Seabrook Substation Reliability Improvement Project

Similar documents
Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

2015 WDC Disturbance and Protection Standards Overview

100 MW Wind Generation Project

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

III. Substation Bus Configurations & Substation Design Recommendations

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Impact of Distributed Energy Resources on Transmission System Reliability

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

Reliability Analysis Update

City of Palo Alto (ID # 6416) City Council Staff Report

Flowgate 10515, an OTDF flowgate, consists of the following elements:

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Electricity Transmission Infrastructure Development in New England

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

15 Nelson-Marlborough Regional Plan

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

Merger of the generator interconnection processes of Valley Electric and the ISO;

The Long-Range Transmission Plan

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Guideline for Parallel Grid Exit Point Connection 28/10/2010

AP1000 Plant Overview

3.0 Radial Distribution Systems

Washington, DC Area Low Voltage Disturbance

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Western NY Public Policy Transmission Planning Report

APR1400 Electric System Design. KHNP KEPCO E&C November 29, 2017

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

TRANSMISSION PLANNING CRITERIA

Sub Regional RTEP Committee South

Case Study on On EHV Circuit Breaker Flashover NTPC-SINGRAULI

Feasibility Study for the Q MW Solar Project

Outage dates (duration): March 2, 1993 to April 20, 1994 (1.1 years) Reactor age when outage began: 11.7 years

Interconnection System Impact Study Report Request # GI

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

GRID INNOVATION CAUCUS CO-CHAIRS

Feasibility Study Report

Generation Interconnection Facilities Study For

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012

15 Nelson-Marlborough Regional Plan

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Feasibility Study Report

CRITICAL ISSUES DOWNTOWN CONTINGENCY PORTFOLIO

INTERCONNECTION FACILITIES STUDY REPORT

The Grid Link Project. Summary of the Report for the Independent Expert Panel

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

Generator Interconnection System Impact Study For

Overview of ISO New England and the New England Wholesale Power Markets

Sub Regional RTEP Committee Mid-Atlantic

ABB POWER SYSTEMS CONSULTING

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

North Oregon Coast Area Study. Adam Lint

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007.

Refurbishment and Life Extension of Existing Facilities in Vermont

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. System Planning

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Status of PNM s Completed Transmission Construction Projects 11/30/2017

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

Sub Regional RTEP Committee Western Region ATSI

The IAEA does not normally maintain stocks of reports in this series.

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

2015 Grid of the Future Symposium

ATTACHMENT - DFO STATEMENT OF NEED

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations

Georgia Transmission Corporation Georgia Systems Operations Corporation

Electric Power Transmission: Research Needs to Sustain a Critical National Infrastructure

Interconnection Feasibility Study Report GIP-084-FEAS-R2

BREAKER FAILURE PROTECTION

Transformer Protection

Implementing a Microgrid Using Standard Utility Control Equipment

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

The Energy Queensland Group Notice of no non-network options

Sub Regional RTEP Committee Mid-Atlantic

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT

Decision on Merced Irrigation District Transition Agreement

Project #148. Generation Interconnection System Impact Study Report

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Cost Benefit Analysis of Faster Transmission System Protection Systems

Western Area Power Administration

DFO STATEMENT OF NEED REPORT

Interconnection Feasibility Study Report GIP-226-FEAS-R3

MILLIGAN SOLAR PROJECT

The Green Line Project

DESCRIPTION OF REQUIREMENTS FOR GENERATION SYSTEMS SEEKING TO PROVIDE SYSTEM RESTART SERVICES

Transcription:

