Northern Line Extension Project

Similar documents
NORTHERN LINE HEADING FOR A SPLIT

Smart Infrastructure and Construction. Kenichi Soga

Delivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD

Modernising the Great Western railway

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Powering Sydney s Future

Dallas CBD Second Light Rail Alignment (D2)

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

THE UK RAIL MARKET 2015

Very Light Rail (VLR) as a means of delivering low-cost railways

02 BUILDING ACCESSIBILITY STATEMENT

BUS SERVICES IN CHAMBERLAYNE ROAD NW10

CTA Capital Construction Update May 17, 2007

Appendix 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

High Speed S&C Design and Maintenance

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Multi Mode TBMs. OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling

4. Good Practice Example: Automatic light metro system (Brescia, Italy)

Chapter 3 Route Window C2 Paddington station. Transport for London

ASHPRINGTON ROAD Part 1

Chapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

CTA Capital Construction Update December 12, 2006

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015

FREQUENTLY ASKED QUESTIONS

Program Overview. February 2018

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways

High Speed 2- engineering, benefits & challenges. Prof Roderick A Smith

TECHNICAL MEMORANDUM

FREQUENTLY ASKED QUESTIONS

Chapter 11 Route Window NE10 Gidea Park station. Transport for London

BRAYBROOK STREET SHAFT

Epping to Chatswood Railway Temporary Transport Plan

NORTH RINGROAD OF VALENCIA (CV30) BENIMAMET TO CIUTAT FALLERA AND CONNECTIONS TO BURJASSOT, BENIMAMET, CV30 AND THE FUTURE NORTH PARK ROAD CIT-01

presented by Y. C. Lam & Tim Leung 21 May 2005

70 YEARS OF 1938 TUBE STOCK

Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7)

INTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland. 17 th November

Central London Plan Update

Welcome. Green Line in Your Community

Green Line LRT: Beltline Segment Update April 19, 2017

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

ASSESSMENT OF THE UPPERLEVELLOOP ALTERNATIVE FORTHE MANHATTANPORTION OF THEEASTSIDE ACCESSPROJECT

1. How has traffic congestion changed in London in recent years? Are there differences in the amount, time, type and/or location of congestion?

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

Domain Station? A smart alternative.

Presentation of the Baltimore Metro System

Proposed Dounreay - Mybster 275 kv / 132 kv

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Confederation Line West Queensway Terrace North. May 27, 2017

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

How our experience could serve your ambitions Lessons learnt

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL

CPG is pleased to report the following accomplishments this quarter:

BLOTTMATTHEWS 2016/17 COMPETITION: AIRPORT TO AIRPORT (A2A)

JRC. Beyond the Elephant. Extending the Bakerloo. Jonathan Roberts, JRC At Lewisham Council Sustainable Development Select Committee 15 March 2012

Island Smart Grid Model in Hawaii Incorporating EVs

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

CIGEO Preparing for construction

Alconbury Weald: the story so far

Attachment E3 Vibration Technical Memorandum

ACEforward. Livermore Valley Chamber of Commerce Business Alliance Meeting. September 6, 2017

Low Impact Light Rail Update

IH 35 FEASIBILITY STUDY

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

TORONTO TRANSIT COMMISSION REPORT NO.

Three ULTra Case Studies examples of the performance of the system in three different environments

Submission to Greater Cambridge City Deal

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

I-405 Sepulveda Pass Improvements Project

UCLA Lake Arrowhead Conference. October 18, 2010

HSR Vancouver WA to Camas Commuter Des, by R.N.

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Transportation Engineering II UNIT - I

TER WP2 Transport Challenges and Global Crisis. Dr. Klaus Schierhackl, CFO Bad Gastein,

UNION STATION MASTER PLAN STUDY

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center

Presentation to the Portfolio Committee on Transport Gautrain Update. Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009

BART Wheel Profile Change

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018

SOUTH TEXAS COMMISSION MEETING

IMPROVEMENT CONCEPTS

Product Data SingleVario 2061

SALE PROPOSAL ROBBINS TBM UG1B-JAIPUR

Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety

CREATING CONNECTIONS IN THE CITY OF KITCHENER

PUBLIC INFRASTRUCTURE PROJECTS

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

CREATING HIGH-SPEED RAILWAYS. Track, Overhead Catenary and Substations. A MAJOR RAIL INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE COMPANY

Appendix E: Basis for Comparative Cost Analysis

NOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA

The $600 Million Rebirth of San Diego Trolley

The Confederation Line Ottawa LRT Project

Transcription:

1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer

2 Northern Line Extension Battersea 2020 - part of the wider Northern Line story

3 Contents Project Background Design constraints Tunnels, Shafts and Station Design Railway Systems Current Status & Progress Questions

4 Background

5 Vauxhall, Nine Elms, Battersea VNEB An Opportunity area in SW London 195 hectares 3 km of Thames river frontage 18,000 new homes 5 hectares of public open space 24,000 new jobs 1 billion of infrastructure Local Transport improvements New schools / healthcare / community space

6 Battersea Power Station Opened 1933 Dormant from 1980s Poor transport links Many development proposals

7 TfL Transport Studies Transport studies in 2009 / 10 considered a number of options: Bus routes and segregation Light Rail London Underground extensions. Victoria Line (Vauxhall), Bakerloo Line (Elephant & Castle), District Line (Sloane Square), Northern Line (Kennington) Conclusion Level of development is such that a high level of public transport capacity is required best delivered through an extension of the tube. Extension of Northern Line Charing Cross branch reduces pressure on Vauxhall station and provide relief to the Victoria line and the existing Northern line south of Kennington

