Istanbul METROBUS BRT. Adapted from Presentations by World Resources Institute/EMBARQ s Sibel Koyluoglu and Dario Hidalgo

Similar documents
Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

What IS BRT, Really? Not BRT and RNY

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

LRT Almaty, PPP. 23 January 2018, Brussels

Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through Experience

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

Kendall Drive Premium Transit PD&E Study

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

HOW TO DELIVER PUBLIC TRANSPORT ON REDUCED BUDGET

5. OPPORTUNITIES AND NEXT STEPS

UCLA Lake Arrowhead Conference. October 18, 2010

Best Practices in Planning and Implementing BRT in China

Key Transfer Stations - Technical Memo

FACTSHEET on Bus Rapid Transit System

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010

Bus System Reform and Social Cohesion

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa

THE WAY WE MOVE LRT FOR EVERYONE

Stakeholders Advisory Working Groups (SAWGs) Traffic and Transit SAWG Meeting #7

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

FREQUENTLY ASKED QUESTIONS

JTA S MOBILITY CORRIDORS. Improving System Performance Through Urban Design

Metropolitan Council Transit Capital Improvement Plan. September 23, 2009

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS

Metropolitan Council Budget Overview SFY

Public Transportation Problems and Solutions in the Historical Center of Quito

METRO Orange Line BRT American Boulevard Station Options

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

BRT: What is it & Where Does it Fit? Sam Zimmerman

Safer Swifter Better Leadrail Infra Solutions Pvt. Ltd. / INDIA

BRT: NOT JUST LOW COST

Urban Mobility by BRT

Alternatives Analysis Findings Report

An Overview of Rapid Transit Typical Characteristics. Date April 30, 2009

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

Regional Integration of Public Transit - From the Perspective of a Transit Company. April 2019 Thomas Werner MVG Munich

Appendix G: Rapid Transit Technology Backgrounder July 2017

Sepulveda Pass Corridor Systems Planning Study

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

2.1 TRANSIT VISION 2040 FROM VISION TO ACTION. Expand regional rapid transit networks STRATEGIC DIRECTION

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

IKORODU- CMS BRT EXTENSION PROJECT

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Bus Rapid Transit in Asia: From Quantity to Quality. What is a Bus Rapid Transit system?

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

Seoul. (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%)

Bi-County Transitway/ Bethesda Station Access Demand Analysis

CONNECTING THE REGION

Urban Transport systems in major cities in China. Sun Kechao Senior Engineer China Academy of Transportation Sciences, Beijing, China

North Shore Alternatives Analysis. May 2012

ELEVATED STRUCTURE. Solving the Traffic Problem in Jakarta. City. The 5 th REAAA Business Forum Manila, 21 st July 2017

Transit Access to the National Harbor

SERVICE DESIGN GUIDELINES

CEDAR AVENUE TRANSITWAY Implementation Plan Update

"Diversity In Europe. a common voice for a sustainable development" Pro-ecological Transport Solutions

TRAVEL DEMAND FORECASTS

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

State Avenue Corridor Bus Rapid Transit (BRT)

Transit Access Study

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

Regional Express Rail: Kipling Station Project Update. Ryah Kazman, Community Relations Specialist Metrolinx

2016 Congestion Report

Transit on the SC Rail Corridor

Metropolitan Freeway System 2013 Congestion Report

Operating & Maintenance Cost Results Report

West Broadway Transit Study. Community Advisory Committee September 17, 2015

Chapter 4 : THEME 2. Transportation

Mass Rapid Transit Options

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

MetroExpress Improvements

The City of Toronto s Transportation Strategy July 2007

O-Train Confederation Line Stage 1

The project faces a number of challenges:

Population density. Population (MM) Extension km²

Build a Green, Harmonious and Integrated Public Transport System

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

SUMMARY OF COMMENTS AT PUBLIC OPEN HOUSES SCOPING OF ALTERNATIVES GATEWAY CORRIDOR ALTERNATIVES ANALYSIS

Roma McKenzie-Campbell Amtrak, Project Manager. Caroline Ducas VHB, Senior Transit Planner. Boston, Massachusetts

The Engineering Department recommends Council receive this report for information.

