Work Light Kit - Installation - Mini Mill - Toolroom Mill

Similar documents
Oil Skimmer Installation

Installation Guide. Installing and Configuring the WABCO Trailer RSSplus with Tire Inflation and Door Ajar Systems. Hazard Alert Messages

VMC - Auto Air Gun. VMC - Auto Air Gun - Introduction. Haas Technical Documentation. AD0116 Rev D Applies to machines built from: December, 2013

Installation Guide. Hazard Alert Messages. How to Obtain Additional Maintenance, Service and Product Information

Air Collet Closer - Upgrade - OL-1

Tool Release Piston (TRP) - Troubleshooting Guide

TOYOTA YARIS KEYLESS ENTRY SYSTEM

INSTRUCTIONS FOR REMOVAL OF GROUND FAULT PROTECTION DEVICE FROM HOBART GENERATOR SETS SPECIFICATION NUMBER

icon User s manual Table of Contents section 6 icon module installation and removal

Throttle Sensitivity Booster

Coolant Refill - Installation

Service Procedure Note Note Note

System Date of Issue Bulletin Number Bulletin Type. Title: Elimination of AC Connectors J29a and J29b

INSTRUCTIONS FOR REMOVAL OF GROUND FAULT PROTECTION DEVICE FROM HOBART GENERATOR SETS SPECIFICATION NUMBERS

INSTALLATION INSTRUCTIONS

Assembly Instruction EL OCHITO WHITE CONTACTS 1000BASE-T/10GBASE-T TYPE I: PIN /SKT CABLE: S/FTP

GENUINE PARTS INSTALLATION INSTRUCTIONS

JOHN DEERE GATOR SWITCH PANEL INSTRUCTIONS FITS 1GTRXUV2 AND 1GTRXUV4 CABS (p/n: 1XUVSP)

Models CHASSIS LUBE ELECTRIC GREASE PUMP Series "C" - 13C MAY FORM Page. Section - Q3

Model CHASSIS LUBE ELECTRIC GREASE PUMP Series "C"

Models CHASSIS LUBE ELECTRIC GREASE PUMP Series "C" - Q3. MAY FORM Section

E.S.P. Embedded Sensing Probes for Motor Brushes

Low Oil Controller Installation and Operations Manual. CS SS07-A2 P/N Enclosure

SELECTRIC, INC. Selectric (PX) Full Voltage Type Motor Control Panel Installation And Operation Manual

Throttle Sensitivity Booster

Installation Tips for your Add-on Remote Start (for GM vehicles with INTSL Install 2) v3.2 Updated 11/12/2012

INSTALLATION AND USER MANUAL

TECHNICAL DOCUMENT. PCNC Mill Enclosure Door Switch Kit. Installation

INSTALLATION INSTRUCTIONS

Installation Tips for your Remote Start/Keyless Entry (for Ford Vehicles) v3.3 Updated 1/13/2013

FlexJet Carriage Circuit Board (PCB) Replacement

Subject: Models/Years Affected: Origination Date: Revision Date:

Installation Tips for your Remote Start/Keyless Entry (for Mazda Vehicles) v3.1 Updated 9/22/2012

Introduction. Prerequisites. Tools Required. Bijur Mechanical - Oil Pump - Axis - Timed Pressure Test LAST UPDATED: 11/26/2018

INSTALLATION INSTRUCTIONS

Repair Instructions for Seat Belt Tensioner Ignition Circuit

1999 Dodge or Ram Truck RAM 1500 Truck 2WD V8-5.9L VIN Z LDC

011 Circuit Protection/Fuse Panel

Conflicts. Camry L (ECO Grade) Security System with Keyless Entry. Part Number: Accessory Code: QK1

Model No. SB1B-14 Linear Standby Regulator. B & C Specialty Products P.O. Box B Newton, KS (316)

