HSC-O1. Dome Mechanical Seal Fiber Optic Splice Closure (FOSC)

Similar documents
SNR-FOSC-D. Dome Mechanical Seal Fiber Optic Splice Closure. Dome Mechanical Seal Fiber Optic Splice Closure (FOSC) SNR-FOSC-D. Installation Manual

SNR-FOSC-F. Dome Mechanical Seal Fiber Optic Splice Closure. Dome Mechanical Seal Fiber Optic Splice Closure (FOSC) SNR-FOSC-F. Installation Manual

Horizontal Fiber Optic Splice Closure (FOSC) Installation Manual

SNR-FOSC-H. Dome Mechanical Seal Fiber Optic Splice Closure. Dome Mechanical Seal Fiber Optic Splice Closure (FOSC) SNR-FOSC-H. Installation Manual

Dome Mechanical Seal Fiber Optic Splice Closure (FOSC) OT-8903-AE. Installation Manual

SNR-FOSC-D-T. Installation Manual SNR-FOSC-D-T. Dome Heat Shrinkable Seal Fiber Optic Splice Closure (FOSC)

B1-OPCL Installation Manual

Horizontal Fiber Optic Splice Closure (FOSC) FOSC-GPJ-A024. Installation Manual

FOSCHF Horizontal Fiber Optic Splice Closure

FOSC-400A4 INSTALLATION INSTRUCTION

Chengdu Qianhong Communication Co., Ltd. Fiber Optic Splice Closure. GJS03-M8AX-JX-144D-Mechnical Sealing Way.

FOSC-100 B/H FOSC-100 B2/H

FOSC-400D5 INSTALLATION INSTRUCTION. Fibre Optic Splice Closure with integrated organiser system

SJOF-BS604A Fiber Optic Splice Closure User Manual Rev.0

OPTICAL FIBER CLOSURE

Fiber optic splice closure

3000SC Fiber Optic Splice Closure

COYOTE Splice Case. Value conscious and benefit-packed: The COYOTE Splice 2-2

CS Fiber Optic Splice Case. Instruction

COYOTE Splice Case. Value conscious and benefit-packed: The COYOTE Splice. 2-2 (440)

OFE-CLS-Type Outside Plant (OSP) Fiber Optic Closures Instructions

Section 3 FIBERLIGN Closure Series

3M Fiber Dome Closure FDC 10

COYOTE Closure. Origin of the Species. Key Features: PATENTED 1-14

Heat Shrink closure Non - Pressurized & Pressurized RTSM Dome Closure RLSS RPBS Vault Closure Lead Sleeve Mechanical Closure Pillar Dp Jointing Kit

OAsys. Outside Plant. Metallic Joint Closure VXOK units. Features and Benefits

COYOTE 28" GLC (Ground Level Closure) Complete Assembly Installation

Features: Use the selection chart below to choose the Splice Case and splice tray organizer which meet the requirements for your application.

B Polyethylene Tape. B Splicing Covering. Holster

COYOTE Dome Closure 9.5" x 28" with Transition Tray for High Density Splice Applications

Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.

Instructions for Preparing AFL OPTICAL GROUND WIRE CABLE (HEXACORE CABLE DESIGNS)

Power Connection Kit installation instructions

LPC Series Fiber Panel 12/24 Fiber Rack-Mount Enclosure Installation Instructions

WRSS Wraparound Repair Sleeve Installation Instructions

FIST-GSS2 FIST-GSS3. Fist Generic Splicing Shelf. Contents. 1 Introduction. 2 General. 3 Installation of the shelf. 5 Termination of the pigtails

Opti-Guard Splice Enclosure

TOYOTA COROLLA ILLUMINATED DOOR SILLS Preparation

COYOTE CLOSURE ADOBE SERIES FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 22" 8.5" x 22" (152.4 mm x mm mm x 558.

ET-PWR-END-KIT Installation Instructions (part #JSR00)

Closure End Plates and Accessories

INSTALLATION INSTRUCTIONS

JANUARY 2015 NOMENCLATURE. TOOLS REQUIRED 3/8" & 7/16" Can wrench or socket 1/4 Nut driver or screwdriver Snips Fiber optic cable opening tools

COYOTE 9.5" x 19" (292 mm x 509 mm) Cross-Connect Dome Closure

3M Cold Shrink QT-III Silicone Rubber Three-Core Termination Kits

COYOTE Dome Closure 6.5" x 22" Kits. COYOTE Dome Closure 6.5" x 22" for Buffer Tube Applications. Includes: (2) Grommets, (1) Buffer

Splice Trays. features and benefits. specifications. A LANscape. Solutions Product. Splice Capacity

THE SB01 SPLICE ENCLOSURE NOW INCLUDES A LID GASKET THAT DOES NOT REQUIRE RTV APPLICATION.