Redefining Mobility Ready or not: Autonomous and connected vehicle planning and policy, now and in the future

Smart Green Transportation of LG CNS. Seoul Case

Urban Mobility and Energy Trends in Istanbul

Strategic Plan

2.4 TRANSIT VISION 2040 FROM VISION TO ACTION. Support the revitalization of urban cores STRATEGIC DIRECTION

ARTERIAL BRT OVERVIEW

FACTSHEET on Metro Systems

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

Mr. Vince Mauceri General Manager Transportation Operations and Technology

Midtown Corridor Alternatives Analysis Initial Screening Analysis

METRO Light Rail Update

Brian Pessaro, AICP National Bus Rapid Transit Institute

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs

Transcription:

Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ s Sibel Koyluoglu and Dario Hidalgo

Historic Istanbul

Modern Istanbul

Istanbul Among World s most historic and rapidly growing cities 12.6 million population Financial, cultural and commercial capital of Turkey, nation >70 million Significant water constaints Congestion cited by citizens as #1 issue Peak hour hwy. speeds 8-10 km/hour 23% of Istanbul commuters spend > 3 hours in traffic. 22% of Istanbul commuters spend 2-3 hours

The First BRT Corridor Istanbul has developed along two narrow east-west penninsulas, Europe, Asia The D-100 national highway forms the main European axis for Istanbul

Four Phases

Before METROBUS: Long, Slow Bus and Minibus Routes Stuck in Traffic

Summary Statistics 4 Phases About 50 Km transitways, terminal to terminal 42 stations Station spacing, 360-3300 meters, average 1.2 Km 350 vehicles Open by March 2009) 40.5 kilometers 31 stops Terminals total implementation cost, $366 million

Running Ways Freeway Median Fully Grade-Separated and Dedicated No Passing Lanes

SERVICE, OPERATIONS Average revenue speeds, 30-40 Km/Hr. Maximum frequency, >120/Hr. Single, all-stops local route alignment but with turnbacks

Operations

STATIONS

Stations Most platforms sized for two buses (three at some) Center platforms, requiring counterflow operation for regular buses

Stations 8 stations are currently accessible to physically challenged passengers Modernizaton of other stations continues

VEHICLES

PHILEAS (Advanced Public Transport System, Holland) Length 26.035 mm Width 2.540 mm Maximum Height 2.949 mm İnside Height 2.250 mm Entrance Height 340 mm Seated 52 Standing 178 Total 230

PHILEAS: Hybrid 20% to 30% fuel savings. Decreased emissions. More acceleration.

MERCEDES CAPACITY Length Inside Height Door Width 19.5 m 2.3 m 1.2 m 43 seated 150 standing 193 Total Capacity Manual ramp at the 2 door Low floor: 320mm vehicle height Kneeling 4 double doors Euro V

Performance to Date

Phase One Opening date: 17.09.2007 Length: 18.3 km Number of stations: 14 1246 Minibuses removed from corridor Revenue Operating Speed: ~40Km/Hr. Ridership: ~300.000 trips/day 21

Mini-Buses Removed from Traffic

Phase Two Opening date: 08.09.2008 Length: 29 km Number of stations: 25 Revenue Operating Speed: ~ 30Km/Hr. 1 hour/direction time savings Ridership: ~550,000 trrips/day 23

Comparison to Mass Rail Transit: Metro, LRT, Suburban Rail >100Km of Mass Rail Transit operating Ridership about 900,000 trips/day METROBUS: ~47 Km operating Ridership about 850,000 trips/day Maximum load point, peak hour, peak direction volume >19,000 passengers/hr.

Passenger satisfaction 93% satisfaction 700 600 500 400 300 200 Series1 100 0 Glad 67% Absulutely Glad 26% Absulutely unsatisfied 2% Unsatisfied 2% No comment 3%

Evaluation Pedestrian Access Handicapped Accessibility Bus Stop Design and Capacity Bus Stop Comfort Bus Stop Location Bus Stop Information X X X X X X Operations (Efficiency needs further study) Trip generators Transfer Characteristics: Physical transfer Electronic ticketing Passenger Characteristics X X X X X

Public Opinion Metrobüs is not built to end congestion. It is built to solve the problem of access. Even if traffic is bad, if people have access to a system that provides speedy access and that means the problem of access has been addressed. Metrobus has solved my problem of access and if the system is expanded, Istanbul s access problem will be solved soon. I definitely don t think metrobus solves the problem. They are narrowing lanes to build metrobus. Most of us still use our cars to go to work and we can no longer drive comfortably.

3 rd corridor crosses bridge to Asia, ending at Söğütlüçeşme, intercity train station with significant parking

Phase Three 11,2 km line Opened March 4, 2009

BEYLİKDÜZÜ - SÖĞÜTLÜÇEŞME Upon completion of phase 4, the 50 km line will have 42 stations and 350 vehicles that will serve an estimated 865.000 passengers/day.

PLANNED CORRIDORS

Planned Corridors 9 corridors are planned. 3 corridors are high priority : EDİRNEKAPI-VEZNECİLER BOSTANCI-SÖĞÜTLÜÇEŞME AKSARAY-MİLLİYET SİTESİ

Expressway Median Pedestrian Access: Trade-off Pro: No appropriation Little opposition to use of land Con: Very difficult to access stations Lesson learned: Use of overpasses and subways (at points with alignment on embankment) works well! Still need to address issue of access for disabled