STATE LOOP 195 PUBLIC MEETING. Footer Text

Similar documents
SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SOUTH TEXAS COMMISSION MEETING

SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Public Information Workshop

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting

ALTERNATIVE PROJECT DELIVERY

PUBLIC INFRASTRUCTURE PROJECTS

Harlem Avenue between 63 rd and 65 th

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

Rolling Road (Route 638) Widening Project

Proposed Project I 35 Improvements from SH 195 to I 10

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Doran Street and Broadway/Brazil Grade Separation Project

Harlem Avenue between 63 rd and 65 th

Final Series of Public Meetings

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

Business Advisory Committee. November 3, 2015

Wentzville Parkway South Phase 2 & 2A

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Summary of the Alcoa Highway Redevelopment Project

CONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY

Purpose and Need Report

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

TURNPIKE SYSTEM. Summary information from: Texas Department of Transportation GENERAL INFORMATION & SYSTEM MAP JOA REALTY

HIGHWAY 28 FUNCTIONAL DESIGN

EXCEPTION TO STANDARDS REPORT

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

US 67 WIDENING PROJECT

IH 35 FEASIBILITY STUDY

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

IMPROVEMENT CONCEPTS

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM

Request for Design Exception (#1) S.M. Wright Phase IIB

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

The Eastern Connector Study November, 2007 planning for the future

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

STH 60 Northern Reliever Route Feasibility Study Report

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Lacey Gateway Residential Phase 1

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

Welcome. Public Open House Schedule. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna. West Kelowna. Wednesday, March 2, :00 p.m. 8:00 p.m.

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

Business Advisory Committee. July 7, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

Arizona-Sonora Border Master Plan. Plan Maestro para la Frontera Arizona-Sonora

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

US 70 Corridor Planning for the Future

Welcome. Please Sign In

Waco Rapid Transit Corridor (RTC) Feasibility Study

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

CROSSING RAIL PROJECT (P4) RAIL

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

CTA Blue Line Study Area

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

FREQUENTLY ASKED QUESTIONS

Letter of Transmittal

Characterization of Combined Use of County Road Segment

San Francisco to San Jose Preliminary Alternatives Analysis

Dempster Street Road Improvements. Preparing for Construction

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Delaware County Engineer s Office

TXDOT PLANNING CONFERENCE. Quincy D. Allen, P.E. Houston District Engineer June 16, 2016

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

FREQUENTLY ASKED QUESTIONS

Restoration of Historic Streetcar Services in Downtown Los Angeles

Transportation & Traffic Engineering

Restoration of Historic Streetcar Services in Downtown Los Angeles

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV

FY 2013 Candidate Projects ($ Thousands) Street & Traffic Control Program - Thoroughfares

Turnpike Mitigation Program Application

What is the Peninsula Corridor Electrification Project (PCEP)?

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

Chapter 7: Corridor Visions

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

ODOT District Two Monthly Construction Update

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

GATTIS SCHOOL RD / SH 130 SUBDIVISION

TRAFFIC IMPACT ANALYSIS

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Transcription:

STATE LOOP 195 PUBLIC MEETING

STATE LOOP 195 From FM 755 to 1 mile west of Loma Blanca Rd

Public Meeting Agenda Welcome & Introductions Octavio Saenz TxDOT Public Information Officer Technical Overview Romualdo Mena Jr., P.E. TxDOT Project Manager Next Steps in Project Development Octavio Saenz - TxDOT Public Information Officer Public Comment Adjournment 3

Public Meeting Purpose Encourage and maintain effective communication with the public Provide project information on SL 195 Follow an important step in the environmental process Receive public input and comments 4

Provide Your Comments Sign up to speak tonight Leave written comment form at registration table tonight Mail or drop off written comments to: TxDOT Pharr District Attn: SL 195 600 W. Interstate 2 Pharr, TX 78577 Fax comments to (956) 702-6110 Email comments to Robin.Gelston@txdot.gov Comments must be received or postmarked by Wednesday March 8, 2017 5

Project Area Project Limits State Loop 195 (SL 195) From FM 755 to 1 mile west of Loma Blanca Rd Total Length: 17.24 miles End Project Loma Blanca Rd US 83 FM 649 FM 3167 SL 195 Begin Project Roma Escobares Garceno FM 755 US 83 MEXICO Villareales Rio Grande City US 83 6

Project Need and Purpose Project Need: Increased congestion Lack of mobility Increased accident rate Poor corridor connectivity Project Purpose: Reduce congestion Improve safety Improve mobility and connectivity by providing a new 4 lane divided highway between Rio Grande City and the City of Roma. 7

Project Need and Purpose 8

Corridors Evaluated 9

Project History Original Project Scope in 2000 Expressway with no frontage roads Access (backage roads) Public Meeting held on Feb. 2,2000 in Roma,Texas Open House and Public Workshops held : Rio Grande City on Dec. 7-10, 2004 Roma on Dec. 7-8, 2004 Project put on hold in 2008 due to funding In Nov. 2012,additional Stakeholder Meetings were held with Starr County, Rio Grande City, City Of Escobares and City of Roma in Nov. 2012 10

SL 195 Proposed Typical Section 300 R.O.W. 38 overall width of new roadway typical sections Eastbound and westbound directions: 4 inside shoulder 12 vehicle travel lane 12 vehicle travel lane 10 outside shoulder Divided roadway with 124 inside median 11

SL 195 Proposed Typical Section 300 ROW 12

SL 195 Proposed Typical Section 450 ROW Overpass approach at US 83 / Loma Blanca Rd 104 width of overpass typical section Eastbound and westbound direction: 17 inside shoulder 12 vehicle travel lane 12 vehicle travel lane 10 outside shoulder And two 38 foot-wide roadbeds access roads 13

SL 195 Proposed Typical Section 450 ROW 14

Project Details Project Scope Proposed divided rural highway in a new location within 300 ROW Construct overpass at US 83/Loma Blanca intersection Construct bridges at FEMA flood zones and 13 other waterways Major intersections with turnarounds within 450 ROW FM 3167, FM 649 and Loma Blanca Crossovers at the following intersections: Charco Blanco Rd, Jesse Warren Rd, Alvarez Rd, San Julian Rd and Ebony Ave Approximately 99 parcels of ROW will be needed One commercial, 11 residential relocations and utilities estimated Construction for this project is proposed in 3 phases 15

Project Schedule* SL 195 Ongoing Public Involvement Schematic Environmental Clearance Final Design Phase I Acquire ROW/Utilities Phase I Letting Phase I Begin Construction Phase I Spring 2017 Spring 2018 Summer 2018 spring 2021 Summer 2021 Fall 2021 *This project schedule and dates are preliminary. 16

Public Comment Period Use the microphone State your name State your interest in the project Give your comments on the project 17

Provide Your Comments Leave written comments at registration table tonight Court Reporter (Translator) Mail or drop off written comments to: Fax comments to (956) 702-6110 TxDOT Pharr District Attn: SL 195 600 W. Interstate 2 Pharr, TX 78577 Email comments to Robin.Gelston@txdot.gov Comments must be received or postmarked by Wednesday, March 8, 2017 18