Question Question 1.2-8

Similar documents
Paradigms in Power System Planning & Operation Contemplating the HVDC Technological Evolution

Cigre SC B4 Activities Towards HVDC Grids. HVDC Grid Workshop Belgium

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Comparison of the Performance of HVDC and HVAC Overhead Transmission Lines for the Itaipu System

15 Nelson-Marlborough Regional Plan

Offshore Wind Connections HVDC for Offshore Grids

The Application of Power Electronics to the Alberta Grid

HVDC Back-to-Back Interconnections Enabling reliable integration of power system

Cascading Fault in AC/DC Hybrid Power Grid Xinzhou Dong

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

Transmission Grid Reinforcement with Embedded VSC-HVDC. Jonatan Danielsson, Sugam Patel, Jiuping Pan, Reynaldo Nuqui

TransWest Express Project

Dr.-Ing. Ervin Spahi, Wadden Sea Forum, Bremerhaven Electric grid on and off-shore: current status, obstacles and new developments

MAXIMIZATION OF ENERGY GENERATED AT THE POWER PLANTS

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

POWER TRANSMISSION OF LOW FREQUENCY WIND FIRMS

Next Generation of UHVDC System. R. Montaño, D Wu, L. Arevalo, B. Jacobson ABB - HVDC Sweden

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative

HVDC Solutions. for Integration of the Renewable Energy Resources. Marcus Haeusler HVDC Lead Engineer. siemens.com/energy/power-transmission

Electrical Test of STATCOM Valves

EPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011

Project #148. Generation Interconnection System Impact Study Report

ABB POWER SYSTEMS CONSULTING

HVDC. TMT&D provides the best and most economical HVDC system.

Electricity sector overview

ABB Wind Power Solution

Evaluation of offshore HVDC grid configuration options

Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances

HVDC Transmission: Part of the Energy Solution? Peter Hartley Economics Department & James A. Baker III Institute for Public Policy, Rice University

NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2.

Extra-High-Voltage SF 6 Gas-Insulated Switchgear

IEEE T&D FACTS Panel Session Part II (08TD0140) Wednesday, April 23, 2008

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

Chapter 3.1: Electrical System

ELG4125: Flexible AC Transmission Systems (FACTS)

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

Cigre and Trends in Power Electronics for the Grid. Bjarne Andersen Chairman of Cigre Study Committee B4 HVDC and Power Electronics

DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK.

ABB Group August 27, 2010 Slide 1

15 Nelson-Marlborough Regional Plan

Chapter 1. Overview of HVDC applications

Electrical grid stability with high wind energy penetration

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM

High Voltage Direct Current Systems

Experience on Realizing Smart Grids. IEEE PES conference, Gothenburg

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

Introduction CONTENT Future of offshore wind energy in Europe Offshore wind energy in Spain Alternatives to the transmission system to the grid Compar

Power Engineering - Egill Benedikt Hreinsson. Lecture 15a. HVDC Transmission. 2 November 2011

The Role of Offshore Wind

Raphael Görner, Head of Marketing & Sales, Grid Systems Germany Building bridges with HVDC Solar Energy for Science

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

DC Arc-Free Circuit Breaker for Utility-Grid Battery Storage System

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS

Electricity industry structure and key players

Physical Design of a Volt/Var Implementation

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

The Grid Link Project. Summary of the Report for the Independent Expert Panel

SUMMARY OF THE IMPACT ASSESSMENT

Status and Trends of HVDC

Alves, F.R.M. Henriques, R.M. Passos Fº, J.A. Gomes Jr., S. Borges, C.L.T. CEPEL UFJF UFJF CEPEL UFRJ

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

GE Energy. Variable Frequency Transformers Grid Inter-tie

Wind Power Plants with VSC Based STATCOM in PSCAD/EMTDC Environment

Electricity System Operator EAD. Difficulties in Grid Planning & Development

Getting Smart Evolution to the Smart Grid April 2008

Long distance bulk transmission

Protective firing in LCC HVDC: Purposes and present principles. Settings and behaviour. V. F. LESCALE* P. KARLSSON

Feasibility Study Report

Review paper on Fault analysis and its Limiting Techniques.

Western Alberta Transmission Line (WATL) HVDC Project

Reactive power support of smart distribution grids using optimal management of charging parking of PHEV

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

OBJECTIVES LCC HVDC SYSTEMS VSC HVDC SYSTEMS COMMON EQUIPMENT DIFFERENT OPTIONS ECONOMIC IMPACTS CONCLUSIONS

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

Project #94. Generation Interconnection System Impact Study Report Revision

CHAPTER 6 DESIGN AND DEVELOPMENT OF DOUBLE WINDING INDUCTION GENERATOR

HVDC Multi-Terminal Interconnections a viable and optimal solution for India

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC

Merchant Transmission Interconnection PJM Impact Study Report. PJM Merchant Transmission Request Queue Position X3-028.

