List of Grid Disturbances above 10 MW. Page 1 of 8

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

ईट ड 16/ ट

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

ईट ड 11/ ट

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

Solutions for Full Length Test - 4

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

ववषय ववद य त पक व ट र व ह ज म पक प वव (AIS 040:2015 प अमभन अमभग रहण )

य पक प रच लन मस द प स ड 25(2700) तकन क स म त प स ड 25

STATION OWNER UNIT NO. UNIT CAPACITY (MW) TYPE

सम मनत यहद प ई ह त ल हदए गए प र चपक म म ख प रपक च म खत पक त पक अध हस त क ष प भ ज

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

Government Of India Ministry of Power. Central Electricity Authority. New Delhi

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

प र ख स ख य ववषय TED 27 (13009) W - II ववद य त पक व ट र व ह प पक व तथ 30 मम ट प अ पतम पक व म पक (AIS 041:2015 प अमभन अमभग रहण)

Agenda of 11 th System Studies Meeting in NER


vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

Government Of India Ministry of Power Central Electricity Authority New Delhi

Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j

Automotive Vehicles Safety Belts, Restraint Systems and Safety Belt Reminder Installation Requirements

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) Ref: ID/TSG/RB/KF/03 Dtd. : 4 th August 2016

North Eastern Regional Power Committee

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector


ल ख षणस पन व य पकप रच लनमस द प स ड 3(12109)C

प 7 म, ज र करन क त र ख.., व ट क न च, न न ल खत अ त: थ पत

इल क र क स लल ग प ख व वषक टट ( प न क ण)

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

Government Of India Ministry of Power Central Electricity Authority New Delhi

/ Telefax : No: 1(2)2015-E/ Battery& Charger TVH/ Dated:

DOCUMENT DESPATCH ADVICE. Technical Committee: Petroleum and Related Products Sectional Committee, PCD 3

Rajasthan Public Service Commission 2016

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 82/MP/2014

No. NERPC/SE (O)/PCC/2013/ Date: 16th August, 2013

File No.CEA-PS-13-17(14)/2/2018-PSPM Division. CEA /PS/PSPM/07/07/2018/ Dated:

म नक भवन, 9 बह द रश ह फर म ग, नई दद ल

Executive Summary on Power Sector. Jul-18

ETD 39 (10038 ) ETD 39 (10039 ) ETD 39 (10040 )

(URL: F /KV Damoh/ / Date:

SOUTHERN REGIONAL POWER COMMITTEE

द क षण क ष तर य व त स म त

INDUSTRY SALES REVIEW. July 2017

Disclosure to Promote the Right To Information

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

North Eastern Regional Power Committee Agenda For

Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC

Disclosure to Promote the Right To Information

भ रत य म नक य क इ ज नय र ग वभ ग फ़ न पर अन प कर : ; फ + : ; ईम ल

Technical Committee: Petroleum and their Related Products of synthesis or biological origin Sectional Committee, PCD 3

Remote Village Electrification

LT ATUL KATARYA MEMORIAL SCHOOL. Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon,

पत स च/ Address List

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

North Eastern Regional Power Committee Agenda

भ रत य म नक य र य र क इ ज ननयरर ग व भ ग य पक पररच लन म मस द रल ख र षण स ञ पन

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI Phone: , , Extn 8406, ; Website:

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

अपर नद शक (प रय जन ),प स क ल, क व र भवन, बगल र Additional Director (Proj.), PCKL, KaveriBhavan, Bengaluru.

NATIONAL INSTITUTE OF WIND ENERGY

व द य त स रक ष व द य त स च म डण रचन / आर खड प रम णपत र अभ य सक रम स म न यत द ण य ब बत.