HS6B Series Subminiature Interlock Switch

FIST-GPS2-J. 19 2HU Splicing, Patching and Storage shelf. 5 Fiber routing. 1 Introduction. Contents. 2 General. 6 Storage. 3 Installation of the shelf

IBER DISTRIBUTION FRAME (FDF) FOR EXCHANGE SIZE 900MM x 2200MM x 300 MM

COYOTE Terminal Dome Closure 6.5" x 22"

SPC-P Smart Power Connection with Temperature Monitoring Transmitter Pipe Mounted Installation Instructions

6. Rear Drive Shaft REAR DRIVE SHAFT

3M Cold Shrink Silicone Rubber Termination QT-III 7600-S-3G Series Three-Core Outdoor Termination

COYOTE Dome Cross-Connect Closure 6-1/2" x 22"

4. Front and Rear Drive Shafts

Southwest Windpower Instruction Sheet AIR-X Circuit Replacement Kit

LiteDOT Installation Document

COYOTE LCC (Low Count Closure)

COYOTE. Retrofit Closure. Refinement of the Breed. COYOTE Retrofit Closure. The ideal Closure for replacement or expansion 1-29

MARCH COYOTE 9.5 x 19 (292 mm x 509 mm) Terminal Dome Closure Kits

THE SB01 SPLICE ENCLOSURE NOW INCLUDES A LID GASKET THAT DOES NOT REQUIRE RTV APPLICATION.

COYOTE 9.5" x 19" (292 mm x 509 mm) Dome Closure

TOYOTA COROLLA ILLUMINATED DOOR SILLS Preparation

FIST-GSS2. Fist Generic Splicing Shelf MK2. Contents. 1 Introduction. 2 General. 3 Installation of the shelf. 5 Termination of the pigtails

Patching & Splicing Shelf. 4.2 Side cable termination directly on the shelf using cable termination plate. IFC cable/break-out cable

FLOODLIGHT unit IMPORTANT WARNING! RRAC055/RRAC059. INSTALL TIME: 30 mins

Scion xb Interior Light Upgrade Part Number: Accessory Code: YI1

Opticom Rack Mount Fiber Enclosures

1. General Description

CHIP FUSE; RECTANGULAR TYPE. RoHS COMPLIANCE ITEM Halogen and Antimony Free

TOYOTA RAV TRAILER WIRE HARNESS Section I Installation Preparation

19 1HU Splicing and Front Patching Shelf

Toyota Prius Interior Light Upgrade

CHIP FUSE; RECTANGULAR TYPE. RoHS COMPLIANCE ITEM Halogen and Antimony Free

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

INSTALLATION INSTRUCTIONS

C Power Connection Kit

HD BULL NOSE FRONT BUMPER FORD SUPERDUTY F PARTS LIST:

Cold Shrink - Silicone Rubber QTII(X)4S-32H Series Cable Termination Instructions

SYSTIMAX G2 4U Fixed Rear Access Combination Shelf Instructions

TOYOTA TACOMA XM SATELLITE RADIO Preparation

Terminator DP/FAK-5 and FAK-5L

Series 3 & 4 Stainless Steel - Accessories

INSTALLATION INSTRUCTIONS

Toyota Venza Interior Light Upgrade

FIST-FPS. Front Patching Shelf. Contents. 1 Introduction. 3 Installation of the shelf. 2 General. 1 Introduction

INSTALLATION INSTRUCTIONS

3M Cold Shrink QT-III Silicone Rubber 3/C Cabinet Mount Termination Kit

PARTS LIST: ELEVATION BULL NOSE FRONT BUMPER FORD SUPERDUTY F

CHIP FUSE; RECTANGULAR TYPE. RoHS COMPLIANCE ITEM Halogen and Antimony Free

TOYOTA AVALON INTERIOR LIGHT UPGRADE Section TOYOTA II - Installation AVALON Procedures

DRH Installation Guide. Date HUAWEI TECHNOLOGIES CO., LTD.

(1) License Plate Light (2) License Plate Plugs

C A Heating Cable Gland Kit Installation Instructions

POWER ASSISTED SYSTEM (POWER STEERING)

Pretium Wall-Mountable Housing (PWH-02P/-04P/- 06P/-12P and FZB-02P-JB)

PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE BEGINNING INSTALLATION. FAILURE TO COMPLY MAY VOID DAVIES, CRAIG WARRANTY.

