Operating manual. High Voltage Testing Sets PGK 70 HB PGK 70-2,5 HB PGK 110 HB PGK 150 HB PGK 260 HB 0-1. Ident. No /00

Similar documents
1 This instrument must only be used by a competent and trained person and operated in strict accordance with the instructions.

User's Manual. High Voltage Megohmmeter. Analog Insulation Tester plus AC Voltage and Continuity Tests. Model

& HIGH CURRENT DC POWER SUPPLIES INSTRUCTION MANUAL

EPS/ELA-Series User Manual EPS/ELA 250W

Dawson DDM190D. Digital Multimeter User s Manual

KV4-300 mk2. KV5-200 mk2. KV5-100T mk2. KV3-250 mk2

Safety Precautions. Damages resulting from failure to observe these safety precautions are exempt from any legal claims whatever.

1.Safe testing IMPORTANT:

OPERATING INSTRUCTION

LED Driver Linear / area fixed output industry. Driver LCI 65W 150mA 400mA TOP INDUSTRY sl TOP series

OPERATING AND MAINTENANCE MANUAL. Primary Current Injection Test Set. 750ADM-H mk2

LED Driver Linear / area fixed output industry. Driver LCI 100W 350mA 900mA TOP INDUSTRY sl TOP series

Matrix APAX. 380V-415V 50Hz TECHNICAL REFERENCE MANUAL

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

Digital/Analog Megohmmeter Model 1026 USER MANUAL

Assembly and Maintenance Manual Type ASNU

INSTRUCTION MANUAL CM69 TRMS AC EARTH LEAKAGE CLAMP METER. 1. SAFETY INFORMATION: Always read before proceeding. REMEMBER: SAFETY IS NO ACCIDENT

INSTRUCTION MANUAL ANALOGUE INSULATION TESTER KEW 3131M KYORITSU ELECTRICAL INSTRUMENTS WORKS,LTD., TOKYO JAPAN

LV Capacitor CLMD03 Power Module Instruction manual

R&S RT-ZC02 R&S RT-ZC03 AC/DC Current Probe User Manual

KEWTECH. KT56 digital multi function tester. Instruction manual

CBC-300 Series & CBC-300C Series Dual Channel Adjust Clutch/Brake Controls

Operating Manual (Edition 04/2004) sinamics. Braking Module / Braking Resistor SINAMICS G130

PURE SINE WAVE DC TO AC POWER INVERTER

Electrical data Nominal voltage AC 24 V, 50/60 Hz DC 24 V

User Guide. Model Insulation Tester / Megohmmeter. Introduction

POWER SUPPLY MODEL XP-800. TWO AC VARIABLE VOLTAGES; 0-120V and 7A, PLUS UP TO 10A. Instruction Manual. Elenco Electronics, Inc.

BM kv Digital Insulation Tester USER MANUAL

BETA Switching Switches and Light Indicators

BoWex FLE-PA. BoWex FLE-PAC. KTR-N Sheet: Edition: EN 1 of BoWex FLE-PA / FLE-PAC Operating/Assembly instructions

Assembly and Maintenance Manual Type AS

MPM-20 INSTRUCTION MANUAL

BellMega BM-510. Operation Manual Ver: 1.0 Rev: 1

OPERATING INSTRUCTIONS

DT33B/C/D OPERATOR S MANUAL LIMITED WARRANTY AND LIMITATION OF LIABILITY

Electronic Ballast EVG 2000-T

Reference Manual. UH28C High Voltage Tester

OPERATING INSTRUCTIONS

BK BK A BK MA BK MA BK J93 MN93-BK MN193-BK MR193-BK SL261-BK SR193-BK

Sinewave Inverters. SWING 150VA and 300VA. User s manual

Atlas ESR and ESR + Equivalent Series Resistance and Capacitance Meter. Model ESR60/ESR70. Designed and manufactured with pride in the UK.

LH41A. User Manual. Clamp On Ammeter. For detailed specifications and ordering info go to

Digital/Analog Megohmmeter Model 1026

Mini Multimeter with Non-Contact Voltage Detector (NCV)

Model Battery Powered Milliohm Meter

INSTRUCTION MANUAL FOR THE THERMOCOUPLE ATTACHMENT UNIT (TAU)

Megohmmeter Test Probe

These operating instructions apply for: NCX 380 NCZ 300 NCX 480 NCZ 370 NCX 580 L NCZ 480 NCX 660 K NCZ 560 NCZ 660 NCZ 800

Operating manual. High-voltage testing adapter VAS 6558A/30. Operating manual. Customer documentation Revision: 00 Version: 07/2018

Technical Manual Electrical Power Supply System T4002

Cable Length Meter INSTRUCTION MANUAL

99 Washington Street Melrose, MA Fax TestEquipmentDepot.com. Instruction Manual. Model 1672 Triple Output Power Supply

EN Operating manual. Motorised zone valve. Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3

ISO-TECH IPS1810H and IPS1603D DC power supply ISO-TECH IPS 1810H et IPS 1603D Alimentation électrique c.c.

