MBTA Key Bus Route Improvement Program. Community Meeting Routes 15, 22, & 28. June 28, 2012 Dudley Library

Similar documents
MBTA Key Bus Route. Community Meeting Route 1 - Boston

MBTA Key Bus Route Improvement Program. Community Meeting Route 66 Allston/Brighton

MBTA Key Bus Route Improvement Program. Community Meeting Route 57 - Boston. January 31, 2011 Boston Arts Academy, 174 Ipswich St.

KEY BUS ROUTE IMPROVEMENT PROJECT ROUTE 23 AGENDA

IMPROVEMENT CONCEPTS

Background Information about the Metrobus 29 Lines Study

5. OPPORTUNITIES AND NEXT STEPS

Chicago Transit Authority Service Standards and Policies

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

Greater Cleveland Regional Transit Authority. Bus Stop Design Guidelines

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

WELCOME TO BLUE HILL AVENUE STATION PUBLIC MEETING October 5, 2016

GODURHAM PROGRESS REPORT

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Develop ground transportation improvements to make the Airport a multi-modal regional

Waco Rapid Transit Corridor (RTC) Feasibility Study

Bus Stop Optimization Study

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Columbia Pike Transit Stations

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

METRO Light Rail Update

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

I-26 Fixed Guideway Alternatives Analysis

Draft Station Plan. Tuesday, November 17th

CROSSING RAIL PROJECT (P4) RAIL

Pulse Overview. Future Pulse Lines

D Line Station Plan: Table of Contents

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Central Park Drives Traffic Management Overview

Mannheim/Higgins. Lee/Touhy. Municipal. Alternate 1), Village of Rosemont (Eastbound. Major Considerations:

48 th and Chicago D Line Stop - September 13 th, 2018 Open House Materials

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run?

Community Open Houses November 29 December 7, 2017

2.0 Development Driveways. Movin Out June 2017

A Transit Plan for the Future. Draft Network Plan

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

Sound Transit Operations July 2016 Service Performance Report. Ridership

South Lexington Transportation Study Lexington, Massachusetts

2019 New Transit Service Plan

Recommended Station Plan

Mobility Corridor Updates. Transit & Active Transportation Projects

ANDERSON PROPERTY SITE ANALYSIS

9. Downtown Transit Plan

Essex Junction Train Station Access and Scoping Study Discussion of Transportation Alternatives

PROPOSED TRAFFIC RESOLUTION

Electric Multiple Unit Procurement Update

METRO Orange Line BRT American Boulevard Station Options

Michigan Avenue Corridor Study. Joint Policy / Technical Committee Meeting Wednesday, June 8, 2016

PAG Environmental Planning Advisory Committee Sun Link Streetcar Update May 1, 2015

State Avenue Corridor Bus Rapid Transit (BRT)

Draft Results and Open House

Essex Junction Train Station Access and Scoping Study Presentation of Transportation Alternatives

TRAIN, BUS & TRANSIT

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

STH 60 Northern Reliever Route Feasibility Study Report

A Rider s View. Presented By Stuart Spina. A Summary of Recommendations. To Improve MBTA Bus Service

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

West Broadway Reconstruction/LRT Design. March 19, 2015

Rapid Transit Implementation Working Group #4 February 9, 2017

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Transportation Sustainability Program

BUS STOP DESIGN & PLANNING GUIDE

New McNicoll Bus Garage Public Open House

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

Transit Access Study

Pace Bus Depot Location Analysis

Transportation Demand Management Element

Draft Results and Recommendations

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

CITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Green Line opens June 14

Attachment D Environmental Justice and Outreach

Fixing the Line s Canarsie Tunnel. Manhattan CB6 11/5/2018

I-26 Fixed Guideway Alternatives Analysis

A Plan to Connect Baltimore

I-225 Rail Line. 13 th Avenue Station Information Meeting. July 25, 2013

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

Update on Bus Stop Enhancements

NEW YORK CITY CARSHARE PILOT

Mobility Corridor Updates. Transit & Active Transportation Projects

FREQUENTLY ASKED QUESTIONS

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

Recommended C Line Station Plan

KANSAS CITY STREETCAR

I-225 Rail Line Iliff and Florida Stations Information Meeting

Stakeholders Advisory Working Group Traffic and Transit Group Meeting #4, October 10, 2007

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT

JTA S MOBILITY CORRIDORS. Improving System Performance Through Urban Design

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

PROPOSED TRAFFIC RESOLUTION

Transcription:

MBTA Key Bus Route Improvement Program Community Meeting Routes 15, 22, & 28 June 28, 2012 Dudley Library Agenda Welcome and introductions Safety briefing/accommodations Key Bus Route Program overview Existing conditions Recommendations Next steps Discussion 2 1

