New Rate. 70/- per mt. 70/- per mt. Shifting of cargo from one bay to another as required by the Shipper/Line

Similar documents
HIND TERMINALS PVT.LTD. Plot No. - 4, Sector-10, Dronagiri Node,Navi Mumbai

WESTPORTS MALAYSIA SDN BHD P.O. BOX 266, PULAU INDAH PORT KLANG TEL: FAX:

WESTPORTS MALAYSIA SDN BHD P.O. BOX 266, PULAU INDAH PORT KLANG TEL: FAX:

WESTPORTS MALAYSIA SDN BHD P.O. BOX 266, PULAU INDAH PORT KLANG TEL: FAX:

ANNEXURE-II STATEMENT SHOWING MF TARIFF AT ICD DASHRATH,VADODARA

RF/OT/FR W.e.f Per Cntr. CONTAINER RENOMINATION CHARGE : Per Cntr. LCL Console Charges per Cntr : Per Cntr

APPENDIX B (FEE SCHEDULE) CENTRALIZED EXAMINATION STATION RATE SCHEDULE. CONSOLIDATED PORT OF DELAWARE RIVER and BAY-PHILADELPHIA, PA

CMA CGM INDIA Terminal Handling Charges

SCHEDULE OF PORTS CHARGES

Effective date from 23rd August 2017

Import 20' full Import 40' full

HAZ CARGO APPLICABLE DRY /HC 45' GATEWAY TERMINAL PORT CHENNAI COCHIN GOA HALDIA KANDLAA. Rs Rs Rs 4400 Rs 5700

SCHEDULE OF PORTS CHARGES

Charter Township of Plymouth ~ Comprehensive Fee Schedule ~ Effective July 24, 2018 WATER AND SEWER SYSTEM

SCHEDULE OF PORTS CHARGES

BOARD OF DIRECTORS OF THE LAS GALLINAS VALLEY SANITARY DISTRICT ORDINANCE NO. 175

COLLECTION OF SOLID WASTE

TARIFF 1 TARIFF 1.1 CONVERSION EQUIVALENCY

01. Name of work : Hiring of A/C luxury cars and passenger Vans (As and when required) 02. Tender No. : BHE/M&S/TPT/ AC LUXURY CARS/11-12

FASTENERS, SPRINGS, DETENT BALLS & MISC. HARDWARE PAINT, SEALANT, ADHESIVES, DECALS & LEAK DETECTORS

EXTRA REFUSE VOLUME CHARGES* Each additional container equivalent to a 48 gallon cart or smaller $4.88

OCEAN CONTAINER SPECIFICATIONS

Appendix B - Schedule of Proprietary Type User Charges. Schedule of Proprietary Type User Charges - Marina Effective 1/1/2019

ORDINANCE NO THE CITY COUNCIL OF THE CITY OF OTHELLO, WASHINGTON DOES ORDAINS AS FOLLOWS:

RAIL ROAD RUNNER CONTAINER SERVICES LTD.

CHAPTER 50: GARBAGE GENERAL PROVISIONS

REVISION OF RENT FOR EXHIBITION HALLS

SCHEDULE OF PORTS CHARGES

UNLOADING & HANDLING GUIDE

Parking and traffic regulations. Last updated: March 2018

Date: SCHEDULE 1 / PART 3 Customs & Excise Tariff

EXHIBIT 2A RESIDENTIAL SERVICES

AGENDA Municipality of South Dundas Ninety Eighth Meeting of the Sixth Council 34 Ottawa Street Morrisburg ON Friday, January 12, :30 AM

DEPARTMENT OF PUBLIC UTILITIES TRANSPORTATION OVERSIGHT DIVISION ONE SOUTH STATION, BOSTON, MA [617]

CITY OF WESTON, a municipal corporation SEWERAGE AND SEWAGE DISPOSAL SERVICE

CITY OF HAYWARD. Schedule of RATES Effective June 1, 2018 through February 28, 2019 Annual Rate Adjustment

Natraj Enterprises w w w. n a t r a j e n t. c o m

Washington County Solid Waste & Recycling Garbage and Recycling Collection Services and Rates for Unincorporated Washington County

