Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Similar documents
Wentzville Parkway South Phase 2 & 2A

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

COST ESTIMATES: Curb-Running

City of Houston Fondren Road Paving and Drainage

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Rolling Road (Route 638) Widening Project

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Public Information Workshop

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

The Eastern Connector Study November, 2007 planning for the future

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

Riverside County Transportation Department Summary of Bids

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines

Received June 2, 2017 PLN-PUDC

IMPROVEMENT CONCEPTS

County of Santa Cruz 0579

Steese Rd - Curb & Sidewalk Improvement

Letter EL652 City of Mercer Island. Page 1. No comments n/a

ANDERSON PROPERTY SITE ANALYSIS

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

800 Access Control, R/W Use Permits and Drive Design

Dixie Transportation Planning Office

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS

LCPS Valley Service Center

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

FREQUENTLY ASKED QUESTIONS

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

FREQUENTLY ASKED QUESTIONS

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

Traffic Impact Analysis Update

ALEXANDRIA, VIRGINIA PRINCE ST. SUITE 114. ADG, INC. COPYRIGHT c. PH

Business Advisory Committee. July 7, 2015

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

EXCEPTION TO STANDARDS REPORT

Appendix G Aquilla Lake Pool Rise Recreational Resources

Construction Realty Co.

STH 60 Northern Reliever Route Feasibility Study Report

Licensed Class C Virginia Contractor No.

STREET IMPROVEMENTS PROPOSAL BID ITEMS

MO 370 Interchange Ramp at Salt River Road - Phase 1

4131 Chain Bridge Road

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Sidewalk Working Group Update October 22, 2018

CITY of NOVI CITY COUNCIL

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

FEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017

City of Grand Forks Staff Report

BUS STOP DESIGN & PLANNING GUIDE

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

PUBLIC INFRASTRUCTURE PROJECTS

Schematic Layout Development

Federal Project No.: HSIP-5A27(567)

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

f.o Date: March 12, 2012 Honorable Chair an SMCRA Board Memb s From: Stephen David, SMCRA Directo

Develop ground transportation improvements to make the Airport a multi-modal regional

Lacey Gateway Residential Phase 1

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Federal Project No.: STP-5128(388)

Energy Technical Memorandum

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

DESIGN STANDARDS SECTION DS 3 STREETS

3.14 Parks and Community Facilities

Purpose: General Provisions:

Update on Transportation Activities in Fairfax County

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

City of Pacific Grove

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Appendix C Preferred Solution

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Summary of the Alcoa Highway Redevelopment Project

Traffic Impact Study Speedway Gas Station Redevelopment

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Transcription:

Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers, Inc. April 20, 2018 Attachment # 1

P a g e 2 Project Overview: At the Board Business Meeting on February 7, 2017, the Board approved (9-0) a Board Member Initiative directing the Department of Transportation and Capital Infrastructure (DTCI) to identify funds to complete a transportation analysis study to address missing pedestrian path segments along West Church Road, Cascades Parkway, Potomac View Road, and any connecting intersections within the as well as a pedestrian connection between Claude Moore Park and Park View High School. DTCI obtained a proposal from a task order civil engineering consultant that the study will cost approximately $10,000. On June 22, 2017, the Board of Supervisors approved to fund a transportation analysis of pedestrian pathways in the.

P a g e 3

P a g e 4 Date of Meeting: June 22 2017 SUPPLEMENTAL# 10 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Response to Board Member Initiative: Identify Funds to Conduct a Transportation Analysis Study to Address Pedestrian Pathways in the Sterling At the pleasure of the Board Mark Hoffman, Transportation and Capital Infrastructure Joe Kroboth, III, Transportation and Capital Infrastructure PURPOSE: To seek approval from the Board of Supervisors (Board) to fund a transportation analysis study of pedestrian pathways in the. RECOMMENDATIONS: Staff recommends the Board approve the use of funds from the Sidewalk Contingency Account to perform a transportation analysis study to address missing pedestrian path segments along West Church Road (State Route 625), Cascades Parkway (State Route 1794), Potomac View Road (State Route 637), and any connecting intersections within the as well as a pedestrian connection between Claude Moore Park and Park View High School. UPDATE: The motion for Item 10 is proposed for revision for the purposes of clarity. At least one Board Member expressed concern that the limits of the study were unclear. This attempts to clarify the limits and extent of the study as proposed by staff in the item. This revised motion does not change the Staff Recommendation or proposed direction of the item, it simply clarifies the scope of this project in the motion. REVISED DRAFT MOTIONS: 1. I move that the Board of Supervisors approve the use of $10,000 from the Sidewalk Contingency Account to fund a study to identify missing sidewalk and pedestrian path segments along West Church Road, between Cascades Parkway and Sterling Blvd; Cascades Parkway, between West Church Road and Potomac View Road; Potomac View Road, between Cascades Parkway and Benedict Drive; and a pedestrian connection between the Claude Moore Park and Park View High School. OR 2. I move an alternative motion. Purpose: The purpose of this study is to evaluate and document the Board of Supervisors initiated analysis of missing pedestrian links within the. The report focuses primarily on the W. Church Road, Cascades Parkway, Potomac View Road and inter-parcel connections to Claude Moore Park from Park View High School. Background: The information used in the study is from Loudoun County GIS data (2016/2017), site visit, Google Earth and County land records. The right of way, property information and floodplain location are approximate based on GIS information.

