2019 & 23 Final LCR Study Results Sierra and Stockton Areas. Ebrahim Rahimi Lead Regional Transmission Engineer Stakeholder Call May 1, 2018

2018 & 22 Final LCR Study Results Sierra and Stockton Areas. Ebrahim Rahimi Lead Regional Transmission Engineer Stakeholder Call April 13, 2017

APPENDIX E: Project Need and Description

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Pacific Gas and Electric Company s Revised 2015 Annual Progress

APPENDIX F: 2012 Request Window Submittals

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Pacific Gas and Electric Company s 2013 Annual Progress Report

APPENDIX E: Project Need and Description

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

PACI RAS Updates. Vahid Madani Pacific Gas and Electric Co. August 2, 2017

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

PG&E s 2017 Request Window Proposals CAISO 2017/2018 Transmission Planning Process

An Inside Look at Electric Reliability 2016 Electric Reliability Report

Sub Regional RTEP Committee Mid-Atlantic

SMUD 2014 Ten-Year Transmission Assessment Plan. Final. December 18, 2014

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Background Information

North Oregon Coast Area Study. Adam Lint

CUSTOMER/ TWIN ARROWS PROJECT

Sub Regional RTEP Committee South

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

2018 & 22 Final LCR Study Results Greater Bay Area

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee Mid-Atlantic

Sub-Regional RTEP Committee PJM South

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Sub Regional RTEP Committee Mid-Atlantic

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

Sub Regional RTEP Committee South

Report of Gary DeShazo

Sub Regional RTEP Committee Western Region ATSI

Reliability Analysis Update

100 MW Wind Generation Project

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Reliability Analysis Update

Generator Interconnection System Impact Study For

Appendix D Black Hills Project Summary

South Dakota 890 Study

15 Nelson-Marlborough Regional Plan

MILLIGAN SOLAR PROJECT

Western Area Power Administration Sierra Nevada Region

Q0044 interconnection at

New 115 kv Disconnect Switches at Bloomsburg MTS

Updates and Modifications to Report

Interconnection System Impact Study Report Request # GI

PREPARED DIRECT TESTIMONY

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC Solution Meeting

Sub Regional RTEP Committee Mid-Atlantic

Generation Interconnection Facilities Study For

15 Nelson-Marlborough Regional Plan

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- --

Generation Deactivation Notification Update

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

2019 & 2023 Final LCR Study Results Greater Bay Area

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

MTEP13 SPM #2- Central Region. March 25, 2013

Western Area Power Administration Sierra Nevada Region

Full Network Model Scope for FNM DB61

Falcon-Midway 115 kv Line Uprate Project Report

Full Network Model Scope for FNM DB2016Q1

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge:

ATTACHMENT Y STUDY REPORT

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Black Hills Project Summary

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

SPP Notification to Construct

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

New Jersey State Report

Key to Status Fields in the Project List

Illinois State Report

DFO STATEMENT OF NEED REPORT

IEEE-PES Chicago Chapter Presentation November 11, Smart Grid. Mike Born. Principal Engineer, Capacity Planning

APPENDIX F: Project Need and Description

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

ABB Automation & Power World: April 18-21, 2011 WPS System Planning. ABB Inc. April 21, 2011 Slide 1

EXCEPTIONS TO NYSRC RELIABILITY RULES

EXCEPTIONS TO RELIABILITY RULES REVISION 4 MAY 8, 2015

Sub Regional RTEP Committee Mid-Atlantic

Transmission Expansion Advisory Committee. Reliability Analysis Update

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection

Generation Interconnection Feasibility Study Report. For. PJM Generation Interconnection Request Queue Position Y Linden 138 kv & 230 kv

Transcription:

1 PG&E s 2012 Request Window Proposals Central Valley Patrick Tan Transmission System Planning PG&E September 27, 2012

Transmission Projects Overview 2 Projects Seeking CAISO Approval Pease 115/60 kv Transformer Addition and Bus Upgrade Placer 115/60 kv Transformer Replacement and SPS Valley Springs No. 1 60 kv Line Reconductoring Salado 115/60 kv Transformer Addition Ripon 115 kv New Line Mosher Transmission Project Kasson SPS

Pease 115/60 kv Transformer Addition and Bus Upgrade 3 Background Pease Substations serves customers in Sutter, Yuba, and Butte Counties of Sierra Division. Two of the three local generators are connected to the Pease-Marysville-Harter 60 kv Line Assessment Loss of Pease-Marysville-Harter 60 kv Line & Greenleaf II (L-1/G-1) is projected to overload the Pease 115/60 kv Transformer and cause low voltages in the area Loss of the Pease-Marysville-Harter 60 kv Line & Pease 115/60 kv Transformer (N-1-1) is projected to cause extremely low voltages in the area During summer weekend days, when local generation is off-line, loss of the Pease 115/60 kv Transformer is projected to cause very low voltages in the area Scope Add a new 115/60 kv transformer rated at 200 MVA at Pease Substation Upgrade the Pease 115 KV Bus Install UVLS to drop load at Harter when low voltages are detected Other Alternatives Considered Status Quo Plumas-Marysville Connection Reconductor Colgate 60 kv System In Service Date May 2016 Cost $25M - $35M

Pease 115/60 kv Transformer Addition and Bus Upgrade 4

Placer 115/60 kv Transformer Replacement and SPS 5 Background Placer Substation serves customers in Placer County of Sierra Division. Primarily fed from two 115 kv lines from Gold Hill and one 115 kv line from Drum 60 kv system primarily fed from one Placer 115/60 kv transformer Assessment Placer 115/60 kv Transformer is projected to overload under normal conditions Loss of Halsey PH (G-1) is projected to overload the Placer 115/60 kv Transformer sooner Loss of the Gold Hill Placer 115 kv Lines (DCTL) is projected to cause very low voltages in the Placer Area and overload the Drum- Higgins 115 kv Line Scope Replace the existing Placer 115/60 KV Transformer with a new 200 MVA transformer Investigate installing a SPS to drop load in the Placer area following a Gold Hill-Placer 115 kv Lines Double Circuit Tower Line (DCTL) outage. Other Alternatives Considered Status Quo Atlantic Placer Voltage Conversion In Service Date May 2016 Cost $15M - $20M