220 CMR : RATES FOR THE TOWING OF MOTOR VEHICLES

Within the incorporated limits of the City of Palo Alto and on land owned or leased by the City. Monthly Refuse Collection Cost

ENVIRONMENT AND HOUSING MANAGEMENT FEES & CHARGES SCHEDULE FROM 1 APRIL 2017

SALLAL WATER ASSOCIATION

Retail Branch Bahrain SCHEDULE OF FEES AND SERVICE CHARGES w.e.f (inclusive of VAT)

VEGA VIRGO. Deadweight: about mt dwat on draft of 8,80 m sfbd Deadweight: about mt dwat on design draft/c.w.l.

CITY OF ELK POINT RESOLUTION

ROAD TRANSPORT AND DISTRIBUTION AWARD 2010

SCHWEIZ REEFER 645,586 cbft / 7,565 sqm / 8,611 pallets

Released under FOIA Request F Partial Release under FOIA exemption (b)(4).

CUSTOMS AND EXCISE ACT, AMENDMENT OF SCHEDULE NO. 1 (NO. 1/3E/...)

ROYAL KLIPPER 580,754 cbft / 6,613 sqm / 8,010 pallets

LOMBOK STRAIT 626,011 cbft / 7,341 sqm / 9,681 pallets

Curtainsider semitrailer S.CS MEGA with VARIOS TopTechnology. Configurator

List of Terms and Conditions for micro-, small and medium- sized Customers* of Commerzbank Zrt.

Collection Frequency. Cart Sizes 1x/week 2x/week 3x/week 4x/week 5x/week 6x/week Cart Rental

truck and trailer equipment guide

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

CHAPTER 22 SOLID WASTE AND RECYCLABLE COLLECTION. (with amendments through )

General Cargo Tariff 1-D SECTION THREE- WHARFAGE, UNLOADING AND LOADING RATES

TOWN OF MONTVILLE SOLID WASTE COLLECTION AND DISPOSAL REGULATIONS ADOPTED BY THE MONTVILLE TOWN COUNCIL AT THEIR REGULAR MEETING OF NOVEMBER 8, 2010

Wholesale Developer Services Charges

Sydney International Container Terminal Ltd (SICTL) Receiving / Delivery Processes

SANTA LUCIA 463,652 cbft / 5,140 sqm / 5,934 pallets

RIPUC No Cancelling RIPUC No Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY NET METERING PROVISION

RATE SCHEDULE CNG COMPRESSED NATURAL GAS SURCHARGE INCENTIVE MECHANISM

Port Tariffs. for use of infrastructure and services provided by the Port of Tromsø

CARGO ALL PLANT CREATED FOR CONSTRUCTION YOUR TRANSPORT ASSISTANT

SUMMARY OF MODIFICATIONS IN FORCE SINCE JUNE 29, 2017 FOR PORT FEES, TRADE REBATES AND WASTE RATE:

QUEBEC NORTH SHORE & LABRADOR RAILWAY COMPANY

DIVISION 1. - GENERAL PROVISIONS. Sec Definitions. Sec Jurisdiction; persons authorized to enforce.

PAID PARKING INFORMATION LEAFLET

HOW TO USE THE TRIP RATE CALCULATOR. Trip Rate Estimator. For best results please read all instructions first.

Imports to various ICD's in India Ex-Chennai, Cochin, Hazira, Krishnapatnam, Kolkata, Mundra, Nhava Sheva & Pipavav gateway Ports

AMENDED SOLID WASTE COLLECTION RATE SCHEDULE ANNUAL CPI ADJUSTMENT - SPECIAL RATE INCREASE EFFECTIVE JUNE 1, 2018

Approved Code of Practice for Safety and Health in Forest Operations

EXPLANATORY MEMORANDUM-TYRE LEVY

City of Dell Rapids Fines, Fees and Rates: (The following municipal fines, fees and rates are set as needed by City Council Ordinance or Resolution.

Electric Rates. For Michigan customers

YANG MING SURCHARGES TARIFF

EXHIBITOR QUICK FACTS

Commerzbank Zrt. List of Terms and Conditions for Corporate Customers of Commerzbank Zrt.

