GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00 $350,000.00 $650,000.00 $650,000.00 $1,145,000.00 $1,145,000.00 3 CONSTRUCTION SIGNAGE LS 0 $10,000 0 4 CLEARING AND GRUBBING BY AREA AC 1 $2,100 $3,000 $12,000.00 $12,000.00 $30,000.00 $30,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 5 TOPSOIL, ON-SITE CY 407 $10 $5,000 $10.85 $4,415.95 $25.00 $10,175.00 $10.85 $4,415.95 $11.00 $4,477.00 6 TOPSOIL, OFF-SITE CY 408 $20 $9,000 $17.36 $7,082.88 $35.00 $14,280.00 $22.40 $9,139.20 $23.00 $9,384.00 7 SUBGRADE PREPARATION SY 7185 $4 $29,000 $2.75 $19,758.75 $2.00 $14,370.00 $2.75 $19,758.75 $3.00 $21,555.00 8 SUBBASE, MODIFIED, 6 IN SY 3438 $7 $25,000 $6.35 $21,831.30 $8.00 $27,504.00 $6.35 $21,831.30 $7.00 $24,066.00 9 EXCAVATION, ROCK CY 104 $100 $11,000 $200.00 $20,800.00 $100.00 $10,400.00 $200.00 $20,800.00 $200.00 $20,800.00 10 EXCAVATION AND DISPOSAL OF EXISTING FILL - CLASS 13 CY 10509 $11 $116,000 $10.00 $105,090.00 $16.00 $168,144.00 $9.00 $94,581.00 $10.00 $105,090.00 11 BURIED WASTE, TRANSPORTATION AND DISPOSAL CY 889 $54 $49,000 $17.75 $15,779.75 $16.00 $14,224.00 $17.75 $15,779.75 $18.00 $16,002.00 12 HAULING NON-CONTAMINATED STAINED OR ODOROUS SOIL CY 593 $5 $3,000 $7.10 $4,210.30 $16.00 $9,488.00 $7.10 $4,210.30 $11.00 $6,523.00 13 HAULING AND DISPOSAL OF CONTAMINATED SOIL CY 59 $75 $5,000 $100.00 $5,900.00 $100.00 $5,900.00 $100.00 $5,900.00 $175.00 $10,325.00 14 DISPOSAL OF CONTAMINATED GROUNDWATER GAL 65000 $0.30 $20,000 $0.75 $48,750.00 $0.25 $16,250.00 $0.00 $0.45 $29,250.00 15 IMPERVIOUS STRUCTURAL FILL (IN PLACE) CY 13628 $15 $205,000 $11.00 $149,908.00 $22.00 $299,816.00 $10.50 $143,094.00 $11.00 $149,908.00 16 REMOVAL OF STRUCTURE, HEADWALL WITH DUCKBILL EA 2 $1,000 $2,000 $285.00 $570.00 $5,000.00 $10,000.00 $285.00 $570.00 $300.00 $600.00 17 SATISFACTORY SOILS (IN PLACE) CY 3899 $13 $51,000 $14.00 $54,586.00 $30.00 $116,970.00 $13.25 $51,661.75 $17.50 $68,232.50 STRUCTURAL 18 VIBRATION MONITORING SUBCONTRACT FOR CONTRACTOR LS 0 $6,000 0 19 DUCT BANK CROSSING LS 0 $18,000 0 $0.00 $0.00 $0.00 STRUCTURAL - FLOODWALL STATION 50+04.23 TO 50+34.23, 51+75 TO DUCT BANK CROSSING, DUCT BANK CROSSING TO 52+28 20 21 TYPE I SHEET PILE - 50+04.23 TO 50+34.23, 51+75 TO DUCT BANK CROSSING, DUCT BANK CROSSING TO 52+28 SF 0 $65 0 $0.00 $0.00 $0.00 50+34.23, 51+75 TO DUCT BANK CROSSING, DUCT BANK CROSSING TO 52+28 LF 0 $1,400 0 $0.00 $0.00 $0.00 STRUCTURAL - FLOODWALL STATION 50+34.23 TO 51+75 AND 52+28 TO 52+49.53 22 REMOVABLE FLOODWALL -STATION 50+34.23 TO 51+75 AND 52+28 TO 52+49.53 LF 0 $1,600 0 $0.00 $0.00 $0.00 STRUCTURAL - FLOODWALL STATION 52+49.53 TO 52+56 23 PERMANENT FLOODWALL -STATION 52+49.53 TO 52+56 LF 0 $2,500 0 $0.00 $0.00 $0.00 REMOVABLE FLOODWALL 24 (UPPER PORTION) SF 234 $138 $33,000 $147.85 $34,596.90 $200.00 $46,800.00 $142.83 $33,422.22 $135.00 $31,590.00 25 SANITARY SEWER TRENCHED, 18" PVC LF 170 $60 $11,000 $157.50 $26,775.00 $150.00 $25,500.00 $157.50 $26,775.00 $170.00 $28,900.00 26 REMOVAL OF SANITARY SEWER 18" LF 170 $28 $5,000 $6.00 $1,020.00 $1.00 $170.00 $6.00 $1,020.00 $6.50 $1,105.00 27 STORM SEWER, TRENCHED, RCP, 12", CLASS III LF 168 $45 $8,000 $32.50 $5,460.00 $60.00 $10,080.00 $32.50 $5,460.00 $38.00 $6,384.00 28 STORM SEWER, TRENCHED, RCP, 15", CLASS III LF 69 $55 $4,000 $42.00 $2,898.00 $63.00 $4,347.00 $42.00 $2,898.00 $46.00 $3,174.00 29 STORM SEWER, TRENCHED, RCP, 18", CLASS III LF 97 $60 $6,000 $40.00 $3,880.00 $65.00 $6,305.00 $40.00 $3,880.00 $67.00 $6,499.00 30 STORM SEWER, TRENCHED, RCP, 24", CLASS III LF 5 $65 $400 $62.00 $310.00 $90.00 $450.00 $62.00 $310.00 $90.00 $450.00 31 STORM SEWER, TRENCHED, RCP, 30", CLASS III LF 30 $128 $4,000 $67.00 $2,010.00 $100.00 $3,000.00 $67.00 $2,010.00 $115.00 $3,450.00 32 STORM SEWER, TRENCHED, RCP, 36", CLASS III LF 229 $136 $32,000 $62.00 $14,198.00 $100.00 $22,900.00 $62.00 $14,198.00 $190.00 $43,510.00 33 STORM SEWER, TRENCHED, RCP, 42", CLASS III LF 45 $145 $7,000 $85.50 $3,847.50 $135.00 $6,075.00 $85.50 $3,847.50 $195.00 $8,775.00 34 STORM SEWER, TRENCHED, RCP, 48", CLASS III LF 1098 $170 $187,000 $102.50 $112,545.00 $135.00 $148,230.00 $102.50 $112,545.00 $11.50 $12,627.00