Introduction Enhancements to 15 Key Bus Routes Funded by $10 million ARRA grant 3 Implementation Process Coordination with municipalities Development of initial concepts Community meetings Incorporation of public comments Refinement of concepts and final community buy-in Final design and construction 4 2

Key Bus Route Goals Reliability Less bus bunching, improved on-time performance Faster service Less stops, shorter trip times, fewer delays Improved accessibility For seniors and persons with disabilities Passenger amenities Shelters, benches, signage, trash receptacles 5 Typical Conditions Bus stop too short Poorly located boarding area 6 Signage issues Bus stops too close 3

Improved Accessibility Legal Mandate All bus doors must open at curb Deter cars from parking in stops Providing accessible curb access requires longer bus stops Bus Stops must meet Current Guidelines for 40 and 60 buses 7 Reliability Issues Bus bunching Overcrowding On-time performance 8 4

Preferred Bus Stop Locations Appropriate distance between stops Sufficient length to allow buses to pull to the curb Clear boarding/alighting area Not blocking crosswalks or driveways Considerate of adjacent traffic and parking 9 Reliability and Faster Service: Stop Location Considerations Ridership customer boardings and alightings Proximity to schools, medical centers etc Reducing traffic congestion Parking impacts Potential to add amenities shelters, benches etc. Distance to adjacent stops 10 5

Optimized Bus Stop Spacing Ideal spacing is one stop every 750-1,320 ft (4-7/mi) Resulting walk time: 4-6 min Route 28 has an average of approximately 650 ft. Some stops as close as 250 ft. 11 Bus Stop Consolidation Benefits Shortens bus trip times Improves service reliability Minimizes stop & go experience Provides additional parking spaces Ability to provide better stop amenities 12 6

Improved Amenities Trash receptacles Shelters 14 Benches Pavement markings Proposed Recommendations Route 28 15 7

Malcolm X opp Madison Park HS OB Lengthen stop to 130 140. Remove 3 parking spaces. Replace trash receptacle and add pavement markings. 1259 16 Malcolm X @ Madison Park HS IB Lengthen stop to 130 140. Remove 2 3 parking spaces. Add trash receptacle and pavement markings. 11148 17 8

Malcolm X opp O Bryant HS OB Lengthen stop to 130 140. Remove 2 3 parking spaces. Add trash receptacle and pavement markings. 11323 18 Malcolm X @ O Bryant HS IB Lengthen stop to 130 140. Remove 2 3 parking spaces. Add trash receptacle and pavement markings. 11149 19 9

Warren @ Kearsage Ave IB Relocate signs to avoid bus blocking crosswalk. Remove 4 5 parking spaces. 21151 20 Warren @ St James OB Remove stop to improve stop spacing and due to insufficient stop length. Reinstate 4 parking spaces. Revised distance = ~850 to Dabney. 400 21 10

Warren @ Dabney Pl OB Relocate stop farside. Remove 4 parking spaces, but reinstate 3 spaces at existing stop. Add bench. 40001 22 Warren @ Moreland IB Maintain and lengthen stop due to neighborhood connectivity. Remove 1 parking space. Add bench. 396 23 11

Warren @ Montrose IB Relocate stop nearside of Whiting to improve stop spacing and due to insufficient stop length. Remove 5 parking spaces, but reinstate 2 spaces at existing stop. 395 24 NEW Warren opp Montrose OB Remove stop due to close proximity to Walnut and insufficient stop length. Reinstate 3 parking spaces. Revised distance to opp Waverly = ~890. 402 25 12

Warren opp Woodbine OB Maintain and lengthen stop due to high ridership. Add trash receptacle. 405 26 Warren @ Woodbine IB Maintain and lengthen stop due to high ridership and neighborhood connectivity. Investigate narrow shelter and/or bench. Add trash receptacle. 393 27 13

Warren @ Maywood IB Maintain stop due to high ridership and crosswalk connection. Relocate front sign nearside of north crosswalk, rear sign farside of south crosswalk. Investigate narrow shelter and/or benches. 392 28 Warren @ Hazelwood OB Remove stop to improve stop spacing. 4 5 parking spaces may be reinstated. Revised distance to Townsend would be 800. 29 408 14

Warren @ Savin IB Remove stop to improve stop spacing and due to driveway within stop. 3 4 parking spaces may be reinstated. Revised distance to Quincy would be 780. 30 391 Warren @ Holborn IB Remove stop to improve stop spacing and due to insufficient stop length. 3 4 parking spaces may be reinstated. Revised distance to Quincy would be ~1040. 389 31 15