RESOLUTION TOWNSHIP OF SUMPTER SEWER, WATER, RUBBISH RATES, CAPITAL BENEFIT CHARGES

CARGO ALL PLANT Constructed to get the job done.

PRICES AND FEES FOR SERVICES IN THE PORT OF TRELLEBORG. The price list is effective as from Jan All prices are in SEK and exclude Swedish VAT.

Rules of use of the Internal Communication System at the John Paul II International Airport Kraków - Balice sp. z o.o.

Regional Office: Vijayapura Plot No6, Trimurthy Nagar Managuli Bypass Road, Vijayapura Diesel Generator Required on Rental Basis

7th Annual TUCSON MODERNISM WEEK TRAILER SHOW

City of Durango Hydrant Use Policy

QUESTION/ANSWER FORUM: DOMESTIC SHIPPING 101

Pinellas County. Staff Report

Tropical Summer Winter. maximum 7 mt (Forklift to be equiped with minimum 4 airtyres) 7 1A 1BC 1D 2AB 2CD 3AB 3CD

Whatcom County Invitation to Bid Bid #17-09

uniqueindustriesinc.com TRANSPORT SOLUTIONS

PARADISE VALLEY CAMPGROUND PARK RULES. 1. SPEED LIMIT: 10 miles per hour for all vehicles, including golf carts. (Fine: $25.00)

Reproduced by Sabinet Online in terms of Government Printer s Copyright Authority No dated 02 February 1998

NESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015

Town of Imperial. Bylaw No A Bylaw to Provide for the Collection and Disposal of Domestic Waste and Other Refuse

STREET LIGHTING SCHEDULE S L

The Town of Oliver is implementing a cart program for the same reasons as the industry service providers as well as a few other reasons including:

PRICES AND FEES FOR SERVICES IN THE PORT OF TRELLEBORG

Winter Storage Program

Transcription:

Exports Sl.No Subject Remarks 1 Carting Charges Unloading of export cargo from Truck to the Export Warehouse/Open yard using labo and/or Fork-lift as per shipping bill declarations and on production of Customs noted Shipping Bills (Minimum Charge Rs.70-00 per Shipping Bill) Additional Charges will be levied for Use of Crane. Shifting of cargo from one bay to another as required by the Shipper/Line 70/- per mt 70/- per mt New Rate An Administrative cost of Rs 200 per amendment will be charged Measurement Charges @ Rs.2.50 per Carton will be levied for Measuring & Issuing Certificate for LCL Cargo as required by the Shipper/Line. 2 H & T TEU FEU Shifting of the nominated Container to stuffing point from within the CFS yard, stuffing the cargo in the container, and transporting the loaded container to JNPCT/GTI/NSICT. a) For Dry Van/Open Top (Within Gauge) (< 23 MTS) 4850 8975 a.1) For Dry Van/Open Top (Within Gauge)- (>= 23MTS to < 27MTS) 5950 10450 a.2) For Dry Van/Open Top (Within Gauge)- (>= 27MTS) 9250 16200 b) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(<23 MTS) 8300 15300 b.1) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (>=23MTs to 9400 16400 b.2) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (> = 27MTS 12700 22200 c) For Reefers : to be transported on a Genset mounted vehicle -(<23MTS) 7100 13100 c.1) For Reefers : to be transported on a Genset mounted vehicle (>=23MTS to <27 8200 14300 c.2) For Reefers : to be transported on a Genset mounted vehicle (>= 27MTS) 11500 20100 (Addl charges will be levied for use of Crane) d) Hazardous cargo Extra Charges 1050/- 2100/- e) Hub Carting Charges 2625/- 5250/- 3 Reworking Charges Providing labour and/or fork-lift for Single Full destuffing or/and Stuffing, and shifting the 3000/- 6000/- MT box MT yard (within GDL) -For Dry Van/OT/Flat Rack (Addl charges will be levied for use of Crane) 4 Cargo Storage Charges General Space (Including Open Yard Storage) 55/- per Sq.Mtr/Week or part thereof (Minimum of 5 Sq.Mtrs per S.Bill will be charged). Reserved Space 175/- Per Sq.Mtr/Month Minimum Unit Space available for reservation Payment terms (For Cancellation notice should be given 1 month in advance) 100sq.mtr (in multiples of 50 5 Container Ground Rent Charges