Page 5 The preliminary engineer s estimates utilize VDOT NOVA Unit Costs or unit pricing from recently completed infrastructure projects in Loudoun County, plus 4% escalation for a 2020 project advertisement. The estimate includes 25-30% Design fees, 18% for Construction Administration services and 25% contingencies. The Right of Way estimate is based on cost per square foot of $11, plus 23% for plat and recordation fees. That unit cost was provided by DTCI based on recent acquisitions for transportation improvements. Introduction: The study is broken down into four (4) areas. Those areas are defined as: Area #1 is Church Road east of Cascades Parkway to Sterling Boulevard Area #2 is Cascades Parkway from Loudoun Park Lane to Potomac View Road Area #3 is Potomac View Road from Cascades Parkway to west of Benedict Drive Area #4 is access through Park View High School to Claude Moore Park

P a g e 6 Church Road Area 1 The limits of Church Road - Area 1 are from the intersection of Cascades Parkway to Sterling Elementary School which is approximately 4,800 feet in length. This study has identified the following design constraints used to determine the best location for the missing pedestrian facilities and provide connectivity to existing pedestrian facilities: Existing roadway ditch section (aerial image and field observation) Existing right of way restrictions, based on Loudoun County GIS information Utilities(field observation) Commercial entrances (aerial image and field observation) Existing pedestrian facility (aerial image and field observation) The selected alternative proposes to install a 6 wide sidewalk as depicted in Typical Sections 1 and 2, but has identified the use of a 10 multi-use path with a 14 Public Access Easement (PAE) in Typical Section 3.

P a g e 7 Existing Ditch The evaluation suggests that the typical sections shown with a retaining wall (estimated 2.5 high) may be required as the sidewalk passes along an existing parking lot on the north side of Church Road. During the design process, it may be determined that the 4 sidewalk buffer strip should be reduced to minimize impacts to the parking area. A reduction in the buffer strip will require a VDOT Design Waiver and concurrence. It might also require a reduction in the sidewalk width from 6 to 4 along the proposed wall. This will not require a VDOT Waiver. The alternative selected suggests installing the sidewalk along the north side of Church Road. From the western study point (Cascades Parkway) to eastern (Sterling Elementary School), the improvements would require: Adjustments to existing utility boxes buffer strip reduction Site access to commercial parcel Addition of pedestrian signal and crosswalk at W. Holly Avenue will require a VDOT Pedestrian Warrant Study Connections to the existing trail along frontage adjacent to Traction Place Changing facility type of a concrete sidewalk adjacent to the roadway to a meandering asphalt trail to accommodate existing drainage Typical Section 3 Easement will be required Claude Moore Park and Sterling Elementary School Looking west on Church Road where retaining wall may be required

P a g e 8 This photograph shows the potential location to add a pedestrian signal and crosswalk. This will require approval of a VDOT crosswalk warrant study. This photograph shows the existing roadside ditch that allows Typical Section 3 to honor existing drainage.

P a g e 9 Looking west on Church Road at an existing crosswalk at N. Aspen Avenue to the Scout Trail. Refer to Appendix 1 for supporting documentation and engineers estimate.

P a g e 10 Cascades Parkway Area 2 The limits of Cascades Parkway - Area 2 are from the intersection of Loudoun Park Lane to the intersection of Potomac View Road which is approximately 3,500 feet in length. This study has identified the following constraints used to evaluate the addition of pedestrian facilities along the east side of Cascades Parkway: Existing pedestrian facilities Adjacent uses Right of way availability Utilities It appears that this area along Cascades Parkway was designed and constructed to accommodate a sidewalk. There were few restrictions found that would encumber the construction of a 6 contract sidewalk as shown in the typical section. Looking north on Cascades Parkway at existing sidewalk bench and utilities

Limited by the available information, it appears there needs to be a modification to Typical Section 1 to accommodate a reduced roadway bench width along the northbound right turn lane on Cascades Parkway to Potomac View Road. It appears any widening may impact an existing utilities and stormwater management pond adjacent to the road. This concept will require a VDOT Design Waiver to reduce the buffer strip from 4 to no buffer strip. P a g e 11 Looking north on Cascades Parkway at the reduced bench width along SWM pond The project will require adjustments to existing utility boxes in the vicinity of the existing signals at Loudoun Park Lane, Woodlawn Road and Potomac View Road.

Cascades Parkway Area 2 Option 2 During field observations it was determined there is pedestrian activities from Victoria Station Drive to businesses north of Woodlawn Road. Option 2 evaluated this section of Cascades Parkway and establish the following constraints: Adjacent uses Right of way availability Utilities P a g e 12 The sidewalk along this section of Cascades Parkway crosses an existing drainage structure and may require a VDOT Design Waiver to reduce the buffer strip from 4 to possibly no buffer strip. Looking south on Cascades Parkway at an existing path along the west side of the road. This area may require a reduced bench width crossing drainage structure

The existing pedestrian path along the west side of Cascades Parkway continues beyond the intersection of Woodland Road. The path resumes along the south side of Woodland Road to local businesses within the area. This study does not include evaluating pedestrian facilities along Woodland Road, however it is suggested that a future study be performed to understand the destinations and need for future pedestrian facilities off of Cascades Parkway. P a g e 13 Refer to Appendix 2 for supporting documentation and engineers estimate.

