UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SURFACE SHIP TORPEDO DEFENSE

Similar documents
CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

PE BB Cont. Cont. S400B, Predator MALET Cont. Cont.

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED CLASSIFICATION: EXHIBIT

CLASSIFICATION: UNCLASSIFIED. DATE February 2008 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/INTEGRATED SURVEILLANCE SYSTEM

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Integrated Surveillance System FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

MK 48 Mod 7 Production Restart

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. Total Prior to FY 2008 Cost. FY 2008 Cost. FY 2008 Award Date. Subtotal Product Development Continuing TBD TBD

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Aircraft Engine Component Improvement Program

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

Exhibit R-2, RDT&E Budget Item Justification February 2004

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED UNCLASSIFIED

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

DDG 51 Program. Sea, Air, Space Exposition Washington, DC 04 April Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Airborne SIGINT Enterprise (JMIP) FY 2012 OCO

CLASSIFICATION: UNCLASSIFIED. Exhibit P-40, BUDGET ITEM JUSTIFICATION CLASSIFICATION: UNCLASSIFIED. P-1 Item No. 46. Page 1 of 17. DATE: February 2011

Manufacturing Implications within. new DODI (Dec 8, 2008) Summary for Industry. National Center For Advanced Technologies.

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Exhibit R-2, RDT&E Budget Item Justification

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

Establishment of Light Tactical Vehicles Program Office

DEPARTMENT OF THE NAVY FY 1999 AMENDED BUDGET ESTIMATES

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2001 BUDGET ESTIMATES

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

DDG 1000 Class Destroyer

CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET (P-40) FY2013 Presidents Budget Submission February 2012

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #30

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-5. FY-10 FY-11 FY-12 FY-12 OCO FY-12 Total FY-13 FY-14 FY-15 FY-16

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-135

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: RQ-4

LAV PROGRAM UPDATE COMBAT VEHICLE CONFERENCE 22 SEPTEMBER

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2003 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES FEBRUARY 2002 SHIPBUILDING AND CONVERSION, NAVY

International Diesel Electric Submarine Integrated Combat System

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-12

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology. FY 2011 Total Estimate. FY 2011 OCO Estimate

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2004/2005 BIENNIAL BUDGET ESTIMATES SHIPBUILDING AND CONVERSION, NAVY

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Combat Vehicle and Automotive Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Aviation S&T: Future Vertical Lift & JMR Tech Demonstrator

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Mobile Source Committee Update

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Gaining Ground. Michael Fabey/AW&ST

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

Transcription:

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RDTEN/BA 4 0603506N/SURFACE SHIP TORPEDO DEFENSE COST (In Millions) Total PE Cost 0225 / Surface Ship Torpedo Defense (SSTD) 9999 / CONGRESSIONAL ADDS 32.668 51.545 57.538 22.641 48.992 57.538 10.027 2.553 0.000 A. MISSION DESCRIPTION: Project 0225 utilizes previous development of components of the AN/WSQ-11 Torpedo Defense System and applies them to a detect to engage hardkill torpedo defense system now called the Anti-Torpedo Torpedo Defense System (ATTDS) as specified in the Capability Development Document (CDD). This acquisition program espouses an evolutionary acquisition strategy of providing incremental surface ship torpedo defense capability to the fleet by implementing first on ships already equipped with sonar systems, fire control systems and launchers. Results of FY06 through FY08 at-sea demonstrations of Torpedo Detection Classification & Localization (TDCL) systems lead to a CRUDES TDCL system specification development in FY09. At sea testing of the EDM-1 design of the Anti-Torpedo Torpedo (ATT) variant of the Common Very Lightweight Torpedo (CVLWT) in FY07 and FY08 will facilitate design of the EDM-2 ATT which will be completed in FY10. Also in FY 09, an EDM of the ship components for CRUDES application will be developed. This EDM will legerage existing program of record systems on CRUDES to provide the TDCL system, a command and control system with user interface, a modified Surface Vessel Torpedo Tube launcher, and a canistered Anti-Torpedo Torpedo. The TDCL system will utilize a sensor set added to the AN/SLQ-25A (NIXIE) System, processing in the SQQ-89, as well as the hull mounted sonar already employed on these ships. The development of the ATT is the first derivative of the CVLWT as a funded acquisition program. An offensive warhead design is being investigated separately by ONR that will allow for a variant of the CVLWT to accommodate multi-mission (offensive & defensive) applications. The ATT as well as the TDCL development are closely linked with the ONR FNC programs (Sea Shield FNC's) which provide advance technology inserts at key transition points in support of the planned ATTDS, and TDCL schedules. (U) Project 9B54A - FY08 Congressional Add: Accelerates development of the Anti-Torpedo Torpedo EDM-2 design effort and conducts additional in-water test events on ATT EDM-1 units. (U) Project 9B55A - FY08 Congressional Add: Apply industry cost affordability manufacturability practices (DFA/DFM) to the ATT system design similar to previous successful efforts to reduce ATT subsystem component manufacturing costs. (U) Project 9D21A - FY09 Congressional Add: Develop the Open Architecture (OA) supportability processes, methods, and tools required to facilitate the real-time capture and cataloging of sailor training, performance, and vocational skills data. (U) Project 9D22A - FY09 Congressional Add: Expand technology development of mobile countermeasures used for Surface Ship Torpedo Defense including device engineering, fabrication and testing capabilities to assess the effectiveness of Next Generation (mobile) Countermeasures. R-1 Line Item No 33 CLASSIFICATION: EXHIBIT R-2 PAGE 1 of 8 RDT&E BUDGET ITEM JUSTIFICATION

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION (CONTINUATION) APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RDTEN/BA 4 0603506N/SURFACE SHIP TORPEDO DEFENSE B. PROGRAM CHANGE SUMMARY: Funding: FY09 President's Budget FY10 President's Budget Total Adjustments (U) Summary of Adjustments Congressional Rescissions Congressional Adjustments SBIR/STTR/FTT Assessment Program Adjustments Rate/Misc Adjustments Total 27.451 49.171 24.739 32.668 51.545 57.538 5.217 2.374 32.799 0.000 0.000 0.000-1.490 2.420 0.000-0.438 0.000 0.000 7.145 0.000 33.644 0.000-0.046-0.845 5.217 2.374 32.799 C. OTHER PROGRAM FUNDING SUMMARY: Line Item No. and Name OPN 2213 Surface Ship Torpedo Defense - SSTD 9.950 19.600 2.184 WPN 3113 Surface Ship Torpedo Defense - SSTD 0.013 0.000 0.000 D. ACQUISITION STRATEGY: The project develops Surface Ship Torpedo Defense (SSTD) capabilities using an evolutionary acquisition incremental development approach. OPN: In FY08 - FY09, the OPN funding upgrades the existing AN/SLQ-25A NIXIE through ECP's performed by the Original Equipment Manufacture (OEM) and includes procurement and installation. The FY09 MS B approves the ATTDS as a system of systems to bring a hard kill torpedo defense system to surface ships. The previous EDM-1 Common Very Lightweight Torpedo (CVLWT) design brings in the hard-kill component of the ATTDS. The EDM-2 design started in FY08 and continuing through FY09 and into FY10. FY10 will develop the dedicated Anti-Torpedo Torpedo variant of the the CVLWT. EDM-2 units to support the System Development and Demonstration phase of the program will be built by ARL/PSU. The offensive capability of the CVLWT either as common vehicle that accommodates both offensive and defensive missions or as a dedicated offensive vehicle may be acquired in a future acquisition cycle. Development of offensive capabilities are conducted by ARL/PSU and funded separately by ONR. R-1 Line Item No 33 CLASSIFICATION: EXHIBIT R-2 PAGE 2 of 8 RDT&E BUDGET ITEM JUSTIFICATION

