James N Thorp Elementary School

Similar documents
Health Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17)

MAINTENANCE CATAGORIES. Visual inspection, cleaning. Repair large scale cracks or settling, major repairs/ replacement. Hire Structural Engineer.

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

East Allen County Schools Facilities History Calendar Years October 5, 2015

METAL STUDS. TOTAL COST (Labor+ Material) UNIT COST (Labor+ Material) ITEM # DESCRIPTION QUANTITY UNIT TRADE COST GENERAL REQUIREMENTS

Watauga County Schools Capital Improvement Plan 2015

Roof and Wall Specialties and Accessories

78' 1" 56' 6" 07-A1.1-SITE (30% of Scale); Ebbert; Projects 10 v1.0; 3/24/ :41 PM

MSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS

TABLE II Electrical Permit Fees

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia

BUILDING PERMIT FEES BUILDING VALUATION DATA

CRDM Projects Approved

New RepairBase Line Item additions for the Update

GREAT NECK UNION FREE SCHOOL DISTRICT

CODE ANALYSIS BUILDING AREA STORIES 2 BUILDING HEIGHT 25'

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.

PRICED BILL OF QUANTITIES Package : Air conditionning. Manhours (h) Unit (tariff) Discount Total Unit. Total. Material cost

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

BISCAYNE POINT ROW IMPROVEMENTS

BUILDING PERMIT FEES

METRO Magnolia Transit Center - Bid Tab

B E C K E R & F R O N D O R F Construction Cost Consulting Project Management

FACILITIES NEEDS ASSESSMENT - FACILITY MASTER PLAN CONSTRUCTION COST ESTIMATE FULLERTON JOINT UNION HIGH SCHOOL DISTRICT

BUILDING MAINTENANCE WORKER/DRIVER

Shelter: Primary Shelter Secondary Shelter Respite Site Only Client Service Center Pet Shelter

Committee Approved Critical Repairs

Building Integrity Property Services

Creating An Accessible World ELVORON CPL.

Sub - contractor Equip. $ UNIT PRICE TOTAL MAT. Unit $

Accessible Routes. Chapter 1. Accessible Routes & Clearances. General Notes

355,100 Sq. Ft. Manufacturing/Warehouse Facility

MAINTENANCE WORKER I/II/III

Public Health Services San Joaquin Co.

REAR +/- 94' 20' 10' 10'-4" 9'-6" 10'-3" 10' 20' 13'-2" Private Office 25. Private Office 23 Private Office 24 7'-1" Open Space 3 14'-7"

ADA Entrance Accessibility

Inspection Points - Motor Homes

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016

Chapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS

(Signed original copy on file)

Home Maintenance Schedule

KITCHEN HOOD SCHEDULE. Owensboro Senior Living MAKE-UP AIR UNIT SCHEDULE PACKAGED TERMINAL AIR CONDITIONING UNIT SCHEDULE

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls

Expedition vehicle UM 8-FH-AS / Unimog 4x4

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

Fair Park - Capital Needs Inventory

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE MARKHAM CAMPUS MARKHAM, ONTARIO

Steese Rd - Curb & Sidewalk Improvement

Chapter 5. General Site and Building Elements

Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL

New RepairBase Line Item additions for the Update

RIVERSIDE 300 RIVERSIDE DR. AUSTIN, TEXAS REVISION TABLE OF CONTENTS WIFI/ FITNESS DECORATIVE LIGHTING PLAN

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Small Business Program October 3, 2012

REPORT. YCC Homewood Avenue, Toronto, ON. of a Class 2 Reserve Fund Study of the Highrise Development Parking Garage at

FOR SALE. Former Husqvarna Outdoor Products Manufacturing / Distribution Facility 240,670± Total SF - Three (3) Buildings - 16.

Temporary Sales Trailer Application

Appendix C. Cost Estimates

ACCESSIBLE COMMUNITY BUILDER CHECKLIST

Above Ground Oil Tanks

COST ESTIMATES: Curb-Running

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

Chapter CALIFORNIA GREEN BUILDING STANDARDS CODE. Palo Alto Municipal Code

FOR SALE OR LEASE EBERHARDT & BARRY INC.