Potomac View Road Area 3 Area 3 - Potomac View Road is from the intersection of Cascades Parkway to the existing sidewalk 750 feet west of Benedict Drive. The study length, on the north side of Potomac View Road, is approximately 3,500 feet. This study evaluated both sides of Potomac View Road. The south side of Potomac View Road would require: Approximately 4,300 feet of sidewalk/trail. Removed and replacement of approximately 600 feet of guardrail and two guardrail terminals Installation of fill slopes along the roadway, tying to existing grade approximately 60 offsite or more Replace 1,200 foot of 4-board fencing Meandering alignment to maintain ADA compliance P a g e 14 Looking east on Potomac View Road at existing guardrail and steep embankment slope Looking east on Potomac View Road at the existing four rail fence

P a g e 15 The critical issue for the southern pedestrian location is the existing terrain as it falls away from the roadway. This would result in lengthy fill slopes that will require substantial earthwork, clearing and construction easements. This evaluation selected installing the new sidewalk/trail on the north side of Potomac View Road. This location will require right of way and easement acquisition, but utilizes the existing and proposed curb and gutter sections that will reduce offsite impacts. Other criteria used to evaluate this location: location of existing sidewalks right of way utilities commercial entrances urban road sections existing drainage It appears that there is limited right of way along the westbound right turn lane on Potomac View Road. A modification to typical section 1 may be required to reduce substantial roadway cuts and right of way impacts. This can be evaluated during the engineering design process and will require a VDOT Design Waiver to reduce the buffer strip from 4 to no buffer strip at all. Looking west on Potomac View Road at the existing right turn lane and steep slopes

P a g e 16 This alternative includes constructing a curb and gutter section from the existing roadway high point to the existing curb and gutter along the WB right turn lane on Potomac View Road approaching the intersection with Cascades Parkway. This concept will require drainage improvements along with the new curb and gutter section. Looking west on Potomac View Road at the high point of the roadway and existing drainage ditch The proposed curb and gutter Typical Section 1 (Area 3) will continue from the westbound right turn lane to a point approximately 2,100 feet east of the Cascades Parkway intersection. The pedestrian facilities will then change to Typical Section 2 (Area 3) which then changes to a meandering 10 asphalt trail for the remaining 1,400 feet. This will honor the existing drainage without requiring considerable roadway improvements and extensive construction costs.

P a g e 17 Existing Ditch This section will require a 14 Public Access Easement (PEA) for use and maintenance of the trail. Looking west on Potomac View Road at the existing road section and drainage ditch Refer to Appendix 3 for supporting documentation and engineers estimate.

Park View High School and Sterling Elementary School Area 4 The limits of the Park View High School Area 4 is approximately 1,200 feet in length. The pedestrian facilities will begin at the southern high school entrance on N. York Road and meander to the existing Scout Trail on the Claude Moore Park property. The study constraints used to evaluate pedestrian facilities: existing sidewalk on N. York Road school properties school bus storage existing Scout Trial wetlands/stream The proposed sidewalk includes two new handicap ramp from the existing sidewalk on N. York Road along the southern side of the school entrance to the parking area. This crossing will require a VDOT crosswalk warrant study to allow crosswalk pavement markings and signage. P a g e 18

The alignment then proceeds south onto the elementary school parcel adjacent to the athletic field, running parallel to the bus storage area meander around the out buildings, utility/light poles and to avoiding large specimen tree. P a g e 19 The trail connects to the Scout Trail south of the existing pedestrian crossing of the existing channel. Refer to Appendix 4 for supporting documentation and engineers estimate.

Summary This study assessed the connectivity of existing pedestrian facilities in the as requested by Supervisor Saines and the Loudoun County Board of Supervisors. The study identified the facility types, location, constraints, right of way impacts and construction cost. P a g e 20 Study Area Location Estimated Estimated Estimated Total Estimated Engineering Costs Right of Way Costs Construction Costs Costs 1 Church Road - East $ 267,729.96 $ 316,845.00 $ 1,070,919.85 $ 1,655,494.81 2 Cascades Parkway - Eastside $ 111,506.04 $ - $ 446,024.15 $ 557,530.19 2 - Opt2 Cascades Parkway - Westside $ 83,855.20 $ 82,350.00 $ 335,420.80 $ 501,626.00 3 Potomac View Road $ 348,219.30 $ 262,710.00 $ 1,160,731.00 $ 1,771,660.30 4 Park View HS $ 55,337.43 $ - $ 221,349.70 $ 276,687.13

Appendix 1 Area 1 W. Church Road P a g e 21

FLOODPLAIN CASCADES PARKWAY RETAINING WALL FLOODPLAIN FLOODPLAIN W CHURCH ROAD EX. CONC. SIDEWALK W HOLLY AVE. PEDESTRIAN SIGNAL N VA. STATE GRID NORTH W. CHURCH ROAD (AREA 1) SHEET 1 of 4 LEGEND PROPOSED 6' CONC. S/W PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL DATE: 03-14-2018 SCALE: 1" = 100' EX. CONC. SIDEW EX. CONC. SIDEWALK MATCHLINE - SEE SHEET 2 OF 4 (AREA 1)

