NICTI Alternatives Analysis

Similar documents
Click to edit Master title style

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Develop ground transportation improvements to make the Airport a multi-modal regional

CrossRail Chicago. CrossRail Chicago, a modern vision for transportation in our region. 1:00 1:00. Union Station 0:30 1:00

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

Locally Preferred Alternative Report

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

5. OPPORTUNITIES AND NEXT STEPS

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Chapter 4 : THEME 2. Transportation

METRO Orange Line BRT American Boulevard Station Options

ARTERIAL BRT OVERVIEW

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005

INDUSTRIAL DEVELOPMENT

SERVICE DESIGN GUIDELINES

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

NORTHERN ILLINOIS COMMUTER RAIL INITIATIVE COMMUTER RAIL FEASIBILITY STUDY

Appendix C. Operating Assumptions (Service Plan) Tables and Figures. Travel time and Ridership Data - Tables

Geary Corridor Bus Rapid Transit

Operating & Maintenance Cost Results Report

1.0 INTRODUCTION Organization of this Report Study Area EXISTING CONDITIONS CTA Rail Forest Park Branch...

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Troost Corridor Transit Study

GO Transit s deliverable: the 2020 Service Plan

Transitways. Chapter 4

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

4.0 TIER 2 ALTERNATIVES

Public Transit Existing Conditions

2.0 Development Driveways. Movin Out June 2017

Regional Transportation Plan: APPENDIX P

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

Figure 2-14: Existing Bus Routing at Irwindale Station

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Leadership NC. November 8, 2018

MetroExpress Improvements

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Transit Access Study

State Avenue Corridor Bus Rapid Transit (BRT)

Service Quality: Higher Ridership: Very Affordable: Image:

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

WAKE TRANSIT PLAN Summer 2018

Chicago Milwaukee Intercity Passenger Rail Corridor

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

CHICAGO TRANSIT AUTHORITY

Transportation Highway Engineering Conference February 24, 2015

Public Meeting Thursday, Dec. 15, 2011 Chicago Union Station Union Gallery Room. Welcome

3. PRELIMINARY DEFINITION OF ALTERNATIVES

The Screening and Selection of Regionally Significant Projects

Background Information about the Metrobus 29 Lines Study

STH 60 Northern Reliever Route Feasibility Study Report

Kendall Drive Premium Transit PD&E Study

TRAIN, BUS & TRANSIT

is being pushed by the locomotive, which reduces the number of seats in that car.

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Presentation by: Jeffrey Sriver Chicago Department of Transportation. APTA 2014 Multimodal Operations Planning Workshop Monday August 11, 2014

TRANSIT IDEA STRATEGIC INITIATIVE On BUS RAPID TRANSIT (BRT)

Key Transfer Stations - Technical Memo

Travel Time Savings Memorandum

RTSP Phase II Update

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS

TORONTO TRANSIT COMMISSION REPORT NO.

Community Open Houses November 29 December 7, 2017

RECOMMENDED ALTERNATIVE REPORT

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

STAR Line Alternatives Analysis

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

Metra seeks your feedback!

Kenosha-Racine-Milwaukee (KRM)

Proposed Program of Interrelated Projects

A Transit Plan for the Future. Draft Network Plan

METRO Light Rail Update

Waco Rapid Transit Corridor (RTC) Feasibility Study

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

North Shore Alternatives Analysis. May 2012

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Halifax Commuter Rail Feasibility Study

Central Loop Bus Rapid Transit

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Maryland Gets to Work

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period

Evaluation of Joint Operations in the Downtown Seattle Transit Tunnel

Travel Forecasting Methodology

RIDERSHIP TRENDS. March 2017

Sepulveda Pass Corridor Systems Planning Study Update

SUMMARY OF COMMENTS AT PUBLIC OPEN HOUSES SCOPING OF ALTERNATIVES GATEWAY CORRIDOR ALTERNATIVES ANALYSIS

Crenshaw-Prairie Transit Corridor Study Public Meetings

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Transcription:

EXECUTIVE SUMMARY Development of Detailed Alternatives Report Prepared for: Northern Illinois Commuter Transportation Initiative City of Rockford, Illinois Prepared by: 222 South Riverside Plaza, Suite 2320 Chicago, IL 60606 Phone: (312) 669-9601 In Association with PB Americas, Inc Images, Inc TEMS, Inc ETC Institute Vandewalle & Associates Vlecides-Schroeder Associates, Inc Fish Transportation Group May 2007