35 STORM SEWER, TRENCHED, RCP, 60", CLASS III LF 204 $190 $39,000 $176.50 $36,006.00 $175.00 $35,700.00 $176.50 $36,006.00 $12.50 $2,550.00 36 STORM SEWER, TRENCHED, RCP, 72", CLASS III LF 168 $213 $36,000 $182.50 $30,660.00 $225.00 $37,800.00 $182.50 $30,660.00 $2,250.00 $378,000.00 37 REMOVAL OF STORM SEWER, VARIOUS, LESS THAN 36" DIA. LF 990 $10 $10,000 $10.50 $10,395.00 $10.00 $9,900.00 $10.50 $10,395.00 $660.00 $653,400.00 38 REMOVAL OF STORM SEWER, VARIOUS, GREATER THAN 36" DIA. LF 65 $15 $1,000 $11.50 $747.50 $25.00 $1,625.00 $11.50 $747.50 $18.00 $1,170.00 39 PIPE APRON, RCP, 60" EA 1 $2,000 $2,000 $1,925.00 $1,925.00 $5,800.00 $5,800.00 $1,925.00 $1,925.00 $475.00 $475.00 40 FOOTING FOR CONCRETE PIPE APRON, 60" EA 1 $3,000 $3,000 $615.00 $615.00 $1,000.00 $1,000.00 $615.00 $615.00 $35.00 $35.00 41 SUBDRAIN, 8" LF 176 $15 $2,700 $16.50 $2,904.00 $45.00 $7,920.00 $16.50 $2,904.00 $50.00 $8,800.00 42 SUBDRAIN CLEANOUT TYPE A1 EA 3 $600 $1,800 $445.00 $1,335.00 $160.00 $480.00 $445.00 $1,335.00 $4,000.00 $12,000.00 43 WATER MAIN, TRENCHED, DIP, 8", NON PERFORATED PORTION OF SUBDRAIN LINE LF 265 $25 $6,700 $33.50 $8,877.50 $65.00 $17,225.00 $33.50 $8,877.50 $10.00 $2,650.00 44 4" DRAIN PIPE LF 20 $60 $1,200 $47.50 $950.00 $100.00 $2,000.00 $47.50 $950.00 $1,800.00 $36,000.00 45 GENERATOR ENCLOSURE DRAIN AND STORM CONNECTION LS 1 $6,000 $6,000 $4,525.00 $4,525.00 $2,300.00 $2,300.00 $4,525.00 $4,525.00 $3,500.00 $3,500.00 46 2" THICK PIPE INSULATION LF 104 $30 $3,200 $9.50 $988.00 $3.50 $364.00 $9.50 $988.00 $7,000.00 $728,000.00 STRUCTURES FOR SANITARY AND STORM SEWERS 47 MANHOLE, TYPE SW-401, 48" DIA EA 2 $2,500 $5,000 $1,630.00 $3,260.00 $2,200.00 $4,400.00 $1,630.00 $3,260.00 $1,800.00 $3,600.00 48 MANHOLE, TYPE SW-401, 60" DIA EA 1 $3,500 $4,000 $3,245.00 $3,245.00 $3,900.00 $3,900.00 $3,245.00 $3,245.00 $3,500.00 $3,500.00 49 MANHOLE, TYPE SW-401, 72" DIA EA 1 $4,500 $5,000 $6,525.00 $6,525.00 $5,000.00 $5,000.00 $6,525.00 $6,525.00 $7,000.00 $7,000.00 50 MANHOLE, TYPE SW-401, 72" DIA WITH EAST JORDAN 1040 M1 OPEN LID EA 1 $4,500 $5,000 $4,415.00 $4,415.00 $5,100.00 $5,100.00 $4,415.00 $4,415.00 $4,750.00 $4,750.00 51 MANHOLE, TYPE SW-401, 84" DIA EA 4 $5,000 $20,000 $7,780.00 $31,120.00 $6,700.00 $26,800.00 $7,780.00 $31,120.00 $8,500.00 $34,000.00 52 MANHOLE, TYPE SW-401, 96" DIA EA 4 $5,400 $22,000 $10,250.00 $41,000.00 $8,000.00 $32,000.00 $10,250.00 $41,000.00 $11,250.00 $45,000.00 53 MANHOLE, TYPE SW-403 MODIFIED, 96" x 96", WITH TIDEFLEX SERIES TF-1 CHECK VALVE EA 1 $55,400 $56,000 $63,955.00 $63,955.00 $59,000.00 $59,000.00 $63,995.00 $63,995.00 $71,000.00 $71,000.00 54 MANHOLE, TYPE SW-404, 120" X 84" EA 1 $5,400 $6,000 $11,075.00 $11,075.00 $21,000.00 $21,000.00 $11,075.00 $11,075.00 $12,250.00 $12,250.00 55 INTAKE, TYPE SW-507 EA 2 $3,200 $7,000 $2,640.00 $5,280.00 $3,000.00 $6,000.00 $2,640.00 $5,280.00 $2,750.00 $5,500.00 56 INTAKE, TYPE SW-508 MODIFIED, 72" x 48" EA 2 $4,800 $10,000 $3,295.00 $6,590.00 $4,600.00 $9,200.00 $3,295.00 $6,590.00 $3,500.00 $7,000.00 57 INTAKE, TYPE SW-510 EA 1 $4,500 $5,000 $3,590.00 $3,590.00 $5,300.00 $5,300.00 $3,590.00 $3,590.00 $3,750.00 $3,750.00 58 INTAKE, TYPE SW-541 EA 1 $3,700 $4,000 $3,472.00 $3,472.00 $6,100.00 $6,100.00 $3,472.00 $3,472.00 $3,750.00 $3,750.00 59 INTAKE, TYPE SW-541 WITH EAST JORDAN 1040 M1 OPEN LID EA 1 $3,700 $4,000 $3,805.00 $3,805.00 $6,100.00 $6,100.00 $3,805.00 $3,805.00 $4,200.00 $4,200.00 60 INTAKE, STORM SEWER, SW-541 MODIFIED, 60" x 48" EA 1 $4,800 $5,000 $3,325.00 $3,325.00 $6,100.00 $6,100.00 $3,325.00 $3,325.00 $3,600.00 $3,600.00 61 INTAKE, STORM SEWER, SW-541 MODIFIED, 72" x 48" EA 1 $5,000 $5,000 $3,755.00 $3,755.00 $6,400.00 $6,400.00 $3,755.00 $3,755.00 $4,000.00 $4,000.00 62 INTAKE EXTENSION UNIT, SW-542 EA 4 $1,620 $7,000 $678.00 $2,712.00 $1,600.00 $6,400.00 $678.00 $2,712.00 $750.00 $3,000.00 63 INTAKE, STORM SEWER, SW-545 MODIFIED, 72" x 48", WITH 24 FT OPENING EA 1 $7,000 $7,000 $4,400.00 $4,400.00 $6,300.00 $6,300.00 $4,400.00 $4,400.00 $4,750.00 $4,750.00 64 CONNECTION TO EXISTING INTAKE EA 4 $650 $3,000 $655.00 $2,620.00 $1,000.00 $4,000.00 $655.00 $2,620.00 $668.00 $2,672.00 65 REMOVE MANHOLE EA 4 $500 $2,000 $330.00 $1,320.00 $500.00 $2,000.00 $330.00 $1,320.00 $375.00 $1,500.00 66 REMOVE INTAKE EA 5 $500 $2,500 $335.00 $1,675.00 $500.00 $2,500.00 $335.00 $1,675.00 $375.00 $1,875.00 67 SUBDRAIN PUMP STATION EA 2 $66,000 $132,000 $71,880.00 $143,760.00 $75,000.00 $150,000.00 $71,880.00 $143,760.00 $80,000.00 $160,000.00 68 72" DIA. HEADWALL WITH DUCKBILL EA 1 $55,000 $55,000 $89,750.00 $89,750.00 $80,000.00 $80,000.00 $80,000.00 $80,000.00 $108,500.00 $108,500.00 69 PAVEMENT, PCC, 7" SY 1134 $45 $51,100 $36.75 $41,674.50 $50.00 $56,700.00 $36.75 $41,674.50 $40.00 $45,360.00 70 CURB AND GUTTER, PCC, 1.5' WIDTH LF 890 $22 $19,600 $14.00 $12,460.00 $23.00 $20,470.00 $14.00 $12,460.00 $16.00 $14,240.00 71 PAVEMENT, HMA, 4" SY 1500 $35 $52,500 $25.55 $38,325.00 $28.50 $42,750.00 $28.50 $42,750.00 $30.00 $45,000.00 72 PAVEMENT REMOVAL, HMA SY 1629 $9 $14,700 $5.75 $9,366.75 $8.00 $13,032.00 $8.10 $13,194.90 $6.00 $9,774.00 73 REMOVAL OF SIDEWALK SY 245 $9 $3,000 $3.30 $808.50 $8.00 $1,960.00 $5.15 $1,261.75 $12.00 $2,940.00 74 REMOVAL OF DRIVEWAY, PAVED SY 111 $9 $1,000 $6.65 $738.15 $8.00 $888.00 $6.50 $721.50 $1.00 $111.00 75 SIDEWALK, PCC, 5 INCH SY 227 $40 $10,000 $37.00 $8,399.00 $56.00 $12,712.00 $37.00 $8,399.00 $40.00 $9,080.00
76 DRIVEWAY, PAVED, PCC, TYPE A, 6 INCH SY 119 $36 $5,000 $39.00 $4,641.00 $58.00 $6,902.00 $39.00 $4,641.00 $42.00 $4,998.00 77 DRIVEWAY, GRANULAR, 6" CLASS A CRUSHED STONE SY 1800 $7 $12,600 $5.30 $9,540.00 $9.00 $16,200.00 $5.30 $9,540.00 $5.75 $10,350.00 78 TEMPORARY GRAVEL ACCESS DRIVE TON 221 $30 $7,000 $21.35 $4,718.35 $30.00 $6,630.00 $38.25 $8,453.25 $23.00 $5,083.00 79 PAVEMENT REMOVAL, PCC SY 1338 $9 $12,100 $6.45 $8,630.10 $9.00 $12,042.00 $8.50 $11,373.00 $7.00 $9,366.00 80 REMOVAL OF CURB AND GUTTER LF 1321 $14 $19,000 $6.80 $8,982.80 $3.00 $3,963.00 $1.90 $2,509.90 $2.00 $2,642.00 81 GEOGRID TENSAR TRIAX TX 140 SY 1800 $7 $13,000 $4.00 $7,200.00 $4.00 $7,200.00 $4.00 $7,200.00 $4.25 $7,650.00 SITEWORK AND LANDSCAPING 82 SUDAS HYDRAULIC SEEDING, FERTILIZING AND MULCHING, TYPE 1 (9010-2.01-A) AC 1.6 $2,000 $3,200 $2,200.00 $3,520.00 $6,500.00 $10,400.00 $2,200.00 $3,520.00 $2,250.00 $3,600.00 83 SUDAS HYDRAULIC SEEDING, FERTILIZING AND MULCHING, TYPE 2- MODIFIED (9010-2.01-B) AC 0.02 $2,000 $100 $40,000.00 $800.00 $10,000.00 $200.00 $40,000.00 $800.00 $40,000.00 $800.00 84 SUDAS HYDRAULIC SEEDING, FERTILIZING AND MULCHING, NATIVE SEEDING (9010-2.01-G) AC 0 $2,000 0 $0.00 $0.00 $0.00 85 STORMWATER POLLUTION PREVENTION PLAN, PREPARATION LS 1 $2,000 $2,000 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,600.00 $1,600.00 86 STORMWATER POLLUTION PREVENTION PLAN, MANAGEMENT LS 1 $2,000 $2,000 $1,500.00 $1,500.00 $2,500.00 $2,500.00 $1,500.00 $1,500.00 $1,600.00 $1,600.00 87 STORMWATER POLLUTION PREVENTION PLAN, INSPECTION LS 1 $2,000 $2,000 $1,500.00 $1,500.00 $900.00 $900.00 $1,500.00 $1,500.00 $1,600.00 $1,600.00 TEMPORARY