Agenda Item: CA-3 Meeting Date: 06/16/2016 MEMORANDUM TO: THROUGH: DATE: FROM: SUBJECT: PRESENTER: RECOMMENDATION: BUDGET IMPACT: PAST ACTION: NEXT ACTION: City Commission Douglas Hutchens, Interim City Managq June 3, 2016 Jorge M. Quintas, P.E., Director, Department of Public Works & Utilities I City Engineer Wastewater Plant Standby Generator Exhaust Repairs Paul Stanek, Assistant Director Public Works & Utilities I) Motion to approve the award of a contract to Ring Power of Riverview, FL in the amount of $67,731 for emergency generator exhaust upgrade. Funds are budgeted in the Water & Sewer Fund (Acct. #441-5265-535-461 0) for this work. The Project Number is 528505. N/A N/A ATTACHMENTS: I) 2) Memo from Chuck Ankney, Purchasing Agent, dated May 27,2016. Quotes from Ring Power dated May 16, 2016 BACKGROUND: The Environmental Protection Agency passed legislation to require the exhaust of standby generators to meet national emissions standards. As such, both the standby generators at the Water Plant and Wastewater Plant require retrofitting to meet the new standard. The work was completed on the Water Plant generator in fiscal year 2015. This request will complete the work on the Wastewater Plant generator. The generator was manufactured by Caterpillar. The sole manufacturer authorized repair faci lity in the Tampa Bay area is Ring Power of Riverview, FL. Brian Antonian, Wastewater Division Plant Supervisor, obtained a quote from Ring Power to supply all materials, labor and equipment to complete the modifications to the existing generator, inclusive of a rental of a generator for use during the period the work is to be completed. The quoted cost to complete the work is $67,731. The existing generator will be offline for one week in order to complete these modifications.
As previously stated, funds for this work are budgeted in the Water and Sewer Utility Fund (Acct. # 441-5265-535-461 0). The Project Number is 528505. Staff is requesting the City Commission award a single source contract to Ring Power. I concur with this request.
D U N~D I N Home of Honeymoon Island Department of Finance Interoffice Memorandum TO: Douglas Hutchens, Interim City Manager THROUGH: Joe Ciurro, Director of Finance {j! FROM: DATE: RE: Chuck Ankney, Purchasing Agent ~ May 27, 2016 Wastewater Division Generator Emissions Upgrade The Wastewater Division has an emergency generator that is in need of modification in order to comply with existing emissions regulations. The generator was manufactured by Caterpillar. The sole manufacturer authorized repair facility in the Tampa Bay area is Ring Power of Riverview, FL. Brian Antonian, Wastewater Division Plant Supervisor, obtained a quote from Ring Power to supply all materials, labor and equipment to complete the modifications to the generator. This includes the rental of a generator for use during the period the work is completed. The quoted cost to complete the work is $67,731. The generator will be offline for one week in order to complete the work. Funds for this work are budgeted in the Water and Sewer Utility Fund (Acct. # 441-5265-535-461 0). The Project Number is 528505. Staff is requesting that the City Commission award a single source contract to Ring Power. Fut1hermore, staff requests that this item be placed on the agenda for the City Commission meeting scheduled for Thursday, June 16,2016. Please call me if you have any questions.!
