Installation and Operation Manual for a Solar System with KPW Collectors

Similar documents
Installation and Operation Manual for a Solar System with KPC1-BP Collectors

for Solar Systems with KTU R Collectors

Solar System with KPG1-ALC Collectors

Solar System with KPH1 ALP Collectors

Solar System with KPS11-ALP Collectors

Solar System with KPS11 ALP Collectors

Manual CPK 7210 N. Flate plate collector. Mounting parallel bench srew mountingsystem x x x x / version

For our present, For their future. Version 11.03

MANUAL. Collector FK7300. Mounting parallel roof bracket attachment system

ES1V2.0, ES1V2.65, ES2V/2.0 AL, EM2V/2.0, ES2V/2.65, ES2H/2.65

Installation instructions

Installation Manual. Logasol SKS 4.0 Mounting on sloped roofs. Flat Plate Collectors. For Contractors. Please read carefully prior to installation.

SOLAR-LUX 6/12 INSTALLATION AND MAINTENANCE INSTRUCTIONS EVACUATED TUBE COLLECTOR ROOF MOUNTING INSTALLATION UK/IE (2011/05) GB/IE

Installation instructions

Installation manual. Excellent efficiency The best characteristics Attractive design. Solartechnik Prüfung Forschung

VIESMANN. Installation instructions VITOSOL 200-T. for contractors. Vitosol 200-T Type SP2 Vacuum tube collector based on the heat pipe principle

FKB-1 / FKC /200/300 l system. Thermosiphon for flat roofs and rooftops. Installation instructions (2010/06) GR

OPERATION AND INSTALLATION

TRIC A On-Roof Installation for EURO- Collectors*

Installation, operating and maintenance instructions

Version For our present, For their future.

Operations and Assembly Manual

CIRCO5SolarCirculationUnit

MAZDON. Table of Contents. Cautions. MAZDON Collector Tube Figure 1 Figure 2

Product Catalog Evacuated tube collectors CPC OEM CPC w OEM

Mounting SySteMS ApplicAtionS overview version 1.2 March 2013

SOLAR WORLD, INC. INSTALLATION MANUAL

Solar Thermal. Grant Solar Pump Station Installation & Servicing Instructions

Energy Systems. Roth HelioPool. Technical information and assembly instructions. living full of energy

05/14. OPC 360 Vacuum Tube Collector Planning/Installation/ Commissioning

VIESMANN. Installation instructions VITOSOL 300-T. for contractors. Vitosol 300-T Type SP3A Vacuum tube collector based on the heat pipe principle

SPLIT SOLAR HEATER SWSP-200 SWSP-300

SOLAR-LUX 6/12 INSTALLATION AND MAINTENANCE INSTRUCTIONS EVACUATED TUBE COLLECTOR FLAT ROOF INSTALLATION (30, 45 ) WALL INSTALLATION (45, 60, 90 )

Solar Expansion Vessels

SOLAR-LIFESTYLE INSTALLATION AND MAINTENANCE INSTRUCTIONS FLAT-PLATE COLLECTOR FLAT ROOF AND WALL-MOUNTED INSTALLATION (2011/05) UK

DS Series Solar System

SOLAR THERMAL Forced circulation solar thermal system with selective flat plate collectors SELECTIVE SLIM

RESOL SBS 1000 * * Connection Operation

Installation instruction

Already from ** about: 60,- /m². Collector-width about 2,0 m. solar area about m². rows of retaining frames. Collector-width about 3,5 m

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

Zhejiang Ejai Kitchen & Bath Technology Co., ltd

OPERATION AND INSTALLATION

SBS Manual for the specialised craftsman. Filling and flushing station. Connection Operation. en Manual

A B C D E F. Tools Required (supplied by others)

Solar Collector SCM 215-series. On-Roof Installation Installation instructions for specialists 03.12

GUIDANCE NOTES. Solar Collectors. On-Roof Installation (First Fix) Please leave these instructions with the User. Baxi Heating UK Ltd 2012

Solar. Solar collectors

Instruction for installation an operating

SDHW System Inspection Form

Schüco Premium Collectors Outstanding quality, performance and design

GTFLOW EXTENSION MANIFOLD ASSEMBLY INSTRUCTIONS

Installation and operating instructions. Solar charge controller 10 A / 15 A / 0 A / 30 A PHOTOVOLTAIK - PHOTOVOLTAICS - PHOTOVOLTAIQUE - FOTOVOLTAICA

INSTALLATION AND COMMISSIONING MANUAL CONTENTS. Function. Important Product range Technical specifications

VIESMANN. Installation instructions VITOSOL 200. for heating engineers. Vitosol 200 Type SD2 Direct flow vacuum tube collector

Nanometrics Solar Power System

Installation Instructions. Vitosol 100. Vitosol 100 Type w 2.5 Flat collector for flat roofs and freestanding installation Part No.