Safe-T-element Installation Instructions

INSTALLATION INSTRUCTIONS

PITNEY BOWES ECO 900 EI. Economy Envelope Inserter FEEDER (REPLACE-A-STATION SERIES) Parts Manual. ECO-900EIPARTSreva 1

INSTALLATION MANUAL HARLEY-DAVIDSON V-ROD DESTROYER DATA ACQUISITION SYSTEM (Part Number 200-KT-V300D)

PITNEY BOWES Sure-Feed Engineering 900 ECO-EI. Economy Envelope Inserter FEEDER (REPLACE-A-STATION SERIES) Parts Manual. 900-ECO-EI_PARTS_rev0 1

INSTALLATION INSTRUCTIONS

Replacing a Load Cell in the 400 Series Force Plate

Assembly Instruction. EL OCHITO BLUE CONTACTS SuperSpeed USB TYPE I: PIN /SKT CABLE:

BX8848 Installation Instructions 4 Diode Wiring Kit For Motorhomes With Red Tail Lights

PITNEY BOWES. SE-900EI Envelope Inserter FEEDER (REPLACE-A-STATION SERIES) WITH DYNAMIC ROTATION. Parts Manual. SE-900EI-PARTSreva_1 1

INSTALLATION INSTRUCTIONS

Auber Instruments v1.1 12/29/ Enclosure Disassembling all the screws and the enclosure will be spitted into four pieces:

WARNING. Important Notice

FLIGHT SIMULATOR SYSTEMS

A. VEHICLE INSPECTION PROCEDURE

Smart Switch with External Switch - 12 volt - ( )

Water in Fuel Sensor Kit

29048, 29049, 29050, 29051, 29052, 29053, 29054,

GMC Duramax (LBZ) High Idle Kit Note: Only for automatic transmissions with cruise control

INSTALLATION INSTRUCTIONS

Nero 6600H/6601H. Installation Guide. Commercial Vehicle Productivity and Security. Antenna Configuration

INSTRUCTIONS, ME2 BACKUP BAR KIT

Conflicts: Highlander without sunroof

Side Door Sill Trim Plate Package Installation

CNC Router Parts CNC Router Parts 2.2 kw Plug and Play Spindle / VFD System CRP800 Retrofit Guide

Subject: Models/Years Affected: Origination Date: Revision Date:

29048, 29049, 29050, 29051, 29052, 29053, 29054,

SELECTRIC, INC. Selectric (PA) Autotransformer Type Motor Control Panel Installation And Operation Manual

INSTALLATION INSTRUCTIONS INFINITI CELLPORT UNIVERSAL HANDS FREE SYSTEM

INSTALLATION INSTRUCTIONS

Installation Instructions

Detroit Speed, Inc. RS Electric Headlight Door Kit 1969 Camaro P/N: (3)

CATALOG OF REPLACEMENT PARTS

PBA Series Prelube Controls

TOYOTA COROLLA 2010 TVIP V4 PREPARATION

TOYOTA TACOMA LED DRL. Part Number: TTA-712

Varicon. Series " x.130" x.150" Grid Pattern FEATURES TECHNICAL SPECIFICATIONS

Varicon. Series " x.130" x.150" Grid Pattern FEATURES TECHNICAL SPECIFICATIONS

An ISO 9001:2015 Registered Company

Headlamp Durability Enhancement

Dinosaur Flexible Wiring Duct

INVERTER FOR DC CRANE CABIN AIR CONDITIONING UNIT 3KW VERSION

INSTALLATION INSTRUCTIONS

PITNEY BOWES Sure-Feed Engineering. 900-EI Envelope Inserter FEEDER (REPLACE-A-STATION SERIES) Parts Manual. 900-EI_PARTS_rev0 1

Installation Instructions for Stand Alone Remote Starter (EVO-ALL-THAR-GM2) Firmware: 4.18, OPTION 15. T2362 Rev#1.2 last updated 10/15/13

TOYOTA TACOMA TVIP V5

UCA ADJUSTABLE ANGLE MULTI COLOR TEMPERATURE

Installation Instructions for Model CityFix

V installation guide cloud softlight large mobile plug-in type

INSTALLATION INSTRUCTIONS: Viewline 52 mm

V installation guide cloud softlight medium mobile plug-in type

Heated Bed Installation Instructions

SRS Airbag Light "ON" - B0111/B0116 Open Side Squib Circuit

Read this document carefully before implementing the upgrade!