EXHIBIT R-2a, RDT&E PROJECT JUSTIFICATION COST (In Millions) Project Cost 22.641 48.992 57.538 RDT&E Articles Qty 0 0 0 A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: Project 0225 utilizes previous development of components of the AN/WSQ-11 Torpedo Defense System and applies them to a Cruiser and Destroyer (CRUDES) based Torpedo Defense System. This development approach espouses an Evolutionary Acquisition strategy of providing incremental surface ship torpedo defense capability to the fleet by implementing first on ships already equipped with sonar systems, fire control systems and launchers. Subsequent increments will install this capability on large deck ships such as Amphibs, Carriers, and Combat Logistic Force (CLF) ships. R-1 Line Item No 33 CLASSIFICATION: EXHIBIT R-2a PAGE 3 of 8 RDT&E PROJECT JUSTIFICATION

EXHIBIT R-2a, RDT&E PROJECT JUSTIFICATION B. ACCOMPLISHMENTS/PLANNED PROGRAM: Accomplishments/Effort/Subtotal Cost 15.496 39.992 41.538 ANTI-TORPEDO TORPEDO (ATT) FY08- Initiate ATT EDM-2 design. Conduct warhead testing CT1-4 in-water trials. Continue ATT Launcher development. FY09- Continue ATT EDM-2 Design. Complete ATT Launcher development. Conduct DDG Demonstration. Complete CDD. Achieve MS B. FY10- Continue ATT EDM Build. Perform Critical Design Review (CDR). Accomplishments/Effort/Subtotal Cost 7.145 9.000 16.000 SHIP SYSTEMS FY08 - Initiate TDCL Performance Spec. Conduct ATT EDM-1 in-water test event. FY09 - Initiate Ship System EDM Design. Conduct DDG-51 TDCL Test Event. Generate ATTDS Spec. Initiate Ship System EDM Build. FY10 - Complete Ship Systems EDM design. Continue Ship System EDM Build. Conduct Critical Design Review (CDR). R-1 Line Item No 33 CLASSIFICATION: EXHIBIT R-2a PAGE 4 of 8 RDT&E PROJECT JUSTIFICATION

EXHIBIT R-3, RDT&E PROJECT COST ANALYSIS Contract Performing Total PY FY 2009 FY 2009 FY 2010 FY 2010 Cost Categories Method Activity & Cost Cost Award Cost Award & Type Location ($000) ($000) Date ($000) Date Systems Engineering WR NUWC, Newport, RI 10.440 7.449 DEC-08 8.400 DEC-09 Systems Engineering ATT Dev. CPFF PSU/ARL, State College, PA 50.270 25.701 FEB-09 29.113 FEB-10 Systems Engineering CPFF JHU/APL, Baltimore, MD 1.020 0.250 NOV-08 0.300 FEB-10 Systems Engineering Warhead Dev. WR NSWC, Indian Head, MD 11.800 8.500 DEC-08 7.800 DEC-09 Systems Engineering WR NUWC, Keyport,WA 7.631 2.495 DEC-08 3.300 DEC-09 Systems Engineering TDCL CPFF Ultra, Braintree, MA 10.800 0.400 JUN-09 3.000 FEB-10 Systems Engineering ATT WR ONR 0.835 0.000 0.100 JAN-10 Systems Engineering TDCL CPFF AAC, Hauppage, NY 0.000 1.200 JUN-09 3.000 FEB-10 Systems Engineering WR OPTEVFOR, Norfolk, VA 0.123 0.150 FEB-09 0.150 FEB-10 Systems Engineering CPFF ArgonST, Manassas, VA 0.800 0.000 0.000 Systems Engineering TDCL WR NSWC, Dahlgren, VA 1.250 1.872 NOV-08 1.400 DEC-09 Systems Engineering TDCL WR SPAWAR, San Diego, CA 0.225 0.000 0.000 Systems Engineering CPFF UT/ARL 0.000 0.200 JAN-09 0.200 JAN-10 Subtotal Product Development 95.194 48.217 56.763 Remarks: Program Management Support FFP EG&G Gaithersburg, Md 2.846 0.000 0.000 Program Management Support C/CPAF Tech-Marine Burke, VA 0.000 0.700 MAR-09 0.700 JAN-10 Travel PD PMS 415 0.235 0.075 NOV-08 0.075 NOV-09 Subtotal Management Services Remarks: 3.081 0.775 0.775 Total Cost 98.275 48.992 57.538 R-1 Line Item No 33 PAGE 5 of 8 CLASSIFICATION: EXHIBIT R-3 RDT&E PROJECT COST ANALYSIS