Powered Industrial Trucks

Greenbush School Maintenance Calendar

UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP PRIMARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

ADA Checklist RESTAURANTS AND CAFETERIAS

FUME HOOD SELECTION GUIDE

PARKING STANDARDS GENERAL DESIGN PRINCIPLES AND INTENT

PRODUCED BY AN AUTODESK STUDENT PRODUCT. View Name. Ref. Breakheart Project

CATERPILLAR 3516B DP2 System

THE CARMONY BUILDING ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED ELECTRICAL SYMBOLS AND ABBREVIATIONS

For Sale Exceptional Manufacturing & Office Facility Gasoline Alley Business Park

RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST

BERLIN MEADOWS. Faris Planning & Design SOUTH LANDSCAPE PLAN EXHIBIT D-1 PLANT KEY TYPICALS SEE PLANT LIST FOR SPECIFIC PLANT SPECIES

CLOVER ESTATES - CHESTERFIELD, MI

PUBLIC NOTICE. Borough of Tenafly ORDINANCE NO

Appendix G Aquilla Lake Pool Rise Recreational Resources

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

The Moscone Center Facility Accessibility Information

5073 Silver Peak Ave. Dacono, Colorado XV-LT #104

"SPOAU" DEDICATED 100% OUTSIDE AIR UNITS Self Contained Single Package or Split System Units

SECTION VII METERING INSTALLATIONS

Guideline for Square Footage Requirements for Educational Facilities (a) 4. Educational Facility Site, Construction, and Reimbursement

2016 FACILITIES IMPROVEMENT PLAN

Elvoron CPL. Planning Guide

Carpenter Home Inspections LLC

CHAPTER V RESIDENTIAL WIRING

AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT. WORK IN PROGRESS September 2010

SDH QUALITY ASSURANCE WALK -NEW

KVR Capture Jet. KVR- Capture Jet Round Island Hood with Perimeter Jets. Round Island Hood with Perimeter Jets

Group Class Code Listing

Architect s Guide for Detailing & Specifying Access Floor Air Plenums

ELASTRIX LLC 95,591 + /- Square Feet on /- acres Pilot Mountain, North Carolina

January, 2014 Page 1 of 6

Annexure-1. Annexure- 1 TECHNICAL SPECIFICATIONS FOR THE MODULAR LABORATORY FURNITURE (CNSNT/RL-4)

STANDARD DRAWING INDEX

Fee Schedule for Whitehall Township

City Hall New Induction and LED Lighting

PROJECT DATA PROJECT ADDRESS: OWNER:

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy Fabric Canopy 1 2 3 4 5 6 7 GRE 7 200 GRE 7 200 200 SF 200 SF CHIMNEY Brick Chimney - Concrete/ Mortar Liner 1 2 3 4 5 6 44 7 144 LF $72,072 $72,072 Assessment Date: 2/19/2013 Page 1 of 20

CORNICE Cornice - Masonry Projecting/Limestone Cornice - Terra Cotta 1 2 3 4 5 BLU 5 1,680 ORA 2 26 6 7 1,680 LF $340,108 26 LF $15,950 $356,058 DOORS Exterior Steel Door Overhead Rolling / Garage Door Store Front Door Transom Lite 1 2 3 4 5 6 YEL 4 4 19 6 YEL 4 1 1 7 2 5 29 EA $77,958 1 EA $10,269 11 EA $5,710 27 EA $6,229 $100,165 ENTRANCE Concrete Exterior Stairs Entrance Controls - Audio and Video Ramp Handrails Stair Handrails Steel or Aluminum Stairs Stone Stairs 1 2 3 4 5 6 70 GRE 6 40 7 GRE 6 52 34 GRE 7 60 YEL 4 250 270 LF $28,958 1 EA $1,430 40 LF 86 LF 60 LF 250 LF $214,500 $244,888 FIRE ESCAPE Fire Escapes 1 2 3 4 5 6 7 5 6 LF $102 $102 FOUNDATION Concrete Foundation 1 2 3 4 5 6 7 40 1,725 1,865 LF $62,498 Assessment Date: 2/19/2013 Page 2 of 20