No. Of Days Upto 7th day 75/- 8th to 15th day 150/- 16th to 30th day 350/- 31st day onwards 600/- Ground Rent charges on Reefer and HAZ Cargo -containers will be levied at 200% of the normal rate. Ground Rent for ODC containers will be levied 300% of the normal rate for days ( < =7) from the first day Ground Rent for ODC containers will be levied 350% of the normal rate for days (>= 8 to <15) from the first day Ground Rent for ODC containers will be levied 400% of the normal rate for days (>=15) from the first day 6 Fuel and Energy Surcharge: Fuel Surcharge Energy Surcharge 375/- per teu 125/- per teu 7 Back to Town Charges on all mode of Transportation (Port to GDL & Back to Port) Loaded Movement From Port to GDL & Back to Port Teu Feu For Dry Van / Open Top Containers (<23MTS) 7770 14400 a.1) For Dry Van/Open Top (Within Gauge)-(>=23MTS to <27MTS) 10100 17700 a.2) For Dry Van/Open Top (Within Gauge)- (>=27MTS) 16600 29100 For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(< 23MTS) 13500 24900 b.1) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(>=23MTS to < 27MT 15750 27580 b.2) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(>=27MTS) 22300 38960 (To be transported on normal Vehicle) For Reefers : to be transported on a Genset mounted vehicle (<23MTS) 12400 22950 c.1) For Reefers : to be transported on a Genset mounted vehicle (>=23MTS to 27MTS) 14700 25750 c.2) For Reefers : to be transported on a Genset mounted vehicle (>=27MTS) 21160 37100 (To be transported on a Gen-set Mounted Vehicle & Detention charges Rs.500 / Per Hour) a) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(<23 MTS) on low bed t 30000 40000 b) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (>=23MTs to < 27MTS 36000 45000 c) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (> = 27MTS) on low be 40000 51000 (To be transported on Lowbed Trailer & Low Bed Trailer detention charge @Rs.500/- per hour. Any ODC Cargo above 30 MTS ( Specific ) will be Charged on case to case basis. Note : Low Bed Trailer intimation must be given before 24 hour prior to movement. Container Ground Rent Charges No. Of Days 75/- /Day Upto 7th day 150/- /Day 8th to 15th day 350/- /Day 16th to 30th day 600/- /Day 31st day onwards Fuel and Energy Surcharge: Fuel Surcharge 750/- Energy Surcharge 250/- EIR Charges 110/- Ground Rent charges on Reefer and HAZ Cargo -containers will be levied at 200% of the normal rate. Ground Rent for ODC containers will be levied 300% of the normal rate for days ( < =7) from the first day Ground Rent for ODC containers will be levied 350% of the normal rate for days (>= 8 to <15) from the first day Ground Rent for ODC containers will be levied 400% of the normal rate for days (>=15) from the first day 8 EXPORT OVER DIMENTION CARGO /HANDLING & TRANSPORTATION ON LOW BED Low Bed Low Bed 20ft 40ft a) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(<23 MTS) on low bed t 15000 20000 b) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (>=23MTs to < 27MTS 18000 22500 c) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- ( = 27MTS) on low bed 20000 25500 Low Bed Trailer detention charge @Rs.500/- per hour. Any ODC Cargo above 27 MTS ( Specific ) will be Charged on case to case basis.