Variable Vane Pump, Direct Controlled PV7...A Series 1X / 2X

FS II - Mounting Instruction. 1 General 2. 2 Pile driving (Ramming) 3. 3 Mounting individual assemblies 4. 4 Components list 5

SOLAR THERMAL EQUIPMENT

Air Handling Units RM-/RL-Line. AHU Casing Characteristics, Design Details For Outdoor Installation And Increased Hygiene Requirements

Powertech/Apricus TM AP Solar Collector Specifications

SOLAR HEATING SYSTEM

EUGEN WOERNER GmbH & Co. KG Postfach 1661 DE Wertheim Am Eichamt 8 DE Wertheim. Pump unit GMZ-E

Solar Collector Product Specifications

INSTALLATION AND COMMISSIONING MANUAL CONTENTS. Function. Product range. Technical specifications. Characteristic components

BRAKE E

Product range Solex Technical data and dimensioning. 5 Years

Contents. Preparing the motor Winding the rotating secondary Winding the primary... 8

Planning and installation instructions

Detailed Assembly Instructions. ATS Evacuated Tube - Solar Panel Units ATS10 / ATS20 / ATS30

SWIMMING POOL SOLAR HEATING SYSTEMS INSTALLATION MANUAL FOR AQUASOL SOLAR COLLECTORS

Play it safe. Mounting instructions incell system. Premium incell XM, L Mounting system for roof-integrated photovoltaic systems

Radial piston pump PR4 Series 1X

TECHNICAL MANUAL PERGOLAS

2015+ SUBARU STI FRONT-MOUNT INTERCOOLER PARTS LIST AND INSTALLATION GUIDE INSTALL DIFFICULTY DISCLAIMER CAUTION INSTALL PROCEDURE TOOLS NEEDED

Solar Thermal Energy Flat & Tube Panel Standard Kits Installation Overview

Design specifications

HYDRAULICS. TX420 & & lower. Hydraulic Tandem Pump Removal. 4. Remove the LH side panel (Fig. 0388).

INSTRUCTION MANUAL. Direct Drive Air Compressor 2320, REV A. 1.

2004 Volvo C70 L5-2.4L Turbo VIN 63 B5244T7 Cylinder Head Assembly Service and Repair, Removal and Replacement: Cylinder Head/Gasket, Replacing

MAJESTIC SLATE CLASS A ECOSTAR GOLD STAR ROOF SYSTEM SPECIFICATIONS

SOLAR TECHNIQUE ATTACK SOLARTHERM HSA 200 PARALLEL MOUNTING BRACKETS ON THE ROOF

Installation manual. Cooling system. Industrial engines DC09, DC13, DC16 OC16. 01:05 Issue 12 en-gb. Scania CV AB 2018, Sweden

CT3202.0_01 EN February 2018

INSTALLATION MANUAL FOR AQUATHERM INDUSTRIES SOLAR COLLECTORS USING STAINLESS STEEL MOUNTING HARDWARE

LK Manifold RF. Design. Requirements. Documentation

SOLAR AEROLINE. fast simple reliable. The perfect connection technology for solar hot water

HELIOMOTION QUICK ASSEMBLY GUIDE PV-1300

Spring hangers, spring supports

SolarSheat Wall Installation Manual

VIESMANN. Installation instructions VITOSOL-F. for contractors

F I R S T! Assembly* 4 Battery systems pull toward you, or 8 battery systems Lift up, both sides with a. Fig. B. *performed by licensed electrician

A B C D E F. b.tools Required (supplied by others) 3/16" Drill Bit 3/8" Wrench Phillips Head Screwdriver

DeltaSol AX. RESOL DeltaSol AX * * Mounting Connection Operation Application examples. manual

SGL2 Solar LED landscape Lamp. Instruction manual

HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

ENGINE COOLING SECTION GENERAL DESCRIPTION / 1 ENGINE COOLING. Figure 1 - Cooling System Flow

SOLAR CHARGE CONTROLLER

Radial piston pump PR4 series 1X

Transcription:

Installation and Operation Manual for a Solar System with KPW Collectors EN v. 1.0