TRINETICS CSD SERIES OIL SWITCH INSTALLATION INSTRUCTIONS

LED Driver Compact fixed output

LED Driver Compact fixed output

PHASE CONVERTERS OPERATING & MAINTENANCE INSTRUCTIONS. MODEL NO: PC40 and PC60. PART Nos:

Belt Conveyor Pull Rope Switch Types HEN, HEK and SEM OPERATING INSTRUCTIONS

Maintenance Manual 13 AMPERE POWER SUPPLY 19A704647P1-P3. Mobile Communications LBI-31801C

INSTRUCTION MANUAL MARTINDALE CM52 CLAMP METER. ELECTRIC Trusted by professionals. Other products from Martindale:

Operating Instructions K Always on the safe side.

WARRANTY INFORMATION...

Low and High Voltage Power Supplies

OPERATIONS AND APPLICATIONS MANUAL MODEL NUMBER PM6. 6 KV DC HIGH POTENTIAL TESTER WITH MEGOHMMETER Version 2.0

99 Washington Street Melrose, MA Fax TestEquipmentDepot.com. Instruction Manual. Model 2831D 4 ½ Digit True RMS Digital Multimeter

Operation and Maintenance manual

REFERENCE MANUAL FORM: MX-TRM-E REL REV MTE

MODVAR Low voltage reactive power compensation modules Installation manual

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

1 Safety instructions. 2 Intended use. 3 Product characteristics. 4 Operation. LB management. Universal touch dimmer insert LED

55185 EMERGENCY PACK FOR LED PANEL TECHNICAL DATA SHEET

DC POWER SUPPLY ALIMENTATION C.C.

1ZSC AAA en, Rev. 6. Resin impregnated paper bushing, oil to SF 6., type GSBK Technical guide

3000 Series Operation Manual

Solenoid Operator 0516 / 1216

Brake Chopper BC BC 4.1. Instruction and Operation Manual

Sinewave Inverters. SWING pro 200VA and 350VA. User s manual

KD1E Range Potential Indicators

LED Driver Linear / area dimming industry. Driver LC 150W mA IND sl EXC EXCITE series

OPERATING INSTRUCTION

Sheet n 1 of 20 Doc. n WDMM/02/E MOD. WDMM INSTALLATION, USE AND SERVICE MANUAL. PETROL INSTRUMENTS S.r.l APRILIA (LT) - ITALY

Radial Aluminium Electrolytic Capacitors 105 C

Operating instructions Flow monitors SI6600 SI6700 SI /02 01/2011

MOdel No: MM19.V3 WARNING CAUTION 1. SAFETY INSTRUCTIONS

Mini Multimeter with Non-Contact Voltage Detector (NCV)

DRVRMDMOTL Motorized Linear Drive. DRVMDMOTLR Motorized Linear and Rotary Drive. Instruction Manual

USER MANUAL. Maxwell Technologies BOOSTCAP 56V UPS Energy Storage Modules. Models: BMOD0130 P056 B02 BMOD0130 P056 B03. Document Number

Users Manual. Phase Rotation Indicator

UV- TECHNOLOGY. Technical Documentation ELC N6 / ELC N8 / ELC N10

SECTION DC POWER SUPPLY/BATTERY CHARGER

Table of Contents. 1. The Statement Overview Instrument Familiarization Method of use General Specifications...

Mounting and operating instructions EB 5801 EN. Electric Actuators Type 5801 (Rotary Actuator) Type 5802 (Linear Actuator)

CBC-300 & CBC Series Dual Channel Adjust Clutch/Brake Controls

MY /2-DIGIT DIGITAL MULTIMETER Users Manual

Contents. Introduction Inspection Notes on Safety Precautions. Chapter 1 Overview Product Overview Names of Parts 2

PHASERS. Operating and Instruction Manual. a n d A C C E S S O R I E S

Solenoid Operator 0513 / 1213

CDBR-B. Instruction Manual. Dynamic Braking Unit. March 2013 Part Number: R4 Copyright 2013 Magnetek

XLM 62V Energy Storage Module

Transcription:

Operating manual High Voltage Testing Sets PGK 70 HB PGK 70-2,5 HB PGK 110 HB PGK 150 HB PGK 260 HB Ident. No. 822-085 BAUR Prüf- und Messtechnik GmbH Raiffeisenstrasse 8, A-6832 Sulz / Austria 06/00 e-mail: headoffice@baur.at internet: http://www.baur.at Tel +43 / 55 22 / 49 41-0 Fax +43 / 55 22 / 49 4 13 0-1

