DEMAND RESPONSE EMERGING TECHNOLOGIES PROGRAM SEMI-ANNUAL REPORT 2015

Similar documents
Smart Charging and Vehicle Grid Integration Silicon Valley Leadership Group PEV Forum December 16, 2014

VGI Communications Protocols. April 2018

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

PNM/EPRI Smart Grid Demonstration. Photovoltaics through Grid Automation, Energy Storage and Demand Response

San Diego Gas & Electric United States

Southern California Edison s AutoDR Program

Plug-in Electric Vehicles

Overview of Proposed/Approved Peak Demand Reduction Demonstration Projections Memorandum to EEAC Peak Demand Reduction Subcommittee December 2, 2016

Chris King, President, emeter Strategic Consulting. Copyright 2011 emeter Corp. All rights reserved.

Impact of Energy Efficiency and Demand Response on Electricity Demand

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for December 2009 [Amended Version]

Advanced Energy Communities: Enabling the customer centered grid

Powering the most advanced energy storage systems

Residential Smart-Grid Distributed Resources

Smart Grid, Intelligent Efficiency, Micro-Grids and Distributed Generation

Large General Service Time-of-Use Storage Program

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT

Boston Scientific Energy Storage Project. Final Report (PUBLIC) November 2016

Smart Grid Technology: Measuring Residential Energy Use

Facilitated Discussion on the Future of the Power Grid

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

Distributed Energy Storage John Steigers Generation Project Development Energy / Business Services

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

Transportation Electrification: Reducing Emissions, Driving Innovation. August 2017

Role of the Customer in Energy Efficiency and Conservation. Lisa Wood Montana s Energy Future Helena, Montana

Solar Electric Systems for Multi-Tenant Units. Presenters

Third-Party Implemented Program Policies and Procedures Manual for Business

Manager of Market Strategy and Planning September 22, 2008

NAVIGANT RESEARCH INTRODUCTION

Electric Vehicle Programs & Services. October 26, 2017

Energy Smart: Update to the New Orleans City Council Utility Committee

How Does Charging Impact the Electrical Infrastructure

Virtual Power Plants Realising the value of distributed storage systems through and aggregation and integration

2018 Program Manual CoolSaver

LADWP Energy Storage Update. Board of Water and Power Commissioners August 15, 2017

Merger of the generator interconnection processes of Valley Electric and the ISO;

California s Energy Storage Summit California Energy Storage Association and Association of California Water Agencies

SMART BUILDINGS AND ENERGY EFFICIENCY

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Grocery and Convenience Stores October 11, 2012

Managing EV Load Workplace Charging Project Utility Perspective

Decision on Merced Irrigation District Transition Agreement

Felix Oduyemi, Senior Program Manager, Southern California Edison

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Lighting and Lighting Controls Energy Savings Opportunities Technical Training Series

Carnegie Mellon University Smart Infrastructure Development

Community Solar Policy

Appendix G - Danvers Electric

Residential ZNE Retrofit EE, DR, IES, HEMS + PV a Tall Loading Order Zero Net Energy Home Design, Development and Implementation

ENERGY STORAGE. resource guide & user instructions

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017

Energy Efficiency Program Overview

CPUC Transportation Electrification Activities

State Policies - Distributed Energy Resources

Schedule SP SOLAR PURCHASE (Experimental)

Communication Standards for Demand Response and Distributed Energy Resources

MILESTONE SUMMARY REPORT Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund

FUTURE OF POWERTRAIN TECHNOLOGY

Genbright LLC. AEE Technical Round Table 11/15/2017

The Storage Opportunity Breakout Session

C PER. Center for Advanced Power Engineering Research C PER

Equipment Management Department. Council Budget Presentation

Driving to Net Zero. County of Santa Clara Office of Sustainability. Submitted to: Santa Clara County Submitted by: ICF

Energy Performance Information Request Timeline

SDG&E Electric Vehicle activities

The Geli Guide to SGIP April 26, 2017

EV Strategy. OPPD Board Commitee Presentation May 2018 Aaron Smith, Director Operations

Schedule GS-2 INTERMEDIATE GENERAL SERVICE

Statewide Permanent Load Shifting Program Proposal

Issue 23 draft for Nuvve

Consumers Energy/NRDC Collaboration on a Pilot Project to Defer Investment in a Michigan Substation

SCE s Conceptual Plans to Launch ZigBee Enabled Programs and Services

What, Why, and Where? Brian Lips Senior Project Manager for Policy NC Clean Energy Technology Center