CONTENTS General Installation and Operation Instructions... 3 Collector Technical Data....... 4 1 Delivery of Mounting System......... 5 2 Sloping Roof Mount............ 6 2.1 Overview......... 6 2.2 Roof anchor installation for sloping roofs...... 7 2.2.1 Installation with roof anchors and auxiliary boards..... 7 2.2.2 Installation with roof anchors and rafters... 8 2.2.3 Installation with roof anchors for slate, shingle or metal roofs... 9 2.2.4 Installation with bolts for fixing rails onto a roof... 10 2.3 Installing rails onto roof anchors...... 10 2.4 Collector mounting.... 11 3 Connection Pipe Passage through a Roof.... 12 4 Flat Roof Mount........ 13 4.1 Overview.... 13 4.2 Flat roof support mounting...... 14 5 Hydraulic Connection......... 18 5.1 Collector connecting.......... 18 6 Temperature Probe Positioning.... 19 7 Pump Station......... 20 8 Expansion Vessel Sizing and Working Pressure Calculation...... 21 8.1 Expansion vessel sizing...... 21 8.2 Calculation of a system working pressure.... 21 8.3 Calculation of an expansion vessel preset pressure....... 21 8.4 Examples of calculating working pressure and expansion vessel pressure.... 21 8.4.1 An example of calculating system working pressure.... 21 8.4.2 An example of calculating expansion vessel pressure.... 21 9 Installation of Air Release Valves...... 22 10 System Filling, Flushing, Leak Test and Air Bleeding...... 23 10.1 Filling....... 23 10.2 Flushing....... 23 10.3 Air bleeding....... 24 10.4 Leak test....... 24 11 Commissioning....... 24 12 Operation, Checks and Maintenance.......... 24 2

GENERAL INSTALLATION AND OPERATION INSTRUCTIONS Collector description REGULUS Flat Plate Solar Collectors are designed for solar domestic hot water heating, backup and pool heating. Solar radiation penetrates the glass and is intercepted by Eta Plus absorption layer applied on a copper absorber. The heat is then transferred into heat carrier fluid. The absorber is sealed in a compact frame with high quality thermal insulation. The collectors are designed for all year round operation, that s why they work in a separate primary circuit filled with antifreeze heat carrier. The collectors are not intended for direct water heating. Transport and handling Collectors shall be transported in their original packing, in upright position (standing on their shorter side, connection points always upwards) or lying horizontal with glass upwards, stack of 8 pieces of KPW1 or 9 pieces of KPW2 max. Mind the connecting pipes during transport and handling, risk of buckling. Installation The installation must be done by a skilled worker or a specialized company. During installation and before commissioning it is necessary to cover collectors in order to avoid overheating and possible burns caused by the hot surfaces. If the collector shall be set on a roof, appropriate safety rules must be observed. Collector placing The glass absorption surface should be orientated to South, with deviations not over 45 (Southwest or Southeast). For all year round operation the right inclination angle is 40-50, for summer operation smaller inclination is better (30 ). The collector can be positioned also vertically (inclination angle of 90, e.g. onto an outer wall), that is the best for winter operation. The inclination angle must not be less than 20. It is recommended to install solar collectors close to the roof ridge due to a snow load in the winter. Lightning protection Lightning protection is obligatory for solar systems. When installed on a roof, collectors must be wired to lightning protection equipment. Local standards shall be observed. Max. permissible wind and snow load 0,8 kn/m 2. Max. permissible wind load negative load 1,0 kn/m 2. 3

Collector Technical Data Model KPW1 - C20AR KPW2 - C32HTF Dimensions W x L x H [mm] 1215 2140 110 1160 1930 90 Collector surface [m 2 ] 2.61 2.24 Connection dimensions 2 G 1/2 outer thread Absorber copper / twin tube-grid type Absorber surface Eta Plus Insulation thickness [mm] 60 40 Max. working pressure [bar] 10 Fluid volume [l] 1.24 1.1 Weight [kg] 49.2 40 Glass [mm] 4 - solar with antireflection layer 4 - solar prismatic Recommended flow rate [l/h] 60-120 Pressure drop for KPW1 - C20 AR collector [Pa] 4500,0 4000,0 3500,0 3000,0 pressure drop [Pa] 2500,0 2000,0 1500,0 1000,0 500,0 0,0 0 50 100 150 200 250 300 flow rate [l/h] Pressure drop for KPW2 - C32 HTF collector [Pa] pressure drop [Pa] 7500,0 7000,0 6500,0 6000,0 5500,0 5000,0 4500,0 4000,0 3500,0 3000,0 2500,0 2000,0 1500,0 1000,0 500,0 0,0 0 50 100 150 200 250 300 350 400 450 flow rate [l/h] 4

