V-NLH-005 Voisey's Bay Terminal Station - VBN T1 Page 1 of 1

Similar documents
Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Calendar Binder Printable Pack. 38 FREE Printable

Recharge Kick-off Meeting Recharge Activity Review Process for

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution

Appendix E. Military Facilities Survey Telephone and Logs

Dawson Tool-Less Guide-Rod Problem s Updated

Request for Proposal for Trolley Security Services

A 500kV AIS Switchyard Rejuvenation in British Columbia using Hybrids

Insulator Replacements

Quick Reference Guide» Empty Car Request Widget

Alberta. Collision Facts. 330 people killed. 17,907 people injured. 140,705 collisions.

A REPORT TO THE SoMo OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. System Planning. Overhaul Diesel Engines.

Turnpike Mitigation Program Application

1

Village of Mount Prospect Electric Aggregation Program

PAG Environmental Planning Advisory Committee Sun Link Streetcar Update May 1, 2015

Frequently Asked Questions (FAQ s)

Lexus has completed the remedy preparations and will begin mailing the remedy owner letter for Safety Recall ELF.

(a) Is the cost of the TL from Labrador included in the $214 /MWH?

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

Too Good to Throw Away Implementation Strategy

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. System Planning

City of Palo Alto (ID # 6416) City Council Staff Report

Maritime Link. MITC Canada Day March 2015

Don t Panic - The ABB Galaxy. Bazmi Husain, Chief Technology Officer, ABB Group

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

MYANMAR RURAL ELECTRIFICATION FUND PTE., LTD. MREF POWER CO., LTD.

Thank you for the detailed information regarding the Refurbishment Project at Marchwood MTS. This project will facilitate equipment maintainability.

FLEX-6000 Rack Mounting Bracket Installation Guide

We trust the foregoing is satisfactory. If you have any questions or comments, please contact the undersigned.

RENSSELAER CITY SCHOOL DISTRICT BOARD OF EDUCATION DRAFT. 25 Van Rensselaer Drive Rensselaer, New York January 16, 2019

OTS Technical Advisory Committee Meeting

Overview of FMCSA s Proposed Hours of Service Rules For Truck Drivers. Rob Abbott Vice President of Safety Policy American Trucking Associations

DRAFT VILLAGE OF ENOSBURG FALLS Meeting of the Board of Trustees August 14, 2018

Snowmen - 1 through 300 Page 1 of 38

How it works How your HAN device helps you monitor electricity use

Oregon Withholding Tax Tables

A REPORT TO. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution. Telecontrol. System Planning

The meeting was called to order at 7:12 pm by Patrick Kinney, Acting Chairman.

Ports of Delaware and Virginia (DE-VA)* Dray Truck Replacement Program Application

Market Drivers for Battery Storage

Thank you Chairman Brown.

Request for Assistance (RFA)

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. System Planning

Quarterly Hogs and Pigs

CN is offering our Fleet Integration Program for grain shippers who are using privately owned, covered hopper cars for

Kettle River Transmission Project

Results from the Auto Laundry News SELF-SERVICE SURVEY.

Japanese Compulsory Insurance (JCI)

THE CALIFORNIA STATE UNIVERSITY Commercial Paper Equipment Financing (CPEF) Fiscal Year Financing Schedules *

WIM #29 was operational for the entire month of October Volume was computed using all monthly data.

City of Grand Island Tuesday, October 23, 2012 Council Session

DATE: MAY 3, 2007 ENVIRONMENTAL MANAGEMENT DIVISION

PRINTING OF BMI WHEELS

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

NUTS & BOLTS Volume 2, Issue 10 October 2016

Sale of land at Old Quarry site, Westmount Gardens to Jersey Electricity plc for creation of electricity substation

Documents: CITY COUNCIL COMMUNICATION GOLF CARTS - COPY.DOCX, GOLF CART PERMIT PROPOSAL.DOCX, IOWA GOLF CART CODE.DOCX

Minutes NASHVILLE METROPOLITAN TRANSIT AUTHORITY SPECIAL CALLED EMERGENCY BOARD OF DIRECTORS MEETING. May 6, 2010

Kotzebue Electric Association Flow Battery Storage Systems Quarterly Report 7/2012 Prepared by Jesse Logan (KEA)

Providing Options: Program Design Focusing on Customer Choice

Alberta Speeding Convictions and Collisions Involving Unsafe Speed

STOR Market Information Report TR27

WELLMAN LAKE CABIN UPDATE Mar 2019

The Corporation of Delta COUNCIL REPORT Regular Meeting. Noise Variance for Construction Works at the Vancouver Landfill

The LREC/ZREC PROGRAM. An Opportunity to Develop Behind The Meter Renewable Generation in Connecticut

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

All Toyota Dealer Principals, Service Managers, and Parts Managers

ABB POWER SYSTEMS CONSULTING

If you have any questions, please do not hesitate to contact the Board's Legal Counsel, Ms. Jacqui Glynn, via or (709)

Willingdon Substation Decommission

Corridor Management Committee. March 7, 2012

LOADING AND UNLOADING SURVEY NATIONAL SCHOOL BUS. Kansas leads the world in the success of each student.

