R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

Similar documents
:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded

ATTACHMENT - DFO STATEMENT OF NEED

DFO STATEMENT OF NEED REPORT

Insulator Replacements

Need Assessment Document (NAD) DDUGJY

CHAPTER 4 PROTECTION REQUIREMENTS

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

CUSTOMER/ TWIN ARROWS PROJECT

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Distribution lines Overload Control to Increase Reliability and Power Loss Reduction

TRANSMISSION PLANNING CRITERIA

LLC FACILITIES STUDY TRANSMISSION SERVICE REQUEST

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

100 MW Wind Generation Project

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

System Improvement Scheme(R&M) : FY

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Dairy Cum Powder Plant

MILLIGAN SOLAR PROJECT

HVDC Systems in India

15 Nelson-Marlborough Regional Plan

Sub-Regional RTEP Committee PJM South

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Report. the feasibility of

Emerald Reactive Support Alternative Solution Expressions of interest

CHAPTER 6 POWER SUPPLY ARRANGEMENTS

EOL tvo'. Eo11)E cyj

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

Appendix 11 RETURN TO APPENDICES LIST. High Voltage Power Supply Upgrade (Welcon Technologies Pty Ltd)

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. System Planning

Tneb Electrical Engineer Handbook Full

North Oregon Coast Area Study. Adam Lint

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Before the. Case No. 106 of 2009

APPENDIX C FACILITY ILLUSTRATION

NOTIFICATION RURAL ELECTRIFICATION PLAN

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO KV BUSBAR ON 30 OCTOBER 2011

AT&C Loss Reduction in Electrical Distribution System by Implementation of HVDS

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWA YS

MINUTES OF THE 47 th SLCF MEETING HELD ON

Metal Clad VCBs ~ Mk1

West Station-West Cañon 115 kv Transmission Project

THE THREE VOLTAGE LEVEL DISTRIBUTION USING THE 1000 V LOW VOLTAGE SYSTEM

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

PUD ELECTRIC SYSTEM INTERCONNECTION

Analysis of Indian electricity distribution systems for integration of high shares of rooftop PV By Joerg Gaebler, IGEN Solar, GIZ India

The Energy Queensland Group Notice of no non-network options

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Appendix D Black Hills Project Summary

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Design Criteria Implementation for the Network Development Plan Hursthill Substation

Line using HTLS Conductors to increase

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

Council of the European Union Brussels, 18 July 2014 (OR. en)

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution

CORRIGENDUM # 1. Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM15118

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES

Transmission Corporation of Telangana, Jawaharlal Nehru Technological University Hyderabad

Designated Entity Pre-Qualification Materials. Exelon Corporation

ORANGE COUNTY TRANSPORTATION AUTHORITY. Agreement to Purchase Compressed Natural Gas Articulated Buses. Staff Report

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor

CHAPTER 11 COST ESTIMATES

TORONTO TRANSIT COMMISSION REPORT NO.

Abstract. List of major symbols TS - DC traction rectifier substation TSC -traction sectioning cabin FL -fault level.

Generator Interconnection System Impact Study For

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

Reengineering of Distribution lines for Power Loss Reduction-Bhiwandi Case Study

AWARD CONTRACT FOR LINE BREAKERS

Sub Regional RTEP Committee Western Region ATSI

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENT AND QUANTITIES

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Modular Standardized Electrical and Control Solutions for Fast Track Projects

IJRASET 2013: All Rights are Reserved

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

BID No.SE/O&M/Amt./T/14-15/T-27 DPDC Full Turnkey SN Description Unit Unit Rate (Rs) Qty

15 Nelson-Marlborough Regional Plan

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2.