1 Delivery of Mounting System Handle with care, transport damage should be claimed immediately. Mounting kits for fixing and connecting KPW1 solar collectors Code Connection kit for a KPW collector array 8116 (3/4 M inlet and 3/4 M outlet) Roof fixing and interconnecting kit for one KPW1 collector 8083 *[for 4 anchors or 2 struts + 1 wind brace] Roof fixing and interconnecting kit for two KPW1 collector 8084 *[for 4 anchors or 2 struts + 1 wind brace] Roof fixing and interconnecting kit for three KPW1 collectors 8085 *[for 6 anchors or 3 struts + 1 wind brace] Roof fixing and interconnecting kit for four KPW1 collectors 8086 *[for 8 anchors or 4 struts + 1 wind brace] * Roof fixing and interconnecting kits are necessary to create a hydraulically connected collector array fixed to 2 mounting rails. The kits contain interconnecting fittings with insulation, two mounting rails, fastening material for mounting collectors onto the rails. They do not involve any roof anchors, struts, wind braces. These shall be selected from the following chart by the roof type and roofing material. Mounting kits for fixing and connecting KPW2 solar collectors Code Connection kit for a KPW collector array 8116 (3/4 M inlet and 3/4 M outlet) Roof fixing and interconnecting kit for one KPW2 collector 8087 *[for 4 anchors or 2 struts + 1 wind brace] Roof fixing and interconnecting kit for two KPW2 collectors 8088 *[for 4 anchors or 2 struts + 1 wind brace] Roof fixing and interconnecting kit for three KPW2 collectors 8089 *[for 6 anchors or 3 struts + 1 wind brace] Roof fixing and interconnecting kit for four KPW2 collectors 8090 *[for 8 anchors or 4 struts + 1 wind brace] * Roof fixing and interconnecting kits are necessary to create a hydraulically connected collector array fixed to 2 mounting rails. The kits contain interconnecting fittings with insulation, two mounting rails, fastening material for mounting collectors onto the rails. They do not involve any roof anchors, struts, wind braces. These shall be selected from the following chart by the roof type and roofing material. Struts and braces for flat roof installations Code Triangular strut for support structures - flat roof 6859 Wind brace 6860 Roof anchors for different types of roofing Code Aluminum anchor for slate or shingle roofs 6920 Aluminum anchor for pantiles - adjustable height 7013 Anchor for pantiles - hot-dip galvanized steel 7929 Aluminum anchor for pantiles - rafter mounted 6932 Stainless-steel anchor for pantiles 6857 Bolt for fixing rails onto a roof 7320 5

2 Sloping Roof Mount 2.1 Overview 13 15 01 16 10 03-B 08 09 05 04 14 Pic. 1: Collector array and roof anchors Pos. Item Code 01 Flat plate collector 8081 / (8082) 03-B 10 Roof anchor with M8 bolt/special head for rails Connecting pipes 04 H profile base rail, aluminum Fixing and interconnecting sets 1 8083 (8087) 2 1.28 m (2 1.22 m) No. of collectors (kit code) 2 8084 (8088) 2 2.5 m (2 2.39 m) 3 8085 (8089) 2 3.73 m (2 3.56 m) 4 8086 (8090) 2 4.95 m (2 4.73 m) 6857 or other, depending on roofing type Item code 05 M8 nut for the base rail 4 pcs 6 pcs 8 pcs 10 pcs 6925 08 M8x18 stainless-steel bolt (allen head) DIN 912/A2 4 pcs 4 pcs 4 pcs 4 pcs 7259 09 Retaining side bracket for KPC, KTU, 3 mm thick 4 pcs 4 pcs 4 pcs 4 pcs 7725 14 Retaining bracket for collector bottom, 1.2 mm thick 2 pcs 4 pcs 6 pcs 8 pcs 7709 15 Retaining side bracket for KPW complete - 2 pcs 4 pcs 6 pcs 8169 Connection pipe KPW G 1/2 l=270 mm - 1 pc 2 pcs 3 pcs 8168 13 Self-adhesive insulation, 18 mm diam., 19 mm thick - 0.3 m 0.6 m 0.9 m 7189 16 Silicone T profile for solar collectors (sold by the meter) Note: Different values for KPW2 - C32 HTF are shown in brackets - 2.2 m (1.98 m) 2 2.2 m (2 1.98 m) 3 2.2 m (3 1.98 m) 6949 8226 6

2.2 Roof anchor installation for sloping roofs Pay attention to situations when battens are thicker than the auxiliary board (30 mm). Then the auxiliary board shall be mounted on an underlay so that its total thickness equals to that of the battens (see pic.). 30 30 10 30 40 rafter counter batten battens auxiliary board underlay waterproofing membrane Pic. 2: Underlay to match thick battens When installing anchors on a rafter, use an underlay as well depending on how thick the battens and counter battens are, so that the installed anchors do not hinder proper seating of tiles. 2.2.1 Installation with roof anchors and auxiliary boards for tile roofs, 3 cm thick additional auxiliary boards shall be mounted to the bottom side of the roof. Then hook the anchors onto the board and fix with a bolt. 125 Ø 6 120 65 Ø 6 90 140 160 Ø 6 65.5 100 40 80 45 35 80 99 79 99 300 35 300 40 290 40 Pic. 3: Stainless-steel roof anchor Hot-dipped steel roof anchor Aluminum roof anchor 7