0-2

Guide to this Operating Instruction, Copyright, Preface Guide to this Operating Instruction Observe info signs! For fast finding of important information the corresponding text passages are marked with symbols (symbols not stated here are self-explaining). More and special information concerning the respective subject are available from BAUR. Important unit information! In any case, read carefully! Copyright Important information text. Copyright by BAUR BAUR Prüf- und Messtechnik GmbH, A-6832 Sulz / Austria All rights reserved. No part of this publication may be reproduced, transmitted, stored in a data processin gsystem or translated into another language without the written permission of BAUR / Sulz, Austria. Subject to modification! In the interest of our customers we reserve the rights for modifications due to technical progress. Illustrations, descriptions and delivery content are therefore not binding. Preface This manual contains all information necessary for the correct handling and use of the high voltage testing set PGK 70 HB, PGK 70-2,5 HB, PGK 110 HB, PGK 150 HB und PGK 260 HB. Before using the surge voltage generator, please read carfully this Operating Instruction. If you have any question, please contact directly Tel +43 / 55 22 / 49 41-0 Fax +43 / 55 22 / 49 41 3 BAUR Prüf- und Messtechnik GmbH, Raiffeisenstrasse 8 A-6832 Sulz / Austria or refer to your nearest BAUR representative. Safety Precautions Please read now and avoid damage and injury later! - The PGK 70 HB, PGK 70-2,5 HB, PGK 110 HB, PGK 150 HB und PGK 260 HB is built in accordance with today's state of engineering and is safe to operate. Individual components and the finished unit are inspected continually by our qualified staff within the framework of our Quality Assurance Provisions. Each unit is subjected to thorough testing prior to shipment. 0-3

Safety Precautions, Warranty Safety Precautions, Continued - It is imperative to every person who is involved with the installation, start-up, operation and maintenance to have read and understood the complete Operating Instruction. - It is the responsibility of the customer to ensur that only authorized persons may be allowed to use the high voltage testing sets. Only authorized personnel! Use the PGK 70 HB, PGK 70-2,5 HB, PGK 110 HB, PGK 150 HB and PGK 260 HB unit as directed! The user - is qualivied and properly instructed and has the necessary experience. - knows the relevant standards, accident prevention rules and operating conditions. - is able to carry out the necessary operations and is aware of the possible dangers involved. - must immediately inform his superior about any conditions of the unit that could affect safety. The high voltage testing sets are to be applied exclusively for voltage proof testing of electrical equipment. The local safety and accident prevention requirements are always applicable to the operation of the PGK 70 HB, PGK 70-2,5 HB, PGK 110 HB, PGK 150 HB and PGK 260 HB unit. Warranty At the customer's written request we undertake to repair or replace at our discretion and as quickly as possible all parts that become faulty or useless as the demonstrable results of poor material, faulty design or defective execution. We bear the costs for repairs and replaced parts, exclusive transportation of the goods, packing and insurance. 12 month warranty time The 12 month warranty time starts with delivery. We shall bear the costs of any faulty parts requiring replacement, but not the costs of transport to us an back to the customer, not the costs of packing and insurance! We shall not be liable for any damage resulting from normal wear and tear, improper handling, nonobservance of Operating Instruction and safety requirements. We shall also refuse to accept any liability if the customer carries out repairs or changes to the unit himself or has others carry out them! The warranty does not cover damage in transit, batteries, fuses and any readjustments in accordance with the Operating Instruction! We draw attention in addition to the "General Terms of Sales and Delivery" of. BAUR Prüf- und Messtechnik GmbH, Raiffeisenstrasse 8 A-6832 Sulz / Austria 0-4

Contents Contents 1. Product Information... 1-1 Overview... 1-1 Design and function... 1-2 Display and operating elements... 1-4 Technical data... 1-5 PGK Load curves... 1-6 2. Packing and Shipping... 2-1 Damage during transport... 2-1 3. Placing into operation... 3-1 Overview... 3-1 Connect to earth... 3-2 Switch on... 3-2 Switch off... 3-4 EMERGENCY-OFF... 3-4 Change operating mode... 3-5 4. Servicing / Maintenance... 4-1 Overview... 4-1 General... 4-2 Fuse... 4-2 0-5

Contents Contents, Continued 5. Options, Accessories and Ordering Information... 5-1 Overview... 5-1 Options... 5-2 Accessories... 5-3 Ordering information... 5-5 0-6

1. Product Information 1. Product-Information Overview This section contains all necessary information about the High Voltage Testing Sets PGK HB. This section contains the following subjects: Subject Page Design and function 1-2 Display and operating elements 1-4 Technical data 1-5 PGK Load curves 1-6 General view PGK 70 HB 1-1

