ECS Pre-Engineered Nitrogen Generator. ECS Pre-Engineered Nitrogen Generator PGEN-20 (Patent Pending) Specifications. circuit) for the 2 hp compressor

Similar documents
LABORATORY ZERO AIR GENERATOR MODEL N-GC1500 USER S MANUAL

70.03 Victaulic Vortex TM

PRE-INSTALLATION GUIDE

The Filling Procedure

VWR Zero Air Generator

Corrosion Solutions. For Dry and Pre-action Fire Protection Systems. N 2 -Blast. Corrosion Inhibiting Solutions

300 Series INSTRUCTION MANUAL. Compressed Air Filters Models 302 (grade) through 317 (grade)

HARMSCO Filtration Products BC6 Series

Compressor Installation Guide

COMPACT GLYCOL FEED SYSTEMS OPERATION & MAINTENANCE MANUAL

Armstrong Double Duty 6 Steam Trap/Pump Combination Installation and Maintenance

BRAKE E

OXYGEN GENERATING SYSTEMS INTL. Oxygen System Start-up, Overview and Maintenance Guide

Installation Manual FTI-10A & FTI-20A SINGLE TANK. Automated Fuel Maintenance System FUEL TECHNOLOGIES INTERNATIONAL

Cummins Coolant Bypass Kit:

GENERAL-SERVICE COMPRESSED-AIR PIPING SECTION GENERAL-SERVICE COMPRESSED-AIR PIPING PART 1 - GENERAL

SOLAR WORLD, INC. INSTALLATION MANUAL

25198:- 1/31/12 11:24 AM Page 2 Filtration Systems

HPCO 2. Fire Extinguishing System

SLP Camaro ZL1 STAGE 2 (625 HP)

2010 Camaro Long Tube Headers, Coated w/high Flow Cats/ Powerflo-X Crossover Assembly

TotalPac 3 Non interlock Preaction, Electric release Remote controlled system

Phone Fax

Check Valves Check Valves are the simplest form of directional control valves, but they can also be used as pressure controls.

Installation, Operation and Maintenance Manual

FireFlex DUAL Single Interlock, Remote controlled system

ROGERS MACHINERY COMPANY, INC

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

Dresser TM Meters and Instruments Field Installation: Cartridge Replacement & Conversion; 1M/3M740/1480 HPC

Installation / Operation Manual

SLP Camaro ZL1 STAGE 3 (650 HP)

Table of Contents - Vangard Filters

PRE-INSTALLATION. INSTALLATION INSTRUCTIONS STEP 1: Park vehicle on level surface and chock rear wheels.

Nelsen Filtration Cartridge Systems

NUMBER: rev S.M. REF.: Refer to 2.47 ENGINE: 50 DATE: June 2001

A. This Section includes piping and related specialties for general-service compressed-air systems operating at 150 psig or less.

Instructions for Installation, Operation, Care and Maintenance

Doosan XHP1170FCAT Bid Specifications

FIRE PROTECTION EQUIPMENT 2017 DATA SHEETS BSP FIRE RESERVES THE RIGHT TO ALTER INFORMATION CONTAINED IN THIS CATALOGUE AT ANY TIME.

PLACING THE MOTOR IN SERVICE

SAMPLE COOLER and SLUDGE TRAP OPERATION & MAINTENANCE MANUAL

TotalPac 3 Double interlock Preaction, Electric/PneuLectric release Remote controlled system

MK7 GTI Electronic Folding Mirror Conversion

TotalPac 3 Double interlock Preaction, Electric/Pneumatic release Remote controlled system

2010 Camaro Long Tube Headers, Coated w/high Flow Cats Use w/#30220

SECTION COMPRESSED-AIR PIPING FOR LABORATORY FACILITIES

A Methane Sample-Draw Detector Operator s Manual

Secondary Coolant 301

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY

FROM A LEADER IN CLEAN AIR TECHNOLOGY

BALL JOINT SPACER INSTRUCTIONS PICK UP, RUNNER, T100

Alliant Energy - Gas Service Manual Chapter 4 Gas Meter Connections

In addition to this instruction sheet, the following are included in this kit (some additional parts are included for future maintenance):