New England Division Seabrook Substation Reliability Improvement Project 1. Project Summary Description Seabrook Substation is critical to ISO-New England as a Pool Transmission Facility, to grid availability for Seabrook Generator and to fulfill NRC loss of offsite power requirements to a nuclear generating station. FPL-NED has a rigorous maintenance program. However, the Seabrook Substation was built in 1982 with first generation GIS technology and equipment failures experienced during the past 2 years have affected availability of the Seabrook Generator, causing in excess of 26 days of unplanned outages since Feb. 2007. Existing design of the Seabrook Substation which has the Reserve Auxiliary Transformers (RAT) connected directly to Bus No. 2 is not optimal and poses reliability concerns as well as operational limitations. FPL-NED s Project cost effectively improves: i) 345kV line reliability, ii) generator availability and iii) ability to perform maintenance or future upgrades as required without the need for a generator outage. Generator refueling outages which are critical to switchyard construction work (e.g. cutover and commissioning of new facilities) are at 18 month intervals and FPL-NED proposes to complete the Project over the next two refueling outages (October 2009; April 2011). The Project, which will be conducted in two stages, is the most cost-effective to significantly improve reliability Two dedicated busses improve the reliability and maintainability of the three 345 kv transmission lines interconnected through the Seabrook Substation. Improves the availability of the Seabrook Generator to New England and increases offsite power reliability per NRC requirements. Modified design provides more separation between transmission lines and the Seabrook Generator. This reduces impact of events that involve a line fault and breaker failure. Improved design will allow more flexibility for clearances to perform future maintenance and upgrades outside of Generator outages and without placing lines in a single-contingency condition. If all permits and approvals are received by March, 2009, then Stage 1 of this project will be completed during the October 2009 refueling outage requiring only a Line 369 outage, and during the April 2011 refueling outage, Stage 2 will be completed. Modified RAT and GSU interconnection is standard design for typical FPL Nuclear substations. Seabrook Substation Reliability Improvement Project 1 1/04/2010

2. Problem Statement Seabrook 345-kV Substation (S/S), located in Seabrook, New Hampshire, is a major bulk power transmission system facility and a critical node on the ISO-New England (ISO- NE) transmission grid. The substation was originally built in 1982 with a gas insulated substation (GIS) design (first generation technology) and consists of eight circuit breakers. The substation is owned, maintained and operated by Florida Power and Light Company - New England Division (FPL-NED). As shown in Figure 1 below, the circuit breakers at Seabrook S/S are arranged in a breaker and one half scheme with connections for five key transmission elements: Line 394 (Ward Hill Tewksbury); Line 363 (Scobie Pond) and Line 369 (Timber Swamp Newington); the reserve auxiliary transformers (RATs) and generator step up transformers (GSUs) used to interconnect the 1318 MW nuclear power station and unit auxiliary transformer (UAT). Figure 1 Existing Seabrook 345-kV Substation FPL-NED has implemented and continues to exercise a rigorous maintenance program on the Seabrook Substation. However, the substation is 26 years old and equipment failures experienced during the past two years have affected availability of the transmission lines and nuclear station causing 26 days of unplanned outages since February 2007. Component failures on the rupture discs, switch rods and connections involving the RATs and GSUs have caused recent station outages. Seabrook Substation Reliability Improvement Project 2

The existing substation design of the Seabrook S/S which has the RATs connected directly to Bus No. 2 is not optimal and poses reliability concerns as well as operational limitations. In the event a fault occurs simultaneous with a breaker failure (eg. 632, and/or 692) then one of the 345-kV lines and the RATs will be lost. Due to the direct connection to Bus No. 2, the failure of the RAT will also result in an outage of Bus No. 2 which severely lowers the reliability performance of the station. This design configuration has limited operating flexibility that does not allow for efficient and effective maintenance of substation equipment. Table 1 below demonstrates the impact on substation reliability performance of the RAT connection onto Bus No. 2. Design modifications are needed to move the RAT connection into a dedicated terminal position within the substation which will substantially improve the reliability of the Seabrook 345- kv Substation. Condition Fault Action Result RAT Failure with Stuck 692 Breaker Trips 369 (to Timber Swamp) Loss of 345-kV transmission line All Facilities In-service RAT Failure with Stuck Opens NNE-Scobie + 394 Trips 363 (to Scobie Pond) 632 Breaker Interface Facility Fault on Line 369 with May require backdown of Trips Bus No. 2 and RAT Stuck 692 Breaker Seabrook generator Fault on Line 363 with May require backdown of Trips Bus No. 2 and RAT Stuck 632 Breaker Seabrook generator Breaker 941 Open RAT Failure Opens NNE-Scobie +394 Open Breaker 22, 632, and and North-South Interface 692 and Isolates Line 394 Facility Breaker 169 Open RAT Failure Open Breaker 22, 632, and Loss of 345-kV Breaker 163 Open 692 and Isolates Line 369 transmission line Open Breaker 22, 632, and RAT Failure 692 and Isolates Line 363 Table 1 - List of Contingencies Involving RAT and Bus No. 2 Opens NNE-Scobie + 394 Interface Facility NRC design requirements for Seabrook Nuclear Generating Station require that the Seabrook 345-kV Substation provide for independent and redundant paths to ensure an available off-site power supply for N-2 contingency conditions. These are codified in the NRC-approved Technical Specifications (Tech. Specs.) and Unit Final Safety Analysis Report (UFSAR). In addition, loss of either off-site power connection (UAT or RAT) places the generating station in an immediate Limited Condition of Operation (LCO). The LCO can require station back down which may have undesired effects on grid reliability and wholesale market prices. A second reliability concern is the generator connection which shares a breaker bay with Line 363. The Seabrook generator is the largest single unit in New England, New York and Canadian Maritimes control areas. A fault on Line 363 with a failed breaker or relay misoperation results in the Seabrook generator being tripped. In addition, maintenance on Breaker 163 with a fault on either Line 394 or 369 with a stuck breaker also trips the 1318 MW Seabrook generator. Condition Fault Action Result 363 Fault with Stuck 163 Largest source loss in All Facilities In-service Trips 1318 MW Generator Breaker Northeast region Breaker 163 Open Fault on Line 394 and Trips 1318 MW Generator Largest source loss in Seabrook Substation Reliability Improvement Project 3