Masonry Foundation GRE 7 550 550 SF $62,498 LIGHTING Exterior Lights - Parapet or Roof Mounted LINTELS 1 2 3 4 5 6 GRE 6 30 7 30 EA $15,015 $15,015 Lintels - Brick Lintels - Steel Lintels - Stone 1 2 3 4 5 6 7 0 240 GRE 6 52 345 60 GRE 7 245 260 LF $8,305 457 LF $35,704 245 LF $44,010 PARAPET Coping - Metal Coping - Stone Coping - Terra Cotta Parapet < 16" Height Parapet 16" to 30" Height 1 2 3 4 5 6 7 GRE 6 50 930 5 1,310 BLU 5 26 530 GRE 6 912 95 6 45 40 1,565 980 LF $4,247 1,335 LF $6,607 556 LF $101,608 1,007 LF $142,023 1,676 LF $403,522 $658,007 ROOF SYSTEM Exterior Downspouts Interior Downspouts Modified Bitumen Roof Roof Structure: Concrete Roof Structure: Heavy Timber 1 2 3 4 5 6 7 GRE 7 228 20 192 BLU 5 23,200 14,400 GRE 7 43,000 GRE 7 12,400 228 LF 312 LF $12,870 37,600 SF $649,334 43,000 SF 12,400 SF $662,204 Assessment Date: 2/19/2013 Page 3 of 20

SUPERSTRUCTURE Concrete Heavy Timber 1 2 3 4 5 6 7 GRE 7 92,150 GRE 7 42,350 92,150 SF 42,350 SF WALLS Brick Prefabricated Metal Panel Wall Stone - Cut 1 2 3 4 5 6 GRE 6 50 53,500 7 GRE 7 550 GRE 6 8,548 53,550 SF $357,228 550 SF 8,548 SF $122,236 $479,465 WINDOWS Curtain wall - Insulated panel Curtain wall - Windows Window - Guards perforated Window - Guards wire guard Windows - Decorative Windows - Sash Aluminum Double-pane EXTERIOR 1 2 3 4 5 6,900 BLU 5 5,600 7,200 1,600 YEL 4 350 GRE 7 50 GRE 6 4,000 5,100 3,000 2,900 SF $27,370 5,600 SF $369,970 2,800 SF $30,270 350 SF $26,757 50 SF 12,100 SF $181,896 $636,263 $3,330,747 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms 1 2 3 4 5 6 7 4 GRE 6 5,777 YEL 4 16,500 GRE 6 5,035 5 EA $1,430 5,777 SF $7,848 16,500 SF $50,729 5,035 SF $2,664 Assessment Date: 2/19/2013 Page 4 of 20

Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Emergency generator 100 to 150 KW natural gas - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection GRE 6 664 3,349 6 GRE 6 3 GRE 6 3 0 GRE 6 31 GRE 6 5 34,500 34,500 4,013 SF $3,811 16 EA $1,716 3 EA $322 3 EA $322 1 EA $13,299 10 EA $2,331 31 EA $7,226 5 EA $1,165 2 EA $2,860 134,500 SF $80,781 134,500 SF $125,018 $301,521 MAIN SERVICE Main Electrical service 1200 A 120/208/3PH Main Electrical service 2000 A 120/208/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels less than 400 amp ELECTRICAL FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller 1 2 3 4 5 6 1 2 3 4 5 6 GRE 6 6 25 1 2 3 4 5 6 34,500 GRE 6 91,350 7 7 7 1 EA $7,150 1 EA $12,155 $19,305 31 EA $50,479 1 EA $1,216 $51,695 $372,520 134,500 SF $48,084 91,350 SF $111,036 1 EA $2,145 Assessment Date: 2/19/2013 Page 5 of 20

