good t

PRODUCT MANUAL Onyx 2 Zone In-Wall Wireless LED Dimmer and Receiver

PRODUCT MANUAL Gecko Wireless 2 Zone LED Dimmer and Receiver

PRODUCT MANUAL Gecko Wireless One Zone LED Dimmer and Receiver

QUASAR KIT No THYRISTOR - TRIAC TESTER

REC-11+ REMOTE RECEIVER UNIT

DC Series Installation Manual (# )

INSTALLATION MANUAL SPECTRUM BRAKE CONTROL

Los Angeles Model Railroad Society. Wiring A Tortoise Switch Machine for the Mainline

BMW K1200LT / K1200RS Testing a Throttle Position Sensor (also called TPS)

Using your Digital Multimeter

Switch Machines Installation & Wiring

RailPro DCC User Manual

Digital Command & Control (DCC) has progressed a great deal over recent years and can now provide a myriad of actions which can be made to precisely r

INSTALLATION GUIDE Table of Contents

Build Instructions and User Guide

PRODUCT MANUAL Desktop LED Dimmer and Receiver

MCC Automatic Start-Stop Microcomputer Charger Control

PROTOSOUND 3.0 HO GAUGE DIESEL & ELECTRIC TROUBLESHOOTING

CP2000 Ballast - Replacing Thyristor Instruction Sheet

G213V STEP MOTOR DRIVE REV 7: March 25, 2011

DMR 3005 WM ONE ZONE WIRELESS DIMMER RECEIVER

DH163PS Fits Many DCC-Ready HO Locomotives

Throttle Cable Pull - Patent Pending By: NetGain Controls, Inc.

The speaker soundbox improves the performance of the speaker in locos which have no purpose designed speaker cradle.

MID-MOTOR EBIKE KITS: INFORMATION FOR INSTALLERS

Installation Instructions for LED Timing Light

Modifying the exterior lighting of the Ram truck

TONY S TECH REPORT. Basic Training

AgriWheel Single Gate Kit Low Voltage & Solar. Installation & Operating Instructions

TIP SHEET. Installation Tips for your RS IB-MUX / PKUMUX (D) + SPDT T1205 v1.2 4/3/14. 1 P a g e

Operation and Installation Manual

CAUTION-ELECTRICALLY OPERATED PRODUCT

MYLOCOSOUND RECORDED SOUND FOR LARGE SCALE RUSTON & HORNSBY AND GENERIC INDUSTRIAL DIESEL LOCOS

DH165IP Fits Many HO Locomotives with DCC 8pin Medium Socket

Covers All 430, 440, 441 and CJ Series Advanced Security Systems.

G203V / G213V MANUAL STEP MOTOR DRIVE

R & D SPECIALTIES ROTROL I USER'S MANUAL

NCE DCC TWIN. In addition to the NCE DCC TWIN, you will need:

FOR New Electric Kit and Remote Control Installation

ECO3-601/602 EcoStar III * Chevy Express/GMC Savana Contact Intermotive for additional vehicle applications

SERIES 700/700E FACTORY KEYLESS UPGRADE INSTALLATION MANUAL

MUSTANG PROJECT. INSTALLING THE Mustang Project LED SEQUENTIAL TAILLIGHT KIT P/N MP-2004-LED AND MP-2004-LED-QK. Price:$9.

Vehicle Reaction Timer Instructions

Chapter 12. Formula EV3: a racing robot

Coleman Air C440-HVM 440 Amp Diversion Controller Version 3.2

OVERVIEW. Table of Contents. Bikes with a H4 or H7 (with P43t expander) headlamps

Automotive Application ET01 Software Revision A 12/06

6R / 5-BUTTON SERIES VEHICLE SECURITY SYSTEM

8.1 Main Light Switch

Generator Set Applications FT-10 Network Control Communications Module (CCM-G) Kit

DLKEK3HN INSTALLATION INSTRUCTIONS

ELECTRIC FENCE ENERGIZER SERVICE MANUAL MODEL 950 SERVICE MANUAL FOR OLLI 950 FENCE ENERGIZERS

RS4000 Setup. Before you install the RS4000 system, check to ensure that nothing was damaged or lost during shipping.