Gunnar Asplund HVDC R&D Manager Sweden. Latest HVDC Light developments. IEEE Montreal

Renewable and Distributed Energy Resource Technologies

The role of Transmission System Operator in Belgium and in Europe. Vlerick Alumni Event 26 January 2016

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

Offshore Wind: Grid Connection & Technology Options. Dietmar Retzmann Focus on. CO 2 Reduction Green Energy Megacities Security of Supply

Rural electrification using overhead HVDC transmission lines

New Mexico Transmission Expansion Concepts For Wind Resources

The Smart Way. HVDC PLUS One Step Ahead. Answers for energy.

HVDC-Flexible in China. Sep

Interconnection Feasibility Study Report GIP-226-FEAS-R3

High Voltage Direct Current and Alternating Current Transmission Systems Conference. August Nari Hingorani

Climate change drivers for a single and smart EU grid

AIR CORE REACTORS. Phoenix Electric Corporation

Transcription:

Question 1.2-7 A dc transmission line running through a forest terrain is vulnerable to forest fires. If it is a bipolar line then both poles can be affected at the same time. What steps can be taken to minimize this risk? Is the answer to run each pole on a separate tower with sufficient distance between two poles? Are there any concerns about continuous earth return operation for a long time? This issue is of particular importance when considering the increasing number of long distance transmission schemes under consideration or under construction in China and India, respectively mentioned in Papers 110 and 117. Is there any data available on the failure rate of bipolar HVDC transmission lines? What data is available on the types of dc transmission line faults? Should AGB4-04 be collecting this data? Question 1.2-8 The converter losses of HVDC VSC systems can be almost 3 times as that of HVDC Line Commutated Converters, as mentioned in Paper 109. How are the other HVDC VSC advantages capitalized against the higher converter losses? Is there more detailed comparative analysis between VSC and LCC technologies to be reported by authors of the above four papers, from Paper 104 or from other contributors? What are presently the main reasons for selecting/rejecting VSC transmission? In the application shown in Paper 116, were there any issues with ESCR requirements in Sicily and Sardinia and for power reversal to North Africa? To contribute with the questions 1.2-7 and 1.2-8 an introduction to the Madeira Transmission System is a must. The Madeira River Power Plants represent the beginning of the Amazon Basin exploitation and are located about 2500 km from the major load centers of the Brazilian Interconnected System. The transmission studies recently finished indicated the DC technology as the solution of minimum investment and less overall costs. The solution recommended by these studies was 2 bipoles of 3,150 MW each, + 600 kv, 4 x 2312 MCM, 2375 km, to supply the loads in the Brazilian Southeast region, as shown in Figure 1. To local reinforcements (Acre and Rondônia), 2 back-to-back converters of 400 MW each are provided, to connect with the existing system of 230 kv, in parallel with the planned HVDC trunk. The reason for using such devices is to avoid overload conditons in the 230 kv system in parallel with the two bipoles and prevent torsional effects on local thermal plants.

Rio Branco 160 km 305 km S.Antônio Jirau Coletora 30km Back-to-back 2x400MW 41km 150km 165km Samuel Ariquemes 118km 2 x 3150 MW - 2375 km Pimenta Bueno 160km 354km Vilhena Jauru Cuiabá +600 kv 230 kv 335km Ribeirãozinho 364km 242km 200km Rio Verde Itumbiara SOUTHEAST REGION Atibaia 350 km N. Iguaçu 3 x 1250 440 kv 250 km 345 kv 440 kv 138 kv Figure 1: DC Alternative According to the Brazilian regulatory system, the process to implement new transmission facilities is done by auctions, and considering the significant investments associated to the Madeira Project, the Ministry of Energy deemed strategic to bid out, in addition to the alternative of lower cost (DC), also the technology of alternating current (AC), in order to increase competitiveness, once in the recent AC new installations expressive discounts were observed. For the distances involved, however, a purely transmission would demand 4 to 5 circuits and would lead to a very high amount of ohmic losses, around 17% of the transmitted power. So, the AC option to be auctioned would then be the 765 kv, and for that the more promising alternative to that level of voltage was rescued, which would be composed by 3 circuits of 6 954 MCM conductor bundle per phase each. In the evolution of technical studies, however, sustained overvoltage problems and risk of industrial frequency resonance appeared. The lack of time for resizing this alternative, and its cost, already well above that of DC alternative, led to the prudent decision to discard it. Finally, in order to meet the strategy of having two technologies at the auction, to stimulate competition and to grant bigger discounts, a hybrid (HB) DC-AC alternative came into play. This alternative provides the flow of approximately 50% of the power to Southeast using DC technology (1 x 3150 MW bipole - equivalent to 1 of the 2 bipoles of the DC alternative) and 50% in alternating current (2 lines of, 6 x 1033 MCM, single circuit, 70% series compensated).