Placer 115/60 kv Transformer and SPS 6

Valley Springs No. 1 60 kv Line Reconductoring 7 Background The Valley Springs No. 1 60 kv Line is located in Calaveras County of Stockton Division. Valley Springs No. 1 60 kv Line is approximately 24 miles and limited by 4/0 AL conductor. Linden Substation is normally served from the Weber-Mormon Jct 60 kv Line and is automatically transferred to the Valley Springs No. 1 60 kv Line during emergency conditions. Assessment Loss of Weber Mormon Jct 60 kv Line is projected to overload the Valley Springs No. 1 60 kv Line. Scope Reconductor 12.8 miles of the Valley Springs No. 1 60 kv Line with a conductor which has a summer normal rating of at least 600 amps. Other Alternatives Considered Status Quo In Service Date May 2016 Cost $7M - $12M

Valley Springs No. 1 60 kv Line Reconductoring 230 kv 8 Valley Springs New Transformer (CAISO Approved) 60 kv Reconductor To East Stockton N/O Mormon Jct N/O N/O North Branch Sub Mormon SW 37 Linden Corral New Hogan Calaveras Cement Transformer Replacement (CAISO Approved) 60 kv Weber 230 kv

Salado 115/60 kv Transformer Addition 9 Background Salado Substation is located in Stanislaus County in the Central Valley Region. Salado is comprised of a 115/60 kv transformer bank, with 3 single-phase units rated for 26.5 MVA each and no spare unit. The 58-year old Transformer serves radial load at Newman, Gustine and Crows Landing 60 kv distribution substations (approximately 8,600 customers, 31 MW total) Assessment Outage of Salado 115/60 kv Transformer results in sustained outages to approximately 8,600 electric customers (31MW). Existing maintenance issues due to radial load and weak back ties Scope This project proposes to install a second 115/60 kv transformer (100 MVA, three-phase with LTC), and to convert Salado 115 kv Bus from a loop arrangement to a Breaker and a Half (BAAH) arrangement. Other Alternatives Considered Status Quo Network the 60 kv System In-Service Date December 2014 Cost $15M - $20M Benefits This project will improve reliability of electric service for PG&E electric customers in Stanislaus County. The BCR is 1.1

Salado Substation Existing System 10

Salado 115/60 kv Transformer Addition 11

Ripon 115 kv New Line 12 Background Ripon Substation, located within San Joaquin County serves over 5,500 electric customers (22 MW), via a radial 4.6-mile long connection off the Riverbank Junction Switching Station Manteca 115 kv Line. The line has an average of 2.2 outages per year. Assessment An outage of the Riverbank Junction Switching Station-Manteca 115 kv Line will result in the loss of electric service to Ripon customers. Existing maintenance issues due to radial load. Scope Build a new 5-mile 115 kv tap line from the Riverbank Jct. Sw. Sta. Manteca 115 kv Line to Ripon Substation. Add two breakers at Ripon to loop the substation. Other Alternatives Considered Status Quo Build a second line and a ring bus at Ripon Substation. In Service Date May 2015 Cost $10M - $15M Benefits This project will improve reliability of electric service for PG&E customers in the Ripon area The BCR is 3.7

Ripon 115 kv New Line 13

Mosher Transmission Project 14 Background The Lockeford No. 1 60 kv Line is located in San Joaquin County. Lockeford No. 1 60 kv Line is approximately 11.5 miles and is limited by 2/0 CU conductor. Mosher Substation is normally served from the Hammer-Country Club 60 kv Line but is automatically transferred to the Lockeford No. 1 60 kv Line during emergency conditions. Assessment An outage of the Hammer Country Club 60 kv Line is projected to overload the Lockeford No. 1 60 kv Line Scope Reconductor the Lockeford No. 1 60 kv Line and install two 60 kv circuit breakers and SCADA at Mosher Substation. Operate Mosher circuit breaker to Lockeford normally open and continue to automatically restore Mosher substation following the Hammer-Country Club 60 kv Line outage. Other Alternatives Considered Status Quo New Underground Stagg-Mosher 60 kv Line In Service Date May 2015 Cost $11M - $15M

Mosher Transmission Project 15

Kasson SPS 16 Background Kasson Substation is located in San Joaquin County of PG&Es Stockton Division. Kasson and Manteca Substations are the main sources to a 60 kv local system serving over 9000 customers via the Kasson Louise & Manteca - Louise 60 kv Lines Assessment Loss of the Kasson 115 kv Bus is projected to overload the Kasson-Louise 60 kv Line, Manteca Louise 60 kv Line, and Manteca 115/60 kv Transformer Scope Install SPS that trips all Kasson 60 kv CBs following a Kasson 115 kv Bus outage Other Alternatives Considered Status Quo Install new Kasson 115/60 kv Transformer and add sectionalizing breaker on 115 kv bus In Service Date May 2015 Cost $1M - $3M

Kasson SPS 17

Conceptual Long Term Plans 18 Projects that Require Additional Analysis: Gold Hill 230/115 kv Transformer Addition Tesla Weber 230 kv Line Equipment Upgrade Vaca Suisun Jameson 115 kv Line Reconductor Weber Mormon Jct 60 kv Line Reconductor and Switch Upgrade Lockeford-Lodi Area Long Term Study