Attention : Ms. G. Cheryl Blundon, Director of Corporate Services & Board Secretary

Algebra 2 Plus, Unit 10: Making Conclusions from Data Objectives: S- CP.A.1,2,3,4,5,B.6,7,8,9; S- MD.B.6,7

ClearRoute Training Courses

Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number # Final Report October 1, 2016

AMENDMENT NUMBER 1 (October 17, 2017) DEADLINE FOR RECEIPT OF PROPOSALS IS AS FOLLOWS: Submittal Due Date & Time: Tuesday, October 24, 2017 at 2:00 PM

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution

SPP Notification to Construct

Facility Management Webinar

Director Corporate Services & Board Secretary. Newfoundland and Labrador Hydro 2015 Capital Budget Application

NEWFOUNDLAND AND LABRADOR HYDRO. Glossary of Terms

SERVICE BULLETIN NUMBER: R DATE: 10/26/15 REVISED: 11/19/15. APPLICABILITY: MY Legacy and Outback Models SUBJECT:

Please Refer to Attached Sample Form

Generator Levy & Commercial Hauler Licensing

Telecommunications Services for FHI360. Request for Quote/Proposal #

Bohn to Kettle River Transmission Project

COUNT, CLASSIFICATION & SPEED SAMPLE REPORTS

Transportation Update. Binford Sloan, Director of Transportation, October 9, 2018 Presented to School Board

A new brake reservoir assembly has been designed to prevent this condition from occurring.

Reliability Analysis Update

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

Incentive Offerings. Customer-Owned: $0.60/W to $4,800

Pedestrians Road Safety

Pedestrians Road Safety

Village of West Dundee Electric Aggregation Program

SPP Notification to Construct

Plug- in Electric Vehicles History, Technology and Rates. Ben Echols

Quarterly Hogs and Pigs

Transcription:

V-NLH-005 Voisey's Bay Terminal Station - VBN T1 Page 1 of 1 1 2 Q. Please provide any documentation relating to negotiations between ABB and Hydro regarding the responsibility for the repair costs. 3 4 5 6 A. See V-NLH-005 Attachment 1 for documentation relating to negotiations between Hydro and ABB regarding the responsibility for the repair costs.

Page 1 of 4 Hello, Page 1 of 4, Vosey's Bay Terminal Station - VBN T1 RE: Voisey Bay Nickel T1 (125 MVA ABB Transformer, Mfg in St. Louis) Jerzy Kazmierczak to: HIreland@nlh.nl.ca 10/29/2015 01:56 PM Cc: Andre Steinberg, "BradEddy@nlh.nl.ca", "DaveHicks@nlh.nl.ca", "PNolan@nlh.nl.ca", "Vince C. McCrum", "MichaelChurchill@nlh.nl.ca", "JenniferWilliams@nalcorenergy.com", "Ed G. tenyenhuis", "Phillip K. James" Hide Details From: Jerzy Kazmierczak <jerzy.kazmierczak@us.abb.com> Sort List... To: "HIreland@nlh.nl.ca" <HIreland@nlh.nl.ca> Cc: Andre Steinberg <andre.steinberg@ca.abb.com>, "BradEddy@nlh.nl.ca" <BradEddy@nlh.nl.ca>, "DaveHicks@nlh.nl.ca" <DaveHicks@nlh.nl.ca>, "PNolan@nlh.nl.ca" <PNolan@nlh.nl.ca>, "Vince C. McCrum" <vince.c.mccrum@ca.abb.com>, "MichaelChurchill@nlh.nl.ca" <MichaelChurchill@nlh.nl.ca>, "JenniferWilliams@nalcorenergy.com" <JenniferWilliams@nalcorenergy.com>, "Ed G. tenyenhuis" <ed.g.tenyenhuis@ca.abb.com>, "Phillip K. James" <phillip.k.james@us.abb.com> History: This message has been replied to. The warranty on this transformer has already expired. At this point we can commit to have factory representative participating in the internal inspection. After the inspection is done we will review the results and evaluate any potential warranty coverage. Best Regards Jerzy From: Ed G. tenyenhuis Sent: Thursday, October 29, 2015 10:23 AM To: HIreland@nlh.nl.ca Cc: Andre Steinberg <andre.steinberg@ca.abb.com>; BradEddy@nlh.nl.ca; DaveHicks@nlh.nl.ca; Jerzy Kazmierczak <jerzy.kazmierczak@us.abb.com>; PNolan@nlh.nl.ca; Vince C. McCrum <vince.c.mccrum@ca.abb.com>; MichaelChurchill@nlh.nl.ca; JenniferWilliams@nalcorenergy.com I just talked to the St Louis factory and you will get the response today. Thanks Ed t. From: HIreland@nlh.nl.ca [mailto:hireland@nlh.nl.ca] Sent: Thursday, October 29, 2015 10:29 AM To: Ed G. tenyenhuis <ed.g.tenyenhuis@ca.abb.com> Cc: Andre Steinberg <andre.steinberg@ca.abb.com>; BradEddy@nlh.nl.ca; DaveHicks@nlh.nl.ca; Jerzy Kazmierczak <jerzy.kazmierczak@us.abb.com>; PNolan@nlh.nl.ca; Vince C. McCrum <vince.c.mccrum@ca.abb.com>; MichaelChurchill@nlh.nl.ca; JenniferWilliams@nalcorenergy.com Subject: Re: Voisey Bay Nickel T1 (125 MVA ABB Transformer, Mfg in St. Louis)