Jennifer Szaro Renewables Manager, OUC

Electric Vehicles as a Grid Resource Lessons Learned for Driving Value from EV Charging Programs

Innovative Utility Energy Efficiency Programs from the Southwest

CITY OF RIO VISTA WATER METER RETROFIT PROGRAM

GRID MODERNIZATION INITIATIVE PEER REVIEW GMLC Control Theory

Achieving Energy Efficiency through Smart Grid. Patty Anderson McKinstry Joe Castro City of Boulder

Corporate Partners Committee Smart Meter Data Access Use Case. June 21, 2011

Assessment of Smart Grid Applications for the City of Palo Alto. City of Alameda Public Utilities Board September 19, 2011

Impacts of Future Codes and Standards on U.S. Electricity Use ( )

Stationary Energy Storage Solutions 3. Stationary Energy Storage Solutions

Oxford case study on storing and sharing solar-generated electricity: Insights from Project ERIC. Energy Storage Summit, 28 April 2016 Twickenham

IEEE-PES Chicago Chapter Presentation November 11, Smart Grid. Mike Born. Principal Engineer, Capacity Planning

E-Mobility Perspectives, Challenges and Globalization Die Stadt der Zukunft Die Zukunft der Stadt Amerikazentrum Hamburg

Batteries and Electrification R&D

Electric Vehicles: Updates and Industry Momentum. CPES Meeting Watson Collins March 17, 2014

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

CVRP: Projected Funding Need and Program-Change Scenarios

Best Practices for Alternative Fuel Infrastructure

Helping Utilities Make Smart Solar Decisions. Montana Clean Energy Pilot Working Group Workshop #5

Evolving our Customer Relationship: Edison SmartConnect Programs & Services Mark Podorsky, Sr. Manager Business Design

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Vermont IEEE PES Drive Electric Vermont Update

California Vehicle-Grid Integration (VGI) Roadmap: Enabling vehicle-based grid services

Electric Vehicle Basics for Your Business

HydroGenerations PROGRAM HANDBOOK

THE PUBLIC SERVICE COMMISSION OF MARYLAND

Transcription:

DEMAND RESPONSE EMERGING TECHNOLOGIES PROGRAM SEMI-ANNUAL REPORT 2015 September 30, 2015

Table of Contents Table of Contents... 2 I. Summary... 4 II. Completed Projects in Q2 2015 and Q3 2015... 4 A. HVAC Optimization... 4... 4... 4... 4... 4 III. Ongoing Projects in 2015... 5 A. 10 kw / 40 kwh Flywheel Energy Storage... 5... 5... 5... 5... 5 B. Residential Pool Pump DR Scaled Field Assessment... 5... 5... 5... 5... 6 C. OpenADR 2.0 A/B Evaluation... 6... 6... 6... 6... 6 IV. New Projects in 2015... 6 A. Residential IDSM Pool Pump Controller... 6... 6... 6... 7... 7 B. EPRI Smart Thermostat Collaborative... 7... 7... 7... 7... 7 C. Phase Change Material for Low Temperature Refrigeration Projects (IDSM)... 7... 7... 8... 8... 8 D. Electric Vehicle to Grid Integration Platform (VGIP)... 8... 8

... 8... 8... 8 Budget... 8 9/30/2015 Page 3 of 9

I. Summary The report is being submitted pursuant to Ordering Paragraph 59, and the discussion at pages 145 146 of Decision (D.) 12-04-045, which adopted budgets and programs for San Diego Gas & Electric Company s (SDG&E s) Demand Response (DR) portfolio for the 2012 2014 program cycle. Ongoing projects include Mainstreaming: 10 kw/ 40 kwh Flywheel Energy Storage, HVAC Optimization, Residential Pool Pump DR Scaled Field Assessment, and Open ADR 2.0A/B Evaluation. II. Completed Projects in Q2 2015 and Q3 2015 A. HVAC Optimization The purpose of this project is to evaluate a building management system overlay that ties together HVAC, occupancy data, weather patterns, and price signals. This system leverages existing building management systems, which are mostly used in large buildings. This software saves some HVAC energy, and reduces the peak demand of buildings by throttling air handler supply fans. In addition, it enables demand response by reducing energy automatically on a DR signal. By reducing the peak demand, customers can save around 10% on their energy bill. All EE and DR trending period and M&V has been complete for this project. Draft report and Final Report completed. Upon peer review will be uploaded to the ETCC website. Upload final report to the ETCC website following peer review. 9/30/2015 Page 4 of 9