Note : Low Bed Trailer intimation must be given before 24 hour prior to movement. 9 GOH CONTAINER ( GARMENT ON HANGER ): EXPORT OPERATION -For GOH Dry Van Containers (<23MTS) 6400 11850 -For GOH Dry Van Containers (<23MTS to < 27MTS)) 7500 13150 -For GOH Dry Van Containers (>27MTS) 10850 19000 10 INTER CFS MOVEMENT : EXPORT OPERATION -For Dry Van / Open Top Containers (<23MTS) 5770 9700 a.1) For Dry Van/Open Top (Within Gauge)-(>=23MTS to <27MTS) 6550 12125 a.2) For Dry Van/Open Top (Within Gauge)- (>=27MTS) 10175 17000 11 Shifting of cargo from one bay to another / shed to Shed as required by the Shipper/Line ( In 90/- Per MT Vehicle detention charges General Space (Including Open Yard Storage) ( Inter CFS ) Rs.500/- per hour (one hour after reporting CWC) 70/- per Sq.Mtr/Week or part thereof (Minimum of 5 Sq.Mtrs per S.Bill will be 12 HUB Carting charges for CBT In 20 / 40 Container Size 2625 5250 HUB Carting charges for CBT In Tempo 1700 13 Crane charges Capacity upto 10 Mt 4500 Per Full shift Capacity upto 20 Mt 7000 Per Full shift Capacity upto 25 Mt 8500 Per Full shift Capacity upto 30 Mt 12250 Per Full shift Capacity upto 40 Mt 20000 Per Full shift Capacity above 40Mt will be charged on case to case basis Forklift Charges upto 12 Mts 2500/- Per Half Shift Additional Forklift 3M/T 2000/- Per Half shift Special Equipment ( Hydra 12 m/t @Rs.7500/- per shift Special Equipment ( Hydra 14 m/t @Rs.9500/- per shift Note : Hydra intimation must be given before 24 hour 14 PLY 1000 (ISPM) 900 (Normal) 8 mm 1450 (ISPM) 1350 (Normal) 18 mm 15 Choking Charges 1800/- 2150/- (With 3 Planks & 3 Wedges) 16 Door / Cargo Lashing With 32 mm Strap 1800/- Per Box Bag Cargo 2400/- Per Box Drum cargo 17 Lashing & Choking 5800 12100 With Wire rope & Nylon Belt (40 mm) Any extra material used will charge at actual 18 Car Lashing 1 car / Box 1800 2 Car / Box 3120 19 Tarpaulin charges 6500 11500 (B) IMPORTS

1 Delivery Charges (FCL/LCL/Bonded) 85/- per MT Loading of Cargo to Party's vehicle using Labour and/ or Fork-Lift (Minimum Rs.85-00 per item or per delivery) (Addl charges will be levied for use of Crane) 2 H & T Destuffed Delivery (Dock Destuffing) Transportation of LDD Container from JNPCT /GTI/ NSICT to GDL, Destuffing the cargo and Carrying the MT container to GDL MT yard. Teu Feu a) For Dry Van/Open Top (Within Gauge) (<23MTS) 5050 9350 a.1) For Dry Van/Open Top (Within Gauge)-(>=23MTS to <27MTS) 6090 10650 a.2) For Dry Van/Open Top (Within Gauge)- (>=27MTS) 9450 16550 b) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (<23MTS) 8400 15550 b.1) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(>=23MTS to 9550 16650 b.2) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (>=27MTS) 12810 22450 c) For Reefers : to be transported on a Genset mounted vehicle (<23MTS) 7250 13400 c.1) For Reefers : to be transported on a Genset mounted vehicle (>=23MTs to <27M 8295 14550 c.2) For Reefers : to be transported on a Genset mounted vehicle (>=27MTS) 11650 20300 (Addl charges will be levied for use of Crane) d) Hazardous cargo Extra Charges 1300/- e) Hazardous charges on LCL Cargo Extra Charges Rs.500 Per Bill of Entry Loaded Delivery (Factory Destuffing) Transportation of LDD Container from JNPCT /GTI/ NSICT to GDL, Grounding for custom examination and Loading the Container on Party's Vehicle Teu Feu -For Dry Van / Open Top Containers (<23MTS) 3885 7200 a.1) For Dry Van/Open Top (Within Gauge)-(>=23MTS to <27MTS) 5050 8850 a.2) For Dry Van/Open Top (Within Gauge)- (>=27MTS) 8300 14550 -For Dry Van Containers (With Waste-Paper) (< 23MTS) 3700 7100 b.1)'-for Dry Van Containers (With Waste-Paper) (>=23MTS to < 27MTS) 4800 8500 b.2)'-for Dry Van Containers (With Waste-Paper) (>=27MTS) 8085 9500 c) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(< 23MTS) 6750 12450 b.1) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(>=23MTS to 7875 13790 b.2) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(>=27MTS) 11150 19480 c) For Reefers : to be transported on a Genset mounted vehicle (<23MTS) 6200 11475 c.1) For Reefers : to be transported on a Genset mounted vehicle (>=23MTS to 27M 7350 12875 c.2) For Reefers : to be transported on a Genset mounted vehicle (>=27MTS) 10580 18550 (To be transported on a Gen-set Mounted Vehicle) d) Hazardous cargo Extra Charges 1300 3 Customs Examination / Reworking Destuffing operation, if carried out as per the request of Consignees/Lines, & Re-stuffing the cargo after Custom Examination. -Less than or Equal to 25 % 750/- per teu -More than 25 % 2500/- per teu