1. Product Information Design and Function: Design The PGK HB instruments are designed as two-part High Voltage Testing Sets. Operating unit with all indicating/operating elements, with power supply and safety devices. High Voltage unit as oil-filled housing with High Voltage transformer with the choice of a rectifier bar for half-wave rectification or a resistance bar as a damping resistor. With the PGK 70-2,5 HB, PGK 110 HB, PGK 150 HB and the PGK 260 the corona protection hood is used as oil expansion tank (conservator) and may not be removed or damaged. With the PGK 70 HB an air cushion in the housing (tube) works as a compressible volume for absorbing the oil expansion. That s why the H.V. unit may only be stored, shipped and operated vertically. High Voltage generation Generation of high voltage is carried out by a H.V. transformer supplied by an variable transformer. During D.C. operation a halfwave rectifier is connected after the H.V. transformer. By turning the half-wave rectifier the polarity of the output voltage can be changed. The capacity of the test object acts as smoothing capacitor. During A.C. operation, a damping resistor is connected to the H.V. circuit instead of the half-wave rectifier (with PGK 260 HB: option - not included) The H.V. units of the PGK HB instruments are equipped with a potential grading ring which can also be used as carrying ring. The instruments may be not operated without this potential grading ring. Operating ranges Depending on the load by the test object and the voltage set, the PGK HB instruments are operating in one of the two operating ranges Continuous Operation and Short-time Operation. Continuous operation: Within this operating range, from no-load to nominal rating up to cut off load the instrument can be loaded continuously. Short-time operation: Within this operating range from cut off load to short circuit the instrument switches current-limiting lamps into the primary circuit of the H.V. transformer in order to reduce the thermal load of the instrument. Additionally, as a protection against overload the overcurrent protection switch (5) with its thermal and magnetic tripping characteristic is tripped after a specific period terminating operation. The time until tripping depends on load and takes from seconds (during short-circuit) to hours (at maximum load). 1-2

1. Product Information ma - meter The ma-meter is connected into the H.V. circuit on earth side. D.C. operation: The ma-meter shows the arithmethic mean value of the output current. A.C. operation: (option with PGK 260 HB) The rectification value of the A.C. is measured by the instrument. However, the display shows the appropriate rms value. That s why there can be deviations of the displayed value from the true rms value if the measured current is not sinusoidle. During no-load the ma-meter shows the current which flows via the self-capacitance of the H.V. transformer. Must be considered during measurements on test objects. kv - meter The kv-meter is connected to a tapping of the H.V. winding and is current-compensated. The compensation is balancing the voltage drop at the internal resistance of the test instrument. D.C. operation: The kv-meter shows the peak value of the output voltage. If the self-capacitance of the test object is very low it is possible that the insulation current of the test object results in a high ripple. In this case, note that the displayed value and the arithmetic mean value of the test voltage can be clearly different. Display during A.C. operation: (option with PGK 260 HB) As with the ma-meter the kv-meter also measures the rectification value and displays the rms value. 1-3

1. Product Information Display and operating elements 1 Mains switch as overcurrent safety switch with thermal tripping 2 Pushbutton Ready to switch on ( ) 3 Pushbutton High Voltage On ( I ) with pilot lamp (clearing of H.V.) 4 Pushbutton High Voltage Off ( ) 5 Overcurrent safety switch with thermal and magnetic tripping 6 Voltmeter for display of output voltage in kv 7 Amperemeter for display of output current in ma 8 Measuring range switch for amperemeter 9 Selector switch for operating mode (+ / ~ / -) 10 Measuring range switch for voltmeter 11 Variable transformer for setting the output voltage 12 Lockabel Emergency off momentary contact switch 13 Indicator lamp, green 14 Indicator lamp, red 1-4

1. Product Information Technical Data PGK PGK 70 PGK PGK PGK unit 70 HB - 2,5 HB 110 HB 150 HB 260 HB Mains voltage see type plate V ~ Mains frequency 45 to 60 45 to 60 45 to 60 45 to 60 45 to 60 Hz Power consumption at nominal working point 640 3200 1380 1380 2600 VA Max. power consumption (in short-circuit operation) 1200 6500 2650 2650 5000 VA Power output at nominal working point AC/DC 330/190 2750/1260 1260/495 990/530 1665/1000 VA/W Max. output voltage ACeff/DC in no-load 56/78 56/78 94/126 110/160 185/260 kv Output voltage ACeff/DC at nominal working point 47/66 55/62 90/108 110/137 185/250 kv Max. output current ACeff/DC at short-circuit 20/12 117/84 30/17 23/20 20/20 ma Accuracy of kv-meter 2,5 2,5 2,5 2,5 2,5 % Accuracy of ma-meter 2,5 2,5 2,5 2,5 2,5 % Dimensions of operating unit 502 x 502x 502 x 502 x 502 x housing (W x H x D) 242 x 290 242 x 290 242 x 290 242 x 290 242 x 290 mm Dimensions of H.V. unit (height / diameter) 810/385 1130/455 1130/455 1450/455 2050/1270 mm Weight of operating unit 13,5 22 17 17 19 kg Weight of H.V. unit 27 93 75 85 260 kg Relative humidity Ambient temperature not condensing working: 0...+45 C storage: -20...+60 C 1-5