Breaker 11 Open Stuck 941 Breaker Northeast region Fault on Line 369 and Largest source loss in Trips 1318 MW Generator Stuck 169 Breaker Northeast region Remove both offsite power Fault on Line 363 and Trips 1318 MW Generator supplies and largest source Stuck 632 Breaker and RAT loss in Northeast region Table 2 List of Contingencies Tripping the Seabrook Generator FPL-NED recommends modifications to improve substation reliability for the transmission lines, 1318 MW generator and offsite power supply for the nuclear station. In addition, condition assessments of the entire switchyard are underway, switch rods are being replaced and proposals are being prepared to add GIS equipment monitoring and failure detection systems. Seabrook Substation Reliability Improvement Project 4

Stage 1 Seabrook Switchyard Reliability Project (October-December 2009) 394 Tewksberry & Ward Hill 363 Scobie Pond 369 Newington Breaker Numbers are preliminary until approved by ISO Line Termination Yard (Air) BUS #2 North Bus Long 1000' GIS Bus GIS Switchyard T-2006 Existing connection - to be modified during outage 22 632 25 Spare 294 163 3J63 BUS #5 T-2006 T-2003A T-2003B 3J94 BUS #3 G106 695 692) 26 RAT1 RAT2 941 11 3J69 16 169 BUS #1 South Bus Existing 26 year old equipment Existing 10 year old equipment New Equipment commissioned in 10/09 New Equipment commissioned in 4/11 Stage 1 - $51.3 Million Not In-Service UAT1 UAT2 UNIT #1 Total Project - $63 Million Seabrook Substation Reliability Improvement Project 5

Stage 2 Seabrook Reliability Project (January 2010-April, 2011) 394 Tewksberry & Ward Hill 363 Scobie Pond 369 Newington Breaker Numbers are preliminary until approved by ISO Line Termination Yard (Air) BUS #2 North Bus Long 1000' GIS Bus GIS Switchyard Existing connection - to be modified during outage : r - RAT 22 632 25 (5) nels relay ond w Spare 294 3J94 941 BUS #3 363 13 3J63 163) 11) 3J69 695 BUS #5 692) 26 (2) BUS #6 T-2006 G106 T-2003A RAT1 T-2003B RAT2 169 (3) 16 (1) th, BUS #1 South Bus to rap Existing 26 year old equipment Existing 10 year old equipment New Equipment commissioned in 10/09 New Equipment commissioned in 4/11 Existing connection - to be modified during outage UAT1 UAT2 UNIT #1 Stage 2-2010- $2.8 Million: 2011 - $8.9 Million Total Project - $63 Million Seabrook Substation Reliability Improvement Project 6