EX. CONC. SIDEWALK ALK EX. ASPHALT TRAIL MATCHLINE - SEE SHEET 1 OF 4 (AREA 1) N LARCH CT TRACTION PL W CHURCH ROAD EX. ASPHALT TRAIL EX. CONC. SIDEWALK DATE: 03-14-2018 SCALE: 1" = 100' N VA. STATE GRID NORTH W. CHURCH ROAD (AREA 1) SHEET 2 of 4 LEGEND PROPOSED 6' CONC. S/W PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL BEGIN MULTI-USE TRAIL MATCHLINE - SEE SHEET 3 OF 4 (AREA 1)

MATCHLINE - SEE SHEET 2 OF 4 (AREA 1) BEGIN MULTI-USE TRAIL W. ASH ROAD N VA. STATE GRID NORTH N ASPEN AVENUE EX. CONC. SIDEWALK EX. CONC. SIDEWALK W CHURCH ROAD EX. CONC. SIDEWALK END MULTI-USE TRAIL EX. CONC. SIDEWALK SCOUT TRAIL CLAUDE MOORE PARK S S W. CHURCH ROAD (AREA 1) SHEET 3 of 4 LEGEND PROPOSED 6' CONC. S/W PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL DATE: 03-14-2018 SCALE: 1" = 100' MATCHLINE - SEE SHEET 4 OF 4 (AREA 1)

W. ASH ROAD N ASPEN AVENUE EX. CONC. SIDEWALK END MULTI-USE TRAIL SCOUT TRAIL EX. CONC. SIDEWALK EX. CONC. SIDEWALK W CHURCH ROAD EX. CONC. SIDEWALK EX. ASPHALT TRAIL EX. ASPHALT TRAIL STERLING ELEMENTARY SCHOOL N YORK RD EX. CONC. SIDEWALK MATCHLINE - SEE SHEET 3 OF 4 (AREA 1) W. CHURCH ROAD (AREA 1) SHEET 4 of 4 LEGEND PROPOSED 6' CONC. S/W PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL DATE: 03-14-2018 SCALE: 1" = 100' N YORK RD EX. CONC. SIDEWALK N VA. STATE GRID NORTH

Loudoun County Department of Transportation and Capital Infrastructure Sterling Sidewalk Study Church Road Area #2 Preliminary Engineers Estimate 3/20/2018 Description Units Quantity Unit Price Total Cost MOBILIZATION LS 1 $ 30,000.00 $ 30,000.00 CONSTRUCTION SURVEYING (CONSTR.) LS 1 $ 12,000.00 $ 12,000.00 PERMITTING LS 1 $ 10,000.00 $ 10,000.00 EARTHWORK CLEARING (tree removal and MOT) LS 1 $ 30,000.00 $ 30,000.00 REGULAR EXCAVATION CY 890 $ 5.00 $ 4,450.00 COMPACTED FILL CY 150 $ 7.00 $ 1,050.00 CULVERT MINOR STR. EXCAV. BOX CULVERT CY 0 $ 25.00 $ - CULVERT EXTENSIONS LF 0 $ 300.00 $ - WINGWALL - CULVERT EA 0 $ 3,000.00 $ - SIDEWALK AGGR. MATL. NO. 21A - 4" SY 3980 $ 12.00 $ 47,760.00 HYDR. CEMENT CONC. SIDEWALK 4" SY 1560 $ 60.00 $ 93,600.00 ASPHALT TRAIL - 10' SY 1580 $ 27.00 $ 42,660.00 HANDICAP RAMPS (CG-12) W/TRUNCATED DOMES EA 19 $ 4,000.00 $ 76,000.00 COMMERCIAL ENTRANCE SY 240 $ 60.00 $ 14,400.00 PRIVATE ENTRANCE SY 115 $ 55.00 $ 6,325.00 PROP. GUARDRAIL LF 0 $ 20.00 $ - REMOVAL OF EX. SIDEWALK AND ENTRANCE SY 240 $ 20.00 $ 4,800.00 MAINT. OF TRAFFIC CONTROL LS 1 $ 80,000.00 $ 80,000.00 DEMO. OF PAVEMENT (FLEXIBLE) SY 0.00 $ 7.50 $ - REMOVE EXIST. GUARDRAIL LF 0.00 $ 8.00 $ - RETAINING WALL SF 375.00 $ 50.00 $ 18,750.00 INLET PROTECTION, TYPE A EA 15 $ 300.00 $ 4,500.00 TEMP. SILT FENCE LF 5120 $ 5.00 $ 25,600.00 REINFORCED SILT FENCE (SSF) LF 2560 $ 15.00 $ 38,400.00 CONSTRUCTION ENTRANCE EA 3 $ 4,000.00 $ 12,000.00 HAND RAILING LF 150 $ 20.00 $ 3,000.00 FENCING LF 220 $ 30.00 $ 6,600.00 MISC. ITEMS WETLAND/STREAM MITIGATION LS 1 $ 10,000.00 $ 10,000.00 NUTRIENT CREDITS LBS 1 $ 25,000.00 $ 25,000.00 UTILITY ADJUSTMENTS (HAND HOLES) LS 1 $12,000.00 $ 12,000.00 UTILITY RELOCATION (POLE) LS 0 $0.00 $ - SIGNAL MODIFICATION - PED HEADS (WEST CHURCH) Includes crosswalk and signage EA 1 $140,000.00 $ 140,000.00 0 $ - $ - Subtotal $ 748,895.00 CI&A (18%) $ 134,801.10 Contingency 25% = $ 187,223.75 Total Construction Estimate = $ 1,070,919.85 Est. Design Fees (25% Construction) $ 267,729.96 Total Estimate R/W Costs $ 316,845.00 Total Estimated Project Cost $ 1,655,494.81 Estimated Right of Way and Easement Impacts Area #1 Right of Way Easements $/SF $ 13.50 $ 13.50 Impacts (SF) 750 22720 Total * $ 10,125.00 $ 306,720.00 * - includes plats and recordation Page 1 of 1