Page 2 of 4 Page 2 of 4, Vosey's Bay Terminal Station - VBN T1 Ed, Can you provide an update on this request. Regards, Sent from my BlackBerry 10 smartphone on the Bell network. From: Ireland Sent: Monday, October 26, 2015 5:06 PM To: Ed G. tenyenhuis Cc: Andre Steinberg; BradEddy@nlh.nl.ca; DaveHicks@nlh.nl.ca; Jerzy Kazmierczak; PNolan@nlh.nl.ca; Vince C. McCrum; Michael Churchill; Jennifer Williams Ed, Further to your email below, can you provide ABB's official position regarding what portion of the cost ABB will cover if it is revealed during or following the internal inspection, the gassing is a result of a design or factory defect. If at all possible we would like your position on this by the end of day Thursday Oct 29, 2015. Regards Ireland Manager Long Term Asset Planning Transmission & Rural Ops TRO LT Asset Planning G & T Newfoundland and Labrador Hydro a Nalcor Energy company t. 709 258 2367 c. 709 486 0350 f. 709 258 2346 e. HIreland@nlh.nl.ca w. www.nlh.nl.ca You owe it to yourself, and your family, to make it home safely every day. What have you done today so that nobody gets hurt? "Ed G. tenyenhuis" ---09/30/2015 12:27:44 AM--- The ABB factory has responded with the following position: From: "Ed G. tenyenhuis" <ed.g.tenyenhuis@ca.abb.com> To: "HIreland@nlh.nl.ca" <HIreland@nlh.nl.ca> Cc: "Vince C. McCrum" <vince.c.mccrum@ca.abb.com>, "BradEddy@nlh.nl.ca" <BradEddy@nlh.nl.ca>, "PNolan@nlh.nl.ca" <PNolan@nlh.nl.ca>, "DaveHicks@nlh.nl.ca" <DaveHicks@nlh.nl.ca>, Andre Steinberg <andre.steinberg@ca.abb.com>, Jerzy Kazmierczak <jerzy.kazmierczak@us.abb.com>

Page 3 of 4 Date: 09/30/2015 12:27 AM Page 3 of 4, Vosey's Bay Terminal Station - VBN T1 The ABB factory has responded with the following position: The transformer was delivered in the middle of 2011 and the factory warranty on this unit was 18 months from delivery. The gassing was observed for the first time in February 2015. In this particular case we can offer a factory representative to be present during the internal inspection (performing the internal inspection) and we can also provide the recommendation for the next step based on the result of the inspection. Regards Ed tenyenhuis Technical / Operations Manager ABB Transformer Service (TRES) Canada Phone +1 905 460 3210 Mobile +1 416 270 9026 ed.g.tenyenhuis@ca.abb.com www.abb.com/transformerservice, Original Message From: HIreland@nlh.nl.ca [mailto:hireland@nlh.nl.ca] Sent: Sunday, September 27, 2015 11:21 AM To: Ed G. tenyenhuis <ed.g.tenyenhuis@ca.abb.com> Cc: Vince C. McCrum <vince.c.mccrum@ca.abb.com>; BradEddy@nlh.nl.ca; PNolan@nlh.nl.ca; DaveHicks@nlh.nl.ca Subject: Voisey Bay Nickel T1 (125 MVA ABB Transformer, Mfg in St. Louis) Hi Ed, I am not sure if you are aware but back in February of this past year we had noticed gassing in T1 at Voisey Bay Nickel Terminal Station. ABB was consulted and later was contracted to complete follow up testing and from this testing there was a recommendation for an internal inspection at a cost of ~$190 k. This unit is an ABB, Serial Number LL09796 01, 230/13.8 kv, 75/100/125 MVA transformer manufactured in 2011 (Mfg in St. Louis), but has seen very light loading, as the processing facility has not come up on load yet. We have to prepare a budget proposal to our Public Utility Board (PUB) requesting funds to complete the internal inspection and probable repairs. This submission is planned to be completed by the middle of this week and we would like ABB's position on Warranty associated with this unit. We would like to have this question answered, as we are sure this will come back to us from the PUB and we would like to know ABB's position prior to

Page 4 of 4 Wednesday of this week. Page 4 of 4, Vosey's Bay Terminal Station - VBN T1 Regards, (Embedded image moved to Ireland file: pic27593.jpg) Manager Long Term Asset Planning Transmission & Rural Ops TRO LT Asset Planning G & T Newfoundland and Labrador Hydro a Nalcor Energy company t. 709 258 2367 c. 709 486 0350 f. 709 258 2346 e. HIreland@nlh.nl.ca w. www.nlh.nl.ca You owe it to yourself, and your family, to make it home safely every day. What have you done today so that nobody gets hurt?