$161,265 PUMP ROOM ASSEMBLY 1 2 3 4 5 6 7 Fire Pump less than 25hp BLU 5 1 1 EA $12,441 $12,441 SPRINKLER SYSTEM Combination Wet and Dry Sprinkler System Sprinkler Heads FIRE PROTECTION MECHANICAL AIR CONDITIONING Window A/C AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Steam 4,000 to 8,000 cfm Air Intake - Built Up Air Handling Air intake for all Air Handling s except built up AHU Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Multi Zone Double Delivery Built Up Air Handling - Hot Water or Dual Temperature Water 15,000 to 30,000 cfm Multi Zone Double Delivery Built Up Air Handling Auxiliaries - Hot Water or Dual Temperature Water 15,000 to 30,000 cfm Reheat Boxes With Steam Coils Return Duct Work - Indoor - Vertical Shaft and Ducts 1 2 3 4 5 6 GRE 6 42,350 GRE 6 42,350 1 2 3 4 5 6 GRE 6 3 11 1 2 3 4 5 6 GRE 6 5 GRE 6 7 GRE 6 400 7 7 7 42,350 SF $30,280 42,350 SF $2,422 $32,703 $206,408 14 EA $8,795 $8,795 1 EA $5,005 5 EA $7,150 1 EA $1,430 1 EA $11,297 1 EA $2,860 1 EA $12,298 1 EA $4,719 7 EA $7,307 400 LF $25,168 Assessment Date: 2/19/2013 Page 6 of 20

Return Fans - Outdoor 5,000 to 10,000 CFM Return Fans - Outdoor greater than 20,000 CFM Return Fans - Outdoor l0,001 to 20,000 CFM Single Zone Built Up Air Handling - Steam 4,000 to 8,000 cfm Single Zone Built Up Air Handling Auxiliaries - Steam 4,000 to 8,000 cfm 2 EA $10,010 1 EA $4,290 1 EA $3,289 2 EA $10,010 2 EA $4,290 $109,123 BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 101-150 HP Boiler Auxiliary - Steam Boiler 101-150 HP Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Glycol Feed System HEAT EXCHANGERS 1 2 3 4 5 6 7 2 EA $29,458 2 EA $4,576 1 EA $2,145 2 EA $601 2 EA $572 1 EA $8,437 1 EA $1,087 $46,875 Heat Exchanger - Steam to Hot Water Shell Type 1 2 3 4 5 6 7 GRE 7 1 1 EA HEATING DEVICES Cabinet Heaters With Electric Coils Fin Tube Electric Fin Tube Hot Water Radiators - Steam Heater - Hot Water Wall Heater - Electric 1 2 3 4 5 6 20 BLU 5 16 68 BLU 5 17 9 BLU 5 6 4 7 2 EA $1,001 120 LF $1,716 84 LF $8,580 17 EA $11,183 11 EA $27,170 10 EA $6,589 $56,239 Assessment Date: 2/19/2013 Page 7 of 20

MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Hot Water 11 to 20 HP Pumps - Hot Water less than 5 HP Pumps - Vacuum 1 2 3 4 5 6,000 GRE 6 500,000 BLU 5 1 7 1 EA $715 1,000 LF $6,864 500 LF $4,433 1,000 LF $8,866 2 EA $5,148 1 EA $1,430 1 EA $14,300 $41,756 TEMPERATURE CONTROL Direct Digital Control (DDC) System Pneumatic System Thermostats - Direct Digital Control (DDC) Thermostats - Pneumatic Zone Dampers UNIT VENTILATION 1 2 3 4 5 6 GRE 6 85,500 BLU 5 49,000 GRE 6 37 GRE 6 33 GRE 6 45 7 85,500 SF $85,586 49,000 SF $210,210 37 EA $5,291 33 EA $4,719 45 EA $6,435 $312,241 1 2 3 4 5 6 7 Ventilators - Steam BLU 5 34 34 EA $267,410 $267,410 VENTILATION Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts 1 2 3 4 5 6 GRE 6 3 6 6 ORA 3 1 7 3 EA $1,287 7 EA $3,661 7 EA $2,517 1 EA $26,884 $34,349 Assessment Date: 2/19/2013 Page 8 of 20