Appendix 2 Area 2 Cascades Parkway P a g e 27

LOUDOUN PARK LN EX. ASPHALT TRAIL CLAUDE MOORE PARK EX. CONC. SIDEWALK CASCADES PARKWAY EX. ASPHALT TRAIL EX. CONC. SIDEWALK VICTORIA STATION DRIVE EX. ASPHALT TRAIL WOODLAND ROAD EX. ASPHALT TRAIL FLOODPLAIN FLOODPLAIN CASCADES PARKWAY (AREA 2) SHEET 1 of 3 LEGEND PROPOSED 6' CONC. S/W PROPOSED 6' CONC. S/W - OPT. 2 PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL DATE: 03-14-2018 SCALE: 1" = 100' N VA. STATE GRID NORTH MATCHLINE - SEE SHEET 2 OF 3 (AREA 2)

RE PARK CLAUDE MOORE PARK CASCADES PARKWAY MATCHLINE - SEE SHEET 1 OF 3 (AREA 2) CASCADES PARKWAY (AREA 2) SHEET 2 of 3 LEGEND PROPOSED 6' CONC. S/W PROPOSED 6' CONC. S/W - OPT. 2 PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL DATE: 03-14-2018 SCALE: 1" = 100' N VA. STATE GRID NORTH CLAUDE MOORE PAR MATCHLINE - SEE SHEET 3 OF 3 (AREA 2)

MARIES ROAD OLD VESTALS GAP ROAD CLAUDE MOORE PARK MATCHLINE - SEE SHEET 2 OF 3 (AREA 2) CLAUDE MOORE PARK NOKES BLVD CASCADES PARKWAY (AREA 2) SHEET 3 of 3 LEGEND PROPOSED 6' CONC. S/W PROPOSED 6' CONC. S/W - OPT. 2 PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL DATE: 03-14-2018 SCALE: 1" = 100' N VA. STATE GRID NORTH POTOMAC VIEW ROAD

Loudoun County Department of Transportation and Capital Infrastructure Sterling Sidewalk Study Cascades Parkway Area #3 Preliminary Engineers Estimate 3/20/2018 Description Units Quantity Unit Price Total Cost MOBILIZATION LS 1 $ 15,000.00 $ 15,000.00 CONSTRUCTION SURVEYING (CONSTR.) LS 1 $ 5,000.00 $ 5,000.00 PERMITTING LS 1 $ 5,000.00 $ 5,000.00 EARTHWORK CLEARING (tree removal and MOT) LS 1 $ 5,000.00 $ 5,000.00 REGULAR EXCAVATION CY 690 $ 5.00 $ 3,450.00 COMPACTED FILL CY 50 $ 7.00 $ 350.00 CULVERT MINOR STR. EXCAV. BOX CULVERT CY 0 $ 25.00 $ - CULVERT EXTENSIONS LF 0 $ 300.00 $ - WINGWALL - CULVERT EA 0 $ 3,000.00 $ - SIDEWALK AGGR. MATL. NO. 21A - 4" SY 3100 $ 12.00 $ 37,200.00 HYDR. CEMENT CONC. SIDEWALK 4" SY 2315 $ 60.00 $ 138,900.00 ASPHALT TRAIL - 10' SY 0 $ 27.00 $ - HANDICAP RAMPS (CG-12) W/TRUNCATED DOMES EA 4 $ 4,000.00 $ 16,000.00 COMMERCIAL ENTRANCE SY 43 $ 60.00 $ 2,580.00 PRIVATE ENTRANCE SY 35 $ 55.00 $ 1,925.00 PROP. GUARDRAIL LF 0 $ 20.00 $ - REMOVAL OF EX. SIDEWALK AND ENTRANCE SY 0 $ 20.00 $ - MAINT. OF TRAFFIC CONTROL LS 1 $ 20,000.00 $ 20,000.00 DEMO. OF PAVEMENT (FLEXIBLE) SY 0.00 $ 7.50 $ - REMOVE EXIST. GUARDRAIL LF 0.00 $ 8.00 $ - RETAINING WALL SF 0.00 $ 50.00 $ - INLET PROTECTION, TYPE A EA 15 $ 300.00 $ 4,500.00 TEMP. SILT FENCE LF 7000 $ 5.00 $ 35,000.00 REINFORCED SILT FENCE (SSF) LF 0 $ 15.00 $ - CONSTRUCTION ENTRANCE EA 2 $ 4,000.00 $ 8,000.00 HAND RAILING LF 0 $ 20.00 $ - FENCING LF 300 $ 30.00 $ 9,000.00 MISC. ITEMS WETLAND/STREAM MITIGATION LS 0 $ 10,000.00 $ - NUTRIENT CREDITS LBS 0 $ 25,000.00 $ - UTILITY ADJUSTMENTS (HAND HOLES) LS 1 $5,000.00 $ 5,000.00 UTILITY RELOCATION (POLE) LS 0 $0.00 $ - SIGNAL MODIFICATION - PED HEADS EA 0 $140,000.00 $ - 0 $ - $ - Subtotal $ 311,905.00 CI&A (18%) $ 56,142.90 Contingency 25% = $ 77,976.25 Total Construction Estimate = $ 446,024.15 Est. Design Fees (25% Construction) $ 111,506.04 Total Estimate R/W Costs $ - Total Estimated Project Cost $ 557,530.19 Estimated Right of Way and Easement Impacts Area #2-1 Right of Way Easements $/SF $ 13.50 $ 13.50 Impacts (SF) 0 0 Total * $ - $ - * - includes plats and recordation Page 1 of 1