remove tiles in a line about as long as the auxiliary board. Usually it is sufficient to shift the tiles upwards. room for an auxiliary board roof battens Pic. 4: Remove roof tiles to fix the board rafter counter batten screw the auxiliary boards so high that the roof anchor does not hinder placing the roof tile with the right overlap hang the roof anchor onto the auxiliary board in a place where it will not hinder the right tile positioning, and screw the roof anchor with stainless-steel bolts for two or more collectors place the anchors about the presumed middle of the collector (distance a) a Pic. 5: Fixing an auxiliary board and roof anchors 2.2.2 Installation with roof anchors and rafters For tiled roofs, rafter anchors can be used. The anchor with a board is made of aluminum and enables horizontal shift of the anchor along the fixing board. 150 Ø 9 65.5 120 54 40 180 56 136 156 Pic. 6: Roof anchors for rafters 8

remove roof tiles where the anchors shall be mounted room for anchor mount roof battens rafter counter batten Pic. 7: Opening the room for anchor installation cut the counter batten used for fixing the waterproofing membrane and if necessary, use an underlay depending on the desired anchor height screw a roof anchor to a rafter and shift it in the groove horizontally so that it does not hinder the right tile positioning for 2 or more collectors place the anchors always about their presumed middles roof battens waterproofing membrane rafter counter batten Pic. 8: A place for mounting a roof anchor on a rafter - detail 2.2.3 Installation with roof anchors for slate, shingle or metal roofs 6 Ø 6 Simply lay the anchor onto the roof tiles in a place where the roof is supported with a strong roofing element (a beam or another support) and fix it with stainless-steel bolts. Cover the anchors with sheet metal to prevent water leakage or use another suitable method recommended by the roofing manufacturer. 228 78 98 Pic. 9: A roof anchor for slate, shingle or metal roof 9

2.2.4 Installation with bolts for fixing rails onto a roof This method of installation is preferably used for roofs of bitumen corrugated 100 140 sheets like Gutta or Onduline etc., or for corrugated eternit or metal sheets. The bolt shall be screwed into a rafter or another massive wooden roof element using spanner No. 8. Pre-drilling 6 mm diam. holes is recommended. Holes should be always drilled in the crest of the roofing wave, not in its valley to avoid leakage. After screwing the bolt in, put on the rubber seal and using a washer and nut, seal the drilled hole. Then mount the U-shaped bracket on the bolt, between two nuts with a serrated washer. Then M8 bolt with floating head (for rails) shall be mounted into the other end of the bracket. First insert the floating head into the groove of the rail, and then tighten the bolt together with the rail to the U-shaped bracket using a nut and a serrated washer. ø 9 40 80 40 2.3 Mounting rails on roof anchors have ready two rails in the length required for the number and type of collectors to be installed. Align the travelling screw head (10) with the horizontal rail and shift the rail onto it, or shift the screws into the rail and fix to the anchors. Use serrated lock washers to fix the nuts. M8 bolt with travelling head top / bottom rail roof anchor Pic. 10: Fixing the rail onto the roof anchors 10

Align the rails so that they lie in parallel to roof tiles. The diagonal between the rails must be of the same length: D1 = D2 Then tighten the nuts on fixing screws. D1 D2 parallel Pic. 11: Alignment of base rails 2.4 Collector mounting collectors must be covered during mounting insert safety retaining brackets into the bottom rail, 2 brackets per a collector 14 04 04 Aluminum rail 14 Safety retaining bracket 14 Pic. 12: Inserting safety retaining brackets insert the retaining brackets into the bottom rail about 100 mm from the collector edge lay the first collector on the rails and align it. The distance between the collector edge and the end of the bottom rail is B = 25 mm. 11

~100 mm 14 ~1005 (~950) mm B ~100 mm Pic. 13: Distance between the safety retaining brackets Insert nuts into both the rails. If you start from the left collector, put the retaining side brackets (code 7725) on the left side of the rails (or vice versa) and fix the collector on this side using M8x18 bolts. Use the complete retaining side bracket (code 8169) on the other side. Do not tighten up the bolts as the next collector shall be pushed under these brackets as well. Place the following collector next to the first one and shift gently to reach a gap of some 7 mm. Then tighten up the M8x18 bolts in the complete retaining side brackets. Continue mounting the following collectors up to max. four collectors in a line. Fix the last collector using the retaining side brackets on its outer side again. When ready, seal the collector array by pressing T-profile silicone sealing strips into the gaps between the collectors. KPW1 - C20AR collector KPW2 - C32HTF collector 1215 1160 08 09 05 33 7 30 110 08 09 05 33 7 30 90 26 1205 16 1205 26 26 1150 16 1150 26 Pic. 14: Fixing the retaining brackets 05 - M8 nut for rails 08 - M8x18 allen head bolt 09 - Retaining bracket 3 Connection Pipe Passage through a Roof For passing the connection pipes through a roof e.g. ventilation tiles can be used, where the hole is modified according to the diameter of the pipe with insulation. However, any preferred method must comply with the standards of the roofing manufacturer. 12