MECHANICAL $876,787 PLUMBING HOT WATER Hot Water Heater - Gas 150,000-300,000 BTU/HR Hot Water Heater - Gas less than 150,000 BTU/HR PIPING 1 2 3 4 5 6 7 2 EA $8,294 1 EA $3,575 $11,869 1 2 3 4 5 6 7 Domestic Piping - Cold Water from Risers to Fixtures 134,500 SF $23,080 Domestic Piping - Cold Water Risers 134,500 SF $44,237 Domestic Piping - Hot Water from Riser to fixtures 134,500 SF $153,868 Domestic Piping - Hot Water Return Risers 134,500 SF $28,850 Domestic Piping - Hot Water Risers 134,500 SF $34,620 Domestic Piping Cold Water Horizontal lines 134,500 SF $119,248 Domestic Piping Hot Water Horizontal lines 134,500 SF $71,164 Domestic Piping Hot Water Return Lines 134,500 SF $73,087 Sanitary Piping 134,500 SF $82,704 Storm Piping 134,500 SF $63,471 Vent Piping 134,500 SF $48,084 $742,413 PUMPS Domestic Booster Pump duplex Sump Pump PLUMBING 1 2 3 4 5 6 GRE 6 3 7 1 EA $3,146 3 EA $4,076 $7,222 $761,504 Assessment Date: 2/19/2013 Page 9 of 20

INTERIOR ADMINISTRATIVE SUITES Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Tile/Sheet Flooring - Wood Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall 1 2 3 4 5 6 7 GRE 6 715 1,961 638 GRE 6 811 715 GRE 6 790 640 GRE 6 358 YEL 4 3 YEL 4 39 GRE 7 1,475 GRE 6 3,782 3,314 SF $9,601 1,526 SF $1,160 1,430 SF $1,130 358 SF $2,703 3 SF $14 39 SF $257 1,475 SF 3,782 SF $8,924 $23,788 AUDITORIUM - DEDICATED Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System 1 2 3 4 5 6 3 171 BLU 5 385 7 GRE 7 1 GRE 7 5 184 EA $11,592 385 EA $46,764 1 EA 5 EA 1 EA $114,400 $172,756 DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door Transom Window 1 2 3 4 5 6 7 GRE 6 3 32 53 GRE 6 7 33 93 6 YEL 4 80 GRE 7 11 GRE 6 740 88 EA $10,476 139 EA $64,367 80 SF $5,720 11 EA 740 SF $13,757 $94,320 Assessment Date: 2/19/2013 Page 10 of 20

DRINKING FOUNTAINS Single Fountain 1 2 3 4 5 6 7 GRE 7 12 12 EA GYMNASIUM / AUDITORIUM Ceiling - Plaster/Drywall Flooring - Wood Lighting - Metal Halide/Sodium Vapor Walls - Concrete Block Walls - Plaster/Drywall KITCHEN 1 2 3 4 5 BLU 5 2,855 6,855 2,657 BLU 5 2,100 7 2,855 SF $28,579 2,855 SF $21,556 12 EA $2,145 1,657 SF $14,217 2,100 SF $30,030 $96,527 Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Lay-In Wall - Concrete Block Wall - Structural Glazed Tile 1 2 3 4 5 6 GRE 6 538 GRE 6 538 YEL 4 9 7 GRE 7 510 GRE 7 150 538 SF $2,031 538 SF $769 9 SF $42 510 SF 150 SF $2,842 LIBRARY Casework Flooring Carpet Lighting - Pendant/ Surface 1 2 3 4 5 6 7 GRE 7 90 GRE 7 1,092 YEL 4 20 90 LF 1,092 SF 20 SF $132 $132 Assessment Date: 2/19/2013 Page 11 of 20

LOCKER/SHOWER ROOM Lockers 1 2 3 4 5 6 GRE 6 8 7 8 EA $393 $393 LUNCHROOM Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Serving Line Wall - Concrete Block Wall - Plaster/Drywall 1 2 3 4 5 6,180 7 GRE 7 2,180 GRE 7 26 GRE 7 30 GRE 6 660 GRE 6 320 2,180 SF $6,172 2,180 SF 26 SF 30 LF 660 SF $1,888 320 SF $755 $8,815 MDF/IDF Finishes Ventilation and Cooling 1 2 3 4 5 6 7 37 60 1 197 SF $466 2 EA $1,401 $1,868 MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room 1 2 3 4 5 6 BLU 5 2,520 2,006 7 1 1 BLU 5 11,696 7,150 39,562 1,303 4,526 SF $38,007 3 SF $16 18,885 SF $166,205 2,865 SF $7,371 $211,599 STAFF RESTROOM Accessories 1 2 3 4 5 6 7 GRE 6 764 1,641 2,405 SF $5,900 Assessment Date: 2/19/2013 Page 12 of 20

Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet 92 2,113 1,768 GRE 7 14 GRE 6 96 GRE 6 420 1,955 GRE 6 36 120 96 GRE 7 10 49 YEL 4 8 1 9 4 29 YEL 4 4 GRE 6 4 41 GRE 7 33 68 1,401 GRE 6 4,017 1,223,118 4,700 GRE 7 213 1 52 4,073 SF $7,070 14 EA 96 SF $453 2,375 SF $1,069 252 SF $375 10 EA 50 EA $1,859 9 SF $29 52 SF $84 4 EA $1,287 45 EA $717 33 EA 1,669 SF $766 5,240 SF $9,478 5,818 SF $7,994 213 SF 54 EA $4,090 $41,172 THEATER Ceiling - Plaster/Drywall Flooring - Concrete Flooring - Tile/Sheet Lighting - Chandelier, Incandescent Lighting - Pendant/ Surface Lighting - Wall Mounted Stage 1 2 3 4 5 6 GRE 6 5,852,548 GRE 6 3,066 GRE 6 6 YEL 4 20 0 7 GRE 7 775 5,852 SF $50,043 1,548 SF $7,305 3,066 SF $4,384 6 EA $1,931 20 SF $150 10 EA $286 775 SF $64,099 VERTICAL CONVEYANCE 1 2 3 4 5 6 7 Elevator - Roped Holeless Hydraulic YEL 4 2 1 3 EA $434,148 Assessment Date: 2/19/2013 Page 13 of 20

Stage Lift 1 EA $3,737 $437,885 VOCATIONAL SHOP Work Sink INTERIOR 1 2 3 4 5 6 7 4 5 EA $3,861 $3,861 $1,160,057 ROOM ADMIN_FLOOR Administrative Office Floor ADMIN_WALL Administrative Office Walls CASEWORK 1 2 3 4 5 6 GRE 6 9 1 2 3 4 5 6,301 7 7 9 SF $13 $13 2,301 SF $5,429 $5,429 Casework 1 2 3 4 5 6 7 GRE 6 931 6 937 LF $33,283 $33,283 CEILING Plaster/Drywall 1 2 3 4 5 6 7 00 9,575 34,834 44,509 SF $27,677 $27,677 Assessment Date: 2/19/2013 Page 14 of 20

CHALK BOARD Chalk Board CORRIDORS 1 2 3 4 YEL 4 1,173 5 6 7 1,173 LF $142,578 $142,578 Asphalt Concrete Block Concrete Epoxy/Painted Drop/Lay-In Exposed Floors Lay-In Lighting Pendant/Surface Plaster/Drywall Single Water Cooler Stair Handrails Stairs Structural Glazed Tile Student Lockers Terrazzo Tile Ceramic/Porcelain Tile/Sheet Flooring Wall Mounted Walls 1 2 3 4 5 6 7 GRE 7 341 GRE 7 15,870 GRE 7 300 10 GRE 7 668,920 3,526 YEL 4 5 YEL 4 632 YEL 4 18,497 1,389 GRE 6 31,564 GRE 6 4 3 GRE 6 381 185 08 GRE 7 60 67 GRE 7 3,950 GRE 7 284 GRE 6 6,895 4,428 GRE 6 3 32 GRE 6 552 360 341 SF 15,870 SF 300 SF 210 SF $450 668 SF 6,446 SF $22,047 5 EA $30 632 EA $384,098 19,886 EA $179,865 31,564 SF $74,475 7 EA $12,298 566 LF 108 EA $772 60 SF 167 EA $23,881 3,950 SF 284 SF 11,323 SF $9,860 35 EA $23,938 912 SF $1,302 $733,018 CORRIDORS CEILING Plaster/Drywall 1 2 3 4 5 6 7 GRE 6 88 9,902 10,739 20,729 SF $28,535 Assessment Date: 2/19/2013 Page 15 of 20