Loudoun County Department of Transportation and Capital Infrastructure Sterling Sidewalk Study Cascades Parkway Option 2 Area #3 Preliminary Engineers Estimate 3/20/2018 Description Units Quantity Unit Price Total Cost MOBILIZATION LS 1 $ 15,000.00 $ 15,000.00 CONSTRUCTION SURVEYING (CONSTR.) LS 1 $ 5,000.00 $ 5,000.00 PERMITTING LS 1 $ 5,000.00 $ 5,000.00 EARTHWORK CLEARING (tree removal and MOT) LS 1 $ 5,000.00 $ 5,000.00 REGULAR EXCAVATION CY 190 $ 5.00 $ 950.00 COMPACTED FILL CY 30 $ 7.00 $ 210.00 CULVERT MINOR STR. EXCAV. BOX CULVERT CY 0 $ 25.00 $ - CULVERT EXTENSIONS LF 0 $ 300.00 $ - WINGWALL - CULVERT EA 0 $ 3,000.00 $ - SIDEWALK AGGR. MATL. NO. 21A - 4" SY 1350 $ 12.00 $ 16,200.00 HYDR. CEMENT CONC. SIDEWALK 4" SY 1150 $ 60.00 $ 69,000.00 ASPHALT TRAIL - 10' SY 0 $ 27.00 $ - HANDICAP RAMPS (CG-12) W/TRUNCATED DOMES EA 15 $ 4,000.00 $ 60,000.00 COMMERCIAL ENTRANCE SY 0 $ 60.00 $ - PRIVATE ENTRANCE SY 72 $ 55.00 $ 3,960.00 PROP. GUARDRAIL LF 0 $ 20.00 $ - REMOVAL OF EX. SIDEWALK AND ENTRANCE SY 72 $ 20.00 $ 1,440.00 MAINT. OF TRAFFIC CONTROL LS 1 $ 30,000.00 $ 30,000.00 DEMO. OF PAVEMENT (FLEXIBLE) SY 0.00 $ 7.50 $ - REMOVE EXIST. GUARDRAIL LF 0.00 $ 8.00 $ - RETAINING WALL SF 0.00 $ 50.00 $ - INLET PROTECTION, TYPE A EA 6 $ 300.00 $ 1,800.00 TEMP. SILT FENCE LF 1800 $ 5.00 $ 9,000.00 REINFORCED SILT FENCE (SSF) LF 0 $ 15.00 $ - CONSTRUCTION ENTRANCE EA 1 $ 4,000.00 $ 4,000.00 HAND RAILING LF 0 $ 20.00 $ - FENCING LF 0 $ 30.00 $ - MISC. ITEMS WETLAND/STREAM MITIGATION LS 0 $ 10,000.00 $ - NUTRIENT CREDITS LBS 0 $ 25,000.00 $ - UTILITY ADJUSTMENTS (HAND HOLES) LS 1 $8,000.00 $ 8,000.00 UTILITY RELOCATION (POLE) LS 0 $0.00 $ - SIGNAL MODIFICATION - PED HEADS EA 0 $140,000.00 $ - 0 $ - $ - Subtotal $ 234,560.00 CI&A (18%) $ 42,220.80 Contingency 25% = $ 58,640.00 Total Construction Estimate = $ 335,420.80 Est. Design Fees (25% Construction) $ 83,855.20 Total Estimate R/W Costs $ 82,350.00 Total Estimated Project Cost $ 501,626.00 Estimated Right of Way and Easement Impacts Area #2-2 Right of Way Easements $/SF $ 13.50 $ 13.50 Impacts (SF) 5790 310 Total * $ 78,165.00 $ 4,185.00 * - includes plats and recordation Page 1 of 1