TotalPac 3 Non interlock Preaction system Pneumatic release

W91/W94 Series TEMPERATURE REGULATORS. Self-Operated Temperature Regulators. Design & Operation W91 Non-Indicating W94 Dial Thermometer

Cummins 6.7 Litre 2500/3500 Diesel EGR System. Always wear gloves and safety glasses when performing this service

Lifeline Medical Systems

HPZA-3500, HPZA-7000, HPZA-18000, HPZA-30000

B-1125 DANKO STOCK. DANKO XL SKID UNIT UPF Defender Poly Tank

N-084M and N-069M-DV Series Heat Exchanger Replacement

The Better Dispensers by Bergquist

DuraMAC LIGHT COMMERCIAL & IRRIGATION WATER PRESSURE BOOSTER SYSTEM INSTALLATION INSTRUCTIONS

Technical Information

Table Summary of Sprinkler System Inspection, Testing, and Maintenance. Reference. Inspection , ,

Series 756 FireLock Dry System Check Valve

Towing and Road Service Guide For The Lexus CT200h. Quality and Education Services AAA Automotive 1000 AAA Drive Heathrow, FL 32746

30.85 FireLock NXT Actuated Valve with LPCB Approved Preaction Trim

TECHNICAL DATA. Notes: For use with Trim Charts on Pages 2-4

ROGERS MACHINERY COMPANY, INC

MODEL 905V OPERATING INSTRUCTIONS

Section 02: Pre-Installation Procedures

Grooved Piping System for Fire Protection Services

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INFLOW CRUDE OIL SAMPLER WITH AI CONTROL

JIS symbols used in this catalog are old symbols following JISB0125-1: Refer to JISB0125-1: 2007 or JFPS2011: 2006 for new symbols.

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC&R VALVES

BALL JOINT SPACER INSTRUCTIONS RUNNER

CHAPTER 79 ENGINE OIL SYSTEM

So how does a turbocharger get more air into the engine? Let us first look at the schematic below:

Instructions for Installation, Operation, Care and Maintenance

READ AND FOLLOW ALL SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS

Suspension System RS6582B

MINI MANIA REMOTE OIL COOLER INSTALLATION INSTRUCTIONS P/N NME1055

Marine Fuel Filtration Marine 800 Series

Welker Probe Instrument Regulator with Liquid Eliminator Cartridge

2008 Saturn Aura V6-3.6L

GTFLOW EXTENSION MANIFOLD ASSEMBLY INSTRUCTIONS

Owner's Manual. Model: LS-PCO-100-GEM ( ) (100 Gallon Skid-Mounted High Pressure Sprayer) Technical Specifications. General Information

Installation, Operation and Maintenance Manual

Instructions for Installation, Operation, Care and Maintenance

SUPPLEMENTAL MANUAL FOR THE INSTALLATION, OPERATION AND MAINTENANCE OF THE XL234 FILTER VESSEL

Towing and Road Service Guide For The 2010 Lexus HS250H. Quality and Education Services AAA Automotive 1000 AAA Drive Heathrow, FL 32746

This catalog contains the following geothermal accessory products and specification guides:

Clear glass doors o Stainless Steel (SS) stainless steel

A. American National Standards Institute: 1. ANSI Z Relief Valves for Hot Water Supply Systems.

Installation Manual. Automated Fuel. Maintenance. System FUEL TECHNOLOGIES INTERNATIONAL LLC

FireLock NXT Deluge Valve. With Deluge Trim Grooved x Grooved. System No. Submitted By Spec Sect Para Location Date Approved Date

Domestic. Pump Series CS Condensate Units SINGLE OR DUPLEX 1,000 THRU 150,000 SQ. FT. EDR-250 THRU 37,500 LB./HR.