1. Product Information PGK output load curves 1-6

1. Product Information 1-7

1. Product Information Load curve PGK 110 HB AC 100 90 80 70 60 U / kv 50 40 30 20 10 0 0 5 10 15 20 25 30 35 I / ma kv Load curve PGK 110 HB DC 140 120 100 80 U / kv 60 40 20 0 0 5 10 15 20 I / ma 1-8

1. Product Information Load curve PGK 150 HB AC 130 120 110 100 90 80 U / kv 70 60 50 40 30 20 10 0 0 3 6 9 12 15 18 21 24 I / ma LLoad curve PGK 150 HB DC 170 160 150 140 130 120 110 100 U / kv 90 80 70 60 50 40 30 20 10 0 0 2 4 6 8 10 12 14 16 18 20 22 I / ma 1-9

1. Product Information Load curve PGK 260 HB AC 220 200 180 Attention : maximum admissible output voltage 190 kv rms. 160 140 120 U / kv 100 80 60 40 20 0 0 5 10 15 20 25 I / ma Load curve PGK 260 HB DC 320 300 280 260 240 220 Attention : maximum admissible output voltage 260 kv 200 180 U / kv 160 140 120 100 80 60 40 20 0 0 2 4 6 8 10 12 14 16 18 20 22 I / ma 1-10

2. Packing and Shipping 2. Packing and Shipping The Test Sets ar shipped in robust cardboard cartons or in shipping containers on wooden pallets. If the instruments are not used immediately, always keep in the closed carton or shipping container and store in dry rooms! The H.V. unit may only be transported and operated vertically. It is important that the tube is not bended so when packing in shipping containers it may not be used as a support. For securing the H.V. unit mounting holes are in the base plate. Additionally, the H.V. unit can be also fasten to the potential grading ring. Please note that the corona protection hood (with the exception of the PGK 70 HB) is not a solid part but a hollow body filled partly with oil which must be protected against impacts and collisions. Damage during transport Complains concerning damages should be made to us without delay, using a standard transport damage claims form. Confirmation of visible damage should immediately be obtained from the carrier. The extent and probable cause of the damage should be stated. If damage is discovered during unpacking, contact the responsible transportation company immediately. Request a written loss assessment and make them responsible for the damage! We also refer to the General Terms of Sales and Delivery of: BAUR Prüf- und Messtechnik GmbH, A-6832 Sulz / Austria 2-1

2. Packing and Shipping Notes 2-2

3. Placing into Operation 3. Placing into Operation Overview In this section you will find all necessary information to put the High Voltage Testing Sets PGK 70 HB, PGK 70-2,5 HB, PGK 110 HB, PGK 150 HB and PGK 260 HB into operation. This section contains the following subjects: Subject Page Connect to earth 3-2 Prepare test 3-2 Switch on 3-3 Switch off 3-4 EMERGENCY OFF 3-4 Change operating mode 3-5 3-1

3. Placing into Operation Connect to earth It is absolutely necessary to connect the H.V. unit to earth and to the test object via one of the two earthing screws on the base plate. The earth lead should be as short as possible and must have a low impedance (min. cross-section of 4 mm², copper). Prepare test Isolate all connections from the test object, secure against repeated switch-on and make sure that zero voltage condition exists. Insulate nearby items which are under voltage.! It must be assured that nearby items under voltage do not result in breakovers or breakdowns, due to applying the test voltage to the test object. Insert rectification resp. resistor bar (option with PGK 260 HB) according to the desired operating mode. Connect operating unit and H.V. unit. Install H.V. connection to the test object. Connect instrument to mains according to specifications on type plate. Turn variable transformer (11) to the left position. Set measuring range selector switch for the kv-meter (10) to II. Set measuring range selector switch for the ma-meter (8) to the highest range in order to avoid damage to the instrument. Short overloads (breakdowns and short-circuits at the test object) are no danger to the ma-meter if ten times the value of the relevant measuring range is not exceeded. Turn mode selector switch (9) to selected operating mode ( +, - or - ). 3-2

3. Placing into Operation Before going into operation, local safety requirements and safety precautions for the protection against direct or indirect contact of live parts have to be met accordingly! Switch on Switch on instrument with mains switch (1) The instrument is in operating condition "IN OPERATION"! the green indication lamp (13) is illuminated Press pushbutton "Ready to switch on" (2). In case the overcurrent protection switch (5) has tripped, a buzzing sound occurs during depression of the "Ready to switch on" pushbutton. Instrument goes into operating condition "READY TO SWITCH ON" only if! the EMERGENCY-OFF pushbutton switch is not depressed,! the overcurrent protection switch (5) has not been tripped. The instrument is in operating condition "READY TO SWITCH ON"! the green indicator lamp (13) is out,! the red indicator lamp (14) is illuminated. Press pushbutton "High Voltage On" I (3) The high voltage transformer will be connected to the mains voltage only, if! the variable transformer is in its left position (neutral position)! the shorting bar of the discharge unit (option) is fully open. The instrument is in operating condition "IN OPERATION"! the pilot lamp "In operation" I of the pushbutton switch (3) is illuminated. Adjust to desired voltage using the variable transformer (11). 3-3