Warren @ Wyoming/Waumbeck OB Consolidate Wyoming and Waumbeck to improve stop spacing and due to lower ridership. New stop farside of Wabon. Remove 4 parking spaces, and reinstate 5 spaces at Wymoning and 4 spaces at Waumbeck. Revised distance = 820 to Townsend and 850 to Brunswick. 32 Warren @ Intervale IB Maintain and lengthen stop due to neighborhood connectivity. No parking impact. Add bench. 387 33 16

Warren @ Brunswick OB Relocate farside of Brunswick. Remove 4 parking spaces, and 4 5 spaces may be reinstated at existing stop. Add bench. 411 34 Blue Hill Ave @ Wayne OB Relocate to farside of Schuyler due to insufficient stop length and to improve stop spacing. Remove 4 parking spaces, but reinstate 2 spaces at existing stop. Add shelter. 413 35 NEW 17

Routes 22/28 Overlap 36 Blue Hill @ Calder OB Remove stop to improve stop spacing and due to insufficient stop length. Reinstate 3 parking spaces. 418 37 18

Blue Hill @ Angell OB Maintain and lengthen stop due to high ridership and public safety concerns. Remove 2 parking spaces. Add amenities. 419 38 Blue Hill @ Harvard OB Lengthen stop. Remove 1 parking space. Add 1 2 benches. 1706 39 19

Blue Hill @ Arbutus IB Maintain stop due to high ridership and neighborhood connectivity. Bus will use driveway for stop egress. 1733 40 Blue Hill @ Hansborough/Havelock OB Consolidate Hansborough and Havelock to improve stop spacing and due to lower ridership. New stop farside of Johnston. Remove 4 parking spaces, and reinstate 4 spaces each at existing stops. Revised distance = 950 to Greenock and 1100 to Morton. 41 20

Blue Hill @ Goodale OB Relocate farside of Goodale due to insufficient stop length. Remove 3 parking spaces, and 2 spaces may be reinstated at existing stop. 42 1713 Blue Hill opp Clarkwood OB Remove stop to improve stop spacing and due to lower ridership. 4 5 parking spaces may be reinstated. Revised distance to Wellington Hill would be 1070. 43 17130 21

Blue Hill @ Hazelton OB Remove stop to improve stop spacing and due to lower ridership. 3 parking spaces may be reinstated. Revised distance to Mattapan St would be 1090. 44 1715 Blue Hill @ Wilmore/Evelyn IB Consolidate Wilmore and Evelyn to improve stop spacing. New stop farside of Fessenden. Remove 4 parking spaces, and reinstate 3 spaces at Wilmore and 4 spaces at Evelyn. Revised distance = 800 to Norfolk and 1000 to Woolson. 45 22

Blue Hill @ Norfolk IB Relocate farside of Babson due to insufficient stop length. Remove 4 parking spaces, and 3 4 spaces may be reinstated at existing stop. Investigate shelter or bench. 46 1726 Blue Hill @ Tennis OB Remove stop to improve stop spacing. 4 parking spaces may be reinstated at existing stop. Revised distance to Almont = 870. 11716 47 23

Blue Hill @ Almont OB Maintain and lengthen stop due to neighborhood connectivity. Remove 1 parking space. 1717 48 Blue Hill opp Woodhaven Coordinate stop location with planned Blue Hill Avenue commuter rail station. 1724 49 24

Blue Hill Ave @ Regis OB Remove stop to improve stop spacing and due to insufficient stop length. Reinstate 3 4 parking spaces. 1719 50 Blue Hill opp Babson OB Relocate stop in coordination with Mattapan Community Health Center. Investigate bench in consultation with Health Center. Mattapan Community Health Center 11719 51 25

Blue Hill @ Babson IB Maintain and lengthen stop. Remove 1 parking space. Add amenities. 1723 52 Summary of Preliminary Recommendations Rt 28 IB OB Total Total existing stops (including Rt 15, 22 overlap) 41 46 87 Total proposed stops (including Rt 15, 22 overlap) 37 36 73 Proposed shelters (where possible) 10 12 2 12 14 Proposed benches 5 7 5 10 12 Proposed trash receptacles 17 13 30 53 26

Route 15: Overview Ruggles Station to Kane Square Via Dudley Square and Upham s Corner Non-KBR service to St Peter s Square and Fields Corner Connects to: MBTA Orange Line and Commuter Rail MBTA Bus Routes 22, 28, 66, and others MBTA s 11 th busiest route 6,951 average daily boardings Peak hour headways every 5-10 minutes On-time performance 73% (weekday) Source: MBTA Service Planning, February 2012 Approximately 3 miles long 2 miles do not overlap with other KBRs 35 Stops: 19 IB (to Ruggles) and 17 OB (to Kane Square) 54 Proposed Recommendations Route 15 55 27