Installation Manual. Automated Fuel Maintenance System FTI-5A FUEL TECHNOLOGIES INTERNATIONAL

SUITMATE Exchange Procedure 10 SUITMATE Maintenance Instructions 12 SUITMATE Troubleshooting 13 Remove / Replace Mechanical Assemblies 16

Parts List See cover Page

Transcription:

ECS Pre-Engineered PGEN-20 (Patent Pending) Specifications PATENT PENDING Dimensions: Weight: Power Supply: Power Supply: Nitrogen/air connection: Drain connection: Nitrogen Gas Output (scfh): 32 (W) X 40 (L) X 58 (H) 425 lbs 460v/3 phase/60hz (dedicated circuit) for the 2 hp compressor 120v/1 phase/60hz (dedicated circuit) for the nitrogen generator cabinet ½ FNPT ½ MNPT 45 scfh of 98% N 2 gas Ordering Information Stock Number: Replacement Filters: Replacement Membrane: PGEN-20 PGEN-FK (annual) PGEN-M (20 year) General Description The ECS Pre-Engineered PGEN-20 is designed for use in implementing the Dry Pipe Nitrogen Inerting (DPNI) process for controlling oxygen corrosion in dry and pre-action fire sprinkler systems. The PGEN-20 is designed for plug and play performance in a typical dry or pre-action fire sprinkler system. The PGEN-20 can be used to provide DPNI for single or multiple zones depending on the number of zones, the maximum volume of the zones and the cumulative volume of all the zones being served. The PGEN-20 system is designed to nitrogen inert all of the zones being served within 14 days. Thereafter, the PGEN-20 continues to automatically provide supervisory nitrogen gas sufficient for pressure maintenance of the fire sprinkler system(s). ECS Pre-Engineered PGEN-20

The PGEN-20 is a self-contained skid mounted unit that includes the following components: 2 hp air compressor power supply (460v/3 phase/60hz) Nitrogen generator cabinet power supply (120v single phase) Single point nitrogen/air discharge ½ FNPT Oil less air compressor with after cooler 20 gallon horizontal air receiver tank with automatic condensate blow down ½ MNPT Cabinet enclosed membrane type nitrogen generator (no nitrogen gas storage) with manual bypass The PGEN-20 is designed to be used in conjunction with the following components as part of the complete ECS Dry Pipe Nitrogen Inerting (DPNI) system: Air maintenance device with on board adjustable regulator (recommend Victaulic Series 757) Riser-mounted ECS Protector Automatic Vent (PAV-D) or ECS Protector SMART Vent (PSV-D) ECS Protector Gas Analyzer (PGA-1 or PGA-2) one per nitrogen generator is recommended ECS In-Line Corrosion Detector (ILD-X) monitoring multiple zones is recommended Installation Instructions Installation of the PGEN-20 requires 3 steps: 1. Mount the PGEN-20 skid to the floor in the appropriate location within the riser room 2. Bring the two (2) dedicated power supply lines to the NEMA4 power supply box on the skid 3. Plumb the nitrogen/air supply line to the trim work on the dry or pre-action zones being served Step 1: Mounting the Skid The PGEN-20 is designed to be mounted directly to the floor in the fire sprinkler riser room. Several factors should be considered in choosing the proper mounting location for the PGEN- 20: Access to the power supply (dedicated circuits as per above) Access to the risers with the nitrogen/air discharge ½ supply line Access to a drain for the condensate discharge line Clearance at the front of the unit to open the cabinet door Clearance from the side of the unit to access the power box The skid base comes with pre-punched holes in the skid feet for easy mounting to the floor using standard anchors. The anchors can be tightened through the pre-punched access holes located at the corners of the skid. ECS Pre-Engineered PGEN-20

32 57 WITH CABINET DOOR OPEN PRE-PUNCHED HOLES FOR MOUNTING 40 Step 2: Power Supply The PGEN-20 requires two dedicated power supply lines. Both lines tie into a single point on the bottom of the NEMA4 power supply box (see diagram). The landing points within the power box are shown in the diagram on the following page. 1. 2 hp compressor power supply 460v/3 phase/60hz dedicated 20 amp circuit 2. Nitrogen generator power 120v/1 phase/60hz dedicated 20 amp circuit ECS Pre-Engineered PGEN-20

120v/1 phase Landing Points Labeled L1, N, G 460v/3 phase Landing Points Labeled L1, L2, L3 ECS Pre-Engineered PGEN-20