3. Placing into Operation Switch off Turn back variable transformer (11) to its left position. Press pushbutton "High voltage off" (4) The instrument returns into the operating condition READY FOR OPERATION. The high voltage transformer is disconnected from the supply voltage! the pilot lamp "IN OPERATION" of pushbutton I (3) is out! the red indicator lamp (14) is out! the green indicator lamp (13) is illuminated! the shorting bar of the discharge unit (option) affects the High Voltage output of the instrument and discharges the connected capacities via the discharge resistor. Switch off with mains switch. Discharge, Connect to earth, Short out Because High Voltage measuring is not carried out directly at the High Voltage output no more voltage is shown on the kv-meter after switching off the instrument although the test object could be charged to full voltage! Before cancelling the safety precautions, it is essential that all live parts must be discharged, earthed and shorted! Discharge test object with discharge bar see table on page 5-3 / Discharge bar Use discharge bar suitable to the particular instrument and note that different discharge times must be met depending on test object capacity and the discharge bar used. EMERGENCY OFF Press EMERGENCY-OFF momentary contact switch (12). The instrument returns to the operating condition READY FOR OPERATION. The high voltage transformer will be isolated from the supply voltage.! the indicator lamp "In operation" I of pushbutton switch (3) is out! the red indicator lamp (14) is out! the green indicator lamp (13) is illuminated The instrument can only be placed in the operating condition READY TO SWITCH ON by pressing the pushbutton switch (2) Ready to switch on if the EMERGENCY OFF momentary contact switch has been unlocked with the key. By pressing the EMERGENCY OFF momentary contact switch and taking out the key, unauthorized use of the instrument can be prevented. 3-4

3. Placing into Operation Change operating mode of instrument (option with PGK 260 HB) Change mode of operating unit Turn mode selector switch (9) into desired position (+ / ~ / -) Change mode of High Voltage unit Unscrew knurled screw (or ball nut of PGK 70 HB) on H.V. output. Loosen threaded insert with screwed-on rectifier bar (resistor bar) using supplied spanner. Slowly pull out bar (the oil should be dripped off from the bar). Unscrew threaded insert from bar. Screw on threaded insert to desired bar (with rectifier bar on the side of desired polarity).! The resistor bar is marked on one end with "~" (front end of screw plug)! The rectifier bar is marked on the ends with "+" and "-"! If negative H.V. should be want the "-" mark must be on top (at the H.V. output) Clean bar with dry (or slightly dampened in petroleum ether) and fuzz-free clothes. Slowly insert cleaned bar into the tube. When operating mode is changed very frequently, it must be observed that always so much insulating oil is within the tube that the bar is immersed in the oil up to the top metal cap. The instrument is filled with insulating oil Technol US 4000 by the manufacturer (see Maintenance). 3-5

3. Placing into Operation Notes 3-6

4. Servicing / Maintenance 4. Servicing / Maintenance Overview In this section you will find all necessary information regarding servicing and maintenance of the High Voltage Testing Sets PGK 70 HB, PGK 70-2.5 HB, PGK 110 HB, PGK 150 HB and PGK 260 HB. This section contains the following subjects: Subject Page General 4-2 Fuse 4-2 4-1

4. Servicing / Maintenance General In order to avoid leakage currents or creeping discharges at the tube or cone of the High Voltage unit it must be kept clean. For this purpose, use only fuzz-free clothes dampened in petroleum ether. From time to time, check function of limiter lamps in the operating unit. This can be easily carried out in short-circuit operation by slowly increasing the voltage at the variable transformer until lamps light up. Oil for refilling around the rectifier or resistor bar is available from BAUR. 0.8lt insulation oil Technol US 4000 ID no. 471-716 Fuse Designation Value Dimension Ident.No. Remarks F1, F2 0,16 AT Ø 5 x 20 mm 563-005 Mains transformer, primary F3, F4 2 AF Ø 5 x 20 mm 563-020 + 12V control F5, F6 3,15 AT Ø 5 x 20 mm 563-021 Discharge unit (option) (S4, F10) 16 AT Mains switch F11 PGK 70 HB 2 A High voltage transformer, primary PGK 110 HB 6 A High voltage transformer, primary PGK 150 HB 6 A High voltage transformer, primary PGK 260 HB 10 A High voltage transformer, primary PGK 70/2,5 HB 14 A High voltage transformer, primary 4-2

5. Options, Accessories and Ordering Information 5. Options, Accessories and Ordering Information Overview In this section you will find all necessary information regarding options and accessories available for the High Voltage Testing Sets PGK 70 HB, PGK 70-2.5 HB, PGK 110 HB, PGK 150 HB and PGK 260 HB. This section contains the following subjects: Subject Page Options 5-2 Accessories 5-3 Ordering information 5-5 5-1