Fiber Splice Panel Rack Mount User Manual

Transcription:

HSC-O1 Dome Mechanical Seal Fiber Optic Splice Closure (FOSC)

Contents 1.Scope of application 2.Basic structure and configuration 3.Necessary tools for installation 4.Installation flow chart 5.The process of installing FOSC. 6.Fiber Optic Splice Closures (FOSC) inspecting and testing items

1.Scope of application This Installation Manual suits for the Fiber Optic Splice Closure (Hereafter abbreviated as FOSC), as the guidance of proper installation. The scope of application is: aerial, underground, pipeline, hand-holes. The ambient temperature ranges from -40 to 65. 2.Basic structure and configuration 2.1 Dimension and capacity Outside dimensión (Height x Diameter) Weight (excluding outside box) Number of inlet/outlet ports Diameter of fiber cable Capacity of FOSC 415mm 190mm 2500g 3100g 4 pieces Φ8mm~Φ16 mm Bunchy: 12-96 (cores), Ribbon: up to 288 (cores) 2.2 Main components No Name of components Quantity Usage Remarks 1 FOSC cover 1 piece Protecting fiber cable splices in whole Height x Diameter 355mm x 150mm 2 Fiber optic splice tray (FOST) Max. 6 trays (bunchy) Max. 4 trays (ribbon) Fixing heat shrinkable protective sleeve and holding fibers 3 Fiber holding tray 1 pcs Holding fibers with protective coat 4 Base 1 set Fixing internal and external structure 5 Plastic hoop 1 set Fixing between FOSC cover and base 6 Seal fitting 1 pc Sealing between FOSC cover and base 7 Seal rings for inlet/outlet ports 4 pcs For the inner seal of inlet/outlet ports; the diameter is 16mm, can shrink to 8.5mm 16mm 8 Pressure testing valve 1 set After inject air, it is used for pressure testing and sealing testing 9 Earthing deriving device 1 set Deriving metal parts of fiber cables in FOSC for earthing connection Suitable for: Bunchy:12,24(cores) Ribbon:6 (pieces) Configuration as per requirement Configuration as per requirement 2 www.comcast-sa.com

2.3 Main accessories and special tools No Name of components Quantity Usage Remarks 1 Heat shrinkable protective sleeve Protecting fiber splices Configuration as per capacity 2 Nylon tie Fixing fiber with protective coat Configuration as per capacity 3 Earthing wire 1 piece Putting through between earthing devices To put through as per actual requirement 4 Abrasive cloth 1 piece Scratching fiber cables 5 Labeling paper 1 piece Labeling fibers 6 Special wrench 2 pieces Installing and tightening nut of reinforced core and nut (plastic) of inlet/outlet tube 7 Measuring paper 1 piece To measure perimeter, of which its diameter is enlarged with seal tape To measure perimeter with the corresponding measuring paper 8 Seal tape 1 ring Enlarging diameter of fiber cable which fits in with gasket ring. 9 Insulation tape 1 ring Enlarging diameter of fiber cable for easy fixing 10 Metal hoop 1 set For wall mounting and pole hugging 11 Buffer tube Decided by Hitched to fibers and fixed with customers FOST, managing buffer. 12 Desiccant 1 bag Put into FOSC before sealing for desiccating air Configuration as per specification Configuration as per requirement 3. Necessary tools for installation 3.1 Supplementary materials (to be provided by operator) Name of materials Scotch tape Ethyl alcohol Gauze Usage Labeling, temporarily fixing Cleaning Cleaning 3 www.comcast-sa.com

3.2 Special tools (to be provided by operator) Name of tools Fiber cutter Fiber stripper Combo tools Usage Cutting off fiber cable Strip off protective coat of fiber cable Assembling FOSC 3.3 Universal tools (to be provided by operator) Name of tools Band tape Pipe cutter Electrical cutter Combination pliers Screwdriver Scissor Waterproof cover Metal wrench Usage and specification Measuring fiber cable Cutting fiber cable Take off protective coat of fiber cable Cutting off reinforced core Crossing/Paralleling screwdriver Waterproof, dustproof Tightening nut of reinforced core 3.4 Splicing and testing instruments (to be provided by operator) Name of tools Fusion Splicing Machine OTDR Provisional splicing tools Usage and specification Fiber splicing Splicing testing Provisional testing Notice: The above-mentioned tools and testing instruments should be provided by the operators themselves. 4 www.comcast-sa.com