Ring Power WI Power Systems Division ~SYKES AmeriPUMPS OLYMPIAN"' GENERAT O RS SULLAIIFt ST. AUGUSTINE 500 World Commerce Parkway St. Augustine FL 32092 904-737-7730 TAMPA 10421 FemHiiiDrive Riverviewfl 33578 813-671-3700 SALES SERVICE PARTS LEASING RENTALS Customer: John VanAmburg Company: City of Dunedin Address: 1401 County rd Dunedin Fl 34698 Phone: 727-298-3100 Ex 1464 Quote#: Date: 5/16/2016 Reference: Estimate on Model: Cat 3512 Serial Number: 24Z0398 Account Numbe r: DESCRIPTION OF MATERIAL UNIT PRICE EXTENSION Ring Power is pleased to offer the following estimate for your consideration: Ring Power will install a catalyst after the existing silencer to meet the Rice Neshap compliance law. Ring Power will remove existing exhaust piping and place the new Catalyst in line after the existing silencer. We will also be using flange pieces and new piping to make the connections, The mounting and bracing will be done off the side of the building and mount in place were the existing exhaust piping is on the building. This will include new bolts and new gaskets. There will be some on site welding that will have to be done in order to make the connections. Ring Power will also have to use a lift to lift the catalyst in place and the piping. Ring Power will be using a boom truck and a man lift to perform this work, we will be supplying all of the lifting equipment. Ring Power will also install the monitoring system and controller in place. This System uses the existing 24 volt generator system to run. This includes all wiring and all connections also mounting of the controller. Once all equipment is installed Ring Power will perform 3 separate one hour test To certify that the generators meet the new Rice Neshap rules. This test is done by hooking up a load bank and running the generator at full load for 3 separate hou s. Once that test is complete Ring Power will provide the test results to the customer so the customer can provide for the EPA. QUOTATION ACCEPTED BY:--------------- DATE: TAX#:------ CUSTOMER: SALESPERSON: ~-~~---------- Service Manager Page 1 of 1
DESCRIPTION OF MATERIAL UNIT PRICE EXTENSION This system reduces the emission by 90% the Rice Neshap rule is 70%. Generator will be off line for 1 week while this work is taking place. All Equipment comes with a 2 year warranty that is backed by Cat. Labor/warranty for installation is 6 months from completion of job. Quote includes lift and rigging. Quote is per generator. Lead time from date of order is 8-10 weeks. Catalyst weight is 3301bs. Catalyst and monitoring system only. Piping and gaskets, bolts and mounting hardware. New insulation and wrap needed for new piping and catalyst. $19,250.00 $6900.00 $4750.00 $19,250.00 $6900.00 $4750.00 All equipment and mise parts. Testing to certify generator meets Rice Neshap ruling. $30,900.00 $4500.00 $30,900.00 $4500.00 Labor and travel and lift and rigging. Man lift and boom truck. Total for all above work. $22,250.00 $1500.00 $22,250.00 $1500.00 $59,150.00 Freight is not included Quote is good for 30days from date of quote. Ring Power Corp., Power Systems Division James Mosley 813.362.0531
DESCRIPTION OF MATERIAL UNIT PRICE EXTENSION james.mosley@ringpower.com 10421 Fern hill Dr Riverview Fl 33578 PO Number (if required).. Tax and freight are not included in this estimate.
Ring Power i!l Power Systems Division OLYMPIAN'" GENERATORS SULLAIFt ST. AUGUSTINE 500 World Commerce Parkway St. Augustine FL 32092 904 737 7730 TAMPA 10421 Fern Hill Drive Riverview FL 33578 813 671 3700 SALeS SERVICE PARTS LEASING RENTALS Date: 05/16/16 Attn: Mr. John VanAmburg Reference: Caterpillar Re'ntallienerator Company: City of Dunedin Phone: 727 298-3100 Project: Dunedin Waste Water Plant DESCRIPTION OF MA TcRIAL UNIT PRICE TOTAL Rental Pricing: (1) Caterpillar 2000 KW diesel generator set, main circuit breaker, 277/480V, 3 phase 1250 gallon on-board fuel tank, sound attenuated enclosure, trailer mounted Auto StarVstop, battery charger $ 6,120.00 I Week (66) 50' sections of 4f0 power cable to provide (33) 1 00' runs 8 runs per phase, 8 neutral, 1 ground $30.00 I Wk $ 1,980.00 I Week Env Disposal Fee: $ 81.00 I Week Fire, Theft, Vandalism Waiver: No charge If a Property Damage Insurance Certificate Is provided See insurance requirements on page 2 $ 1,134.00 I Week Transportation (includes delivery and pick up) $ 40o.bo Project Location: Waste Water Plant Notes: Sales Tax and fuel are not included Generator to arrive with less than 200 gallons in the tank Customer to provide fuel as needed Prior to return, the fuel tank must be drained to the level at which it arrived Rental rates are based on standby usage which include up to 7 hours of usage per week. Above these hours an overtime charge of $125.00 per hour will apply Page 1 of 2
Insurance Requirements: Liability Insurance Certificate (Reguired prior to delivery) Ring Power requires the customer to provide a certificate of insurance showing General Liability Coverage for a minimum of $1,000,000.00. Ring Power needs to be added as additional Insured and loss payee, as well named as certificate holder. Property Damage Insurance Certrficate (QQ!ional) Ring Power requires the customer to provide a certificate of insurance showing Property Damage Coverage for rented I leased equipment for the replacement value of the equipment. Ring Power needs to be added as additional insured and loss payee, as well named as certificate holder. If a property damage certificate is not provided, there will be an additional charge of 14% for our Fire, Theft, Vandalism Waiver. Please feel free to contact me with any questions Thank You, Alan Obal Cell# 727-639-0599 Power Systems Rental Division Ring Power Corporation