GENERAL INSTRUCTIONS. PERFORMER-PLUS CAMSHAFT / LIFTERS / LUBE KIT MODEL: c.i.d. Chevrolet V8 Engines CATALOG #2117

Similar documents
PERFORMER-PLUS CAMSHAFT / LIFTERS / LUBE KIT CATALOG # 2103 MODEL: 400 c.i.d. Chevrolet V8 engines GENERAL INSTRUCTIONS

INSTALLATION INSTRUCTIONS

PERFORMER-PLUS CAMSHAFT / LIFTERS / LUBE KIT MODEL: 351-M/400 c.i.d. Ford V8 CATALOG #2172 INSTALLATION INSTRUCTIONS

Performer-Plus Camshaft/Lifters/Lube Kit Part #2182 For 351-Windsor Ford V8 Engines Installation Instructions

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7112 MODEL: c.i.d. Oldsmobile V8, 1967 & later

1-3/4" or 1-7/8" headers Aftermarket/re-curved distributors

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7194 MODEL: c.i.d. Chrysler V8, 1968 & later

TORKER-PLUS Camshaft/Lifters/Lube Kit CATALOG #5002 MODEL: c.i.d. Chevrolet V8

Performer RPM Camshaft/Lifters/Lube Kit CATALOG #7106 MODEL: c.i.d. Ford V8

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7122 MODEL: c.i.d. Ford V8 (not for Boss 302 or 1985 & later roller lifter engines)

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7102 MODEL: c.i.d. Chevrolet V8, 1957 & later

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7102 MODEL: c.i.d. Chevrolet V8, 1957 & later

PERFORMER-PLUS Camshaft/Lifters/Lube Kit #2177 MODEL: c.i.d. Chrysler V8, 1967 & later (Not for 1985 & later 318 V8 with roller lifters)

PERFORMER-PLUS Camshaft/Lifters/Lube Kit CATALOG #2157 MODEL: c.i.d. Pontiac V8, 1965 & later

TORKER-PLUS Camshaft/Lifters/Lube Kit Part #5022 MODEL: c.i.d. Ford V8 (not for Boss 302 or 1985 & later roller lifter engines)

Performer-Plus 5.0L Hydraulic Roller Lifter Camshaft only CATALOG #3722 MODEL: 5.0 Litre Ford V8, 1985 & later INSTRUCTIONS

BEFORE BEGINNING INSTALLATION

BEFORE BEGINNING INSTALLATION

Edelbrock E-Force RPM Carburetor Supercharger Chevrolet LS Engines

Edelbrock E-Force RPM Carburetor Supercharger C.I.D. Small-Block Chevy

WEIAND STREET WARRIOR INTAKE MANIFOLD P/N s 8125, 8125P, 8126, & 8126P SMALL BLOCK CHEVROLET

WEIAND X-CELerator Intake Manifold P/N 7516

Edelbrock E-Force rpm carburetor Supercharger c.i.d. Small-Block chevy

WEIAND INTAKE MANIFOLD P/N 7550 SMALL BLOCK CHEVROLET 3x2 BBL

EDELBROCK THUNDER SERIES AVS CARBURETORS Part #1801, 1802, 1803, 1804, 1805, 1806, 1812, 1813, 1825, 1826 INSTALLATION INSTRUCTIONS

Installation Instructions

PERFORMER AND PERFORMER RPM CYLINDER HEADS For Small-Block Chevrolet V8 Engines INSTALLATION INSTRUCTIONS

PERFORMER AND PERFORMER RPM CYLINDER HEADS For Small-Block Chevrolet V8 Engines INSTALLATION INSTRUCTIONS CATALOG #S

CARBURETOR REFERENCE PARTS REQUIRED FOR INSTALLATION. Performer #1407 (750 cfm) A, I, K, L, N, O #1481 Chrysler Throttle Lever Kit for auto trans.