ROLLED EROSION CONTROL PRODUCTS (RECP) TYPE 88 2D SY 1258 $5 $7,000 $1.40 $1,761.20 $2.50 $3,145.00 $1.40 $1,761.20 $1.50 $1,887.00 89 SILT FENCE, INSTALLATION LF 900 $2 $2,000 $1.80 $1,620.00 $2.00 $1,800.00 $1.80 $1,620.00 $2.00 $1,800.00 90 SILT FENCE, REMOVAL OF SEDIMENT LF 900 $1 $900 $0.50 $450.00 $1.00 $900.00 $0.50 $450.00 $0.75 $675.00 91 SILT FENCE, REMOVAL OF DEVICE LF 900 $0.25 $300 $0.50 $450.00 $0.50 $450.00 $0.50 $450.00 $0.50 $450.00 92 INLET PROTECTION DEVICE, INSTALLATION EA 17 $150 $3,000 $50.00 $850.00 $180.00 $3,060.00 $50.00 $850.00 $50.00 $850.00 93 INLET PROTECTION DEVICE, MAINTENANCE EA 17 $150 $3,000 $25.00 $425.00 $50.00 $850.00 $25.00 $425.00 $25.00 $425.00 94 RIP RAP, CLASS E REVETMENT TON 81 $50 $5,000 $42.00 $3,402.00 $55.00 $4,455.00 $32.80 $2,656.80 $35.00 $2,835.00 95 ROCK MULCH (INCLUDES 3RD ST. LIFT STATION) TON 17 $400 $7,000 $60.00 $1,020.00 $150.00 $2,550.00 $60.00 $1,020.00 $65.00 $1,105.00 96 RIP RAP, REMOVE STOCKPILE AND REINSTALL CY 553 $20 $12,000 $6.25 $3,456.25 $40.00 $22,120.00 $6.25 $3,456.25 $8.25 $4,562.25 97 BOLLARD, PERMANENT EA 14 $1,500 $21,000 $775.00 $10,850.00 $300.00 $4,200.00 $700.00 $9,800.00 $500.00 $7,000.00 98 REMOVE EXISTING RETAINING WALL LF 0 $50 0 $0.00 $0.00 $0.00 3RD STREET SANITARY LIFT STATION MODIFICATIONS 99 STRUCTURAL MODIFICATIONS LS 1 $120,000 $120,000 $112,000.00 $112,000.00 $100,000.00 $100,000.00 $70,000.00 $70,000.00 $110,000.00 $110,000.00 100 ELECTRICAL MODIFICATIONS LS 1 $285,000 $285,000 $100,000.00 $100,000.00 $275,000.00 $275,000.00 $150,000.00 $150,000.00 $300,000.00 $300,000.00 101 STARNET TEMP TRAILER LS 1 $85,000 $85,000 $147,500.00 $147,500.00 $140,000.00 $140,000.00 $88,403.45 $88,403.45 $190,000.00 $190,000.00 PUMP STATION #5 102 PROCESS LS 1 $21,000 $21,000 $22,500.00 $22,500.00 $17,500.00 $17,500.00 $20,000.00 $20,000.00 $20,800.00 $20,800.00 PUMP STATION #6 103 PROCESS LS 1 $22,000 $22,000 $24,500.00 $24,500.00 $20,000.00 $20,000.00 $22,000.00 $22,000.00 $24,900.00 $24,900.00 PUMP STATION #7 104 PROCESS LS 1 $21,000 $21,000 $24,000.00 $24,000.00 $20,000.00 $20,000.00 $21,000.00 $21,000.00 $22,000.00 $22,000.00 PUMP STATION #8 105 PROCESS LS 1 $25,000 $25,000 $24,000.00 $24,000.00 $19,000.00 $19,000.00 $21,000.00 $21,000.00 $22,400.00 $22,400.00 PUMP STATION #9 106 STRUCTURAL & PROCESS LS 1 $1,618,000 $1,618,000 $1,837,000.00 $1,837,000.00 $1,700,000.00 $1,700,000.00 $1,400,000.00 $1,400,000.00 $1,500,000.00 $1,500,000.00 107 ELECTRICAL LS 1 $925,000 $925,000 $518,000.00 $518,000.00 $965,000.00 $965,000.00 $925,000.00 $925,000.00 $1,380,000.00 $1,380,000.00 PUMP STATION #10 108 STRUCTURAL & PROCESS LS 1 $1,276,000 $1,276,000 $1,225,000.00 $1,225,000.00 $1,300,000.00 $1,300,000.00 $1,210,000.00 $1,210,000.00 $1,176,000.00 $1,176,000.00
109 ELECTRICAL LS 1 $440,000 $440,000 $528,000.00 $528,000.00 $360,000.00 $360,000.00 $300,000.00 $300,000.00 $510,000.00 $510,000.00 WEST GATE STRUCTURE 110 STRUCTURAL & PROCESS LS 1 $165,000 $165,000 $173,000.00 $173,000.00 $200,000.00 $200,000.00 $190,000.00 $190,000.00 $202,000.00 $202,000.00 111 ELECTRICAL LS 1 $57,175 $58,000 $30,000.00 $30,000.00 $4,460.00 $4,460.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 OTHER ELECTRICAL 112 12 STRAND FIBER OPTIC CABLE LF 3255 $6 $20,000 $1.31 $4,264.05 $6.60 $21,483.00 $2.00 $6,510.00 $7.00 $22,785.00 113 96 STRAND FIBER OPTIC CABLE LF 235 $15 $4,000 $8.51 $1,999.85 $27.00 $6,345.00 $9.00 $2,115.00 $30.00 $7,050.00 114 2" HDPE FIBER OPTIC CONDUIT LF 2810 $35 $99,000 $9.25 $25,992.50 $22.70 $63,787.00 $10.00 $28,100.00 $25.00 $70,250.00 115 36" x 24" HANDHOLE EA 9 $2,000 $18,000 $3,000.00 $27,000.00 $2,500.00 $22,500.00 $3,000.00 $27,000.00 $2,750.00 $24,750.00 116 SUBDRAIN PUMP STATION ELECTRICAL (3- LOCATIONS) LS 