4. Installation flow chart. 1. Open the closure 2. Determine length of fiber cable to be fixed and stripped inside FOSC 3. Strip off protective coats of fiber cable and fiber 4. Separate fiber cores and prepare work prior to fixing fiber 5. Fix fiber cable and reinforced core 6. Splice fibers 7. Install heat shrinkable protective sleeve and house fibers 8. Check up comprehensively 9. Assemble FOSC housing and fix FOSC 5 www.comcast-sa.com

5. The process of installing FOSC. 5.1 Step One Open the closure 5.1.1 Cleaning the locale and determine where to install the FOSC and then place fiber cables required. 5.1.2 Check whether the main components and accessories have been well prepared inside the package. 5.1.3 Open the closure 1 demount hoop fixing bolt and pull hoop locking system out, then proceed in demounting the hoop. 2 Pull the FOSC cover upwards out, installation could begin. 5.1.4 See Drawing 1 Important issues: If the weather condition is not good enough, then a tent must be pitched for waterproof and dustproof 5.2 Step Two -Determine length of fiber cable to be fixed and stripped inside FOSC 5.2.1 1. Fiber cable in 110mm length: the distance from small gasket ring to fiber cable pressboard 2. Fiber cable in 1720mm length: it is used to be winded and spliced after stripping. 3. Fiber with protective coat in 120mm length: the distance from the fixing point of fiber cable to the fixing point of FOST (fiber optic splice tray). 4.Fiber in 1600mm length: after stripping off the protective coat, it is to be winded inside the FOST after splicing with other fibers 5.2.2 See Drawing 2 Important issues: 1. Reserve enough length of fiber cable to be spliced. 2. Stripping length also could be decided by customers according to installation requirement 6 www.comcast-sa.com

5.3 Step Three Strip off protective coat of fiber cable and fiber 5.3.1 Strip off protective coat of fiber cable from the temp. locating mark with the cutter and the stripper, please refer to Drawing 2 for stripping length. Stripping length also could be decided according to installation requirement 5.3.2 See Drawing 3. Important issues: If it is difficult to pull all the protective coat of fiber cable at one time, strip it off section by section to avoid fiber breakage. 5.4 Step Four Separate fiber cores and prepare work prior to fixing fiber cable. 5.4.1 Wind 2 layers of insulation tape on protective coat of fiber core for protection. Meanwhile, get rid of the stuffing to separate fiber core and clean them. Form a ring with the diameter of 100mm or so and fix it on the fiber cable temporarily by adhesive tape. 5.4.2 Reserve reinforced core in 50mm length and cut off the unnecessary ones. 5.4.3 See Drawing 4. Important issues:inlet/outlet tubes are to be selected accurately to make it easy for splicing and sealing. 7 www.comcast-sa.com

5.5 Fix reinforced core, and pyrocondense, fix and seal fiber cable. 5.5.1 This FOSC is provided with 4 inlet/outlet tubes, which suits for fiber cable with max. diameter ф 16mm. 5.5.2 After deciding number of fiber cable inlet/outlet, demount the nut, gasket and gasket ring of the corresponding inlet/outlet tubes according to the diameters of fiber cables actually to be installed, insert them into fiber cable in sequence, then insert fiber cable into inlet/outlet cable, tighten the nut to make the seal very well without seal tape in need. 5.5.3 While diameter is small, enlarge the diameter with seal tape at fixing position of small gasket ring, of which the perimeter is to be measured with measuring paper. 5.5.4 Fix fiber cable to the fixing seat, press it with the pressboard. While diameter is small, enlarge the diameter with insulation tape at the fixing position of fixing seat. 5.5.5 Demount the nut of fixing device of reinforced core with special wrench (plastic one), set the reinforced core into fixing slot, tighten the nut, retighten it with metal wrench (metal wrench to be provided by operator). 5.5.6 See Drawing 5 Important issue: Fixing nut of reinforced core should be tightened. 5.6 Step Six - Splice fibers 5.6.1 Follow user manual of fusion splicing machine to splice fiber. Important issue: pay attention to the twist and bend of fiber. 8 www.comcast-sa.com