Edelbrock Enforcer EFI Supercharger C.I.D. Small-Block Chevy

Performer #1407 (750 cfm) A, I, K, O OEM (Quadrajet)* A, F, H, K,

CARBURETOR REFERENCE PARTS REQUIRED FOR INSTALLATION

DESCRIPTION MECHANICAL FUEL PUMP FUEL FILTER HIGH PRESSURE (35-90 PSI) HIGH PRESSURE (35-90 PSI) (STEEL/INCLUDED)

Holley GM BBC Single-Plane EFI Intake Manifold Kits

DUAL QUAD F-28 MANIFOLD CATALOG #5435 For Ford c.i.d. V8 (not Boss 302) Non-EGR INSTRUCTIONS

Edelbrock EFI Universal Fuel Sump System - Adjustable Part #36031, INSTALLATION INSTRUCTIONS

PERFORMER RPM 2-O & 2-R MANIFOLDS CATALOG #7161 & #7163 MODEL: Chevrolet c.i.d.v8, 1965 & later, Non-EGR INSTRUCTIONS

PERFORMER RPM 460 MANIFOLD CATALOG #7166 MODEL: Ford 429/460 V8 INSTRUCTIONS

PERFORMER T.B.I. CATALOG #3713 MODEL: CHEVROLET 4.3 Litre 90 V6 T.B.I. (1987 and later) INSTRUCTIONS

BEFORE BEGINNING INSTALLATION

CAUTIONS AND WARNINGS

Roller Camshaft Installation


PERFORMER TRUCK 5.0 MANIFOLD #3841 MODEL: Ford 5.0 Litre V8 (trucks only), 1987 to 1996, EGR INSTRUCTIONS

Installation Instructions

2005 Saturn L ENGINE Engine Mechanical - 3.0L (L81) - L300

State of California AIR RESOURCES BOARD. EXECUTIVE ORDER D 289 Relating to Exemptions Under Section of the Vehicle Code

E-STREET 2 EFI IGNITION CONTROL KIT Part #3674, 3675, 3676, 3679, 3680 INSTALLATION INSTRUCTIONS

jegs.com

Do-It-Yourself Crate Engine Performer Performer RPM E-Tec

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

1983 BMW 320i. 1.8L 4-CYL 1983 Engines - 1.8L 4-Cylinder Engines - 1.8L 4-Cylinder

The spacers can be made out of.750 round aluminum bar with a.3125 to.318 hole drilled in center.

TIMING CHAIN. TIMING CHAIN Removal and Installation EM-35 PFP:13028 EBS00I2X KBIA2511E

1995 Aerostar/Ranger/Explorer

DrVanos.com Stage II Installation Instructions. Tool rental is available with the purchase of a vanos kit *See website for more info*

2003 Nissan-Datsun Truck Frontier 4WD V6-3.3L (VG33E)

Classification: Reference: Date: VE30DE CAM TIMING

EDELBROCK THUNDER SERIES AVS CARBURETORS Part #1801, 1802, 1803, 1804, 1805, 1806, 1812, 1813, 1825, 1826 INSTALLATION INSTRUCTIONS

Edelbrock Victor II Intake Manifold. For Chrysler 5.7L (Eagle) and 6.1L Gen III HEMI Engines Part #7179

Lower Intake Manifold Replacement


FORD V8 ENGINES 209. the treated area, the block is cracked and should be replaced.

Valve gear, servicing

Distributor Replacement

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

Disassembly and Assembly

Edelbrock Victor II Intake Manifold. For Chrysler 5.7L (Eagle), 6.1L and 6.4L Gen III HEMI Engines Part #7179

REMOVAL & INSTALLATION

1 of 10 2/10/2017 5:20 PM

TIMING BELT COMPONENTS EM 15

2.2L 4-CYL - VIN [S]

2000 Nissan Altima SE

KIT CONTENTS. Multimeter or test light Wire crimpers or soldering equipment. Wire terminals & connectors 10A inline fuse

Use Installation Procedure 1 when the crankshaft has NOT been rotated from the original position.

QUICK FUEL TECHNOLOGY HOT ROD SERIES CARBURETORS SLAYER SERIES CARBURETORS SUPER STREET SERIES CARBURETORS

REMOVAL & INSTALLATION

Valve Rocker Arm and Push Rod Installation (6.2L LS3)

1998 Saab 900 SE ENGINES Saab 2.0L & 2.3L 4-Cylinder

WATER PUMP INSTALLATION INSTRUCTIONS WEIAND WATER PUMPS ACTION PLUS & TEAM G APPLICATIONS FOR SMALL BLOCK & BIG BLOCK CHEVROLETS

Disconnect the breather tube from the air cleaner outlet duct.