4 Flat Roof Mount 4.1 Overview 13 15 01 16 10 08 09 05 04 03-C 24 14 Pic. 15: Triangular support and wind brace Pic. 16: Collector array Pos. Item Code 01 Flat plate collector 8081 / (8082) 03-C Triangular support 6859 24 Wind brace 6860 Connection pipes Fixing and interconnecting kits 04 Aluminum base rail 1 8083 (8087) 2 1.28 m (2 1.22 m) Note: Different values for KPW2 - C32 HTF are shown in brackets in the entire text Number of collectors (kit code) 2 8084 (8088) 2 2.5 m (2 2.39 m) 3 8085 (8089) 2 3.73 m (2 3.56 m) 4 8086 (8090) 2 4.95 m (2 4.73 m) Item code 05 M8 nut for the base rail 4 pcs 6 pcs 8 pcs 10 pcs 6925 08 M8x18 stainless-steel bolt (allen head) DIN 912/A2 4 pcs 4 pcs 4 pcs 4 pcs 7259 09 Retaining side bracket for KPC, KTU, 3 mm thick 4 pcs 4 pcs 4 pcs 4 pcs 7725 14 Retaining bracket for collector bottom, 1.2 mm thick 2 pcs 4 pcs 6 pcs 8 pcs 7709 15 Retaining side bracket for KPW, complete - 2 pcs 4 pcs 6 pcs 8169 Connection pipe for KPW G 1/2 l=270 mm - 1 pc 2 pcs 3 pcs 8168 13 Self-adhesive insulation, 18 mm diam., 19 mm thick - 0.3 m 0.6 m 0.9 m 7189 16 Silicone T profile for solar collectors (sold by the meter) - 2.2 m (1.98 m) 2 2.2 m (2 1.98 m) 3 2.2 m (3 1.98 m) 6949 8226 13

4.2 Flat roof support mounting A flat roof support consist of two rails, triangular supports and one wind brace. The number of triangular supports depends on the number of collectors. Use one support for each collector. One wind brace is sufficient up to the rail length of 6.15 m. lay two rails on the mounting surface and insert the nuts into their grooves Distance between the rails = 1720 mm The diagonals between the base rails must be of the same length: D1 = D2 03-C 1720 mm 04 D1 D2 a 04 03-C Triangular support 04 Aluminum rail Pic. 17: Aligning the rails and mounting the first triangular support the triangular supports come screwed together with two bolts. Fix the loose support ends with a bolt. The distance of the first triangular support from the end of the rail is a 600 mm. fix the triangular support to the rail with travelling screws with a special head, serrated lock washers and nuts. Secure the travelling screws inside the rail by 90 turn (see pic. 18). 14

13 mm spanner a b c Pic. 18: Assembly by means of the travelling screws with a special head fix further triangular supports to the rails in the same manner. Always adjust the distance between them in such a way that the triangular support is positioned approximately under the middle of a collector. If you install also the wind brace between the supports, tighten only one support. The wind brace will set the right distance between the supports. fix the wind brace to a triangular support and to the rail (see pic. 19). One wind brace is sufficient for one support structure (up to the H-rail length of 6.15 m). B A 24 Pic. 19: Fixing the wind brace 15

insert M8 nuts (23) into the rail (04). For fixing the wind brace to the rail, use special bolts with a stop. The bolt stop will bore itself into the rail when tightened, thus the precise bolt position is fixed and prevents possible coming loose of the wind brace. That s why a click can be heard during tightening. This means that the bolt position is already fixed towards the rail. After this click, tighten the bolt completely. 24 15 03-C 03-C Triangular support 04 Aluminum rail 08 M8x16 bolt with allen head 15 M8 bolt with a stop 24 Wind brace 04 15 08 Pic. 20: Wind brace and rail assembly go on assembling the remaining triangular supports so that the individual supports lie at the presumed collector middle, i.e. c 1000 mm. 03-C Pic. 21: Mounting further supports c 16

tip over the support structure into its working position (Pic. 22 - the windbrace vertically). Secure the support structure either by screwing it into the roof, or applying a burden. If secured with a burden, for a wind load up to the building height of 8m and snow load up to 0.75 kn/m 2, the burden must be distributed according to the following table: Pic. 22: Static safety (burden) Flat roof mount up to 8 m 1 collector 290 kg 2 collectors 580 kg 3 collectors 870 kg 4 collectors 1160 kg In no event the permissible roof load shall be exceeded; consulting a static expert in advance is recommended. A damaged roof must be re-insulated by a specialist. Place the collectors on the support structures and fix to the rails in the same manner as if installing on an inclined roof (see point 2.5). Minimum distance between collector fields see pic. 23. 3x height collector collector height Pic. 23: Minimum distance between collector fields 17