5.7 Step Seven -Install heat shrinkable protective sleeve and house fibers. 5.7.1 When having completed splicing the fibers, the first fiber ring should be housed on the farthest side of FOST, the remaining fiber should be winded, forming a ring with diameter not less than 80mm. then put it into FOST (Fiber Optic Splice Tray) together with heat shrinkable protective sleeve. ( Firstly fix heat shrinkable protective sleeve into the slot, then enlarge the diameter of fiber ring properly.) 5.7.2 See Drawing 6 Important issue: pay attention to the twist and bend of fiber. 5.8 Step Eight - Check up comprehensively To ensure the technical requirements, the following instructions must be followed: 5.8.1 Fibers with protective coat are fixed with nylon tie at the entrance of FOST. 5.8.2 Grommet should be pressed from inside to outside in order to properly install FOST. 5.8.3 If there are fibers with protective coat reserved available, wind it into the fiber holding tray. 5.8.4 Check whether the internal tighteners and reinforced core are well tightened. 5.8.5 Check whether gasket ring is installed neatly and smoothly without any breakage. If not, level it up with seal tape. 5.8.6 See Drawing 7. Important issues: If any problems occur, they should be solved right away. 9 www.comcast-sa.com

5.9 Step Nine Assemble FOSC housing and fix FOSC 5.9.1 Put FOSC cover on base directly. 5.9.2 Install plastic hoop between FOSC cover and the base, tighten hoop locking system, which is to be fixed by hoop fixing bolt then. 5.9.3 All nuts (plastic ones) of base need to be retightened once more. 5.9.4 FOSC installation 1 Aerial application: fix metal hoop and transom to the pole. Please refer to Drawing 8 2 Wall mounting application: fix the bracket on the wall with the bolt. (metal hoop is not required.) 3 Underground application: metal hoop is not required. 5.9.5. See drawing 8 Important issues: 1. Pay attention while installing plastic hoop. 2. The specification of the bolt for wallmounting is M8. 10 www.comcast-sa.com

6. Fiber Optic Splice Closures (FOSC) inspecting and testing items Inspecting item Package Appearance Sign Fiber storage device Electrical jointing device Sealing performance Re-sealing performance Pull Punching Impact Technical Requirements Each small package contains one fiber optic splice closure, together with its accessories, tools, installation manual and packing list. Intact in shape, no burrs, bubbles, chaps, pores, warps, impurities and other defects, all background colors should be even and continual There is a clear sign on the housing, such as name and model of the product, etc. The fibers reserved are to be winded in fiber optic splice tray (FOST), the length of fibers housed in FOST is >1.6m, the curved radius is >30mm. During the installation and maintenance, there should be no attenuation on fibers. Inside FOSC: metallic components of fiber cables has the functions of electrical putting through, earthing connection and disconnecting. It is possible to install earthing deriving device outside the housing After sealing according to the stipulated operation procedures, the injected air pressure is 100KPa±5Kpa, when immersed in clean water of normal temperature for 15 minutes, there should be no air bubbles, then observed for 24 hours, there should be no change of air pressure. After reopening and resealing according to the stipulated operation procedures, the injected air pressure is 100KPa ± 5Kpa, when immersed in clean water of normal temperature for 15 minutes, there should be no air bubbles, then observed for 24 hours, there should be no change of air pressure. Bearing pull is 800N at axle orientation, there should be no breakage on the housing. Bearing pressure of 2000N/10cm for 1 minutes, there should be no breakage on the housing Bearing impact energy of 16N m, 3 times of impacts there should be not breakage on the housing Inspecting type Routine test (Before leaving Type test factory) full At least 3 sets sampled each time At least 3 sets sampled each time 11 www.comcast-sa.com

Impact Bending Torsion Temperature circle Voltage resistance strength Isolating resistance Bearing impact energy of 16N m, 3 times of impacts there should be not breakage on the housing The spot between the FOSC and seal fitting can bear bending tension of 150N at bending angle of ±450 for 10 circles, there should be no breakage on the housing Bearing torsion 50N m, 10 circle at torsion angle±900, There should be no breakage on the housing Injected air pressure of 60KPa±5 KPa, the temperature circle ranging from -40 ~+65, 10 times of the circular tests (one circular consists of high temperature for 2 hours + indoor temperature for 2 hours + low temperature for 2 hours + indoor temperature for 2 hours) when the pressure declines, the amplitude is 5Kpa, immerse the swatch in clean water of normal temperature for 15 minutes, there should be no air bubbles. After sealing the FOSC according to the stipulated operation procedures immerse it in clean water of normal temperature in 1.5m depth for 24 hours, there should be no breakdown or arc over between the metallic components of the FOSC, between metallic components and the ground at DC 15KV for 1 minutes. After sealing the FOSC according to stipulated operation procedure immerse it in clean water in 1.5m depth for 24h, the isolating resistance between the metallic components of the FOSC, between the metallic components and the ground should be 2 10 4 MΩ. At least 3 sets sampled each time 12 www.comcast-sa.com

13 www.comcast-sa.com