5. Options, Accessories and Ordering Information Options Discharge unit For PGK HB instruments an automatic discharge unit is available consisting of a short-circuit bar activated by a rotary magnet and a discharge resistor connected in series between test object and test instrument. Control is accomplished via the operating unit. By pressing pushbutton Ready to switch on (2) the short-circuit bar is moved away from the corona protection hood. Reaching the end position is monitored. When the instrument is back in operating condition READY FOR OPERATION a short-circuit bar is moved to the corona protection hood by a spring. A discharge resistor is responsible for discharging the connected capacitances. Folding tripod As additional accessory a folding tripod can be supplied. It makes operation of the instrument easier if no working table is available. Working height is approx. 90cm. Transport case In order to make shipping of the PGK HB Sets to the customers easier a transport case is available. Moving frame For the H.V. units a moving frame with big steering rollers can be supplied. 5-2

5. Options, Accessories and Ordering Information Accessories The PGK HB instruments are supplied with the accessories specified below. The rectifier bar is in the H.V. unit when supplied and the instrument is in the operating mode negative D.C.. Rectifier bar (option with PGK 260) The rectifier bar supplied with the instrument is used for protecting the instrument against transient voltages and high currents in case of short-circuit during A.C. operation. PGK unit 70 HB 70/2,5 HB 110 HB 150 HB 260 HB Resistance value 33 kω 3 kω 30 kω 99 kω 132 kω Tolerance ± 10 % ± 10 % ± 10 % ± 10 % ± 10 % Spanner for replacing rectifier / resistor bar Is used for loosening the threaded insert when changing the operating mode of the instrument. It is a cylindrical spanner which is inserted into the two holes in the threaded insert. Discharge bar For discharging capacitive test objects during D.C. operation the discharge bars ES 70 - ES 260 are used. PGK unit 70 HB 70-2,5 HB 110 HB 150 HB 260 HB Discharge bar ES 70 ES 70 ES 110 ES 150 ES 260 max. permissible voltage 80 kv 80 kv 120 kv 180 kv 280 kv max. permissible discharge energy 12.000 Ws 12.000 Ws 18.000 Ws 27.000 Ws 42.000 Ws Time between 2 discharges 10 min. 10 min. 10 min. 10 min. 10 min. Earth lead As earth connection between H.V. unit and test object a flexible copper earth lead with a length of 2,5 m and a cross-section of 4mm² is supplied. On both ends cable lugs are attached with a hole diameter of 8,5 mm. 5-3

5. Options, Accessories and Ordering Information Mains supply The PGK HB instruments are supplied with a plugable mains supply cable with a 1,5 mm² cross-section and with a length of 2,5 m. Ident.No. Type 554-015 Powercord with safety plug 554-016 Powercord with US plug 554-017 Powercord with free cable end Connection H.V. / Operating unit Connecting lead between H.V. and operating unit is 5 m long and is connected with lockable connectors on both sides. High Voltage connecting leads A High Voltage insulated wire with a length of 5 m and a crosssection of 1,5 mm² is used as High Voltage connecting lead. The instrument side is equipped with a cable lug with hole diam. 8,5 mm (with PGK 70 HB a banana plug with 4 mm) and the test object side is equipped with an alligator clip. 5-4

5. Options, Accessories and Ordering Information Ordering information PGK 70 HB Mains voltage 220-230V 110-120V*) 240V Item supplied Options Ordering information PGK 70/2,5 HB High Voltage Test Set PGK 70 HB with accessories 411-010 411-110 411-210 Operating unit 470-006 470-007 470-008 High Voltage unit 470-042 470-042 470-042 Discharge bar ES 7012kWs 411-510 411-510 411-510 Mains connection 554-015 554-016 554-017 Connecting cable H.V. / Operating unit, 5 m 471-933 471-933 471-933 Earth lead, 3 m 460-462 460-462 460-462 High Voltage connection, 2,5 m with alligator clip 460-476 460-476 460-476 Spanner for replacing rectifier / resistor bar 460-459 460-459 460-459 Rectifier bar (built in) 470-062 470-062 470-062 Resistor bar fo A.C. operation 470-061 470-061 470-061 Folding tripod for 19" units, working height approx. 90cm 411-536 Automatic discharge device EM 70, 20kWs 470-620 Emergency Off unit with signal lamps, 25 m 471-219 Emergency Off unit with signal lamps, 50 m 470-809 Transport case for operating unit 19" (WxHxD) 626x383x382 mm 470-765 Transport case for High Voltage unit (WxHxD) 440x940x440 mm 411-530 *): Delivery includes external autotransformer; mains connection cable without termination, fix mounted Mains voltage 220-230V 110-120V*) 240V Item supplied Optionen High Voltage Test Set PGK 70/2,5 HB 411-011 411-111 411-211 Operating unit 470-031 470-032 470-033 High Voltage unit 470-047 470-047 470-047 Discharge bar ES 7012kWs 411-510 411-510 411-510 Mains connection 554-015 554-016**) 554-017 Connecting cable H.V. / Operating unit, 5 m 471-933 471-933 471-933 Earth lead, 3 m 460-462 460-462 460-462 High Voltage connection, 2,5 m with alligator clip 460-477 460-477 460-477 Spanner for replacing rectifier / resistor bar 460-459 460-459 460-459 Rectifier bar (built in) 470-063 470-063 470-063 Resistor bar fo A.C. operation 470-064 470-064 470-064 Moving frame H.V. unit 470-577 Folding tripod for 19" units, working height approx. 90 cm 411-536 Automatic discharge device EM 70/2,5, 45kWs 470-621 Emergency Off unit with signal lamps, 25 m 471-219 Emergency Off unit with signal lamps, 50 m 470-809 ransport case for H.V. / Operating unit 19" (WxHxD) 720x1716x720 mm 411-537 *): Delivery includes external autotransformer; mains connection cable without termination, fix mounted **) fix installed mains connection 5-5