Falcon-Midway 115 kv Line Uprate Project Report

Different Techniques of Loss Minimization in Distribution System

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Vehicle Replacement Policy - Toronto Police Service

Transcription:

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD ABSTRACT --------------------------------------------------------------------------------------------------------- Electricity - Madurai Region - Ramnad EDC - Enhancement of existing power transformer capacity from 1x8 MVA to 2x8 MVA at Abiramam 33/11 kv SS - Administrative approval - Accorded. TECHNICAL BRANCH (Per). CMD.TANGEDCO Proceedings No.94 Dated: 20.02.2017 Masi: 08, Thiruvalluvar Aandu 2048. READ: Chairman Cum Managing Director s approval dated 14.02.2017. PROCEEDINGS: 1. The Tamil Nadu Generation and Distribution Corporation Limited hereby approves the proposal for enhancement of existing power transformer capacity from 1x8 MVA to 2x8 MVA at Abiramam 33/11 kv SS in Ramnad EDC of Madurai Region at an estimated cost of Rs.89.86 Lakhs Gross and Nett. subject to enhancement of existing 110/33 kv power transformer capacity from 2x10 MVA to 2x16 MVA at Kamudhi 110/33-11 kv SS. The detailed estimate and report are annexed to these proceedings. 2. The expenditure is chargeable to TANGEDCO - Funds under IPDS scheme - Capital Expenditure Ramnad EDC - A/C code No: 18.105. 3. By virtue of the provisions contained in sub-section (2) (a) of section 185 of the Electricity Act, 2003, the TANGEDCO being the Licensee and successor entity of Tamil Nadu Electricity Board will exercise the powers of the Telegraph Authority under the provisions of section 164 of the Electricity Act, 2003, which have already been conferred upon the Board under section 51 of the Indian Electricity Act, 1910. 4. The work is to be taken up after ensuring budget provision. // BY ORDER OF THE CMD// Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region R.S.USHA CHIEF ENGINEER/ PLANNING & RC

(Per). CMD.TANGEDCO Proceedings No.94, dated: 20.02.2017 Copy to: The Director /Transmission Projects/ TANTRANSCO/Chennai 2. The Director/Distribution/TANGEDCO/Chennai-2 The Director/Finance/TANGEDCO/Chennai-2 The Chief Engineer/Transmission/Chennai-2 The Chief Engineer/Transmission Projects/Trichy The Chief Engineer/R-APDRP/Chennai -2 The Superintending Engineer/ Ramnad EDC The Superintending Engineer / GCC / Madurai The Superintending Engineer / Transmission -I/ Chennai - 2 The Superintending Engineer /Transmission -II/ Chennai -2 The Resident Audit Officer (AGO S Unit) / Chennai 2 B.P.Section (Administrative Branch) Stock file // FORWARDED BY ORDER// EXECUTIVE ENGINEER/MASTER PLAN I

Enclosure to (Per).CMD.TANGEDCO Proceedings No.94, dated: 20.02.2017 REPORT TO ACCOMPANY THE ESTIMATE This proposal envisages enhancement of power transformer capacity from 1x8 MVA to 2x8 MVA at Abiramam 33/11 kv SS in Ramnad EDC of Madurai Region at an estimated cost of Rs.89.86 Lakhs Gross and Nett. Need: At present, Abiramam 33/11 kv SS is having 1x8 MVA Power Transformer. The sustained peak reached on the existing power transformer is 4.446 MVA which is 55.6% its capacity. Load growth at this SS is about 6.33%. In case of outage in the existing power transformer at Abiramam 33 kv SS, there is no possibility to back feed the areas fed by the above substation from the nearby Parthibanoor 33 kv substation, since it is situated at a distance of 15 kms. from Abiramam 33 kv SS. Back feeding will lead to low voltage problem. Even though the existing power transformer is loaded less than 70% of its capacity, it is essential to erect additional 8 MVA power transformer at Abiramam 33 kv SS in order to satisfy N-1 condition. Further, load growth is expected to increase in and around Vangarupuram & Abiramam town areas which are being fed off Abiramam 33 kv SS. It is seen that the voltage regulation of Vangarupuram feeder of Abiramam 33 kv SS is beyond the permissible limit of 8%. In this connection, the CE/D/Madurai has reported the following; i) Improvement proposal is under preparation for strengthening of existing conductor in Vangarupuram feeder and will be carried out, so as to bring down the voltage regulation of the above feeder within the permissible limit. ii) Further, as the existing Abiramam feeder runs through Kanmai & dense Juli flora forests, in order to avoid breakdowns and to minimize the supply restoration time, it has been proposed to bifurcate the above feeder to form 1 no. additional 11 kv feeder and provision towards 1 No. 11 kv bay has been made in this proposal. However, the CE/D/Madurai Region has to evolve separate improvement proposal for bifurcation of the feeder and obtain administrative approval from the Competent authority. Hence, in order (i) to have N-1 criteria as per CEA regulation and (ii) to meet the future load growth, it becomes necessary to enhance the 33/11 kv power transformer capacity from 1x8 MVA to 2x8 MVA at Abiramam 33/11 kv SS.