Appendix 3 Area 3 Potomac View Road P a g e 33

CASCADES PARKWAY CLAUDE MOORE PARK POTOMAC VIEW RD NOKES BLVD PEDESTRIAN SIGNAL CASCADES PARKWAY N DATE: 03-14-2018 SCALE: 1" = 100' VA. STATE GRID NORTH POTOMAC VIEW ROAD (AREA 3) SHEET 1 of 3 LEGEND PROPOSED 6' CONC. S/W PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL MATCHLINE - SEE SHEET 2 OF 3 (AREA 3)

MULTI-USE TRAIL MATCHLINE - SEE SHEET 1 OF 3 (AREA 3) CLAUDE MOORE PARK POTOMAC VIEW RD LEGEND PROPOSED 6' CONC. S/W PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL N DATE: 03-14-2018 SCALE: 1" = 100' VA. STATE GRID NORTH POTOMAC VIEW ROAD (AREA 3) SHEET 2 of 3 MATCHLINE - SEE SHEET 3 OF 3 (AREA 3)

MULTI-USE TRAIL MATCHLINE - SEE SHEET 2 OF 3 (AREA 3) MULTI-USE TRAIL POTOMAC VIEW RD LEGEND PROPOSED 6' CONC. S/W PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL N DATE: 03-14-2018 SCALE: 1" = 100' VA. STATE GRID NORTH POTOMAC VIEW ROAD (AREA 3) SHEET 3 of 3 EX. CONC. SIDEWALK EX. CONC. SIDEWALK

Loudoun County Department of Transportation and Capital Infrastructure Sterling Sidewalk Study Potomac View Area #4 Preliminary Engineers Estimate 3/20/2018 Description Units Quantity Unit Price Total Cost MOBILIZATION LS 1 $ 25,000.00 $ 25,000.00 CONSTRUCTION SURVEYING (CONSTR.) LS 1 $ 12,500.00 $ 12,500.00 PERMITTING LS 1 $ 7,500.00 $ 7,500.00 EARTHWORK CLEARING (tree removal and MOT) LS 1 $ 20,000.00 $ 20,000.00 REGULAR EXCAVATION CY 1600 $ 5.00 $ 8,000.00 COMPACTED FILL CY 500 $ 7.00 $ 3,500.00 CULVERT MINOR STR. EXCAV. BOX CULVERT CY 0 $ 25.00 $ - CULVERT EXTENSIONS LF 0 $ 300.00 $ - WINGWALL - CULVERT EA 0 $ 3,000.00 $ - SIDEWALK AGGR. MATL. NO. 21A - 4" SY 3875 $ 12.00 $ 46,500.00 HYDR. CEMENT CONC. SIDEWALK 4" (APPROX. 2,100') SY 1400 $ 60.00 $ 84,000.00 ASPHALT TRAIL - 10' (APPROX. 1,550') SY 1550 $ 27.00 $ 41,850.00 HANDICAP RAMPS (CG-12) W/TRUNCATED DOMES EA 3 $ 4,000.00 $ 12,000.00 COMMERCIAL ENTRANCE SY 80 $ 60.00 $ 4,800.00 PRIVATE ENTRANCE SY 100 $ 55.00 $ 5,500.00 PROP. GUARDRAIL LF 0 $ 20.00 $ - REMOVAL OF EX. SIDEWALK AND ENTRANCE LF 2005 $ 22.00 $ 44,110.00 MAINT. OF TRAFFIC CONTROL EA 5 $ 6,000.00 $ 30,000.00 DEMO. OF PAVEMENT (FLEXIBLE) LF 1400 $ 100.00 $ 140,000.00 REMOVAL OF EX. SIDEWALK AND ENTRANCE SY 0 $ 20.00 $ - MAINT. OF TRAFFIC CONTROL (25 DAYS) LS 1 $ 96,000.00 $ 96,000.00 DEMO. OF PAVEMENT (FLEXABLE) SY 0.00 $ 7.50 $ - REMOVE EXIST. GUARDRAIL LF 0.00 $ 8.00 $ - RETAINING WALL SF 0.00 $ 50.00 $ - INLET PROTECTION, TYPE A EA 6 $ 300.00 $ 1,800.00 TEMP. SILT FENCE LF 4930 $ 5.00 $ 24,650.00 REINFORCED SILT FENCE (SSF) LF 2466 $ 15.00 $ 36,990.00 CONSTRUCTION ENTRANCE EA 3 $ 4,000.00 $ 12,000.00 HAND RAILING LF 0 $ 20.00 $ - FENCING LF 0 $ 30.00 $ - MISC. ITEMS WETLAND/STREAM MITIGATION LS 0 $ 10,000.00 $ - NUTRIENT CREDITS LBS 0 $ 25,000.00 $ - UTILITY ADJUSTMENTS (HAND HOLES) LS 1 $5,000.00 $ 5,000.00 UTILITY RELOCATION (POLE) LS 0 $0.00 $ - SIGNAL MODIFICATION - PED HEADS (CASCADES PARKWAY) Including Crosswalk and Signage EA 1 $150,000.00 $ 150,000.00 0 $ - $ - Subtotal $ 811,700.00 CI&A (18%) $ 146,106.00 Contingency 25% = $ 202,925.00 Total Construction Estimate = $ 1,160,731.00 Est. Design Fees (30% Construction) $ 348,219.30 Total Estimate R/W Costs $ 262,710.00 Total Estimated Project Cost $ 1,771,660.30 Estimated Right of Way and Easement Impacts Area #3 Right of Way Easements $/SF $ 13.50 $ 13.50 Impacts (SF) 2660 16800 Total * $ 35,910.00 $ 226,800.00 * - includes plats and recordation Page 1 of 1

