Exhibit R-2, RDT&E Budget Item Justification February 2004

Similar documents
UNCLASSIFIED. Total Prior to FY 2008 Cost. FY 2008 Cost. FY 2008 Award Date. Subtotal Product Development Continuing TBD TBD

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification February 2004

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

PE BB Cont. Cont. S400B, Predator MALET Cont. Cont.

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Aircraft Engine Component Improvement Program

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED CLASSIFICATION: EXHIBIT

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-135

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Integrated Surveillance System FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

CLASSIFICATION: UNCLASSIFIED. Exhibit P-40, BUDGET ITEM JUSTIFICATION CLASSIFICATION: UNCLASSIFIED. P-1 Item No. 46. Page 1 of 17. DATE: February 2011

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Airborne SIGINT Enterprise (JMIP) FY 2012 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SURFACE SHIP TORPEDO DEFENSE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-5. FY-10 FY-11 FY-12 FY-12 OCO FY-12 Total FY-13 FY-14 FY-15 FY-16

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-12

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Air Force Operational Energy

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Qty (Each)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 P-1 Line #51

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: RQ-4

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology. FY 2011 Total Estimate. FY 2011 OCO Estimate

OTC/MANE-VU. 19 November 2014

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #30

NDIA Tactical Wheeled Vehicles (TWV) Conference 8 February 2010 COL Mark Barbosa, G-8

UNCLASSIFIED UNCLASSIFIED

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARCHIVED REPORT. Boeing B-52 Stratofortress - Archived 2/2003

Customer Service, Operations and Security Committee. Information Item III-A. January 12, 2017

DEFENSE LOGISTICS AGENCY AMERICA S COMBAT SUPPORT LOGISTICS AGENCY

CLASSIFICATION: UNCLASSIFIED. DATE February 2008 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/INTEGRATED SURVEILLANCE SYSTEM

Gaining Ground. Michael Fabey/AW&ST

MA THOR SolarLight UAS

PM Light Tactical Vehicles

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UTILITY HELICOPTERS & CORPUS CHRISTI ARMY DEPOT Our Key s to Aviation Readiness

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: End Item Industrial Preparedness Activities FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

December 2018 RenewableGenerations Monthly Report

Selected Acquisition Report (SAR)

Transcription:

PE NUMBER: 3215F PE TITLE: E-4B NATIONAL AIRBORNE Exhibit R-2, RDT&E Budget Item Justification 3215F E-4B NATIONAL AIRBORNE Cost ($ in Millions) 4777 Total Program Element (PE) Cost E-4B Aircraft Modernization Actual 26 6.323 6.323 27.286.286 28 29 Complete Total A. Mission Description and Budget Item Justification The E-4B National Airborne Operations Center (NAOC) modernization program upgrades the fleet of four highly modified Boeing 747-2 aircraft to add new capability and improve reliability in support of the two primary missions for this weapon system. The E-4B NAOC fleet satisfies the military requirement to provide a survivable operations center as an alternate to the National Military Command Center (NMCC) located in the Pentagon. The E-4B NAOC fleet also satisfies the military need for an airborne operations center with communications capabilities that will permit senior national leadership to monitor and control military and civil national assets during all phases of national conflict or disaster. Developmental modifications include, but are not limited to, upgrades and enhancements to aircraft structures, propulsion system, fuel system, environmental control system, electrical generation and distribution systems, flight safety and navigation systems (with their associated communications equipment), and the related aircraft operations center facilities, equipment, and communications necessary for the E-4B fleet to execute its primary mission as an alternate NMCC. Modifications currently underway or planned for accomplishment under this project in the next four to five years include: Modification Block 1 (Mod Blk 1): A group designator for modifications being started and completed together on the same aircraft. The RDT&E elements of Mod Blk 1 include Audio Infrastructure Update (AIU) (formerly Block 5A) and Global Air Traffic Management (GATM) II. The Senior Leaders Communication System (SLCS) is also included in the Mod Blk 1 work, but is not considered R&D work. The SLCS modification is entirely funded with Procurement (Aircraft Modification) funds. AIU affects the primary mission internal audio distribution and recording system. It replaces obsolete 196s era equipment with digital technology that corrects a major sustainment issue associated with out-dated analog voice data distribution and recording equipment. The planning for internal the noise reduction modification of the senior leadership conference room (Area 4) was completed during 3 as part of the "Block 5B - Data Concept Exploration". The exploration revealed that installation of the Area 4 noise reduction would be most efficiently performed if done in conjunction with the AIU modification. Consequently, the internal noise reduction modification is being performed during the same depot period that the AIU modification was begun, November 23. Future noise reduction modifications will be accomplished during depot periods in conjunction with the AIU portion of the Mod Blk 1 modification. GATM II is the second part of a 3-phased implementation of Global Access, Navigation, and Safety/Global Air Traffic Management modifications to permit unencumbered access to international airspace and to maintain the level of E-4B flight safety consistent with civil standards that become effective in CY5. SLCS: Completion of 2 DERF funded SLCS study during 2 concluded that the technical solution to the SLCS requirements would not require research and development. Consequently, the SLCS modification is funded with Aircraft Procurement modification funds. SLCS will provide an 'office in the sky' capability for senior R-1 Shopping List - Item No. 166-1 of 166-7 1535 Exhibit R-2 (PE 3215F)