Executive Summary The first level screening recommendations were to develop detailed alternatives for four of the initial thirteen alternatives. Two commuter rail alternatives and two bus rapid transit alternatives were brought forth and are being detailed in the second level screening process. This Executive Summary provides a brief description of alignments, station locations, and operating plans. The analysis of each will support regional decision making in the selection of a Locally Preferred Alternative. Commuter Rail Alternatives There are two commuter rail alternatives being considered in the second level screening analysis: CR 5 Commuter Rail on the IC&E/Illinois Railway and CR 6- Commuter Rail on the Union Pacific Belvidere Subdivision Line. Alternative CR5 Commuter Rail on the IC&E / Illinois Railway (Exhibit 1) Alignment CR5 begins in downtown Rockford, runs south on the IL Railway to serve the Chicago Rockford International Airport, turns east on the IC&E Railway and travels eastward through Ogle, De Kalb, and Kane Counties terminating at the Metra Elgin/Big Timber Road Station. Two sub-alternatives have been identified to serve the airport. Stations For the CR5 alternative, preliminary station stops are recommended for downtown Rockford, Chicago Rockford International Airport, I-39 at IL 72, Kirkland, Genoa, Hampshire, and Elgin. Detailed analysis and discussions with the communities will need to occur before exact station locations are identified. Sub-Alternatives Two sub-alternatives have been identified with the CR5 Alternative in order to identify how best to serve the airport and the downtown. Both sub-alternatives will be evaluated as part of the ridership modeling process. One sub-alternative (CR5 A) provides a rail connection to downtown Rockford and the terminal at the Chicago Rockford International Airport. It requires a new track to be built around the north and west sides of the airport. The other sub-alternative (CR5 B) provides a rail connection to downtown Rockford and a short shuttle bus connection to the terminal at the airport. At a point where Airport Drive and the Illinois Railway intersect, a rail-bus transfer station would be provided. Passengers would transfer to a shuttle bus to take them one-half mile to the airport terminal. 1

Alignment: CR-5 (52 miles) Two sub-alternatives at West End: Sub-Alternative A Rail to airport terminal and downtown Sub-Alternative B Rail to downtown / shuttle bus to airport terminal Preliminary Stations: Downtown Rockford Chicago Rockford International Airport I-39 and IL 72 Kirkland Genoa Hampshire Big Timber Road 2

Alternative CR6 Commuter Rail on the Union Pacific (UP) Belvidere Subdivision (Exhibit 2) Alignment CR6 begins in Rockford. Service then runs on the Union Pacific Railroad eastward through Winnebago, Boone, McHenry and Kane Counties to the Metra Elgin/Big Timber Road Station. Three sub-alternatives for serving downtown Rockford and the airport have been developed. Stations For the CR6 alternative, preliminary station stops are envisioned for downtown Rockford, Chicago Rockford International Airport, one or more of the following on the east side of Rockford: Mulford Road/ Alpine Road/Perryville Road, Tollway Station Point, downtown Belvidere, Marengo, Huntley, and Elgin. Detailed analysis and discussions with the communities will need to occur before exact station locations are identified. Sub-Alternatives The following sub-alternatives have been identified with the CR6 Alternative. Each sub-alternative will be evaluated as part of the ridership modeling process. One sub-alternative (CR6 A) provides a rail connection to downtown Rockford with a shuttle bus connection from the downtown station to the airport, approximately five miles. Another (CR6 B) provides a direct rail connection to downtown and to the airport. Service would begin at the airport on a new spur track constructed specifically to serve the airport terminal. The spur track would provide a connection between the north side of the airport terminal and the Illinois Railway tracks. Service would continue into the downtown via the Illinois Railway to the CN tracks. The third sub-alternative (CR6 C) provides a direct rail connection to the airport with a bus connection to downtown Rockford. Service would begin at the airport on a new spur track as described with CR6 B. Immediately east of where Kishwaukee Street and the CN tracks intersect, a rail-bus transfer station would be located. Passengers would transfer from the train to a shuttle bus to serve downtown Rockford, approximately two and a half miles.. Rail Operations For any alternatives that are considered, there are two general options to operate the service. One is to operate the extension as a separate line, or shuttle operation, with a scheduled cross-platform at the Metra/Elgin Big Timber Station to interface with the existing Metra/Milwaukee District service. The other option is to operate the extension through to the terminus of the existing line (in this case Chicago Union Station), i.e. through-route service. Each service scenario is being considered, but it is recommended that there be a blend of both service options, allowing for some trains to operate as through-route service and others to operate as shuttles. Recommended operational scenarios would be the result of travel flow analysis and discussions with other rail operators along the shared tracks. Rail Service Frequency Initial commuter rail service could operate with the following proposed frequencies: seven inbound and seven outbound weekday trains distributed between the AM peak, PM peak, and midday time periods. Three inbound trains and three outbound trains would operate on the weekends. Ultimately, service frequencies will be determined by a technical analysis of ridership demand, travel patterns and capacity. 3

Alignment: CR-6 (48 miles) Three sub-alternatives at West End: Sub-Alternative A Rail to downtown / shuttle bus to airport terminal Sub-Alternative B Rail to downtown and airport terminal Sub-Alternative C Rail to airport terminal / shuttle bus to downtown Preliminary Stations: Downtown Rockford Chicago Rockford International Airport Kishwaukee (alternative CR6 C only) Alpine Road* Mulford Road* Perryville Road* Marengo Tollway Station Point Huntley Belvidere Big Timber Road *One of three stations for selection 4