SMALL BLOCK CHEVROLET SUPERCHARGER SYSTEM

SPECIFICATIONS TEST AND ADJUSTMENT SPECIFICATIONS SPECIFICATIONS ENGINE FD620D, K SERIES

1999 Nissan Altima GLE


SPECIFICATIONS TEST AND ADJUSTMENT SPECIFICATIONS SPECIFICATIONS ENGINE FD620D, K SERIES

14-6. TSB Revision ENGINE COOLING ON-VEHICLE SERVICE

Engine. Special Tool(s) Adapter for (T97T-6256-A) Adapter for (T97T-6256-D)

1 of 12 11/20/2016 9:32 PM

Precision Degree Wheel Kit

REMOVAL & INSTALLATION

1992 Toyota Cressida


Engine - Timing Chain/Front Cover Revised Procedure Classification: EM98-009

Testing and Inspection. Diagnostic Procedure Step 1-2

Toothed belt, removing and installing

Distributor Replacement (HVS)

11A-1 ENGINE CONTENTS

IN-VEHICLE SERVICE. Engine Components

2001 Dodge Dakota ENGINES 4.7L V8

Transcription:

Page 1 PERFORMER-PLUS CAMSHAFT / LIFTERS / LUBE KIT MODEL: 283-400 c.i.d. Chevrolet V8 Engines GENERAL INSTRUCTIONS PLEASE study these instructions carefully before beginning this installation. Most installations can be accomplished with common tools and procedures. However, you should be familiar with and comfortable working on your vehicle. If you do not feel comfortable performing this installation, it is recommended to have the installation completed by a qualified mechanic. If you have any questions, please call our Technical Hotline at: 1-800-416-8628, 7:00 am - 5:00 pm, Pacific Standard Time, Monday through Friday. IMPORTANT NOTE: Proper installation is the responsibility of the installer. Improper installation will void your warranty and may result in poor performance and engine or vehicle damage. These instructions are designed to give general installation guidelines. A complete step-by-step procedure manual would require many pages. If you are a novice or just learning to work on automotive engines, we recommend consulting either Chilton or Motors automotive manuals before you begin. You may also wish to contact an experienced mechanic. Be advised: improper installation may result in LOW MILEAGE, POOR PERFORMANCE, COSTLY REINSTALLATION AND EVEN ENGINE DAMAGE. Installing a camshaft is a complex procedure. Please follow these instructions carefully. Failure to do so may void your warranty. Before you begin the removal and installation process, please examine the kit for possible shipping damage. If the camshaft is damaged, contact your dealer immediately. Also, make sure you have all the recommended tools and parts as listed below. As you read through these instructions the first time, use the preparation checklist to check off the exact items you will need. If the vehicle is equipped with air conditioning, the system must be evacuated prior to starting. Performer-Plus camshaft #2117 is ground specifically for use with the E-Street EFI system, #3600. Tools & Equipment For Installation Box and open end wrenches Socket set Distributor wrench Pliers (channel locks & hose clamp) Screw drivers (regular and phillips) Torque wrench Hammer Gasket scraper or putty knife Timing light Vacuum gauge Rags Water bucket Harmonic balancer puller Masking tape (for tagging hoses and electrical wires) Engine oil & filter Crankshaft dampener puller PREPARATION CHECKLIST Hardware & Parts To Buy Gaskets - Edelbrock or OE Equivalent Pipe plugs, if needed Edelbrock Gasgacinch #9300 RTV Silicone Sealant Chalk Paper and pencil Radiator coolant Edelbrock Sure Seat Valve Springs, #5802 or #5902 (for rotators) Edelbrock Performer-Link True Rolling Timing Chain and Gear Set, #7800 Teflon tape Front cover oil seal, OEM or equivalent NOTE: Sure seat springs #5902 not applicable to cylinder heads 1977 and later with casting #14014416. These heads must use Edelbrock spring set #5802. REMOVAL OF ENGINE PARTS BEFORE CAMSHAFT INSTALLATION Be sure to keep all parts in order WARNING! DO NOT REMOVE RADIATOR CAP OR RADIATOR HOSES WHILE ENGINE IS HOT! 1. Disconnect the battery. 6. Tag and remove coil wires and sensor wires. 2. Drain radiator coolant. Drain plug will normally be located on lower right or left side of the radiator facing the engine. 7. Tag and remove vacuum lines. 3. Remove radiator and air conditioning condenser if so equipped. In some cases, the front grille may have to be removed. Measure distance from front cover to grille or brackets that may interfere with camshaft against the length of the camshaft. 4. Remove the gas cap to relieve pressure. Disconnect fuel line and plug. Replace gas cap. 5. Disconnect all linkage from carburetor such as throttle, throttle springs, transmission, cruise control and automatic choke. 8. Remove valve covers. 9. Remove distributor cap and wires, rotate engine until rotor points towards number 1 terminal in cap and pointer on front cover is on top dead center (TDC) and remove distributor. Note the approximate position of the distributor housing in relation to the manifold to assist in getting the distributor properly located during re-installation. 10. Remove carburetor and intake manifold. Remove and discard intake manifold gasket. 11. Remove rocker arms and pushrods.

