Technical Requirements for Renewable Energy Power System

Similar documents
Interface Requirements for Grid Connection of Renewable Energy Power System

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

Welcome. Requirements for erecting EV Charging Facilities

Net Metering Interconnection Requirements. Customer Generation Capacity Not Exceeding 100 kw. Date: Version: 1

Guidelines for connection of generators:

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

Copyright 2003 Advanced Power Technologies, Inc.

Net Metering Interconnection Requirements

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

GUIDELINES FOR OPERATING, METERING AND PROTECTIVE RELAYING FOR. NET METERED SYSTEMS UP TO 50 kw AND BELOW 750 VOLTS

Jemena Electricity Networks (Vic) Ltd

Net +Plus Connection Code

RULES & REGULATIONS FOR RENEWABLE GENERATION SYSTEMS 2. SUMMARY OF APPLICATION AND INTERCONNECTION PROCESS

SA Power Networks Commissioning Witnessing Checklist

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Technical Standard - TS 129. Small Inverter Energy Systems (IES) - Capacity not exceeding 30kW. SA Power Networks. Published: November 2017

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

GRID CONNECTION ISSUES FOR DISTRIBUTED GENERATION REVIEW & STANDARDS

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

AS/NZS AS/NZS

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

Definitions. Scope. Customer Generation Interconnection Requirements

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

Appendix A2: Technical Requirements for Distributed Generators > 10 kw to be Connected to Kitchener-Wilmot Hydro Inc. s Distribution System

REQUIREMENTS FOR GRID INTERCONNECTION OF RENEWABLE GENERATION SYSTEMS

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

NRS 097-series / Grid Code Discussion:

CHAPTER 7 ELECTRIC VEHICLE CHARGING FACILITIES

Guideline No.: E-07(201610) E-07 TRANSFORMERS. Issued date: October 28,2016. China Classification Society

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

Enquiry Form for Micro and Small Generators 5MW and Less

PHILIPPINE DISTRIBUTION CODE 2017 EDITION

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

E-15 Uninterruptible Power Systems (UPS)

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Backfeed, Safety, and Work Practices

Electric Networks/Ina Lehto Updated Original 12/2011

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Guideline No.: E-07(201501) E-07 TRANSFORMERS. Issued date: October 20,2015. China Classification Society

TANZANIA BUREAU OF STANDARDS

Micro Embedded Generating Units (0-30 kva)

Section 6. Generation Interconnection

Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd

شركة كهرباء محافظة القدس المساهمة المحدودة

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Large Embedded Generation User Guide A

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

G83/2 Engineering Recommendation

Distributed Generation Interconnection Policy

APPLICATION ELECTRICITY SERVICES. APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

TILLAMOOK PEOPLE S UTILITY DISTRICT

TECHNICAL SPECIFICATION

CHAPTER 2 HOW TO APPLY FOR ELECTRICITY

IES GRID FEED-IN LIMITER

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

NET METERING PROGRAM. Technical Interconnection Requirements

NB/T Translated English of Chinese Standard: NB/T ENERGY INDUSTRY STANDARD

Standby Power Systems

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

National Distributed Energy Resources Grid Connection Guidelines. Technical Guidelines for Basic Micro EG Connections

Valcom Failsafe Unit. 1620ESv2 SERIES. Operation and Maintenance Manual

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1

MIRUS International Inc. TYPICAL SPECIFICATION ULLTRA & ULLTRA-H1E 31 Sun Pac Blvd., Brampton, Ontario, Canada L6S 5P6

Reviewed: DD Month University Code of Practice for Electrical Safety. PART B - Design and Construction of Electrical Equipment within the University

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

If any further information is required for CHELCO to fulfill its reporting requirements, please let us know.

Standards, Procedures and Policies for Grid Connection

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

NS194B Guidelines for Rotating Machines Connected to the Ausgrid Network. October 2014

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Noble County Rural Electric Membership Corporation

AGN 041 Alternator Operating Speed

.3 Section Waste Management and Disposal.

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Power conversion systems for energy storage. Engineering that stores

Health & Safety Issues Associated with Solar Photovoltaic (PV)

University of Houston Master Construction Specifications Insert Project Name SECTION ELECTRONIC VARIABLE SPEED DRIVES PART 1 - GENERAL

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

Louisville Gas and Electric Company

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

DG SYNCHRONIZING &AMF PANEL

James Hamilton Electrical Pty Ltd (Inc in Qld) A.C.N trading as. Power Drive Systems. Generator Control Specialists

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

REQUIREMENTS FOR GRID INTERCONNECTION RENEWABLE GENERATION SYSTEMS

Connecting your business diesel generation

Marina Bay Sands Guidelines for Electrical and Wiring Service

E-15 Uninterruptible Power Systems (UPS)

Exemptions currently in force

Transcription:

Hotline: 2843 3228 Email address: RE@hkelectric.com Issued on 20 Nov 2018

1. Introduction 1.1. This document aims to provide the technical requirements for renewable energy power system (the REPS) connected to the 220/380 V low-voltage electricity supply network operated by HK Electric (the Grid). 1.2. This document is only applicable to inverter-based REPS of aggregated power rating up to 1,000 kw. For inverter-based REPS other than the above rating or non-inverter-based REPS, the applicant should provide the proposed installation arrangement for HK Electric s consideration as soon as possible in the planning stage. 1.3. The declared limits of the supply voltage and frequency of the Grid under normal conditions are 220/380 V ± 6% and 50 Hz ± 2%, respectively. The REPS shall be compatible with the HK Electric s supply system. 1.4. The installation shall also comply with HK Electric s Supply Rules, and Guide to Connection of Supply (GCS), the latest edition of Code of Practice for the Electricity (Wiring) Regulations, EMSD s Technical Guidelines on Grid Connection of s and relevant guidance notes, and relevant Government Ordinances. 1.5. This document shall not be construed as a part of terms and conditions of the supply agreement. 1.6. If there is any inconsistency or ambiguity between this document and GCS, this document will prevail. 1.7. If there is any inconsistency or ambiguity between the English and Chinese versions, the English version shall prevail. 2. Safety Requirements 2.1. The REPS shall be designed with an anti-islanding function to automatically disconnect the REPS from the Grid in the event of deenergisation of the Grid. The time delay for the automatic disconnection of the REPS shall not exceed 2 seconds. In case of failure of the antiislanding function of the REPS, there will be a safety hazard for personnel working on the de-energised circuit. Operational procedures or other means shall be adopted to ensure all REPS connected to the deenergised circuit are disconnected before work. Hotline: 2843 3228 Email address: RE@hkelectric.com Issued on 20 Nov 2018 1 / 4

2.2. Proper warning labels shall be displayed at all electrical equipment with dual power supply sources. Typical examples of warning labels are shown in the appendix of the Commissioning Report for Renewable Energy Power System (Sample). 2.3. An up-to-date single-line electrical diagram (showing clearly the connection arrangements via the electricity account meter to the HK Electric s supply point with Supply Number) shall be displayed in prominent positions at different appropriate locations to facilitate responsible personnel to properly shut down the grid connection arrangement under normal and emergency conditions. 2.4. A Registered Electrical Worker shall be designated by the Customer to communicate directly with HK Electric under normal and emergency operations. 3. Protection Requirements 3.1. Technical assessment shall be carried out by the Customer s Registered Electrical Contractor (REC) or Registered Electrical Worker (REW) to ensure that all the electrical equipment in the customer installations and the Grid are safe to operate in the new fault level with the grid connection of the REPS and to avoid improper operations of protective devices during fault conditions and under all possible operation conditions. The new fault level shall not exceed 40 ka. 3.2. The REPS shall be equipped with an appropriate earthing system so as to ensure the operation safety of the worker and the installations. The REPS shall still have an effective earthing system even when the REPS is disconnected from the Grid. 3.3. A synchronisation check function shall be installed at the REPS such that voltage fluctuation at the connection point of the Grid during synchronisation operation of the REPS shall be limited to below 3%. 3.4. The REPS shall be equipped with proper protection facilities to protect it against transient abnormalities (e.g. supply interruption, voltage fluctuation, frequency fluctuation and voltage dip) that may originate from the customer installations and the Grid. 3.5. When sustained voltage and frequency fluctuations are detected, the protection facilities of the REPS shall be able to disconnect the REPS from the Grid with a time delay according to Table 1 below. Hotline: 2843 3228 Email address: RE@hkelectric.com Issued on 20 Nov 2018 2 / 4

Table 1 Voltage (measured at the connection point of the Grid) Maximum trip time* V < 50 % 0.1 s 50 % V < 85 % 2 s 85 % V 110 % Continuous operation 110 % < V < 135 % 2 s V 135 % Frequency (measured at the connection point of the Grid) f < 49 Hz f > 51 Hz 0.05 s Maximum trip time* 0.2 s 0.2 s * The REPS does not have to cease to energize if the voltage returns to normal continuous operation conditions within the specified trip time. The owner or registered electrical contractor of the REPS shall arrange to design the protection settings of the REPS taking into consideration its ridethrough capability under abnormal voltage and frequency conditions. 3.6. In the event of automatic disconnection of the REPS due to fluctuation in voltage, frequency or anti-islanding operation, the REPS can be reconnected to the Grid only after the Grid has resumed to normal conditions continuously for at least 5 minutes. 4. Power Quality Requirements 4.1. The power output of REPS to the Grid shall not be less than 0.85 power factor lagging. 4.2. The total harmonic current distortion of the REPS output shall not exceed 5 % at the output of the REPS. 4.3. Direct Current (DC) shall be prevented from flowing into the Grid so as to avoid voltage distortion and adverse impacts to other electrical equipment. An isolation transformer shall be installed in the REPS to limit the DC current flowing into the Grid to below 0.5% of the rated inverter output. 4.4. After the connection of the REPS to the Grid, the voltage fluctuation at the connection point of the Grid due to the output power of the REPS shall not exceed 1%. Hotline: 2843 3228 Email address: RE@hkelectric.com Issued on 20 Nov 2018 3 / 4

4.5. For connection of 1-phase REPS to the Grid, the maximum rated output current shall not exceed 60 A. For REPS with rated output power greater than 13.2 kva, the REPS shall be connected to the Grid in 3-phase arrangement. 4.6. The negative phase sequence voltage at the supply point shall not exceed 1.3% of the positive sequence voltage in a 3-phase supply system. - END - Hotline: 2843 3228 Email address: RE@hkelectric.com Issued on 20 Nov 2018 4 / 4