Adequacy of transmission system: Details of the source SS: a. Name of the substation Kamudhi 110/33-11 kv SS b. 110/33 kv power transformer capacity 2x10 MVA c. Peak reached in MVA 15.4 d. Proposed addition in MVA Sd. enh at Muthukulathur SS: 8 Now proposed enh: 8 Total: 16 e. Anticipated peak in MVA 31.4 f. Whether pr. tr. capacity is adequate: Not adequate. In order to avoid overloading, administrative approval has already been accorded for enhancement of existing 110/33 kv power transformer capacity from 2x10 MVA to 2x16 MVA at Kamudhi 110 kv SS vide (Per) CH TRANSCO Proceedings No.209, dt.25.11.16 and the works will be carried out. Details of the source feeder: a. Name of the feeder 33 kv Kamudhi Abiramam # b. Size/capacity of the conductor Raccoon - 15 MVA c. Present loading in MVA 5.5 d. Proposed addition in MVA 8.0 e. Anticipated load in MVA 13.5 f. Whether the conductor is adequate: Adequate at present. Details of work involved: Erection of 1 no. 8 MVA, 33/11 kv power transformer at Abiramam 33/11 kv SS & its associated equipments. Erection of 2 Nos. LV breakers with associated equipments. EXECUTIVE ENGINEER/MASTER PLAN I

DETAILED ESTIMATE FOR ENHANCEMENT OF EXISTING 33/11 KV POWER TRANSFORMER CAPACITY FROM 1x8 MVA to 2x8 MVA at ABIRAMAM 33/11 kv SS IN RAMNAD EDC RS. in Lakhs S.NO DESCRIPTION QTY RATE PER TOTAL 1 33 kv AB switch 1 No 0.213 E 0.213 2 11 kv VCB (2 LV + 1 feeder) 3 Nos. 1.054 E 3.162 3 11 kv AB switch 4 Nos 0.366 E 1.464 4 11 kv CTs 9 Nos 0.176 E 1.584 5 33 kv LAs (Station type) 3 Nos. 0.037 0.111 6 11 kv LAS (Station type) 3 Nos 0.021 E 0.063 7 11 kv LAS (Distn. type) 3 Nos 0.003 E 0.008 8 Plinth for breaker 3 Nos 1.000 E 3.000 9 Control cable LS 3.000 10 C&R Panel LS 5.000 11 33 kv & 11 kv structure modifications LS 5.000 12 Subtotal 22.605 13 Contingencies 1% 0.226 14 Cost of Material 22.831 15 Labour and Transport 15% 3.425 16 Total for works 26.256 17 8 MVA, 33/11 kv Power Transformer 1 No 43.333 No 43.333 with OLTC 18 Plinth, labour &Transport 1 No 5.00 No 5.000 19 Earthing 1 No 0.55 No 0.550 20 Fire Protection wall 1 Loc 3.00 E 3.000 21 Estt and Supervision charges 15% 11.721 22 Total for works (Gross) & (Nett) 89.86 Executive Engineer/Master Plan I