PROFESSIONAL 270 o PIR MOTION DETECTOR

INSTALLATION MANUAL. Model: PLUS For Technical Assistance, please call (800) , or visit

Smart Wi-Fi Sprinkler Timer and Flow Meters

DOOR SAFETY KIT INSTALLATION MANUAL

TrailerTail does not open at all (one or both sides) TrailerTail does not latch closed... 5

Quick user guide for the DM dispenser

PHOENIX Amp Brushless Sensorless Speed Control. 1.0 Features of the Phoenix-25 : 2.3 Connecting the Motor. 2.4 Reversing Rotation

QUASAR ELECTRONICS KIT No WINDSCREEN WIPER CONTROLLER

Vehicle Security System

Model PRO-9675FT4 Owner's Manual

LAB 7. SERIES AND PARALLEL RESISTORS

Please check our application list to see if we have a specific Harness Kit available for your motorcycle.

Cabin Light. Hi All, 1

LG Air Conditioning Universal & Multi Split Fault Codes Sheet. Universal and Multi Split Units

Lionel Hot Box Car Mini Commander Installation Guide

KENSUN HID AUTOMOTIVE HEAD LAMP CONVERSION KIT INSTALLATION MANUAL

INSTALLATION INSTRUCTIONS DODGE DAKOTA 2 KIT # 682 (2WD), 692 (4WD) 3 KIT # 683 (2WD), 693 (4WD)

Low Profile 8 150watt Amplified Subwoofer Installation Instructions

STEAM MYLOCOSOUND MAY 4 TH 2017

ALTERNATOR - BOSCH 35/75-AMP & 40/90-AMP

HO MODULE HANDBOOK Fourth Edition - November 2009

Ball Speed Display Manual

SM361 RIG SWITCH CONSTRUCTION MANUAL

PHOENIX Features of the Phoenix-25 : 2.3 Connecting the Motor. 2.4 Reversing Rotation. 2.5 Connecting the Receiver

Hyundai EXCEL Remote Immobiliser System Installation Manual Revision 1 10/12/99 Part No

I. Before starting installation

I N S T A L L A T I O N I N S T R U C T I O N S TIMING COMMANDER Interface Gauge Ver 7

TIP SHEET T0937. Installation Tips For RS00/PS00 + ADS-TBSL-PL + SPDT

DLRM DLRM

Rigid Base / Turntable Bed. Exploded side view of bottom rotating wood drive wheel, showing optics aligned to stop bracket.

12V 160W Folding Portable Solar Panel Kit KDSLR160PNLA User Manual

PHOENIX Features of the Phoenix-10 : 2.3 Connecting the Motor. 2.4 Reversing Rotation. 2.5 Connecting the Receiver

POWER LOCK SYSTEMS 8P - 1 POWER LOCK SYSTEMS TABLE OF CONTENTS

Installation Instructions

VS 315 DELUXE 4-CHANNEL MOTORCYCLE ALARM. Installation And Operation Manual MEGATRONIX CALIFORNIA, U.S.A. VS 315 1

Vehicle Security System

S1 Sequential. T56 Magnum. Sequential shifter. Contents and assembly instructions

Traffic Lights - fully assembled - just connect to DC or DCC. Level Crossings - assembled - N & OO versions - DC / DCC

Transcription:

Cross Hare Installation Guide Introduction: The Cross Hare is designed to provide all of the functions you need to control a one or two track grade crossing in a prototypical manner. The Cross Hare uses up to 8 optical sensors for train detection and to control the sequencing of the crossing. While the Cross Hare is designed to work with a dual track crossing, you can also use it with a single track crossing by only using 4 of the sensors. The Cross Hare will automatically detect whether it needs to watch one or two tracks. Should you not want to use the optical sensors, the Cross Hare will also operate using a simple on/off input such as from a block detector output (e.g. DCC Specialties Block Watcher). This Cross Hare Kit (for Lighted Crossbucks Only) includes: 1 Cross Hare Control Board 1 Cross Hare Interface Board 1 Connection Wire Harness [Connect Cross Hare to Interface Board] 1 Tomar H-862B Crossing Signal Kit [lights only] 1 TDS 28mm Bass Speaker 4 Optic Cross Hare sensors. More can be purchased separately for double track configurations. Mounting the Crossing Signals Drill a 1/8 hole and glue the signal in place on the layout. The prototype is located with the gate 90 degrees to the highway and placed 12-17 scale feet from the center line of tracks and 24 minimum clearance from the highway curb. 1