Exhibit R-2, RDT&E Budget Item Justification 3215F E-4B NATIONAL AIRBORNE leaders that includes commercial Direct Broadcast Service (DBS), and video teleconferencing capability, plus access to Defense Information System Network (DISN) and Public Switch Network (PSN) for voice, video and data exchange on and off the airplane (external e-mail and Internet access). Data LAN (Local Area Network) Infrastructure (DLI) (formerly part of Block 5B): A primary mission equipment modification that will greatly improve the ability to store, manipulate, distribute and view information related to the aircraft's primary mission. These enhancements will increase the accuracy, timeliness, and throughput of tactical and strategic information presented to embarked military decision-making commanders. (Internal Noise Reduction moved to AIU portion of Mod Blk 1) Because the E-4B program develops modifications for a fielded system, it is categorized as a budget activity 7 - Operational System Development. B. Program Change Summary ($ in Millions) Previous President's Budget 47.867 44.377 53.164 Current PBR/President's Budget Total Adjustments -.474 -.377 Congressional Program Reductions -.377 Congressional Rescissions -.76 Congressional Increases Reprogrammings 1.372 SBIR/STTR Transfer -1.14 Significant Program Changes: The 5 plan for Mod Blk 1 and for Data LAN Infrastructure (DLI), formerly a major component of Block 5B, has been changed. The production schedule for Mod Blk 1 has been accelerated while the estimated cost of the DLI RDT&E work during 5 has been decreased due to a new DLI technical approach. The net effect is to increase the 5 Procurement funds request and to decrease the 5 RDT&E request as shown above. R-1 Shopping List - Item No. 166-2 of 166-7 1536 Exhibit R-2 (PE 3215F)

Exhibit R-2a, RDT&E Project Justification Cost ($ in Millions) 4777 E-4B Aircraft Modernization Quantity of RDT&E Articles Actual 26 6.323 27.286 28 29 Complete Total A. Mission Description and Budget Item Justification The E-4B National Airborne Operations Center (NAOC) modernization program upgrades the fleet of four highly modified Boeing 747-2 aircraft to add new capability and improve reliability in support of the two primary missions for this weapon system. The E-4B NAOC fleet satisfies the military requirement to provide a survivable operations center as an alternate to the National Military Command Center (NMCC) located in the Pentagon. The E-4B NAOC fleet also satisfies the military need for an airborne operations center with communications capabilities that will permit senior national leadership to monitor and control military and civil national assets during all phases of national conflict or disaster. Developmental modifications include, but are not limited to, upgrades and enhancements to aircraft structures, propulsion system, fuel system, environmental control system, electrical generation and distribution systems, flight safety and navigation systems (with their associated communications equipment), and the related aircraft operations center facilities, equipment, and communications necessary for the E-4B fleet to execute its primary mission as an alternate NMCC. Modifications currently underway or planned for accomplishment under this project in the next four to five years include: Modification Block 1 (Mod Blk 1): A group designator for modifications being started and completed together on the same aircraft. The RDT&E elements of Mod Blk 1 include Audio Infrastructure Update (AIU) (formerly Block 5A) and Global Air Traffic Management (GATM) II. The Senior Leaders Communication System (SLCS) is also included in the Mod Blk 1 work, but is not considered R&D work. The SLCS modification is entirely funded with Procurement (Aircraft Modification) funds. AIU affects the primary mission internal audio distribution and recording system. It replaces obsolete 196s era equipment with digital technology that corrects a major sustainment issue associated with out-dated analog voice data distribution and recording equipment. The planning for internal the noise reduction modification of the senior leadership conference room (Area 4) was completed during 3 as part of the "Block 5B - Data Concept Exploration". The exploration revealed that installation of the Area 4 noise reduction would be most efficiently performed if done in conjunction with the AIU modification. Consequently, the internal noise reduction modification is being performed during the same depot period that the AIU modification was begun, November 23. Future noise reduction modifications will be accomplished during depot periods in conjunction with the AIU portion of the Mod Blk 1 modification. GATM II is the second part of a 3-phased implementation of Global Access, Navigation, and Safety/Global Air Traffic Management modifications to permit unencumbered access to international airspace and to maintain the level of E-4B flight safety consistent with civil standards that become effective in CY5. SLCS: Completion of 2 DERF funded SLCS study during 2 concluded that the technical solution to the SLCS requirements would not require research and development. Consequently, the SLCS modification is funded with Aircraft Procurement modification funds. SLCS will provide an 'office in the sky' capability for senior leaders that includes commercial Direct Broadcast Service (DBS), and video teleconferencing capability, plus access to Defense Information System Network (DISN) and R-1 Shopping List - Item No. 166-3 of 166-7 1537 Exhibit R-2a (PE 3215F)