P a g e 38 Appendix 4 Area 4 Park View High School and Sterling Elementary School

SCOUT TRAIL CLAUDE MOORE RECREATION CENTER BUS STORAGE LOT N VA. STATE GRID NORTH N YORK RD PARK VIEW HIGH SCHOOL & STERLING ELEMENTARY SCHOOL (AREA 4) LEGEND PROPOSED 6' CONC. S/W PROPOSED 10' ASPHALT TRAIL PROPOSED R/W AND EASEMENTS PROPOSED WALL DATE: 03-14-2018 SCALE: 1" = 100' SCHOOL STERLING ELEMENTARY EX. CONC. SIDEWALK SCHOOL ENTRANCE HIGH SCHOOL PARK VIEW EX. ASPHALT TRAIL N YORK ROAD EX. CONC. SIDEWALK

Loudoun County Department of Transportation and Capital Infrastructure Sterling Sidewalk Study Park View HS Area #5 Preliminary Engineers Estimate 3/20/2018 Description Units Quantity Unit Price Total Cost MOBILIZATION LS 1 $ 10,000.00 $ 10,000.00 CONSTRUCTION SURVEYING (CONSTR.) LS 1 $ 6,000.00 $ 6,000.00 PERMITTING LS 1 $ 3,000.00 $ 3,000.00 EARTHWORK CLEARING (tree removal and MOT) LS 1 $ 15,000.00 $ 15,000.00 REGULAR EXCAVATION CY 50 $ 5.00 $ 250.00 COMPACTED FILL CY 0 $ 7.00 $ - CULVERT MINOR STR. EXCAV. BOX CULVERT CY 0 $ 25.00 $ - CULVERT EXTENSIONS LF 0 $ 300.00 $ - WINGWALL - CULVERT EA 0 $ 3,000.00 $ - SIDEWALK AGGR. MATL. NO. 21A - 4" SY 1525 $ 12.00 $ 18,300.00 HYDR. CEMENT CONC. SIDEWALK 4" (APPROX. 10') SY 140 $ 60.00 $ 8,400.00 ASPHALT TRAIL - 10' (APPROX. 1,250') SY 1170 $ 27.00 $ 31,590.00 HANDICAP RAMPS (CG-12) W/TRUNCATED DOMES EA 4 $ 4,000.00 $ 16,000.00 COMMERCIAL ENTRANCE SY 0 $ 60.00 $ - PRIVATE ENTRANCE SY 0 $ 55.00 $ - PROP. DRAINAGE PIPE LF 22 $ 150.00 $ 3,300.00 PROP. ENDWALL EA 2 $ 1,500.00 $ 3,000.00 MAINT. OF TRAFFIC CONTROL EA 0 $ 6,000.00 $ - DEMO. OF PAVEMENT (FLEXIBLE) LF 0 $ 100.00 $ - REMOVAL OF EX. SIDEWALK AND ENTRANCE SY 0 $ 20.00 $ - MAINT. OF TRAFFIC CONTROL (3 DAYS) LS 1 $ 1,500.00 $ 1,500.00 DEMO. OF PAVEMENT (FLEXABLE) SY 0.00 $ 7.50 $ - REMOVE EXIST. GUARDRAIL LF 0.00 $ 8.00 $ - RETAINING WALL SF 0.00 $ 50.00 $ - INLET PROTECTION, TYPE A EA 4 $ 300.00 $ 1,200.00 TEMP. SILT FENCE LF 2500 $ 5.00 $ 12,500.00 REINFORCED SILT FENCE (SSF) LF 0 $ 15.00 $ - CONSTRUCTION ENTRANCE EA 0 $ 4,000.00 $ - HAND RAILING LF 0 $ 20.00 $ - FENCING LF 825 $ 30.00 $ 24,750.00 MISC. ITEMS WETLAND/STREAM MITIGATION LS 0 $ 10,000.00 $ - NUTRIENT CREDITS LBS 0 $ 25,000.00 $ - UTILITY ADJUSTMENTS (HAND HOLES) LS 0 $5,000.00 $ - UTILITY RELOCATION (POLE) LS 0 $0.00 $ - SIGNAL MODIFICATION - PED HEADS EA 0 $150,000.00 $ - 0 $ - $ - Subtotal $ 154,790.00 CI&A (18%) $ 27,862.20 Contingency 25% = $ 38,697.50 Total Construction Estimate = $ 221,349.70 Est. Design Fees (25% Construction) $ 55,337.43 Total Estimate R/W Costs $ - Total Estimated Project Cost $ 276,687.13 Estimated Right of Way and Easement Impacts Area #4 Right of Way Easements $/SF $ 13.50 $ 13.50 Impacts (SF) Total * $ - $ - * - includes plats and recordation Page 1 of 1