1 $108,000 $108,000 $13,000.00 $13,000.00 $18,200.00 $18,200.00 $20,000.00 $20,000.00 $19,000.00 $19,000.00 BASE BID TOTAL: (ITEMS 1-116) BASE BID TOTAL $7,512,600 $6,883,145.33 $7,465,846.00 $6,497,591.22 $9,910,771.75 $377,000 $7,889,600 BID ALTERNATE 1 - PUMP STATION 5 MODIFICATIONS 117 CLEARING AND GRUBBING AC 0.18 $2,100 $400 $12,000.00 $2,160.00 $30,000.00 $5,400.00 $12,000.00 $2,160.00 $13,000.00 $2,340.00 118 TOPSOIL, ON-SITE CY 81 $10 $900 $10.85 $878.85 $25.00 $2,025.00 $10.85 $878.85 $11.00 $891.00 119 SUBGRADE PREPARATION SY 116 $4 $500 $2.75 $319.00 $2.00 $232.00 $2.75 $319.00 $3.00 $348.00 120 SUBBASE, MODIFIED, 6 IN SY 116 $7 $900 $2.90 $336.40 $8.00 $928.00 $2.90 $336.40 $3.00 $348.00 121 (UPPER PORTION) SF 78 $138 $11,000 $175.00 $13,650.00 $150.00 $11,700.00 $145.00 $11,310.00 $144.00 $11,232.00 122 GENERATOR ENCLOSURE DRAIN AND STORM CONNECTION LS 1 $6,000 $6,000 $4,525.00 $4,525.00 $2,300.00 $2,300.00 $4,525.00 $4,525.00 $4,000.00 $4,000.00 123 4" DRAIN PIPE LF 50 $60 $3,000 $47.50 $2,375.00 $50.00 $2,500.00 $47.50 $2,375.00 $43.00 $2,150.00 124 PAVEMENT, PCC, 7" SY 83 $45 $3,800 $49.00 $4,067.00 $58.00 $4,814.00 $49.00 $4,067.00 $50.00 $4,150.00 125 CURB AND GUTTER, PCC, 1.5FT WIDTH LF 16 $30 $500 $42.00 $672.00 $23.00 $368.00 $42.00 $672.00 $45.00 $720.00 126 PAVEMENT REMOVAL, PCC SY 74 $9 $700 $5.90 $436.60 $9.00 $666.00 $5.90 $436.60 $6.50 $481.00 127 SIDEWALK, 5 IN PCC SY 34 $15 $600 $43.00 $1,462.00 $56.00 $1,904.00 $43.00 $1,462.00 $45.00 $1,530.00 128 REMOVAL OF CURB LF 20 $14 $300 $1.90 $38.00 $3.00 $60.00 $1.90 $38.00 $2.00 $40.00 129 SUDAS HYDRAULIC SEEDING, FERTILIZING AND MULCHING, TYPE 1 AC 0.05 $1,800 $100 $20,000.00 $1,000.00 $10,000.00 $500.00 $20,000.00 $1,000.00 $22,000.00 $1,100.00 130 RELOCATED SHURBS EA 11 $200 $2,200 $19.00 $209.00 $50.00 $550.00 $19.00 $209.00 $140.00 $1,540.00 131 RELOCATED PERENNIALS EA 73 $50 $3,700 $10.00 $730.00 $50.00 $3,650.00 $10.00 $730.00 $11.50 $839.50 132 INLET PROTECTION, INSTALL EA 1 $150 $200 $50.00 $50.00 $180.00 $180.00 $50.00 $50.00 $50.00 $50.00 133 INLET PROTECTION, MAINTENANCE EA 1 $150 $200 $25.00 $25.00 $50.00 $50.00 $25.00 $25.00 $25.00 $25.00 134 CHAIN LINK GATE FOR GENERATOR ENCLOSURE LS 1 $2,000 $2,000 $1,200.00 $1,200.00 $600.00 $600.00 $0.00 $550.00 $550.00 135 ROCK MULCH TON 8 $400 $3,200 $60.00 $480.00 $150.00 $1,200.00 $60.00 $480.00 $60.00 $480.00 136 AMENDED SOIL CY 32 $100 $3,200 $100.00 $3,200.00 $25.00 $800.00 $100.00 $3,200.00 $100.00 $3,200.00 137 BOLLARD, PERMANENT EA 6 $1,500 $9,000 $775.00 $4,650.00 $350.00 $2,100.00 $700.00 $4,200.00 $300.00 $1,800.00 138 BOLLARD, REMOVABLE EA 4 $1,000 $4,000 $1,600.00 $6,400.00 $440.00 $1,760.00 $1,000.00 $4,000.00 $450.00 $1,800.00 PUMP STATION #5 139 STRUCTURAL AND PROCESS LS 1 $572,000 $572,000 $440,500.00 $440,500.00 $390,000.00 $390,000.00 $405,000.00 $405,000.00 $464,000.00 $464,000.00 140 DEDUCT BASE BID PUMP STATION #5 PROCESS ITEM LS 1 ($21,000) ($21,000) $22,500.00 ($22,500.00) $17,500.00 ($17,500.00) $20,000.00 $20,000.00 $20,800.00 $20,800.00 141 ELECTRICAL LS 1 $354,000 $354,000 $319,000.00 $319,000.00 $415,000.00 $415,000.00 $420,000.00 $420,000.00 $250,000.00 $250,000.00
BID ALTERNATE 1 TOTAL: (ITEMS 117-141) $961,400 $785,863.85 $831,787.00 $847,473.85 $732,814.50 BID ALTERNATE 1 TOTAL $ $49,000 1,010,400 BID ALTERNATE 2 - PUMP STATION 6 MODIFICATIONS 142 TOPSOIL, ONSITE CY 29 $10 $300 $10.85 $314.65 $25.00 $725.00 $10.85 $314.65 $11.00 $319.00 143 SUBGRADE PREPARATION SY 130 $4 $600 $2.75 $357.50 $2.00 $260.00 $2.75 $357.50 $3.00 $390.00 144 SUBBASE, MODIFIED, 6 IN SY 130 $7 $1,000 $6.50 $845.00 $8.00 $1,040.00 $6.50 $845.00 $7.00 $910.00 145 EXCAVATION AND DISPOSAL OF EXISTING FILL - CLASS 13 CY 256 $11 $3,000 $7.30 $1,868.80 $16.00 $4,096.00 $7.30 $1,868.80 $8.00 $2,048.00 146 IMPERVIOUS STRUCTURAL FILL (IN PLACE) CY 130 $15 $2,000 $8.35 $1,085.50 $25.00 $3,250.00 $8.35 $1,085.50 $15.00 $1,950.00 147 (UPPER PORTION) SF 78 $138 $11,000 $175.00 $13,650.00 $150.00 $11,700.00 $145.00 $11,310.00 $140.00 $10,920.00 148 4" DRAIN PIPE LF 22 $60 $1,400 $47.50 $1,045.00 $100.00 $2,200.00 $47.50 $1,045.00 $38.00 $836.00 149 GENERATOR ENCLOSURE DRAIN AND STORM CONNECTION LS 1 $6,000 $6,000 $4,525.00 $4,525.00 $2,300.00 $2,300.00 $4,525.00 $4,525.00 $4,000.00 $4,000.00 150 CURB AND GUTTER, PCC, 1.5' WIDTH LF 6 $22 $200 $42.00 $252.00 $35.00 $210.00 $42.00 $252.00 $45.00 $270.00 151 PAVEMENT, HMA, 4" SY 100 $45 $4,500 $25.55 $2,555.00 $40.00 $4,000.00 $28.50 $2,850.00 $30.00 $3,000.00 152 PAVEMENT REMOVAL, HMA SY 214 $9 $2,000 $5.90 $1,262.60 $8.00 $1,712.00 $5.90 $1,262.60 $6.50 $1,391.00 153 DRIVEWAY, PAVED, TYPE B, 7" PCC SY 30 $45 $1,400 $49.00 $1,470.00 $58.00 $1,740.00 $49.00 $1,470.00 $50.00 $1,500.00 154 REMOVAL OF CURB LF 34 $14 $500 $1.90 $64.60 $3.00 $102.00 $1.90 $64.60 $2.25 $76.50 155 SUDAS HYDRAULIC SEEDING, FERTILIZING AND MULCHING, TYPE 1 AC 0.018 $1,800 $100 $50,000.00 $900.00 $10,000.00 $180.00 $50,000.00 $900.00 $50,000.00 $900.00 156 INLET PROTRECTION, INSTALL EA 1 $150 $200 $50.00 $50.00 $180.00 $180.00 $50.00 $50.00 $170.00 $170.00 157 INLET PROTECTION, MAINTENANCE EA 1 $150 $200 $25.00 $25.00 $50.00 $50.00 $25.00 $25.00 $25.00 $25.00 158 BOLLARD, PERMANENT EA 6 $1,500 $9,000 $775.00 $4,650.00 $400.00 $2,400.00 $700.00 $4,200.00 $500.00 $3,000.00 159 CHAIN LINK GATE FOR GENERATOR ENCLOSURE LS 1 $2,000 $2,000 $1,200.00 $1,200.00 $600.00 $600.00 $1,500.00 $1,500.00 $550.00 $550.00 PUMP STATION #6 160 STRUCTURAL AND PROCESS LS 1 $370,000 $370,000 $345,000.00 $345,000.00 $350,000.00 $350,000.00 $305,000.00 $305,000.00 $362,000.00 $362,000.00 161 ELECTRICAL LS 1 $313,000 $313,000 $283,000.00 $283,000.00 $240,000.00 $240,000.00 $250,000.00 $250,000.00 $89,000.00 $89,000.00 162 DEDUCT BASE BID PUMP STATION #6 PROCESS ITEM LS 1 ($19,000) ($19,000) $24,500.00 ($24,500.00) $20,000.00 ($20,000.00) $22,000.00 $22,000.00 $24,900.00 $24,900.00 BID ALTERNATE 2 TOTAL: (ITMES 142-162) $709,400 $639,620.65 $606,745.00 $566,925.65 $458,355.50 BID ALTERNATE 2 TOTAL $35,500 $744,900 BID ALTERNATE 3 - PUMP STATION 7 & 8 MODIFICATIONS 163 TOPSOIL, ON-SITE CY 54 $10 $600 $10.85 $585.90 $25.00 $1,350.00 $10.85 $585.90 $12.00 $648.00 164 SUBGRADE PREPARATION SY 120 $4 $500 $2.75 $330.00 $2.00 $240.00 $2.75 $330.00 $3.00 $360.00 165 SUBBASE, MODIFIED, 6 IN SY 60 $7 $500 $6.50 $390.00 $8.00 $480.00 $6.50 $390.00 $7.00 $420.00 166 EXCAVATION AND DISPOSAL OF EXISTING FILL - CLASS 13 CY 65 $11 $1,000 $7.30 $474.50 $16.00 $1,040.00 $7.30 $474.50 $8.00 $520.00 167 IMPERVIOUS STRUCTURAL FILL (IN PLACE) CY 74 $15 $2,000 $8.35 $617.90 $25.00 $1,850.00 $8.35 $617.90 $9.00 $666.00 168 (UPPER PORTION) SF 78 $138 $11,000 $175.00 $13,650.00 $150.00 $11,700.00 $145.00 $11,310.00 $140.00 $10,920.00
169 GENERATOR ENCLOSURE DRAIN AND STORM CONNECTION LS 1 $6,000 $6,000 $4,525.00 $4,525.00 $2,300.00 $2,300.00 $4,525.00 $4,525.00 $4,000.00 $4,000.00 170 4" DRAIN PIPE LF 20 $60 $1,200 $47.50 $950.00 $100.00 $2,000.00 $47.50 $950.00 $45.00 $900.00 171 RELOCATE DUCKBILL AND MOUNT TO EXISTING HEADWALL LS 1 $2,000 $2,000 $15,125.00 $15,125.00 $3,000.00 $3,000.00 $4,500.00 $4,500.00 $4,800.00 $4,800.00 STRUCTURES FOR SANITARY AND STORM SEWERS 172 48" DIA. HEADWALL WITH RELOCATED DUCKBILL LS 1 $5,000 $5,000 $29,700.00 $29,700.