5 Hydraulic Connection Hydraulic connection is done with flexible connection pipes and cap nuts. Tighten the cap nuts with a 23 mm spanner. Put the insulation on the threaded connections only after a successful pressure test. Pic. 24: Collector interconnecting (in series) 5.1 Collector interconnection 23mm spanner Pic. 25: Hydraulic connection 18

Maximum of 4 collectors may be connected in series via connection pipes with cap nuts. It is advisable to keep the connection piping from collectors as short as possible. The recommended pipe diameters and flow rates through collectors are shown in Tab. 1. Number of collectors Connection scheme Flow rate Connecting pipes Max. pipe length 4 1 x 4 in series 2 l/min Cu 18 x 1 Max. 30 m of the inlet 6 2 x 3 in parallel 4 l/min Cu 18 x 1 and outlet piping together 8 2 x 4 in parallel 4 l/min Cu 18 x 1 9 3 x 3 in parallel 6 l/min Cu 22 x 1 12 4 x 3 in parallel 8 l/min Cu 28 x 1,5 Tab. 1: Recommended pipe diameters All solar components must be carefully and safely sealed and must be made of material resistant to glycol and temperatures up to 160 C. For connection piping we recommend using KOMBIFLEX stainless-steel flexible pipes, or copper pipes connected by soldering. In no event plastic tubes can be used for inlet/outlet piping as they do not meet the requirements for solar systems. Pipes for collectors can be lead through disused chimneys, ventilation shafts or grooves in a wall. In order to prevent high thermal losses through convection, open shafts shall be properly sealed. Also thermal dilatation shall be remembered and pipes fitted with compensators or other compensation elements. Piping shall be connected to the house earthing. Pipes of the solar system must be fitted with thermal insulation e.g. of AEROFLEX type, so that thermal dissipation from the pipes does not deteriorate a total efficiency of the solar system. The thermal insulation must be resistant to temperatures up to 160 C, for outdoor piping also a UV protection is essential as well as non-deliquescence of the material. For indoor piping, the thermal insulation should be at least 13 mm thick, for outdoor piping at least 19 mm. 6 Temperature Probe Positioning Two blind-plugged sensor mounting pockets are located on the upper side of each KPW1 - C20AR collector, next to the connections. KPW2 - C32HTF collectors have only one blind plugged mounting pocket each. take out the blind plug from the last collector downstream (for KPW1 - C20AR, from the last mounting pocket downstream). push the probe through this blind plug insert the probe into the mounting pocket and fix it by pressing the plug in use a twisted wire 2x1 mm 2, non-shielded, separated from power cables. Its maximum length is 100 m. Minimize the number of electrical boxes a terminal blocks connection length: up to 25 m cross section: 0.25 mm 2 connection length: up to 50 m cross section: 0.5 mm 2 connection length: up to 100 m cross section: 1.0 mm 2 the thermal and mechanical resistance of the wire used must correspond to the environs the wire passes through Pic. 26: Location of temperature probe mounting pockets in KPW1 - C20AR and KPW2 - C32HTF 19

7 Pump Station The pump station shall be installed in accordance with the respective manual. Regulus pump stations contain these principal components: circulation pump thermometer for return line, or also feed line if two-pipe station is used return line with a ball valve and a check valve integrated flowmeter safety valve, pressure gauge and expansion vessel connection fill and drain valve thermal insulation An example of a pump station is shown in Pic. 28. Pic. 28: FlowConB pump station 1 - Assembly holes 2 - Pressure gauge 3 - Ball valve with a check valve and thermometer 4 - Ball valve and flowmeter 5 - Fill valve 6 - Drain valve 7 - Air separator with manual discharge (not included in FlowConB package) Safety valves are always included in pump stations. If no pump station is used in the installation, the solar system shall be equipped with a 6 bar safety valve, resistant to high temperatures (usually up to 160 C). 20