12. Remove hydraulic valve lifters. 13. Remove crankshaft pulley and crankshaft dampener using a suitable puller. 14. Loosen oil pan and remove water pump and front cover. NOTE: The front cover oil seal should be replaced before the front cover is re-installed. 15. Remove the fuel pump and fuel pump pushrod. 16. Remove bolts retaining camshaft sprocket. Remove sprocket and chain. 17. Remove crank sprocket using a gear puller. 18. Remove camshaft. VALVE SPRINGS WARNING ABOUT YOUR WARRANTY: In order for this Performer- Plus cam and lifter kit to be covered under ANY WARRANTY you must use either the correct Edelbrock Sure Seat valve springs or the stock original equipment valve springs. Failure to do so could cause the cam lobes to wear excessively and could cause additional engine damage. 1. This camshaft is designed to function either with the stock springs or with Edelbrock Sure Seat valve springs #5802 (std. retainer set), or for use with valve rotators, use #5902. 2. For older vehicles and vehicles with high mileage we highly recommend replacing the valve springs with Sure Seat Valve Springs # 5802 (std. retainer set), or for use with valve rotators, #5902. NOTE: Sure Seat Springs #5902 not applicable to cylinder heads 1977 and later with casting #14014416. These heads must use Edelbrock spring set #5802. 3. Check spring height and set to factory specifications for correct year and model. DUE TO THE MANY POSSIBLE SETTINGS OVER THE YEARS, WE ADVISE CHECKING MOTORS, CHILTON, OR FACTORY SERVICE MANUALS FOR CORRECT SPRING HEIGHT FOR YOUR VEHICLE. LIFTERS 1. New lifters must be used with a new camshaft. Use only the lifters supplied with your kit. 2. Check to make sure all lifters fit freely in lifter bores. INSTALLATION INSTRUCTIONS 1. Coat cam lobes and bottom of each lifter with the supplied assembly lube. THIS WILL PREVENT CAM LOBE AND LIFTER WEAR FROM OCCURRING DURING INITIAL ENGINE START UP. 2. Install new camshaft with new sprockets and timing chain. When using Performer-Link True Rolling Timing Chain and Gear Set (#7800 or #7802) with an Edelbrock cam and lifter kit, straight up timing alignment is achieved. If any other timing gear set is used, it is necessary to check camshaft position for correct timing alignment. This requires indexing the camshaft with a degree wheel to verify timing alignment. O.E.M. or non-edelbrock timing gear sets are not recommended for use with Edelbrock camshafts. Use locking compound material on bolt threads holding gear to cam. Torque to factory recommendations specified in Motors or other repair manual. 3. Install camshaft with timing marks lined up as recommended by factory specifications. See Figure 2. 4. PUSHROD AND ROCKER ARM INSTALLATION - After the cam is installed and timed correctly (see Figure 2), install pushrods, lifters and rocker arms. VALVE ADJUSTMENT 1. Turn the engine over until the No. 1 cylinder exhaust lifter starts to move up. At this point, install adjusting nut on intake rocker arm and adjust to zero clearance between rocker arm and valve. Now, turn adjusting nut down (clockwise) 1/2 turn more for final adjustment. 2. Turn the engine over again until the intake lifter just stops coming down. At this point install adjusting nut on exhaust rocker arm and adjust to zero clearance between rocker arm and valve. From this point turn adjusting nut down (clockwise) 1/2 turn more for final adjustment. 3. The above procedure assures correct hydraulic lifter preload. Repeat this procedure for each of the other seven cylinders. 4. Install front timing cover with new gasket. NOTE: Install new seal between oil pan and front cover if old seal is damaged after removal. Use RTV silicone sealant on seal to ensure proper seal to pan. 5. Torque front timing cover bolts to 6-7 ft. lbs. 6. Install front harmonic balancer and torque to 60 ft/lbs. 7. Install fuel pump. 8. Install water pump using new gaskets and torque to 30 ft.-lbs. 9. Install intake manifold using new intake gasket set and torque bolts to 25 ft/lbs. DISTRIBUTOR INSTALLATION AND ENGINE TIMING 1. Turn the engine over in direction of rotation until the No. 1 intake valve closes and continue until the pointer on the front cover is approximately five degrees before top dead center (BTDC). See Figure 1 for firing order. 2. Re-install the distributor with the rotor pointing towards No. 1 terminal in the cap, and with the distributor housing in its original position. If distributor will not drop down all the way to the flange on the manifold, it will be necessary to align the distributor shaft with the oil pump drive. Slowly rotate the engine until the distributor drops down against the manifold, then continue turning until two complete revolutions are completed and the timing marks once again come to five degrees BTDC. 3. Lightly tighten the hold-down clamp so that the distributor can still be turned to determine final setting using a timing light with the engine running. 4. Replace valve covers, carburetor linkage and remaining vacuum and electrical connections. 5. Engine oil & filter should be changed before and after break-in. We highly recommend using Edelbrock s Zinc Additive, #1074, during the break-in procedure. Page 2