Step 2: Plumb the Nitrogen/Air Supply Line The nitrogen/air discharge plumbing from the PGEN-20 can be connected directly to the dry or pre-action valve trim work as per standard fire sprinkler compressed air supply lines using ½ black steel, galvanized steel or copper lines. The PGEN-20 requires an in-line Air Maintenance Device (AMD) that is equipped with an on board field adjustable pressure regulator for each zone being served. The preferred AMD is the Victaulic Series 757. ECS Pre-Engineered PGEN-20

Maintenance of the PGEN-20 The nitrogen cabinet contains three (3) separate cartridge filters. It is recommended that each of the filter cartridges be replaced as part of an annual preventative maintenance program. The filter replacement kit for the PGEN-20 is part number PGEN-FK. The nitrogen separation membrane will require replacement after approximately 20 years of service. The membrane replacement part number is PGEN-M. Cartridge Filter Exchange Procedure Preliminary Steps (taking the PGEN-20 out of service) 1. Turn the power supply to the unit off 2. Close the inlet and outlet ball valves on the bypass loop 3. Depressurize the nitrogen generator internal inlet piping by slowly unscrewing the petcock valve on the bottom of the leftmost filter housing 4. Once the pressure has stopped venting through the petcock the filter housings have been depressurized. Coalescing Filter Cartridge Exchange Procedure The two filters with the condensate drain tube extending from the bottom of the filter housing are coalescing filters. To replace the filter cartridges follow Step 1 through Step 6. CLEAR DRAIN TUBE ECS Pre-Engineered PGEN-20

Step 1: Step 2: Step 3: Grasp the ¼ clear drain tube on the bottom of the filter housing with the right hand. With the left hand, push upward on the grey retaining ring on the filter housing outlet fitting. This motion will allow for the ¼ clear drain tube to be removed from the fitting. Gently pull the ¼ clear drain tube downward out of the fitting and let it hang. Once the ¼ clear drain tube has been disconnected, the filter housing bowl may be unscrewed from the top portion of the filter housing which is connected to the internal system piping. Once the filter housing bowl has been removed, the filter cartridge inside is removed by first unscrewing the black retaining disc at the base of the cartridge and then pulling down on the cartridge. Discard the old filter cartridge and replace it with the appropriately marked filter cartridge from the maintenance kit by pushing up so that it fits snugly onto the receiving stepped cylinder in the upper part of the filter housing. Screw the black retaining disc back onto the central metal threaded rod. Important: HAND TIGHTEN ONLY! FILTER CARTRIDGE BLACK DISC ECS Pre-Engineered PGEN-20

Step 4: Step 5: Step 6: Replace the filter housing bowl by screwing it onto the filter housing top. Important: HAND TIGHTEN ONLY! Reconnect the ¼ clear drain tube into the fitting on the filter housing bowl. Make sure that it fully seats in the fitting and is retained snugly. Repeat Step 1 through Step 5 for the remaining coalescing filter. Activated Carbon Filter Cartridge Exchange Procedure The filter without condensate drain tube extending from the bottom of the filter housing is an activated carbon filter. To replace the filter cartridge follow the steps below. Step 7: Step 8: Step 9: Step 10: Step 11: Remove the filter housing bowl by unscrewing it from the top portion of the filter housing which is connected to the internal system piping. Once the filter housing bowl has been removed, the filter cartridge inside is removed by first unscrewing the black retaining disc at the base of the cartridge and then pulling down on the cartridge. Discard the old filter cartridge and replace it with the appropriately marked filter cartridge from the maintenance kit by pushing up so that it fits snugly onto the receiving stepped cylinder in the upper part of the filter housing. Screw the black retaining disc back onto the central metal threaded rod. Important: HAND TIGHTEN ONLY! Replace the filter housing bowl by screwing it onto the filter housing top. Important: HAND TIGHTEN ONLY! Tighten the petcock valve to the closed position. The PGEN-20 unit can now be placed back into service. Return the PGEN-20 to Service 1. Turn the power supply to the unit on 2. Open the inlet and outlet ball valves on the bypass loop ECS Pre-Engineered PGEN-20