8 Expansion Vessel Sizing and Working Pressure Calculation (valid for height up to 20 m only, otherwise the size shall be calculated) 8.1 Expansion vessel sizing A solar expansion vessel shall be sized for a temperature difference between the min. winter temperature (as low as -20 C) and the max. summer temperature, and to contain fluid volume of all collectors in case of stagnation (max. collector temperature at no flow and high sunshine intensity). In solar systems with forced circulation only such pressure expansion vessels shall be used that are fitted with a propylene-glycol resistant membrane and whose min. working pressure is 6 bar. The recommended size of an expansion vessel see Table 2. Number of collectors Expansion vessel size Max. piping length up to 3 18 Max. 30 m of the inlet 4 25 and outlet piping together 6 60 8 60 9 80 12 100 Tab.2: Expansion vessel recommended size Pic. 29: Expansion vessel 8.2 Calculation of a system working pressure The overpressure in the solar system is calculated using the relation p = 1.3 + (0.1 h) p pressure in a solar system [bar] h height from a pressure gauge to the middle of a collector field [m] Adjust the overpressure by discharging solar liquid after the pressure test is done. 8.3 Calculation of an expansion vessel preset pressure Before filling the system, adjust the initial overpressure in the expansion vessel to a value by 0.5 bar below the calculated system overpressure. p exp = p - 0.5 [bar] In order to set the overpressure, use a current car-tyre pressure gauge of a suitable pressure range. The expansion vessel has a current tyre valve under its lid. 8.4 Examples of calculating working pressure and expansion vessel pressure 8.4.1 An example of calculating system working pressure The height from a pressure gauge to the middle of a collector: h = 10 m Overpressure in the solar system (the solar system is to be pressurized to this value): p =1.3 + (0.1 h) = 1.3 + (0.1. 10) = 2.3 bar 8.4.2 An example of calculating expansion vessel pressure Before filling the system, the preset pressure in the expansion vessel shall be adjusted to the value of: p exp = p - 0.5 = 2.3-0.5 = 1.8 bar 21

9 Installation of Air Release Valves When using KPS10, it is not necessary to install an air vent at the highest point of the system supposed the fluid speed in a pipe will be over 0.4 m/s. This speed is guaranteed when the recommended pipe diameters are respected, cf. Tab. 1. In this case it is sufficient to fit the pump station with an air separator (see pic. 31). Pic. 30: Horizontal air separator and an automatic air vent Pic. 31: Air separator 22

10 System Filling, Flushing, Leak Test and Air Bleeding The below listed procedures are valid when a Regulus pump station is used. 10.1 Filling in order to fill the system, use a filling device with a reservoir for solar liquid and a filling pump (see pic. 32) attach the filling hose to the feed valve and open the valve completely attach the return hose to the bleed valve and open the valve completely close the integrated ball valve in the flowmeter (the groove in the flowmeter s adjusting screw must be horizontal). Open the check valve above the pump by turning the ball valve by 45 (intermediate position between opening and closing) Pic. 32: Filling a solar system turn on the filling pump and pour sufficient quantity of solar fluid into the reservoir of the filling device and fill the solar system 10.2 Flushing flush the solar system for at least 15 minutes using the filling device. In order to bleed air from the system perfectly, open shortly the integrated ball valve of the flowmeter from time to time (the groove vertically). 23

10.3 Air bleeding with the filling pump running, close the bleed valve and increase the pressure up to about 5 bar close the feed valve and turn off the filling pump, open the regulation screw on the flowmeter (groove horizontally), do not disconnect the filling-pump hoses! set the circulation pump(s) to the highest speed and repeat switching on and off to air-bleed the system (an air-free pump works almost noiselessly) watch the system pressure and when it starts falling, increase it by turning on the filling pump and opening the feed valve to 5 bar repeat air bleeding so long until the float in the flowmeter s regulation valve takes a steady position during pump operation and bubbles stop appearing in the flowmeter. After that, let the circulation pump run for at least 5 minutes. in case an automatic air vent/s is/are used anywhere in the solar system, close this valve after air bleeding. 10.4 Leak test examine the whole system at 5 bar pressure (all connections, solar collectors, valves etc.), no visible leaks are allowed. Leave the system under pressure for at least 2 hours, then examine the system repeatedly. consider the test result successful if no leaks appear and/or no noticeable pressure drop appears in the system set the working pressure by point 8.2 Calculation of a system working pressure set the pump to a suitable speed and set the flow by the flowmeter and data in Tab. 1/page 18 disconnect the hoses of the filling device and screw caps on the feed and bleed valves open entirely the ball valve above the pump after several days of operation, air-bleed the system again Do not flush the system with water. Since it is impossible to empty it completely, a risk of frost damage appears. 11 Commissioning adjust the solar regulator according to the respective instruction manual remove collector covers place a sufficiently sized vessel (to hold the entire solar fluid volume) under the outlet of the safety valve check if the circulation pump switches when the preset temperature difference between solar collectors and secondary circuit is reached 12 Operation, Checks and Maintenance The solar system offers unmanned and almost maintenance-free operation. Despite that, it is important to check the right functioning of the system within the first days of operation. First of all the temperature, system pressure and pump operation shall be checked. Once a year, preferably during a sunny day, it is necessary to check the working order and tight fixing of the collectors, verify the system tightness and pressure (incl. pressure in the expansion vessel) and the pump operation. At least once in every 2 years the heat carrying fluid shall be checked for its antifrost properties. The system shall be always replenished with the same fluid as the original filling was. The system must not be replenished with water. 02/200 9 REGULUS spol. s r.o. Do Koutů 1897/3 http://www.regulus.eu 143 00 Praha 4 E-mail: sales@regulus.cz 24