Malcolm X opp Madison Park HS OB Lengthen stop to 130 140. Remove 3 parking spaces. Replace trash receptacle and add pavement markings. 1259 56 Malcolm X opp O Bryant HS OB Lengthen stop to 130 140. Remove 2 3 parking spaces. Add trash receptacle and pavement markings. 11323 57 28

Malcolm X @ O Bryant HS IB Lengthen stop to 130 140. Remove 2 3 parking spaces. Add trash receptacle and pavement markings. 11149 58 Malcolm X @ Madison Park HS IB Lengthen stop to 130 140. Remove 2 3 parking spaces. Add trash receptacle and pavement markings. 11148 59 29

Dudley @ Warren IB Remove stop to improve stop spacing. Maintain no parking. 1491 60 Dudley Station Circulation To Uphams Corner To Ruggles 61 30

Dudley @ Greenville OB Investigate narrow shelter/1 2 benches. Add pavement markings. 1493 62 Dudley @ Dearborn IB/ Mt Pleasant OB Remove IB and OB stops to improve stop spacing. Reinstate parking. 1489 1494 63 31

Dudley @ Adams IB Relocate stop to farside due to narrow sidewalk at existing stop. Remove 3 parking spaces. NEW 1488 64 Dudley @ Hampden IB Consolidate with Magazine to midblock between Magazine and Dunmore. Investigate narrow shelter. Add amenities. 1487 NEW 1486 65 32

Dudley opp Hampden OB Consolidate with Blue Hill to midblock between Blue Hill and Dunmore. Investigate shelter. Add amenities. 1496 NEW 1497 66 Dudley @ Hampden and Blue Hill Coordination with Rt 45 67 33

Dudley @ Dennis OB Relocate stop to farside of Dennis to minimize parking impact & improve safety. Add amenities. 1498 NEW 68 Dudley @ Shirley Remove IB and OB stops to improve stop spacing. Reinstate parking. 11280 69 1127 34

Dudley @ East/West Cottage Investigate shelter at IB and OB stops. Add amenities. 1484 1499 70 Dudley @ Howard Relocate stop to farside of Howard to minimize parking impact and improve safety. Add pavement markings. 1500 NEW 71 35

Dudley @ Humphreys IB Remove stop to improve stop spacing. Remove shelter. Reinstate parking. 1482 72 Dudley @ Monadnock OB Consolidate with Columbia to farside of Virginia. Investigate narrow shelter. Add amenities. 11501 NEW 73 1503 36

Proposed Columbia OB Investigate proposed stop mid block Columbia in front of Citizens Bank to improve bus connections. NEW 74 Columbia Rd @ Dudley St 230ft KEY Existing Stops Proposed Stops 75 37

Columbia IB Lengthen stop to 100. Remove 1 2 parking spaces. Investigate adding shelter or 1 2 benches. Add trash receptacle and pavement markings. 1480 76 Columbia IB/OB Coordination with Other Routes 77 38

Hancock @ Bird OB Lengthen stop to 90. Remove 1 parking space. Add amenities. 1504 78 Hancock @ Jerome IB Investigate narrow shelter or 2 benches. Add pavement markings. 1479 79 39

Hancock @ Glendale Remove IB and OB stops to improve stop spacing. Reinstate parking. 1505 11478 80 Hancock @ Rowell IB Investigate narrow shelter or 2 benches. Add pavement markings. 1478 81 40

Hancock @ Howe Remove IB and OB stops to improve stop spacing. Reinstate parking. 1477 1507 82 Hancock @ Bowdoin Relocate stop to farside of Cameron. Add amenities. 1508 83 NEW 41

Summary of Preliminary Recommendations Rt 15 IB OB Total Total existing stops (not including Rt 22, 28 overlap) 19 17 36 Total proposed stops (not including Rt 22, 28 overlap) 12 12 24 Proposed shelters (where possible) 6 4 10 Proposed benches 3 5 4 7 7 12 Proposed trash receptacles 7 9 16 84 Public Outreach Community meetings for each route Flyers, e-mail blasts, mailings, newspaper ads Outreach to public and elected officials Key Bus Route project website 85 42

86 Comments and Next Steps Project Updates at www.mbta.com/keybusroutes Mail to MBTA Operations and Service Development, 45 High St, Boston, MA 02110 Email to keybusroutes@mbta.com Submit comments by Friday, July 15 Discussion 87 43

Project Schedule Bus Routes 15/22/28/32 Develop Concept Apr May June July Dec Summer 2013 Finalize Plan Engineering Implementation Public Process 88 4/5, 4/9, 4/24, 4/26, 4/30, 5/1 6/11, 6/19, 6/20, 6/21, 6/26, 6/28 Discussion These are PROPOSED RECOMMENDATIONS We want to hear from you! 89 44