8 Key Programme Requirements Capability of up to 30 trains per hour Efficient, safe and reliable service Minimise environmental impacts Minimal impact on the existing railway Fully integrated with the urban design Fully integrated with other transport operators

9 Project Overview

10 Design Constraints

11 Local Geology Made ground Alluvium River Terrace Deposit London Clay Formation Lambeth Group River terrace deposit London Clay Lambeth Group

12 Challenges Tunnels Thames Water assets Power assets Victoria line Network Rail assets Existing Northern line including Oval station Existing properties Interfacing developments Encirclement at Kennington loop Battersea Dogs and Cats Home National Grid site Kennington Station New Cross passages within existing platforms Deep excavations Station boxes Noise & Vibration Schools Listed properties Local residents

13 Constraints Thames Water Ring Main Sewers Victoria Line EDF Cable Tunnel Kennington Loop Northern Line

14 Alignment

15 Tunnel Alignment Constrained by TWAO Limits of Deviation Minimise journey time Minimise ground borne noise and vibration Safety Quality of ride London Underground standards Curves - min radius 300m Concession from 400m. Gradients - max 2.00%, min 0.250%, level stations Cant - max 125mm, Speed - Vmax. 90km/h.

16 P&C and Junctions Kennington Step Plate Junctions Northbound Cv9.25 NLE 245m rad / NL (Loop) straight Southbound Cv9.25 equal split NLE 490m rad / NL (Loop) 490m rad

17 P&C and Junctions Battersea scissors crossover, - 4 Standard Straight Cv9.25, with large radius curves between turnouts, scissors crossover is slightly tapered, being wider at platform end. Crossover is level throughout.

18 Tunnel Design

19 Overview of Tunnelling Main TBM drives approx. 5.2km total TBM could not junction with the loop Shafts located 70m and 200m from junctions - SCL Difficult to mechanise excavation around existing tunnel - SGI

20 Tunnel Section Bolted RC Segmental Lining 5.2 Diameter I/D

21 EPBM Tunnelling 2 x TBMs (Amy & Helen) Reduces risks with ground conditions Reduced settlement - Predicted 0.5% vol. loss

22 Muck Removal

23 Muck Removal

24 Step Plate Junctions Interfaces with operational railway Interdependencies with various systems and disciplines Installation of new CMS Re-routing and relocation of services providing continuity. Removal of existing cast iron tunnel segments and support structure over weekend possessions Installation of new track and power assets Commissioning of new railway during a 10 day blockade

25 Step Plate Junctions

26 Step Plate Junctions

27 Tunnel and Station Cross Passages Three cross passages between the bored running tunnels were constructed to facilitate operational evacuation as agreed with LFB. Constructed in the London Clay and Lambeth Group using timber headings and SGI Segments Four new cross passages in Kennington Station between the existing platforms to facilitate congestion relief and station evacuation. Constructed in the London Clay and using timber headings and SGI Segments

28 Kennington Ventilation Shaft Designs

29 Kennington Shaft Structures Secant Piled Wall Construction SCL Shaft for tunnel interface Complex integration with multidiscipline services Kennington Green Kennington Park Two Permanent ventilations shafts at Kennington Green and Kennington Park to allow air in and out of the underground tunnels to help cool the Tube. It is also required to enable emergency intervention and evacuation from the tunnels.

30 Stations Design

31 Nine Elms Station

32 Nine Elms Station West End Entrance

33 Ticket Hall Level

34 Platform Concourse

35 Nine Elms Station Longitudinal Section

36 Battersea Power Station

37 Street Level Entrance

38 Ticket Hall Level

39 Platform Level

40 Battersea Power Station -Longitudinal Section

41 Railway Systems

42 Track Form The new track being installed is flat bottom rail 4800m of Sonneville LVT Block track form for the Tunnels First substantial use on Tube network Delkor RF167 base plates for 4NO. Platform safety pit areas in Battersea and Nine Elms

43 Plain Line Track Methodology LVT Blocks and rail delivered into tunnel Rail Installed onto Blocks and set on alignment jigs

44 Plain Line Track Methodology Stage 2 Concrete Pour Final alignment adjustment and clean

45 Plain Line Track Methodology Track Jigs removed and made good Thermit welding

46 Delivery of 91m Length Rail 7/10/18

47 Delivery of 91m Length Rail 7/10/18

48 Current Status

49 Status Overview All tunnelling work complete as of mid September 2018 Track installation has commenced. Works between the Step plate junction and shafts, plain line between Battersea Launch tunnels and Nine Elms box and platform areas to Battersea Power Station are all complete Excavation works to both Kennington Shafts are ongoing with construction of secondary structures. Nine Elms and Battersea Power stations secondary structures works are ongoing Design works for Signals and Systems ongoing with Thales (PFI Contract) Fit Out works have commenced - NLE due for completion 2020

50 Current Status - Photographs Battersea Power Station

51 Current Status - Photographs Battersea Power Station

52 Current Status - Photographs Nine Elms Station

53 Current Status - Photographs Nine Elms Station

54 Current Status - Photographs Kennington Shafts

55 Questions