MTEP14 South SPM #2. MISO Texas Project Information. April 7, 2014

Similar documents
Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

MTEP13 SPM #2- Central Region. March 25, 2013

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017

ATTACHMENT Y STUDY REPORT

Sub Regional RTEP Committee Mid-Atlantic

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description

Chapter 7 - Appendix A

Feasibility Study Report

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

TEXAS ECONOMIC STUDY REPORT ICTES INFORMATIONAL ONLY

Market Efficiency RTEP Proposal Window

Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects

Generation Deactivation Notification Update

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Stability Study for the Mt. Olive Hartburg 500 kv Line

Market Efficiency RTEP Proposal Window

ATC Year Assessment Network Project List. MTEP Cost Reason for Change since Previous System Addition

SERTP rd Quarter Meeting

System Impact Study Report

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

100 MW Wind Generation Project

Monthly Construction Plan Project Status Report Report Date: 1/16/2014

Transmission Expansion Advisory Committee

1. Administrative Items... SPP. 2. Stakeholder Web-Presentation... ABB

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

Feasibility Study Report

Sub Regional RTEP Committee Western Region ATSI

CUSTOMER/ TWIN ARROWS PROJECT

Market Efficiency Update

Sub-Regional RTEP Committee PJM South

Sub Regional RTEP Committee - Southern. August 19, 2011

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

New 115 kv Disconnect Switches at Bloomsburg MTS

Sub Regional RTEP Committee Mid-Atlantic

Review Initial Results of Reliability Assessments. Inter-regional. Discuss Alternative Solutions from Stakeholders

Entergy Draft Construction Plan Update 1

South Carolina Regional Transmission Planning. Stakeholder Meeting. Web Conference

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

MTEP14 West SPM #2. ATC, DPC, XEL Project Review. April 2, 2014

SERTP rd Quarter Meeting

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities

Minnesota Biennial Transmission. Zone Meeting 8

MILLIGAN SOLAR PROJECT

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- --

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

APPENDIX C FACILITY ILLUSTRATION

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

Western NY Public Policy Transmission Planning Report

2018 & 22 Final LCR Study Results Greater Bay Area

Q0044 interconnection at

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

DFO STATEMENT OF NEED REPORT

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Feasibility Study Report

SPP Notification to Construct

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

Market Efficiency Planning Study

Entergy Final Construction Plan

Connection Engineering Study Report for AUC Application: AESO Project # 1674

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission

Black Hills Project Summary

North Oregon Coast Area Study. Adam Lint

2016 SDG&E Grid Assessment Results

Appendix B. Summary of Changes to the Year Assessment

2016 SPP Transmission Expansion Plan Project List Kansas Projects

Seabrook Substation Reliability Improvement Project

National Grid s 2018 Local Transmission Plan

Transmission Expansion Advisory Committee

Transmission Planning Attachment K Public Input Meeting

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

The Long-Range Transmission Plan

15 Nelson-Marlborough Regional Plan

South Dakota 890 Study

Sub Regional RTEP Committee Mid-Atlantic

Western Area Power Administration

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

SPP Notification to Construct

Transcription:

MTEP14 South SPM #2 MISO Texas Project Information April 7, 2014

MISO Southern Region EAST TEXAS ELECTRIC COOPERATIVE 2

East Texas Electric Cooperative (ETEC) No projects submitted for moving to Appendix A or Appendix B in MTEP14 for ETEC 3 3

MISO Southern Region ENTERGY TEXAS 4

Entergy-Texas Entergy-Texas has a total of 16 project proposals in the MTEP14 database Of those 16 projects: 6 project proposals have a target appendix of Appendix A. Of those 6, 3 projects have a cost >$5M, 1 project has a cost between $1M and $5M, and 2 projects have a cost <$1M. 10 project proposals are targeted for Appendix B. These are reliability driven projects. Of those 6 projects designated to move to Appendix A All are Baseline Reliability Projects 4 Projects driven by a new load addition 2 Projects are relay modifications 5

MISO MTEP14 APPENDIX A PROJECTS 6

Projects Driven by Protection System Modification Target Appendix Prj. ID Project Name Project Description 4801 ETI SPOF Projects: Modify ETI SPOF Projects: Modify relaying at relaying at Sabine 230/138 kv Sabine 230/138 kv Expected ISD Estimated Cost 6/1/2015 A in MTEP14 4802 ETI SPOF Projects: Modify relaying at VFW Park 230 kv ETI SPOF Projects: Modify relaying at VFW Park 230 kv 6/1/2015 $1,994,400 7