Detroit Speed, Inc. RS Electric Headlight Door Kit 1968 Camaro P/N: (3)

INSTALLATION INSTRUCTIONS

V cloud softlight small mobile ( V) installation guide

INSTALLATION INSTRUCTIONS TRAILER HITCH MAIN HARNESS KIT

Condition. Correction

Solenoid Valve Output Module IC693MDL760 Product Description

Transcription:

Work Light Kit - Installation - Mini Mill - Toolroom Mill Revision 1 LAST UPDATED: 01/21/2019 AD0100 Machine Compatibility Depending upon the year the machine was built, it will have either a 6.5" (165 mm) pendant, or a 3" (76 mm) pendant. Document Applies to these Parts 6.5" PENDANT 3" PENDANT KIT P/N 93-2972 QTY: 1 KIT P/N 93-2971 QTY: 1 Page 1 of 11 pages

Pendant (6.5" - 165mm) - Work Light - Installation - Mini Mill - Super Mini Mill Page 2 of 11 pages

1 Push [POWER OFF]. Set the main circuit breaker to the OFF position. Lock the main circuit breaker. Use an approved lock with an approved safety tag. Using the magnetic base, attach the LED LAMP ASSEMBLY to the machine at a position that fully illuminates the workpiece. 2 Remove the Molex connector from the power extension cable [3]. Connect the power extension cable [3] to the new female C13 WORK LAMP POWER CABLE [1]. Use the CRIMP WIRE NUTS [2]. 3 Connect the cable attached to the work light to one end of the work-light extension cable [3]. Inside the enclosure, push the included plastic hose [1] up through the front hole of the pendant arm. Push the hose through the arm until it comes out the bottom of the pendant arm at the rear of the machine. Use tape [2] to attach the work-light extension cable to the hose. Wrap the hose and cable together tightly into a smooth bundle that will slide through the pendant arm without getting caught. Pull the hose from the back of the machine until the cable comes out of the arm. Page 3 of 11 pages

4 Insert the (2) screws [1] included in the kit through the switch bracket [2] and through the two holes near the rear end of the pendant arm. Place a washer [3] and a nut [4] on each screw. Tighten the nuts. Install the pushbutton switch [5] into the switch bracket. The switch will snap into place. Connect the work-light extension cable [6] to the pushbutton switch. Route the power cable [7] from the switch to the ground-fault circuit interrupter inside control cabinet. Connect the power cable to the terminals of the ground-fault circuit interrupter outlet marked "LOAD" [8]. Set the main circuit breaker to the ON position. Push [POWER ON]. Press the [RESET] button on the outlet. Page 4 of 11 pages

Pendant (3" - 76mm) - Work Light - Installation - Mini Mill - Super Mini Mill Page 5 of 11 pages

1 Push [POWER OFF]. Set the main circuit breaker to the OFF position. Lock the main circuit breaker. Use an approved lock with an approved safety tag. Using the magnetic base, attach the LED LAMP ASSEMBLY to the machine at a position that fully illuminates the workpiece. 2 Connect the cable attached to the work light to one end of the work-light extension cable [3]. Inside the enclosure, push the included plastic hose [1] up through the front hole of the pendant arm. Push the hose through the arm until it comes out the bottom of the pendant arm at the rear of the machine. Use tape [2] to attach the work-light extension cable to the hose. Wrap the hose and cable together tightly into a smooth bundle that will slide through the pendant arm without getting caught. Pull the hose from the back of the machine until the cable comes out of the arm. 3 Route the work-light extension cable [1] into the control cabinet. Use cable ties to bundle the worklight extension cable with the existing wiring. Connect the end of the cable [2] into P36 [3] on the I/O PCB. Connect one end of the power cable provided in the kit to the terminals of the ground-fault circuit interrupter outlet marked "LOAD" [4]. Connect the other end [5] to P83 [6] on the I/O PCB. Page 6 of 11 pages

