ADDITIONAL INFORMATION P18-117 Western Grove lucldo&assodates EW etackenzie NM 7^R^ LMV. ^\U,...^..^^^^.. ^ TWITION FLORIDA
----Crosstowrr Pkwy ^J -b0 2 If TI ITION luddo&associates atackenzic DBE) ER I..\1\ H IR\I, P.L. Location Map & Entitlements
} Development Order Changes: Updated per authorized executive order extensions (6 years); Build Out Date: August 22, 2047 Termination Date: August 21, 2054 Removal of State Land Planning Agency, regional planning agency and "additional parties" references throughout; 3. Environmental and Natural Resources Changes: #34/23: Updated date from January 1, 2017 to January 1, 2020 to prepare a Conservation Area Management Plan; #35/#36/24: Added acknowledgement of the U.S. Army Corps of Engineers permit issuance; TRI ITION ri ackenzie D l.!'a Ell LW FIRM, NL. Development Order Changes
4. Transportation Changes: Development Order Changes: City to convey Fern Lake to Mattamy (Westcliffe Lane north to Crosstown); Mattamy to convey Tradition Parkway to City (N/S `A' west to Rangeline Road); #17/16: Tradition Parkway construction (from current terminus to N/S `A') changed from 0 trip threshold to 756 trips or 900 DU's; #17/16: Secondary Emergency Access Road should be eliminated; # 18/17: Tradition Parkway (N/S `A' to Rangeline) added to Table 2/ Phase 2; #18/17: N/S `A' and Crosstown Parkway moved to Phase 3 from Phase 2; :.$;f T1ITION.acKenzie D11Ll Eli LH IR\I, P.L. Development Order Changes
City to convey Fern Lake to Mattamy Mattamy to reconvey Tradition Parkway to City N/S `A' and Crosstown Parkway moved to Phase 3 (from Phase 2) Tradition Parkway construction changed from 0 thresholds to 756 trips or 900 DU's TUITION. ckenzic DRI 1 FR L:\\\' FIRM, I'.L. Transportation Changes
Road From To Current terminus N/SA Tradition (SW Stony Pkwy Creek Way) Secondar y Emerenc g yaccesz Road t\.5shown on Revised Ma ph or LIal W-112A ' -1 Trip Threshold1 756 0 756 Dwelling Units Required Improvement 0-900 2L Q-PGG Emergency Acoese., R oad Status - Western Grove Cumulative Total Net External DRI PM Peak Hour Trips per Exhibit E TUITION FLORIDA luc'i'do& associates,; ckenzic Ell LW, FIMI, Pi. Condition #17: Table 1 Change
Road From To Trip Threshold' Dwelling Units Required Improvement Phase 1 N/S A Tradition Pkwy /2 mile south of Tradition Pkwy 2,122 2,050 2L N/S A '/z Mile south of 1 Mile south of Tradition Pkwy Tradition Pkwy 2,484 2,400 2L Phase 2 N/S A Tradition Pkwy Westcliffe Ln 2,845 2,750 2L Tradition NIS A Rangeline Rd 2,845 2,750 2L Pkwy NIS M Crosstown Parkway2 Westcliffe Lane N/S A Westcliffe Ln Rangeline R NIS A Westcliffe Ln Crosstown Pkyey 2,845 2,750 N/S A 2,845 2,750 2-L SW Tremonte Avenue 2,948 2,850 2L Phase 3 Crosstown Pkwy 3,718 3,600 2L Status Crosstown Parkway Rangeline Rd N/S A 3,718 3.600 2L NIS A^ 1 Mile south of Tradition Pkwy Discovery Way 3,718 3,600 2L 'Western Grove Cumulative Total Net External DRI PM Peak Hour Trips per Exhibit E Crosstown Parkway from Rangeline Road to N/S A (collectively, the "Northern Link"), upon the Northern Linkandfor the "Southern Link" (N/S A from 1 Mile south of Tradition Parkway to Discovery Way) may be swapped, so that the Southern Link will be triggered in Phase 2 and the Northern Link triggered in Phase 3. TIpITION ackenzie D.RE ER I..\\\ FIR\1, l..l. Condition #18: Table 2 Change
o PR ^osm Ras- -N.. o urulv EASOJJEDT STDRH'KATER HA.IADE)EHT O RESUENTIAE u ECHacR.Hcoo/l1LLA[ ECANERaac SCHOOL - DPEN SPACE/URBAN DUFFER 0 AD,. PARK n.019rervato1j AREA (%'-/O SW Way n.avw:at, 1/7ANamI Palm Bwc6, LLC Luddo & Aroodafa A., 4 Map H Master Development Plan 0916.18 r TIITION.,acKenzie D11E Ell I \\V FIR \I. N.L. Revised Map H
eackenzie lucido&associates DREN ER LW: FIR \I, P.L. TIAJITION