Projects Driven by New Load Addition Target Appendix Prj. ID Project Name Project Description 4800 Parkway: Construct new Construct new Parkway 138 kv substation substation near Hickory Ridge Expected ISD Estimated Cost 12/1/2014 $8,475,000 4803 Nederland 230 kv Substation: Construct new substation Construct new Nederland 230 kv substation 10/1/2014 $11,700,000 A in MTEP14 4804 Petry Woods 138 kv Substation: Construct new substation Construct new Petry Woods 138 kv substation 6/30/2014 $7,650,000 4805 Ranchland 69 kv Substation: Construct new substation Construct new Ranchland 69 kv substation 12/1/2014 $3,402,000 8

MISO MTEP14 APPENDIX B PROJECTS 9

Projects Driven by New Load Addition Target Appendix Prj. ID Project Name Project Description 4798 Forest: Add distribution Install Distribution transformers and transformers at new substation facilities at the Forest 138 kv substation Expected ISD Estimated Cost 6/1/2016 $2,480,000 B in MTEP14 4799 Dishman: Construct new substation Construct new 230kV substation on the Amelia to Helbig 230kV line 6/1/2017 $10,500,000 10

Projects driven by contingent events for Entergy Texas 11

New China to Stowell 138 kv Line P4618 (11-ETI-037) 20 Mi New 138 kv line: Expected In Service Date: 6/1/2018 Estimated Cost: $31,500,000 Target Appendix: B in MTEP14 Project Type: Baseline Reliability TPL Category: P1.2 (Fault Transmission Circuit) 12 MISO, using Ventyx Velocity Suite 2014

Kolbs 230kV Substation Add Capacitor Bank P4620 (12-ETI-006) Add a 72 Mvar 230kV Capacitor Bank: Expected In Service Date: 6/1/2018 Estimated Cost: $1,350,000 Target Appendix: B in MTEP14 Project Type: Baseline Reliability TPL Category: P3.2 (Generator + Line) 13 MISO, using Ventyx Velocity Suite 2014

Gulfway 230 kv Substation Upgrade Equipment P4621 (12-ETI-017) Upgrade Terminal on VFW Park Line bay: Expected In Service Date: 6/1/2018 Estimated Cost: $100,000 Target Appendix: B in MTEP14 Project Type: Baseline Reliability TPL Category: P2.3 (Breaker Fault) 14 MISO, using Ventyx Velocity Suite 2014

Raywood Area Improvements P4619 (14-ETI-001-01) Add 2nd 138-69 kv Autotransformer at Raywood: Expected In Service Date: 6/1/2018 Estimated Cost: $3,600,000 Target Appendix: B in MTEP14 Project Type: Baseline Reliability TPL Category: P1.3 (Fault Transformer) 15 MISO, using Ventyx Velocity Suite 2014

Raywood Area Improvements P4624 (14-ETI-001-02) 2.2 MI Add 2nd 69kV line: Expected In Service Date: 6/1/2018 Estimated Cost: $5,400,000 Target Appendix: B in MTEP14 Project Type: Baseline Reliability TPL Category: P1.2 (Fault Transmission Circuit) 16 MISO, using Ventyx Velocity Suite 2014

Egypt to Panorama 138 kv Line: Reconductor Line P4617 (13-ETI-013) Reconductor the 138 kv Line Expected In Service Date: 6/1/2017 Estimated Cost: $1,500,000 Target Appendix: B in MTEP14 Project Type: Baseline Reliability TPL Category: P3.2 (Generator + Line) 17 MISO, using Ventyx Velocity Suite 2014

Panorama to Longmire 138 kv Line: Reconductor Line P4623 (13-ETI-014) Reconductor the 138 kv Line Expected In Service Date: 6/1/2019 Estimated Cost: $3,200,000 Target Appendix: B in MTEP14 Project Type: Baseline Reliability TPL Category: P3.2( Generator + Line) 18 MISO, using Ventyx Velocity Suite 2014

Upgrade Splendora to Apollo 138 kv line P4622 (11-ETI-026) Upgrade 138 kv line: Expected In Service Date: 6/1/2019 Estimated Cost: $3,000,000 Target Appendix: B in MTEP14 Project Type: Baseline Reliability TPL Category: P3.2 (Generator + Line) 19 MISO, using Ventyx Velocity Suite 2014

Contact Information Edin Habibovic Manager Expansion Planning, Southern Region ehabibovic@misoenergy.org William Kenney Expansion Planning Engineer, Southern Region WKenney@misoenergy.org 20