4 Cargo Storage Charges Per m 2 /week Storage charges for LCL Cargo first week 95/- 2nd week onwards 150/- (Minimum of 5 M 2 item will be charged) Storage charges for LCL - ODC Cargo first week 150/- 2nd and 3rd week 175/- fourth week onwards 300/- (Minimum of 5 M 2 item will be charged) 5 Container Ground Rent Charges No of Days First 3 days 150 per teu/per day 4 to 6 days 300 per teu/per day 7 to 9 days 400per teu/per day 10 to 12 days 500per teu/per day 13 to 15 days 700 per teu/per day 16 to 30 days 800 per teu/per day 31 to 60 days 900 per teu/per day 60 to 90 days 1200 per teu/per day 91 to 180 days 2000 per teu/ per 181 to 365 days 5000 per teu/ per > 365 days 10000 per teu/ per Ground Rent charges on Reefer and HAZ Cargo -containers will be levied at 200% of the normal rate. Ground Rent for ODC containers will be levied 300% of the normal rate for days ( < = 7) Ground Rent for ODC containers will be levied 350% of the normal rate for days >= 8 to <15 Ground Rent for ODC containers will be levied 400% of the normal rate for days >=15 6 Survey Charges: Survey Charges per container 175/- per box 7 Fuel and Energy Surcharge: Fuel Surcharge 375/- per teu Energy surcharge per Teu 125/- per teu 8 Monitoring and Security Charges: Monitoring, Shifting and stacking of High Valued cargo containers 1000/- 9 House keeping charges 100/- 10 Documentation and Processing Charges FCL 150/- Per box LCL 50/- Per item 11 Late Surcharge fees 6000/- 12 Import HUB Charges TEU FEU Stuffing Charges 2000/- 4000/- Fuel Surcharge 375/- 750/- Energy Surcharge 125/- 250/- EIR Charges 55/-

Survey Charges 175/- Per box House keeping charges 100/- Documentation and Processing Charges: 150/- Per Box EIR Charges Gate Out 100/- Per Box Loaded Container Ground Rent As per Tariff Locking charges 50/- / Per Day Cargo Storage Charges Empty Container Ground Rent As per Tariff As per Tariff Loaded Container Lift on / Off As per Tariff C EMPTY & OTHER GENERAL OPERATIONS 1 Transportation (Excl Lo/Lo) Movement of Containers from GDL to JNPT/NSICT/ CWC/Maersk and other CFSs at Dronagiri & Vise versa For Empty Containers 1200/- per teu For Loaded Containers 2250/- per teu 2 Lift-Off / Lift-On Lift-Off / Lift-On in GDL Complex For Empty Containers 150/- per teu For Loaded Containers 275/- per teu 3 Internal Shifting Shifting from One location to another within GDL For Empty Containers 300/- per teu For Loaded Containers 1350/- per teu 4 Sweeping Charges 40/- per teu 5 Shifting the MT container for Washing Shifting the MT container to Washing yard, 300/- per teu Washing the container and stacking back the container at Empty yard 6 Reefer Plugging / Monitoring / PTI Reefer Plugging Charges 2250/- per day or part/container Reefer Monitoring Charges 825/- per day Week days 900/- per day on Sundays/Holidays (For a max of 5 Containers per Line.) (Rates applicable for both Import & Export Loaded Containers) PTI Charges for Reefer Containers Running Full 20' 600/- 1000/- 40' 700/- 1100/- 7 Survey Charges CLP Charges for Container stuffed at CFS 55/- per teu EIR Charges FCL 100/- Per box LCL 50/- per item Pre-Repair Damage Survey 45/- per container Post-Repair Damage Survey 45/- per container