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $33,000.00 $33,000.00 173 PAVEMENT, PCC, 7" SY 60 $45 $2,700 $49.00 $2,940.00 $58.00 $3,480.00 $49.00 $2,940.00 $50.00 $3,000.00 174 PAVEMENT, HMA, 4" SY 202 $45 $9,100 $25.55 $5,161.10 $30.00 $6,060.00 $28.50 $5,757.00 $30.00 $6,060.00 175 PAVEMENT REMOVAL, HMA SY 202 $9 $1,900 $5.90 $1,191.80 $8.00 $1,616.00 $5.90 $1,191.80 $6.50 $1,313.00 176 REMOVAL OF DRIVEWAY, GRAVEL SY 53 $5 $300 $15.40 $816.20 $8.00 $424.00 $15.40 $816.20 $3.75 $198.75 177 DRIVEWAY, GRANULAR, 6" CLASS A CRUSHED STONE SY 53 $7 $400 $5.50 $291.50 $9.00 $477.00 $5.50 $291.50 $6.00 $318.00 178 REMOVAL, RECREATIONAL TRAIL SY 35 $9 $400 $5.90 $206.50 $8.00 $280.00 $5.90 $206.50 $6.00 $210.00 179 RECREATIONAL TRAIL SY 35 $33 $1,200 $45.00 $1,575.00 $50.00 $1,750.00 $41.50 $1,452.50 $140.00 $4,900.00 180 SUDAS HYDRAULIC SEEDING, FERTILIZING AND MULCHING, TYPE 1 AC 0.04 $1,800 $70 $25,000.00 $1,000.00 $10,000.00 $400.00 $25,000.00 $1,000.00 $25,000.00 $1,000.00 181 SILT FENCE, INSTALLATION LF 150 $2 $300 $2.00 $300.00 $2.00 $300.00 $2.00 $300.00 $2.00 $300.00 182 SILT FENCE, REMOVAL OF SEDIMENT LF 150 $1 $200 $0.50 $75.00 $1.00 $150.00 $0.50 $75.00 $0.50 $75.00 183 SILT FENCE, REMOVAL OF DEVICE LF 150 $0.25 $100 $0.50 $75.00 $0.50 $75.00 $0.50 $75.00 $0.50 $75.00 184 INLET PROTECTION, INSTALL EA 1 $150 $200 $50.00 $50.00 $180.00 $180.00 $50.00 $50.00 $50.00 $50.00 185 INLET PROTECTION, MAINTENANCE EA 1 $150 $200 $25.00 $25.00 $50.00 $50.00 $25.00 $25.00 $25.00 $25.00 186 RIP RAP, CLASS E REVETMENT TON 148 $50 $8,000 $42.00 $6,216.00 $55.00 $8,140.00 $32.80 $4,854.40 $36.00 $5,328.00 187 ROCK MULCH TON 7.5 $400 $3,000 $60.00 $450.00 $150.00 $1,125.00 $60.00 $450.00 $65.00 $487.50 188 BOLLARD, PERMANENT EA 2 $1,500 $3,000 $775.00 $1,550.00 $390.00 $780.00 $700.00 $1,400.00 $500.00 $1,000.00 189 CHAIN LINK GATE FOR GENERATOR ENCLOSURE LS 1 $2,000 $2,000 $1,200.00 $1,200.00 $600.00 $600.00 $1,500.00 $1,500.00 $550.00 $550.00 PUMP STATION #7 190 STRUCTURAL AND PROCESS LS 1 $620,000 $620,000 $491,000.00 $491,000.00 $525,000.00 $525,000.00 $463,000.00 $463,000.00 $534,000.00 $534,000.00 191 ELECTRICAL LS 1 $464,000 $464,000 $381,000.00 $381,000.00 $500,000.00 $500,000.00 $380,000.00 $380,000.00 $325,000.00 $325,000.00 192 DEDUCT BASE BID PUMP STATION #7 PROCESS ITEM LS 1 ($18,000) ($18,000) $24,000.00 ($24,000.00) $20,000.00 ($20,000.00) $21,000.00 $21,000.00 $22,000.00 $22,000.00 PUMP STATION #8 193 STRUCTURAL AND PROCESS LS 1 $246,000 $246,000 $264,000.00 $264,000.00 $250,000.00 $250,000.00 $255,000.00 $255,000.00 $322,000.00 $322,000.00 194 ELECTRICAL LS 1 $253,000 $253,000 $190,000.00 $190,000.00 $250,000.00 $250,000.00 $185,000.00 $185,000.00 $110,000.00 $110,000.00 195 DEDUCT BASE BID PUMP STATION #8 PROCESS ITEM LS 1 ($22,000) ($22,000) $24,000.00 ($24,000.00) $19,000.00 ($19,000.00) $21,000.00 $21,000.00 $22,400.00 $22,400.00 BID ALTERNATE 3 TOTAL: ITEMS 163-195) $1,605,870 $1,367,471.40 $1,550,847.00 $1,302,068.20 $1,327,724.25 BID ALTERNATE 3 TOTAL $81,000 $1,686,870 OWNER OPTIONAL BID ITEMS 196 OWNER OPTIONAL BID ITEM - PS 5 - ENGINE GENERATOR ENCLOSUR LS 1 $60,000 $60,000 $55,000.00 $55,000.00 $15,000.00 $15,000.00 $25,000.00 $25,000.00 $35,000.00 $35,000.00 197 OWNER OPTIONAL BID ITEM - PS 6 - ENGINE GENERATOR ENCLOSUR LS 1 $60,000 $60,000 $55,000.00 $55,000.00 $23,000.00 $23,000.00 $25,000.00 $25,000.00 $35,000.00 $35,000.00 198 OWNER OPTIONAL BID ITEM - PS 7 - ENGINE GENERATOR ENCLOSUR LS 1 $70,000 $70,000 $64,000.00 $64,000.00 $23,000.00 $23,000.00 $25,000.00 $25,000.00 $40,000.00 $40,000.00 199 OWNER OPTIONAL BID ITEM - 3RD ST SEWAGE LIFT STATION PUMP STLS 1 $12,000 $12,000 $15,000.00 $15,000.00 $28,000.00 $28,000.00 $25,000.00 $25,000.00 $15,000.00 $15,000.00 OWNER OPTIONAL BID ITMES TOTAL (ITEMS 196-199) $202,000 $189,000.00 $89,000.00 $100,000.00 $125,000.00 NEW ITEMS TO BE ADDED TO BASE BID 200 STORM SEWER, TRENCHED, RCP, 60", CLASS III, SPECIAL LF 16 $400 $7,000 $75.00 $1,200.00 $175.00 $2,800.00 $73.00 $1,168.00 $1,000.00 $16,000.00