4 Remove the back of the pendant. Remove the hole plug [2] from the side of the pendant and install the pushbutton switch [1]. The switch will snap into place. Connect the switch cable [3] provided in the kit to the switch and to J4 [4] on the SKBIF PCB. Attach the rear cover to the pendant. Set the main circuit breaker to the ON position. Push [POWER ON]. Press [SETNG/GRAPH]. Change Setting 7, Parameter Lock to OFF. Press [PARAM/DGNOS]. Set Parameter 737:7 WORKLIGHT VIA SKBIF to 1. Page 7 of 11 pages

Pendant (6.5" - 165mm) - Work Light - Installation - Toolroom Mill Page 8 of 11 pages

1 Push [POWER OFF]. Set the main circuit breaker to the OFF position. Lock the main circuit breaker. Use an approved lock with an approved safety tag. Using the magnetic base, attach the LED LAMP ASSEMBLY to the machine at a position that fully illuminates the workpiece. Remove the rear panel from the pendant. Remove the hole plug [1] from the side of the pendant and install the pushbutton switch [2]. 2 Remove the Molex connector from the power extension cable [3]. Connect the power extension cable [3] to the new female C13 WORK LAMP POWER CABLE [1]. Use the CRIMP WIRE NUTS [2]. 3 Connect the work-light extension cable provided in the kit to the pushbutton switch. Route the worklight extension cable into the pendant arm. Pull the cable out of the pendant arm through the small hole near the back of the enclosure. Press the cable underneath the cable retainers on the top of the enclosure. Push the cable through the hole near the front of the enclosure. Connect the work-light extension cable to the work light cable. Page 9 of 11 pages

4 Connect the power cable [1] to the pushbutton switch. Route the power cable into the pendant arm. Pull the cable out of the small hole at the bottom of the pendant arm at the back of the machine. Connect the power cable to the terminals of the ground-fault circuit interrupter outlet marked "LOAD" [2]. Attach the rear cover to the pendant. Set the main circuit breaker to the ON position. Push [POWER ON]. Press the [RESET] button on the outlet. Page 10 of 11 pages

Pendant (3" - 76mm) - Work Light - Installation - Toolroom Mill 1 Push [POWER OFF]. Set the main circuit breaker to the OFF position. Lock the main circuit breaker. Use an approved lock with an approved safety tag. Using the magnetic base, attach the LED LAMP ASSEMBLY to the machine at a position that fully illuminates the workpiece. 2 Route the work-light extension cable [1] into the control cabinet. Use cable ties to bundle the worklight extension cable with the existing wiring. Connect the end of the cable [2] into P36 [3] on the I/O PCB. Connect one end of the power cable provided in the kit to the terminals of the ground-fault circuit interrupter outlet marked "LOAD" [4]. Connect the other end [5] to P83 [6] on the I/O PCB. 3 Remove the back of the pendant. Remove the hole plug [2] from the side of the pendant and install the pushbutton switch [1]. The switch will snap into place. Connect the switch cable [3] provided in the kit to the switch and to J4 [4] on the SKBIF PCB. Attach the rear cover to the pendant. Set the main circuit breaker to the ON position. Push [POWER ON]. Press [SETNG/GRAPH]. Change Setting 7, Parameter Lock to OFF. Press [PARAM/DGNOS]. Set Parameter 737:7 WORKLIGHT VIA SKBIF to 1. Page 11 of 11 pages