8 Locking Charges 50/- per day/teu 9 Crane Charges Capacity 10 MT Note: (Deployment of different crane capacities will be subject to cargo nature, weight and operational issues) 4500/- (per full shft) 2500/-(for half shift)

10 Empty Ground Rent Charges No of Days Upto 7th day 10/- per teu 8-10 days 75/- per teu 11-15 days 150/- per teu 16th day onwards 250/- per teu (Date in and Date out/stuffing date,both will be taken into account for calculating Empty Ground Rent charges). Ground Rent for ODC containers will be levied 300% of the normal rate 11 Weighment Charges 850 per teu (Including shifting of container from stack to weighbridge and back) 12 Bond Insurance Charges 0.25 per 1000 of (assessed value+ Bond Cargo Storage Charges Storage charges 80/- Per m 2 /week (Minimum Charges will be collected for 4 weeks on actual area occupied) 20% additional charges on Hazardous Cargo on the entire amount 13 Fumigation Charges 20' 40' Fumigation of container to all ports except Australia(Without wood packing ) with MBR 850 1800 Fumigation of container to all ports except Australia(With wood packing ) with MBR 1500 2250 Fumigation of container to Australian Ports (With/Without wood packing ) with MBR 2200 4500 Fumigation of container to Australian ports(with Wood packing) with MBR 2000 4000 Fumigation of container to all ports except Australia with Aluminium Phosphide 450 800 Fumigation of container to Australian Ports with Aluminium Phosphide 500 850 Pallet fumigation with MBR 1500 2050 14 Weighment & waiting Charges for Scanning (In case containers are selected by customs for scanning) For FCL containers: Rs.750 per teu For LCL containers: Rs.400 per Bill of Entry E BUFFER H&T 20' 40' -For Dry Van / Open Top Containers 2780 5100 a.1) For Dry Van/Open Top (Within Gauge)-Between 23 and 27 MT 3900 6750 a.2) For Dry Van/Open Top (Within Gauge)-More than 27MT 7200 12550 c) For Out-of Gauge (OOG) Cargo on flat Rack/Open Top Containers-(<23 MTS) 5650 10350 b.1) For Out-of-gauge (OOG) Cargo of flat Rack/Open Top Containers-(>=23MTS to < 6775 11690 b.2) For Out-of*gauge (OOG) Cargo on flat Rack/Open Top container-(>=27mts) 10050 17380 c) For Reefers : to be transported on a Genset mounted vechicle (<23MTS) 5100 9375 c.1) For Reefer : to be transported on a Genset mounted vechicle (>=23MTS to 27MT 6250 10775 c.2) For Reefers: tobe transported on a Genset mounted vehicle (>=27MTS) 9480 16450 (To be transported on a Genset Mounted Vehicle) Ground Rent charges

No of Days Upto 7th day 75/- 8-10 days 150/- 11-15 days 350/-

16th day onwards 500/- Customs Examination / Reworking Destuffing operation, if carried out as per the request of Consignees/Lines, & Re-stuffing the cargo after Custom Examination. -Less than or Equal to 25 % -More than 25 % 750/- per Teu 2500/- F ESTATE RELATED CHARGES Service Charges 1 AC Office - Area 120 F 2 11000/- per month 2 Non-AC Office - Area 120 F 2 8300/- per month (Service payable quarterly in advance) Security Deposit 1 AC Office - Area 120 F 2 33000/- 2 Non-AC Office - Area 120 F 2 24900/- (Security deposit does not bear any interest) 3 Locker 75/- per locker / per month 4 FOR THE PURPOSE OF THIS TARIFF CONTAINERS MORE THAN 40' WILL BE CHARGED @ 2.5 TIMES THE PER TEU RATE SERVICE TAX WHEREVER APPLICABLE WILL BE CHARGED *FOR SAFETY REASONS IF ODC CARGO IS TO BE MOVED ON LOWBED TRAILORS, MOVEMENT CHARGES WILL BE QUOTED ON CASE TO CASE BASIS