EXHIBIT R-4, SCHEDULE PROFILE FY 08 FY 09 FY 10 1 2 3 4 1 2 3 4 1 2 3 4 Program Milestones MS B EDM -2 DESIGN EDM -2 BUILDS 6 3/4 FORM FACTOR/ ANTI TORPEDO TORPEDO (ATT) CDD CT 1-4 CDR DCL DEMOs DDG Demo SHIP SYSTEMS DCL SYSTEM, COMMAND & CONTROL, LAUNCHER ATT DS SP EC SHIP SYS. EDM DESIGN SHIP SYS. EDM BUILD R-1 Line Item No 33 CLASSIFICATION: EXHIBIT R-4 PAGE 6 of 8 SCHEDULE PROFILE

EXHIBIT R-4a, SCHEDULE DETAIL APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME Schedule Profile MILESTONE B CAPABILITIES DEVELOPMENT DOCUMENT (CDD) EDM-2 DESIGN CDR SYSTEM DEMO TRIAL MILESTONE C IN-WATER TRIALS (CT) DT/OT TESTS OT&E FRP IOC Q4 Q4 Q1-Q4 Q1-Q4 Q1 Q1 Q2 SHIP SYSTEMS DCL DEMOS DDG DEMO ATTDS SPEC EDM DESIGN EDM BUILD Q1-Q4 Q3 Q2-Q3 Q1-Q4 Q3-Q4 Q1-Q2 Q1-Q4 R-1 Line Item No 33 CLASSIFICATION: EXHIBIT R-4a PAGE 7 of 8 SCHEDULE DETAIL

EXHIBIT R-2a, RDT&E PROJECT JUSTIFICATION RDTEN/BA 4 0603506N/SURFACE SHIP TORPEDO DEFENSE 9999/CONGRESSIONAL ADDS B. ACCOMPLISHMENTS/PLANNED PROGRAM: 9B54A/Anti-Submarine Warfare (ASW) Enhancements 7.713 0.000 0.000 Accelerates development of the Anti-Torpedo Torpedo EDM-2 design effort and conducts additional in-water test events on ATT EDM-1 units. 9B55A/Anti-Torpedo Torpedo (ATT) 2.314 0.000 0.000 Apply industry cost affordability manufacturability practices (DFA/DFM) to the ATT system design similar to previous successful efforts to reduce ATT subsystem component manufacturing costs. 9D21A/ Supportability Training Services Infrastructure 0.000 1.596 0.000 Develop the Open Architecture (OA) supportability processes, methods, and tools required to facilitate the real-time capture and cataloging of sailor training, performance, and vocational skills data. 9D22A/ Mobile Acoustic Decoys for Surface Ship Defense 0.000 0.957 0.000 Expand technology development of mobile countermeasures used for Surface Ship Torpedo Defense including device engineering, fabrication and testing capabilities to assess the effectiveness of Next Generation (mobile) Countermeasures. R-1 Line Item No 33 CLASSIFICATION: EXHIBIT R-2a PAGE 8 of 8 RDT&E PROJECT JUSTIFICATION