III. Ongoing Projects in 2015 A. 10 kw / 40 kwh Flywheel Energy Storage Berkeley Energy Sciences Corporation (BESC) is developing a low-cost flywheel energy storage device. The first generation device has the target of 40 kwh / 10 kw. This flywheel uses high-strength steel as a rotor, and this design has the potential of a 20 year lifetime with over 90% AC to AC efficiency. If successful, this project leads to BESC s second generation technology which is 125kW/500kWh. This project is in collaboration with CEC PIER. BESC received a $1.8M grant from PIER to build the flywheel. SDG&E will provide measurement and evaluation. Inverters selected and the fly wheel prototype has been constructed Site location is being selected and install is beginning. Vendor is working through some permitting issues. B. Residential Pool Pump DR Scaled Field Assessment Pool Pumps are one of the largest consistent energy users in the home, and the lowest-hanging fruit for DR. This approach will hopefully establish a low cost DR retrofit controller for single speed pool pumps. One way this technology aims to be low cost is the capability of delivering DR utilizing digital FM radio signaling. Installations have been completed at each home. DR test events have been called and analysis of each DR even has been calculated. The final report is being drafted. 9/30/2015 Page 5 of 9

Complete the final report. C. OpenADR 2.0 A/B Evaluation Evaluate OpenADR 2.0 A/B signals for demand response, ancillary services, and real time pricing. Evaluate DR potential at site, and A/S potential at site. Send OpenADR 2.0 signals from LBNL or a certified server. SDG&E has collaborated with the Demand Response Research Center at LBNL on this project. The results will be shared with other IOU s during scheduled monthly Test loads have been selected and simulated DR events have been called per the M&V plan of the project. Analyze the simulated test events energy data, various system performance, and system latency. LBNL to draft final report and finish report by the end of Q4 2015. IV. New Projects in 2015 A. Residential IDSM Pool Pump Controller One low cost technology that can unlock IDSM potential for single speed, dual speed, and variable speed pool pumps. This residential solution encompassing all pool pumps provides annual kwh savings and additional kw (load) on demand response days. This project will establish the annual savings and aggregated DR dispatchable load to assist in cost effective growth of Demand Response Programs. 9/30/2015 Page 6 of 9

Vendor donated all labor and materials for this project. 3 rd party energy engineering firm selected and contracted. 50 residences with pool pumps have been selected. 30 day baseline trending has been completed and installations have started. Approximately 8 out of 50 complete. Complete all 50 installations and start the post trending and simulated Demand Response events. B. EPRI Smart Thermostat Collaborative Define methods to translate the value proposition from a field demonstration to utility programs of the products and services in the study. Understand all the costs and benefits from the various thermostat hardware and software offerings as well as the data streams that comes from the products and services. 12+ utilities are participating in this study, 15 smart thermostat products and/or services, and other stakeholders such as EPA, DoE, LBNL, NREL, ICF, and itron. The information from this project is also shared with the statewide ET-DR team on our monthly The collaborative project is in year 2 of 3 for the entire project. SDG&E joined the project late based on new internal interest from customer programs demand response team. September / October time frame will have preliminary deliverables for participants in the study. C. Phase Change Material for Low Temperature Refrigeration Projects (IDSM) Evaluate the direct energy efficiency savings and DR potential that result from installing Phase Change Materials (PCMs) inside low temperature walk-in freezers. 9/30/2015 Page 7 of 9

3 rd party energy engineering firm selected to perform the measurement and verification. 3 sites selected waiting for signed Field Demonstration Agreements to hold project kick off meetings. Execute Field Demonstration Agreements for all 3 sites, hold kick off meetings and begin baseline trending of existing refrigeration equipment. D. Electric Vehicle to Grid Integration Platform (VGIP) This project will create requirements and use cases for unified grid services platform that is secure, low cost, on an open platform. It will also aide in the development architecture and functionality of the VGIP (OpenADR2.0b, SEP, HAN). Lastly, this project will assess performance of the VGIP against utility requirements through field tests and trials. BMW, Chrysler, Ford, GM, Honda, Mercedes, Mitsubishi, Nissan, and Toyota have agreed to be study participants. Contracts signed to start the project. Work with EPRI to launch the project. Budget Approved Budget source per D.14-05-025 (issued May 15, 2014) Decision Approving Demand Response Program Improvements and 2015-2016 Bridge Funding Budget. Projected Program Budget 9/30/2015 Page 8 of 9

Program Name 2015 Budget 2016 Budget Total 2015-2016 Budget Emerging Technology Demand Response $701,807 $705,526 $1,407,333 9/30/2015 Page 9 of 9