20' 40' a) For Dry Van/Open Top (Within Gauge) (< 23 MTS) a.1) For Dry Van/Open Top (Within Gauge)- (>= 23MTS to < 27MTS) a.2) For Dry Van/Open Top (Within Gauge)- (>= 27MTS) b) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(<23 MTS) b.1) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (>=23MTs to < 27MTS) b.2) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (> = 27MTS) c) For Reefers : to be transported on a Genset mounted vehicle -(<23MTS) c.1) For Reefers : to be transported on a Genset mounted vehicle (>=23MTS to <27MTS) c.2) For Reefers : to be transported on a Genset mounted vehicle (>= 27MTS) 5/- per Sq.Mtr/Week or part there (Minimum of 5 Sq.Mtrs per S.Bill 175/- Per Sq.Mtr/Month Minimum Unit Space a100sq.mtr Ground Rent charges on Reefer and HAZ Cargo -containers will be levied at 200% of the normal rate. Ground Rent for ODC containers will be levied 300% of the normal rate for days ( < =7) Ground Rent for ODC containers will be levied 350% of the normal rate for days (>= 8 to <15) Ground Rent for ODC containers will be levied 400% of the normal rate for days (>=15) Fuel and Energy Surcharge: Export Fuel and Energy Surcharge per Teu

a) For Dry Van/Open Top (Within Gauge) (<23MTS) a.1) For Dry Van/Open Top (Within Gauge)-(>=23MTS to <27MTS) a.2) For Dry Van/Open Top (Within Gauge)- (>=27MTS) b) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (<23MTS) b.1) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(>=23MTS to <27MTS) b.2) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers- (>=27MTS) c) For Reefers : to be transported on a Genset mounted vehicle (<23MTS) c.1) For Reefers : to be transported on a Genset mounted vehicle (>=23MTs to <27MTS) c.2) For Reefers : to be transported on a Genset mounted vehicle (>=27MTS) -For Dry Van / Open Top Containers (<23MTS) a.1) For Dry Van/Open Top (Within Gauge)-(>=23MTS to <27MTS) a.2) For Dry Van/Open Top (Within Gauge)- (>=27MTS) -For Dry Van Containers (With Waste-Paper) (< 23MTS) b.1)'-for Dry Van Containers (With Waste-Paper) (>=23MTS to < 27MTS) b.2)'-for Dry Van Containers (With Waste-Paper) (>=27MTS) c) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(< 23MTS) b.1) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(>=23MTS to < 27MTS) b.2) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open Top Containers-(>=27MTS) c) For Reefers : to be transported on a Genset mounted vehicle (<23MTS) c.1) For Reefers : to be transported on a Genset mounted vehicle (>=23MTS to 27MTS) c.2) For Reefers : to be transported on a Genset mounted vehicle (>=27MTS) per teu Per m 2 /week (Minimum of 5 M 2 per

Ground Rent for ODC containers will be levied 300% of the normal rate for days ( < = 7) Ground Rent for ODC containers will be levied 350% of the normal rate for days >= 8 to <15 Ground Rent for ODC containers will be levied 400% of the normal rate for days >=15 Fuel and Energy Surcharge: Fuel and Energy surcharge per Teu 2050/- per day or part/container 275/- per shift on Week days 00/- per shift on Sundays/Holiday (For a max of 5 Containers per Line.)

4500/- (per full shft) 2500/-(for half shift) per 1000 of (assessed value+ duty) Bond Cargo Storage Charges Storage charges Per m 2 /week (Minimum Charges will be collected for 4 weeks on actual area occupied) 20% additional charges on Hazardous Cargo on the entire amount Fumigation Charges 20' 40' AC Office - Area 1211000/- per month Non-AC Office - Area 128300/- per month AC Office - Area 120 F 2 Non-AC Office - Area 120 F 2 250/- (Per Yr)