Bus Rapid Transit Alternatives From the initial screening, two bus rapid transit (BRT) alternatives have been advanced for further evaluation: BRT1 and BRT2. Both alternatives operate from Rockford to Schaumburg. BRT1:Via U.S Highway 20 is designed to operate with transit priority treatments, including authority to operate on the shoulders of the Tollway through congested areas along I-90. This alternative may become the TSM alternative. BRT2: Via U S Business Highway 20/East State Street includes the construction of a dedicated busway (i.e. a separate lane) along I-90, through the congested sections of the corridor. The routings west of Belvidere provide different travel options for BRT 1 and 2. Sub-alternative A emphasizes travel speed, while Sub-alternative B focuses on connectivity and ease of access. East of Belvidere, operation would be the same. Both sub-alternatives will be evaluated in the ridership modeling process to determine which performs best. Sub-Alternative A: Via US Highway 20 (Exhibit 3) Alignment The starting location for each trip would alternate between downtown Rockford and the new IL 173 interchange. Trips starting in downtown Rockford would travel via South Main, US Highway 20 and I-90, while trips starting at the IL 173 interchange would operate via I-39 to I-90. Branch service from Belvidere and Marengo/Huntley would join with the core service. Stations For Sub-Alternative A, fourteen preliminary station stops are recommended: downtown Rockford, Rockford Airport, 11 th Street, Alpine Road, Harrison Avenue, IL 173, Riverside, Lyford Road, Tollway Station Point (Irene Road), Belvidere / Genoa Road Interchange, Marengo Interchange, Elgin/Big Timber Road, Prairie Stone, and Schaumburg Transportation Center. Branches Branches take advantage of the flexible nature of buses since they allow the bus to operate along main arterials in a community to pick up passengers before entering the busway along the Tollway. This service configuration provides more customers a one-seat ride. Belvidere Branch To provide service to the Belvidere area, some branch trips would originate in Belvidere. Service would begin at the intersection of US Business Highway 20/East State Street on the northwest side of Belvidere and operate on State Street US Highway 20 I-90. Preliminary stations are at US Business Highway 20 / East State Street and downtown Belvidere. After serving the Belvidere Road/Genoa Road park-n-ride lot, the route would make the same stops as the other options as it travels to Schaumburg. Marengo / Huntley Branch To provide access to/from Marengo/Huntley branch service would begin in downtown Marengo and operate via US Highway 20 Marengo/Huntley Road Main Street to downtown Huntley. It would serve a station in downtown Huntley and follow IL 47 to I-90. The route then would make the same stops as the other options as it travels to Schaumburg. 5

Alignment: BRT1 & 2- Sub Alternative A: Via US Highway 20 (73 miles) Preliminary Stations: Downtown Rockford Harrison Avenue Tollway Station Point (Irene Road) Prairie Stone Chicago Rockford International Airport I-73 Belvidere/Genoa Road Interchange Schaumburg Transportation Center 11 th Street Riverside Marengo Interchange Belvidere Branch: US Business Highway 20 and Downtown Belvidere Alpine Road Lyford Big Timber Road Marengo/Huntley Branch: Downtown Marengo, Downtown Huntley and Huntley Interchange 6

Sub-Alternative B: Via US Business Highway 20 / East State Street (Exhibit 4) Alignment The starting location for each trip would alternate between downtown Rockford and the new IL173 interchange. Trips starting in downtown Rockford would travel via US Business Highway 20/East State Street State Street through downtown Belvidere US Highway 20 Genoa Road and I-90.Trips starting at the IL173 interchange would operate via I-39 to I-90. Branch service from Marengo/Huntley (described in Sub-Alternative A) would join with the core service. Stations For Sub-Alternative B, thirteen preliminary station stops are recommended: downtown Rockford, Fairview Avenue, Mulford Road, IL 173, Riverside Drive, Lyford Road, US Business Hwy 20/East State Street (Belvidere), downtown Belvidere, Belvidere / Genoa Road Interchange, Marengo Interchange, Elgin/ Big Timber Road, Prairie Stone, and Schaumburg Transportation Center. Service Frequency Initial bus rapid transit service could operate from Rockford to Schaumburg with 15 minute headways to up to 60 minute headways for the branch services. Midday service would be every 2 hours. Weekend service would range from hourly service to service every two hours. Ultimately, service frequencies will be determined by a technical analysis of ridership demand, travel patterns and capacity. 7

Alignment: BRT1 & 2-Sub Alternative B: Via US Business Highway 20 / East State Street (66 miles) Preliminary Stations: Downtown Rockford Downtown Belvidere Marengo/Huntley Branch: Downtown Marengo, Downtown Huntley, Huntley Interchange Fairview Avenue Belvidere/Genoa Road Interchange Mulford Road Marengo Interchange IL 173 Big Timber Road Riverside Drive Prairie Stone Lyford Road Schaumburg Transportation Center US Business Hwy 20/State Street (Belvidere) 8