Working with the Cross Hare The normal usage of the Cross Hare is to simply run a train through the crossing and watch the Cross Hare do its job. The initiation sequence takes approximately 8.5 seconds to complete, and it starts when an outer sensor is crossed. Hence, with the outer sensor 60 out, you do not want to approach the crossing at anything more than 35 SMPH (scale miles per hour), otherwise your train will enter the roadway before the gates are fully down. You won t hurt anything, but it does not look realistic. Conversely, the Cross Hare allows you 50 seconds to make the nearest gate. This time limit is to allow you to simulate prototype performance in which an active crossing will go inactive if the train stops short of the crossing. Hence, you have to go 60 in no more than 50 seconds, for a minimum speed through the crossing of 6 SMPH. If you stay within these speed limits and run through the crossing, the Cross Hare will give you an excellent simulation of the prototype. If you go too slow or stop short of the roadway, the Cross Hare will raise the gates after about 50 seconds. After the gates go up, the crossing will remain inactive until one of the inner sensors (Sensor 2, Sensor 3, Sensor 6, or Sensor 7) is covered. If one of these sensors covers, then the crossing will go active again. When this happens, the sensor delays are set to their maximum values to allow you to run switching operations through the crossing at slow speeds. One thing to remember: there is always a background timer that expires 2 minutes after there is no sensor cover/uncover activity. This is to allow a train to enter the crossing section, stop, and then reverse and leave without moving across the roadway. After 2 minutes, the crossing automatically resets and is waiting for the next train. Figure 1. Double Track Grade Crossing 1) There are many ways to install the crossing gates depending on the road configuration that is passing over the tracks. a) Figure 1 shows how to orient the optical sensors relative to the crossing gate poles. b) Regardless of how you place the gates relative to each other, Sensor 2 (6) wants to be 3 to the left of the far pole position c) Sensor 3 (7) wants to be 3 to the right of the near pole position as shown in Figure 1. d) Sensor 1 (5) should be placed 60 to the left of Sensor 2 (6) e) Sensor 4 (8) should be placed 60 to the right of Sensor 3 (7). 2) You can use either Sensor group for either track 3) Either group can be used for a single track crossing. 2

4) You can invert the sensor sequence (e.g. 4, 3, 2, 1 from left to right) as long as they remain in either ascending or descending order. 5) The distances given are not critical, but you should attempt to match them within a tie or two because the Cross Hare uses the known position of the sensors to sequence the crossing correctly. The same is true of the rail distance between the two gate poles. Try to keep it at around 6.5 inches, but an inch or two either way should be OK. 6) The sensors are mounted between the ties of the track. If your room is reasonably bright, or if you provide auxiliary light at each sensor (such as a street light, platform light, etc.) it is possible to cover the sensors with a thin layer of ballast to hide them. Generally, you probably won t notice them even if they are exposed to room light, which will give the best performance. a) Use a #60 drill to create two holes through the roadbed that are about 0.10 (3/32 ) inches apart and roughly centered between the rails. b) Insert the sensor leads in the holes and gently press the sensor between the ties. c) You can then either solder a wire to each sensor lead or use a socket strip (Digikey part 952-1938- ND) to plug onto the sensor leads. Either way, you want to use a twisted pair of wires (single track) or three wires twisted together (two tracks) for each sensor position. d) The easiest way to get twisted wires is to use a drill. e) Select your three wires slightly longer than you need f) Chuck them in a drill and have a friend or bench vise hold the other end. g) Run the drill until you get about 6 twists per foot. h) Select a color for the common wire, another for Sensor 1 and the remaining color for Sensor 5 Figure 2. S1, S5 Sensor Wiring Diagram i) Connect a lead from Sensor 5 to a lead from Sensor 1. It doesn t make any difference which lead you select; the sensors are not polarity sensitive. j) Connect the common color wire to the junction of the Sensor 1 and Sensor 5 leads. k) Connect the Sensor 1 color wire to the remaining Sensor 1 lead and the Sensor 5 color wire to the remaining Sensor 5 wire. 3

Figure 3. Cross Hare Diagram 7) Run the sensor cables to the Cross Hare and connect the common wire to J2-1. a) If you are running wiring for a single track, connect either wire to J2-1. b) Connect the Sensor 1 colored wire to J1-5 on the Cross Hare 4

c) Connect the Sensor 5 color wire to J1-6. 8) Repeat this for the remaining three groups (or individual) sensors. a) The 2/6 common wire connects to J2-3. Figure 4. b) The 3/7 common wire connects to J2-4. c) The 4/8 common wire connects to J2-6. d) Sensor 2 connects to J1-7 e) Sensor 6 connects to J1-8 f) Sensor 3 connects to J1-9 g) Sensor 7 connects to J1-10 h) Sensor 4 connects to J1-11 i) Sensor 8 connects to J1-12. 9) The sensor group 1, 2, 3, and 4 connects to J1-5, J1-7, J1-9 and J1-11 in order. Figure 5. 5