The supply to the existing regional 230 kv system is accomplished by 3 x 500/230 kv transformers in. The alternative also provides for step down transformations in Jauru, Cuiabá and Água Vermelha substations. The configuration proposed for this alternative is shown in Figure 2. R.Branco Jirau 3300MW 305 km S.Antônio 3150MW Coletora Porto Velho 160 km 3 X 300 30km 41km Samuel Ariquemes 300 km C.Oeste P.Bueno Vilhena 1 x 3150 MW - 2375 km 335 km 3x954MCM Jauru Cuiabá Ribeirãozinho +600 kv 230 kv 200km 380 km Rio Verde 400 km Rio Araguaia A. Vermelha 5 km A. Vermelha existente Itumbiara SOUTHEAST REGION 250 km Atibaia 350 km N. Iguaçu 3 x 1500 440 kv 345 kv 440 kv 138 kv Figure 2: HB Alternative With the experience gained in the preparation of these studies, the Brazilian contributions on the issues raised in WG - B4 are listed: 1. Steps to minimize the risks of forest fires and concerns about earth return operation for a long time: a. To minimize the risk of problems due to fires and winds, a minimum distance of 10 km between bipoles was established; b. The possibility to put converters in parallel, in case of losing one line, together with the capacity of the remaining line of twice the rated current in emergency, increases the reliability as well as reduces the time of system operation with earth return;

c. The possibility to operate lines in parallel, in case of losing one converter, not only reduces losses but also keeps the lines always energized, minimizing the risk of theft. 2. Definition of converters overloading capacity The converters capability to sustain overload is not necessary in alternative HB, since, during the first 30 minutes after any failure in the DC side, the AC system accommodates this overload. After that, re-dispatching becomes necessary, due to the loading limitations of the series capacitor banks. In the DC alternative, a transient overload capability (about 5 seconds) of 50% is essential to prevent frequencies higher than 66 Hz. In a period of 30 minutes, an overload capacity of 10% in the remaining converters is sufficient to ensure the fulfillment of the N-1 criterion in any scenario studied. In the worst of them, losing a pole during the wet period (5 months per year) and with light load in Acre/Rondônia (about 9 hours a day) and with all the 88 generators fully dispatched, the need arises to redistribute a generation amount of no more than 1000 MW along the system. This is accomplished by the machine controllers (speed governors), at the Madeira complex as well as in the rest of interconnected system. According to the above results, and considering that currently the system coexists with losses of generation even larger than 1000 MW, the choice of an overload capacity of about 10% could be an option. However, to ensure some operating security margin to the system, the System Operator suggested as a strategy the requirement of 33 %overcapacity for the DC alternative converters. 3. Use of other technologies For reinforcements in the local Acre/Rondônia system, two back-to-back converters of 400 MW each were considered. It was not found necessary to provide overload capacity for these equipments. Due to the low short-circuit ratio verified at 230 kv busbar, it was necessary to recommend the installation of 3 synchronous compensators of 100 Mvar each. For each of the above, other control or technology related solutions to improve the performance of the CA system of 230 kv can be adopted, provided that they clearly have performance equal to or superior than those obtained in the analyses already prepared. 4. - Definition of voltage transmission According to the characteristics of the Brazilian Interconnected System at the time of the Madeira River power plants implementation (year 2012), a sudden loss of a single ±800 kv bipole carrying close to 6000 MW would certainly imply stability problems, leading to the collapse of the same Interconnected System. Even though it was not part of the planning criteria, the possibility of loss of a bipole was considered as an additional security measure to select two bipoles, regardless of the system voltage.

The choice of the 600 kv level was based on the comparison of the total costs of the ±500, ±600 and ±800 kv transmissions. Figure 3 shows the percentage of investments associated with the construction of 2 bipoles at each voltage level. One can see, as expected, that the investments in lower voltages are lower. The losses, however, have opposite behavior, and an analysis of the overall transmission costs (investment and losses) shown in Figure 4 points out that the transmission at ±500 or ±800 kv has costs approximately 10% higher than those at 600 kv. Comparação de investimentos não comuns % 120,0 100,0 80,0 60,0 40,0 20,0 0,0 2CC5 00 2CC600 2CC800 % 100,0 107,4 114,1 Figure 3 Investm ent (%) 120,0 100,0 80,0 60,0 40,0 20,0 0,0 2CC500 2CC600 2CC800 % 110,5 100,0 108,7 Figure 4 Overal Cost (%) It is interesting to note that, if a single bipole were acceptable, the level of ±800 kv would have greater economic benefits and would become the alternative with the lower total costs. For the assumptions used, therefore, the conclusion is that the alternative of ±600 kv is the one with lower overall costs.