5. Options, Accessories and Ordering Information Ordering information PGK 110 HB Mains voltage 220-230V 110-120V*) 240V Items supplied Options High Voltage Test Set PGK 110 HB with accessories 411-017 411-117 411-217 Operating unit 470-444 470-445 470-446 High Voltage unit 470-449 470-449 470-449 Discharge bar ES 11018kWs 411-511 411-511 411-511 Mains connection 554-015 554-016 554-017 Connecting cable H.V. / Operating unit, 5 m 471-933 471-933 471-933 Earth lead, 3 m 460-462 460-462 460-462 High Voltage connection, 2,5 m with alligator clip 460-477 460-477 460-477 Spanner for replacing rectifier / resistor bar 460-459 460-459 460-459 Rectifier bar (built in) 470-439 470-439 470-439 Resistor bar for A.C. operation 470-440 470-440 470-440 Moving frame High Voltage unit 470-577 Folding tripod for 19" units, working height approx. 90 cm 411-536 Automatic discharge device EM 110, 45kWs 470-622 Emergency Off unit with signal lamps, 25 m 471-219 Emergency Off unit with signal lamps, 50 m 470-809 Transport case for H.V. / Operating unit (WxHxD) 670x1680x760 mm 471-179 *): Delivery includes external autotransformer; mains connection cable without termination, fix mounted Ordering information PGK 150 HB Mains voltage 220-230V 110-120V*) 240V 5-6 Items supplied Options High Voltage Test Set PGK 150 HB with accessories 411-013 411-113 411-213 Operating unit 470-016 470-017 470-018 High Voltage unit 470-044 470-044 470-044 Discharge bar ES 150 411-512 411-512 411-512 Mains connection 554-015 554-016 554-017 Connection cable H.V. / Operating unit, 5 m 471-933 471-933 471-933 Earth lead, 3 m 460-462 460-462 460-462 High Voltage connection, 2,5 m with alligator clip 460-477 460-477 460-477 Spanner for replacing rectifier / resistor bar 460-459 460-459 460-459 Rectifier bar (built-in) 470-057 470-057 470-057 Resistor bar for A.C. operation 470-058 470-058 470-058 Moving frame High Voltage unit 470-577 Folding tripod for 19" units, working height approx. 90 cm 411-536 Automatic discharge device EM 150, 45kWs 470-624 Emergency Off unit with signal lamps, 25 m 471-219 Emergency Off unit with signal lamps, 50 m 470-809 Transport case for H.V. / Operating unit (WxHxD) 720x720x1970 mm 471-178 *): Delivery includes external autotransformer; mains connection cable without termination, fix mounted

5. Options, Accessories and Ordering Information Ordering information PGK 260 HB Mains voltage 220-230V 110-120V*) 240V Items supplied Options High Voltage Test Set PGK 260 HB with accessories 411-016 411-116 411-216 Operating unit 470-026 470-027 470-028 High Voltage unit 470-046 470-046 470-046 Discharge bar ES 26042kWs 411-514 411-514 411-514 Mains connection 554-015 554-016 554-017 Connection cable H.V. / Operating unit, 5 m 471-933 471-933 471-933 Earth lead 3 m 460-462 460-462 460-462 High Voltage connection, 2,5 m with alligator clip 460-477 460-477 460-477 Spanner for replacing rectifier / resistor bar 460-459 460-459 460-459 Rectifier bar (built in) 470-060 470-060 470-060 Resistor bar for A.C. operation 470-059 Moving frame High Voltage unit 470-584 Folding tripod for 19" units, working height approx. 90 cm 411-536 Automatic discharge device EM 260 470-627 Emergency Off unit with signal lamps, 25 m 471-219 Emergency Off unit with signal lamps, 50 m 470-809 Transport case for H.V. / Operating unit (WxHxD) 1350x2220x1350 mm 411-533 *): Delivery includes external autotransformer; mains connection cable without termination, fix mounted 5-7

5. Options, Accessories and Ordering Information Notes 5-8