CAMSHAFT & LIFTER RUN-IN IMPORTANT: DO NOT ALLOW THE ENGINE TO RUN UNDER 2000 RPM FOR THE FIRST 1/2 HOUR. Slow idle speeds may result in severe cam and lifter wear. START THE ENGINE AND BRING TO BREAK-IN RPM. IMPORTANT NOTES AFFECTING YOUR WARRANTY CAM LOBE WEAR Cam lobe wear is almost non-existent unless mismatched parts are used or installation of the cam and lifters is done improperly. Most cam damage is caused by the timing gear loosening due to improper torque on bolts. Bolts holding gear to camshaft should be torqued carefully and a locking compound applied to threads of bolts. Before installing your new Performer-Plus camshaft, check the gear drive on the distributor and oil pump for any signs of wear. If worn, be sure to replace with a new gear or you may wear out your camshaft prematurely. High-volume oil pumps are not recommended with Performer-Plus camshafts. Edelbrock camshafts are designed to use O.E.M. type gears only. CAM GEARS AND CAMSHAFT END PLAY If cam gear becomes loose, the cam will slide back in the block, causing the lifters to hit the lobes next to them and also the cam bearing journals. If the engine is run after this happens, the bottom of the lifters and the sides of the lobes will become chipped. SPECIAL INSTRUCTIONS IGNITION TIMING Increase initial setting to 14 BTDC (Before Top Dead Center). Total of initial and centrifugal advance not to exceed 32. Full advance achieved at 3,000-3,500 rpm. Vacuum advance curve should be 2 to 4 advance at 8-9 inches of vacuum, increasing to 12 advance at 13 inches of vacuum. Vacuum advance line must be connected to direct manifold vacuum for best performance, not ported vacuum. NOTE: The best combination for any particular vehicle or application must be determined by trial and error using the above information as a guideline. TUBULAR EXHAUST SYSTEM For best performance, a tubular exhaust system is recommended with the Performer package to provide the most low-end torque. Please consult your Edelbrock dealer or the Edelbrock catalog for a listing of available Edelbrock Tubular Exhaust Systems. Be sure to check local emission control regulations for legality of camshaft and exhaust system changes. IMPORTANT NOTE: When using Performer-Link True Rolling timing chain and gear sets (#7800 or #7802) with an Edelbrock cam and lifter kit, straight up timing alignment is achieved. If any other timing gear set is used, it is necessary to check camshaft position for correct timing alignment. This requires indexing the camshaft with a degree wheel to verify timing alignment. O.E.M. or non-edelbrock timing gear sets are not recommended for use with Edelbrock camshafts. Firing Order: 1-8-4-3-6-5-7-2 Timing Marks Figure 1 283-400 c.i.d. Chevrolet V8 Firing Order and Timing Marks Turn distributor counter clockwise to advance timing Figure 2 Timing Chain Sprocket Alignment Page 3

WARNING: In addition to the break-in procedure described in the main installation instructions, you must use Edelbrock break-in oil PN 1070 or equivalent. If using your own engine oil, use Edelbrock Zinc Additive PN 1074 or equivalent. Failure to use proper engine break-in oil or zinc additive can permanently damage the new camshaft and void manufacture warranty. Engine break-in oil and zinc additive is NOT included with this camshaft and must be purchased separately. PN 1070 PN 1074 Edelbrock LLC 2700 California Street Torrance, CA 90503 Tech Line: 1-800-416-8628