Exhibit R-2a, RDT&E Project Justification Public Switch Network (PSN) for voice, video and data exchange on and off the airplane (external e-mail and Internet access). Data LAN (Local Area Network) Infrastructure (DLI) (formerly part of Block 5B): A primary mission equipment modification that will greatly improve the ability to store, manipulate, distribute and view information related to the aircraft's primary mission. These enhancements will increase the accuracy, timeliness, and throughput of tactical and strategic information presented to embarked military decision-making commanders. (Internal Noise Reduction moved to AIU portion of Mod Blk 1) Because the E-4B program develops modifications for a fielded system, it is categorized as a budget activity 7 - Operational System Development. B. Accomplishments/Planned Program ($ in Millions) Accomplishment/Planned Program Complete AIU (formerly part of Blk 5A, now a component of Mod Blk 1) System Engineering & Prototype Kit Complete Data LAN Infrastructure (formerly part of Blk 5B) - Data Concept Exploration Complete GATM II System Engineering and Prototype Kit Contractor Technical and Program Management Support Mod Blk 1 - AIU prototype installation (formerly called Block 5A) Mod Blk 1 - GATM II prototype installation Total Cost C. Other Program Funding Summary ($ in Millions) Actual AF RDT&E Other APPN Aircraft Procurement AF, Budget Activity 5, Weapon System Code E4, PE 3215F; Mod 4381 19.145 49.726 (AIU--formerly Blk 5A);4381B (Blk 5B); Mod 979 (GATM Phase II) 4.438.25 4.686 2.244 26 27 28 96.564 91.57 64.482 22.58 29 6.581.25 1. 2.85 3 3.364 1.54 8.996.672 Total Cost Complete 343.995 D. Acquisition Strategy A mod block structure has been established which includes AIU (formerly part of Block 5A)), GATM II and SLCS (note: SLCS doesn't require RDT&E funding). System engineering, design, and prototype installation is being done under a Cost Plus Incentive Fee (CPIF) contract with Boeing - Wichita Development & Modification Center. Installations are performed in conjunction with Program Depot Maintenance (PDM) at Boeing's Wichita facility. R-1 Shopping List - Item No. 166-4 of 166-7 1538 Exhibit R-2a (PE 3215F)

Exhibit R-3, RDT&E Project Cost Analysis Cost Categories (Tailor to WBS, or System/Item Requirements) ($ in Millions) Product Development Boeing Boeing - Wichita None Subtotal Product Development Support DISA None Subtotal Support Test & Evaluation 65 FT None Subtotal Test & Evaluation Management Program Office contractor support Subtotal Management Total Cost Contract Method Performing Activity & Total & Type Location Prior to 23 Cost Sole Source CPAF/T&M Sole Source CPIF Boeing Aerospace Operations Witchita Development & Modificaiton Center 23 23 Cost Award Date Project Order Sole Source T&M 24 24 Cost Award Date 25 25 Complete Cost Award Date 55.3 18.529 Oct-2 41.195 9.668 Nov-4 9.668.25.365 Apr-3.613 Mar-4.1 Mar-5.25.365.613.1.172.271 Jan-3.284 Nov-3.1 Nov-4.172.271.284.1 2.732 1.68 Oct-2 1.98 Jan-4 1.34 Jan-5 2.732 1.68 1.98 1.34 58.157 R-1 Shopping List - Item No. 166-5 of 166-7 1539 Total Target Cost Value of Contract 73.532 26.62 Feb-3 41.195 Nov-3 55.3 45.149 MIPR 77.483 151.15 1.328 1.328.827.827 7.552 7.552 16.722 Exhibit R-3 (PE 3215F)

Exhibit R-4, RDT&E Schedule Profile R-1 Shopping List - Item No. 166-6 of 166-7 154 Exhibit R-4 (PE 3215F)

Exhibit R-4a, RDT&E Schedule Detail Schedule Profile Complete Systems Engineering for GATM and AIU portion of Mod Block 1 Initiate Purchase Prototype Hardware for GATM and AIU portion of Mod Block 1 Start Prototype Install for GATM and AIU portion of Mod Block 1 Complete Prototype Install for GATM and AIU portion of Mod Block 1 Conduct OT&E for Mod Block 1 Begin DLI Concept Exploration (DLI) R-1 Shopping List - Item No. 166-7 of 166-7 1541 2Q 1Q 1Q 1Q 2Q 2Q Exhibit R-4a (PE 3215F)