$28,535 FLOOR Tile/Sheet Wood 1 2 3 4 5 6 7 GRE 6 3,253 25,676 GRE 6 358 15,222 28,929 SF $4,652 15,580 SF $2,703 $7,355 GYM_WALL Gymnasia Walls KITCHEN_WALL Kitchen Walls LIBRARY_CEILING 1 2 3 4 5 6,060 1 2 3 4 5 6 GRE 6 70 7 7 1,060 SF $9,095 $9,095 70 SF $178 $178 Plaster/Drywall 1 2 3 4 5 6 7 GRE 7 1,092 1,092 SF LIBRARY_WALL Plaster/Drywall,684 1,684 $3,973 LIGHTING 1 2 3 4 5 6 7 $3,973 Lighting Pendant/Surface 1 2 3 4 5 6 7 GRE 7 14 BLU 5 600 270 14 EA 870 EA $235,950 $235,950 Assessment Date: 2/19/2013 Page 16 of 20

LUNCH_WALL Lunchroom Walls 1 2 3 4 5 6 GRE 6 600 7 600 SF $1,716 $1,716 MARKER BOARD Marker Board 1 2 3 4 5 6 7 GRE 7 977 977 LF RESTROOM_WALL Restroom Walls STAIRS 1 2 3 4 5 6 GRE 6 702 7 702 SF $1,787 $1,787 Asphalt Terrazzo 1 2 3 4 5 BLU 5 96 6 7 8 193 96 SF $4,805 211 SF $204 $5,009 THEATER_FLOOR Auditorium Floor 1 2 3 4 5 6 7 GRE 7 388 388 SF THEATER_WALL Auditorium Walls 1 2 3 4 5 6 GRE 6 8,312 7 8,312 SF $17,235 $17,235 Assessment Date: 2/19/2013 Page 17 of 20

WALL Concrete Block Metal/Folding Panel Plaster/Drywall Wall ROOM 1 2 3 4 5 6 7 GRE 7 25,015 GRE 6 300 0 37,212 GRE 7 400 25,015 SF 300 SF $708 37,232 SF $87,896 400 SF $88,604 $1,341,435 SITE ATHLETIC Basketball - Asphalt 1 2 3 4 5 6 7 GRE 7 10,400 10,400 SF CIVIL/DRAINAGE Catch Basin Site Drain Site Manhole 1 2 3 4 5 6 7 9 YEL 4 2 9 10 EA $1,216 2 EA $2,231 10 EA $1,216 $4,662 FENCING Chain Link Ornamental Iron 1 2 3 4 5 6 7 BLU 5 300 90 0 1,900 390 LF $32,175 1,920 LF $3,775 $35,950 LANDSCAPE Asphalt Play Area/Hardscape 1 2 3 4 5 6 7,220 3,800 5,020 SF $10,468 Assessment Date: 2/19/2013 Page 18 of 20

Benches Grass Hardscape - Concrete Parkway trees Retaining Wall - Concrete BLU 5 2 GRE 6 54,738 BLU 5 3,700 5,500 GRE 7 41 00 1,840 2 EA $1,557 54,738 SF $21,917 9,200 SF $80,223 41 EA 2,040 SF $58,988 $173,152 PARKING LOT Asphalt Concrete Curbs Parking lot interior plantings Trash Enclosure 1 2 3 4 5 6 7,270 7 GRE 7 630 GRE 7 12 GRE 7 850 27,270 SF $23,398 630 LF 12 LF 850 SF $23,398 PLAYGROUND Playground Equipment - Combo 3-12 Playground Surfacing - Poured Surface 1 2 3 4 5 6 7 GRE 7 2,600 1 EA 2,600 SF SIDEWALKS Internal Walks Perimeter Sidewalks SIGNAGE 1 2 3 4 5 BLU 5 140 6 GRE 6 575 23,000 7 140 LF $4,360 23,575 SF $54,269 $58,629 Flag Pole Marquee - Building Mounted Back Lighted Marquee - Free Standing Back Lighted 1 2 3 4 5 6 7 GRE 7 1 GRE 7 2 1 EA 1 EA 2 EA Assessment Date: 2/19/2013 Page 19 of 20

SITE Campus Need ² ³ $295,791 $8,345,249 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 2/19/2013 Page 20 of 20