10) The sensor group 5, 6, 7, and 8 connects to J1-6, J1-8, J1-10, and J1-12 in order. If you are wiring a single track crossing, you can use either group on the J1 connector. 11) The J6 Audio Output is connected to the Interface Board via the Wire Connection Harness. See Diagram below. Figure 6. 12) The Cross Hare has a provision to help you check your sensor wiring. a) Install the small jumper connector on the SWD pair of pins on the J6 connector. b) Apply power to the Cross Hare by connecting DCC1 and DCC 2 (pins 1 and 2 of J1) to either a DCC or approximately 12VDC power source. c) D3 should come on indicating power is present, but D1 should be off. d) Use a railcar (or your hand, or any other light blocking device) to cover Sensor 1. D1 should turn on. e) Now remove the covering device and D1 should go out. f) Repeat the cover/uncover sequence a couple of times and make sure that D1 flashes on and off in synch with your covering/uncovering the sensor. g) Repeat the test for each of the sensors that you installed. h) If a sensor does not work, check its wiring. If you have an ohmmeter, you can also check your sensor wiring. In normal room light, the sensors will read between 400 and 1000 ohms. When you cover them, it should increase by a factor of 10 or more, depending on how well you cover them. 13) Option Selection: The Cross Hare has three option enable connections. Connecting an option input to any one of these connections will enable the option. The option enable connections are J2-2, J2-5, and J2-11. a) By default, the crossing flashers will simulate incandescent lamps. They will quickly fade on and then slowly fade off. If you want the flashers to simulate more modern LED lamps, then connect an option enable to J2-12. i) For example, connect J2-2 to J2-12. With this connection, the flashers will turn hard on and then hard off. 6

b) Use of the warning bell varies in different parts of the country. In the northeast, many crossings sound the warning bell continuously as long as the crossing is active. This is the default warning bell operation of the Cross Hare. In other parts of the country, the warning bell will sound until the gates are fully down, and then it will stop. The bell will remain silent until the gates start up again. The warning bell will then sound until the gates are fully up. If you prefer this type of operation, then connect an option enable from J2-5 to J2-10. 14) In some track configurations, there may be a need to trigger the crossing from some other track such as a siding or yard in addition to the main route through the crossing. In this case, you can add a sensor in series with Sensor 1, Sensor 4, Sensor 5, and/or Sensor 8 as required to accommodate these extra tracks. If you do add extra sensors, connect an option enable from J2-11 to J2-9. This tells the Cross Hare that it needs to look for two sensors at these locations. In an extreme case, you can double up all eight sensors to cover a four track main. If you do this, the Cross Hare may not be quite as tolerant of lighting variations, but it will work fine with normal room lighting. 15) If you do not want to install all of the optical sensors, you can still operate the Cross Hare from a single discrete. The discrete trigger + terminal is J2-8, and the discrete terminal is J2-7. If you do not have sensors installed, connecting these two points together through a switch (block detector, JMRI controlled switch, etc.) will activate the crossing. Opening the switch will cause the crossing to deactivate. 16) If you have at least four optical sensors installed, then the J2-7 to J2-8 connection will reset the crossing if the connection is closed (it should normally remain open in this case). The reset will place the Cross Hare into its initial condition of waiting for one of the outer sensors to cover indicating that a train is coming. The reset can be controlled manually, by a block detector, or any other method that creates a connection. Figure 7. 7

Figure 8. Cross Hare Interface Board (CHIB) Cross Hare Interface Board 17) The Cross Hare Interface Board [CHIB] is designed so the user can connect the Cross Hare s light and audio outputs in a convenient and organized manner. The CHIB s J1 terminal is used for the outputs from the Cross Hare. 18) Cross Hare Terminal J4 connections: a) Cross Hare J4.6 to CHIB J1.12 b) Cross Hare J4.5 to CHIB J1.11 c) Cross Hare J4.4 to CHIB J1.10 19) Cross Hare Terminal J8 connections: a) Cross Hare J8.4 to CHIB J1.3 20) Cross Hare Terminal J6 connections: a) Cross Hare J6.7 to CHIB J1.2 b) Cross Hare J6.11 & J6.12 to CHIB J1.2 21) The CHIB s J2 terminal is used for the lighting outputs. The Cross Hare s lighting output is designed to drive 3v. No resistors are necessary when using the Tomar Highway Grade Crossing kits. 22) Pins J2.1, J2.2, J2.3, J2.4 are Left Lamp Negative [ ] 23) Pin J2.5 is Left Light Common [+] 24) Pins J2.7, J2.8, J2.9, J2.10 are Right Lamp Negative [-] 25) Pin J2.6 is Right Light Common [+] 26) The CHIB s J1.5 [+] and J1.6 [-] pins are the speaker outputs. 8