201 SUBDRAIN, NON-PERFORATED, TRENCHED, PVC, 8" LF 300 $38 $12,000 $17.00 $5,100.00 $45.00 $13,500.00 $16.50 $4,950.00 $18.00 $5,400.00 ADDITIONAL BASE BID TOTAL (ITEMS 200-201) $19,000 $6,300.00 $16,300.00 $6,118.00 $21,400.00 ADDITIONAL BASE BID TOTAL $1,000 $20,000 BID ALTERNATE 4 - FLOOD PROTECTION SOUTH OF CLEAR CREEK EAST OF 1ST AVE TO RAILROAD 202 CLEARING AND GRUBBING BY AREA AC 0.1 $2,100 $300 $12,000.00 $1,200.00 $30,000.00 $3,000.00 $12,000.00 $1,200.00 $13,000.00 $1,300.00 203 EXCAVATION AND DISPOSAL OF EXISTING FILL - CLASS 13 CY 2427 $11 $27,000 $7.30 $17,717.10 $16.00 $38,832.00 $7.30 $17,717.10 $8.75 $21,236.25 204 IMPERVIOUS STRUCTURAL FILL (IN PLACE) CY 1196 $15 $18,000 $8.35 $9,986.60 $25.00 $29,900.00 $8.35 $9,986.60 $9.00 $10,764.00 205 SATISFACTORY SOILS (IN PLACE) CY 1231 $13 $17,000 $11.50 $14,156.50 $30.00 $36,930.00 $11.50 $14,156.50 $12.50 $15,387.50 STRUCTURAL 206 VIBRATION MONITORING SUBCONTRACT FOR CONTRACTOR LS 1 $6,000 $6,000 $20,000.00 $20,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $6,500.00 $6,500.00 207 DUCT BANK CROSSING LS 1 $18,000 $18,000 $42,250.00 $42,250.00 $4,000.00 $4,000.00 $15,000.00 $15,000.00 $22,200.00 $22,200.00 STRUCTURAL - FLOODWALL STATION 50+04.23 TO 50+34.23, 51+75 TO DUCT BANK CROSSING, DUCT BANK CROSSING TO 52+28, 52+56 TO 52+94 208 TYPE I SHEET PILE - 50+04.23 TO 50+34.23, 51+75 TO DUCT BANK CROSSING, DUCT BANK CROSSING TO 52+28, 52+56 to 52+94 SF 2260 $45 $102,000 $39.35 $88,931.00 $40.00 $90,400.00 $38.00 $85,880.00 $47.00 $106,220.00 209 210 PERMANENT FLOODWALL PILE CAP WITH FORMLINER -STATION 52+56 to 52+94 LF 38 $1,000 $38,000 $1,300.00 $49,400.00 $700.00 $26,600.00 $1,200.00 $45,600.00 $725.00 $27,550.00 50+34.23, 51+75 TO DUCT BANK CROSSING, DUCT BANK CROSSING TO 52+28 LF 83 $1,400 $117,000 $435.25 $36,125.75 $600.00 $49,800.00 $600.00 $49,800.00 $325.00 $26,975.00 STRUCTURAL - FLOODWALL STATION 50+34.23 TO 51+75 AND 52+28 TO 52+49.53 211 REMOVABLE FLOODWALL -STATION 50+34.23 TO 51+75 AND 52+28 TO 52+49.53 LF 163 $1,600 $261,000 $676.50 $110,269.50 $600.00 $97,800.00 $750.00 $122,250.00 $700.00 $114,100.00 212 PERMANENT FLOODWALL -STATION 52+49.53 TO 52+56 LF 6 $2,500 $15,000 $4,020.00 $24,120.00 $800.00 $4,800.00 $2,600.00 $15,600.00 $4,400.00 $26,400.00 213 (UPPER PORTION) SF 1071 $138 $148,000 $112.00 $119,952.00 $150.00 $160,650.00 $145.00 $155,295.00 $125.00 $133,875.00 214 SUBDRAIN, 8" LF 252 $15 $3,800 $16.50 $4,158.00 $45.00 $11,340.00 $16.50 $4,158.00 $18.00 $4,536.00 215 SUBDRAIN CLEANOUT TYPE A1 EA 3 $600 $1,800 $445.00 $1,335.00 $160.00 $480.00 $445.00 $1,335.00 $500.00 $1,500.00 STRUCTURES FOR SANITARY AND STORM SEWERS 216 SUBDRAIN PUMP STATION EA 1 $66,000 $66,000 $72,275.00 $72,275.00 $75,000.00 $75,000.00 $72,275.00 $72,275.00 $78,000.00 $78,000.00 217 SILT FENCE, INSTALLATION LF 350 $2 $700 $2.00 $700.00 $2.00 $700.00 $2.00 $700.00 $2.00 $700.00 218 SILT FENCE, REMOVAL OF SEDIMENT LF 350 $1 $300 $0.50 $175.00 $1.00 $350.00 $0.50 $175.00 $0.50 $175.00 219 SILT FENCE, REMOVAL OF DEVICE LF 350 $0.25 $100 $0.50 $175.00 $0.50 $175.00 $0.50 $175.00 $0.50 $175.00 220 RIP RAP, REMOVE STOCKPILE AND REINSTALL CY 122 $20 $3,000 $6.25 $762.50 $40.00 $4,880.00 $6.25 $762.50 $7.00 $854.00 221 BOLLARD, PERMANENT EA 3 $1,500 $5,000 $775.00 $2,325.00 $400.00 $1,200.00 $700.00 $2,100.00 $500.00 $1,500.00 222 REMOVE EXISTING RETAINING WALL LF 117 $50 $6,000 $56.30 $6,587.10 $20.00 $2,340.00 $56.25 $6,581.25 $65.00 $7,605.00 BID ALTERNATE 4 TOTAL (ITEMS 202-222) $854,000 $622,601.05 $644,177.00 $630,746.95 $607,552.75 BID ALTERNATE 4 TOTAL $43,000 $897,000 BASE BID TOTAL (ITEMS 1-116) + (200-201) $7,531,600 $6,889,445.33 $7,482,146.00 $6,503,709.22 $9,932,171.75