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

Session IV ESMAP Approach and Pilot Overview

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

INDRA MARSHAL POWER TILLER

भ रत य म नक ब य र य त क इ ज ननयरर ग व भ ग. एम.ई.ड.20/ट March 2018

ट ईड 6/ TED 7/T

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

दय अन फ ध क स चन. Tender Ref. No.: SCIC/Tenders/2014/001, Date: 10 th Oct, 2014

Disclosure to Promote the Right To Information

Application is to be sent to the undersigned in two sealed covers on or before 21st July 2018 by 1500 hrs. as under:

ट ईड 6/ TED 7/T

THE ASIAN SCHOOL, BAHRAIN MONTHWISE DISTRIBUTION OF SYLLABUS FOR THE YEAR

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information

स त य; त, प रश सनक क य ष य,

DOCUMENT DESPATCH ADVICE. Biodiesel, Diesel Fuel Blend ( B6 to B20) Specification

AIRPORTS AUTHORITY OF INDIA OFFICE OF THE AIRPORT DIRECTOR ल. ग. ब. हव ई L G B I AIRPORT, GUWAHATI TECHNICAL DIRECTORATE क ट शन

पत स च / Address List

Disclosure to Promote the Right To Information

Transcription:

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong Parmaw, Lapalang, Shillong - 793006, Meghalaya Ph. No: 0364 2534039 Fax No: 0364-2534040 Website: www.nerpc.nic.in No. NERPC/COM/REA/2018/1177-1223 25 th June, 2018 To 1. CMD, TSECL, Bidyut Bhawan, Agartala 799 001 2. Director (Distribution), MePDCL, Lumjingshai, S.R. Road, Shillong 793 001 3. Engineer-in-Chief (P&E), P&E Dept., Govt. of Mizoram, Aizawl 796 001 4. Chief General Manager (Comml), APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati 781 001 5. Chief Engineer (E Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar 791 111 6. Managing Director, MSPDCL, Keishampat, Imphal-795 001. 7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima 797 001 8. Chief Engineer, Loktak HE Project, Vidyut Vihar, Komkeirap, Manipur 795 124 9. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong 793 003 10. Executive Director, NERTS, POWERGRID, Lapalang, Shillong 793 006 11. Managing Director, OTPC, 6 th Floor, IFCI Tower, 61 Nehru Place, New Delhi 110 019 12. GM (Comml.), NTPC, 3 rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 वषय: मई 2018 क एब त आध रत स श धत आर. ई. ए Sub: ABT based Revised REA for May, 2018. मह दय, Sir, मई 2018 म ह क एब त आध रत स श धत य उज ल ख (आर.ई.ए) क त आव यक करव ई क लए स ल न ह आर.ई.ए ल ख उ.प.. व.स क व बस ईट www.nerpc.nic.in पर भ उपल ध कर दय गय ह A copy of Revised ABT based Regional Energy Accounting (REA) for the month of May, 2018 is enclosed herewith for necessary action. The Revised REA is also available in NERPC website www.nerpc.nic.in. स घटक अपन अवल कन / ट प णय य द क ई ह त आर.ई.ए क ज र ह न क 15 दन क अ दर भ ज द य द स घटक स क ई प यवह र नह ह त ह त ज र कय गय आर.ई.ए क अ तम म न ज एग Constituents may send their observation/ comments, if any on the same within 15 days from the date of issue of REA. In case no communication is received from constituents, the REA as issued would be treated as final REA. स ल नक : उपर त न स र Encl.: As above. भवद य / Yours faithfully, एल. ब. म आनथ ग/ L.B.Muanthang अध ण अ भय त / Superintending Engineer व ण य / Commercial

Copy forwarded to: 1. CE (G. M.), CEA, SewaBhawan, R.K.Puram, New Delhi 110 066. 2. G. M., NERLDC, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6. 3. C.G.M (SLDC ) AEGCL, Kahelipara, Guwahati. 4. Gen. Manager (Comml.), NHPC Ltd., NHPC Office complex, Sector 33, Faridabad-121003. 5. G.M (Commercial) APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati - 781 001. 6. General Manager, Ranganadi HEP, NEEPCO, Yazlee, Ar. Pradesh 7. Project Manager, Doyang HEP, NEEPCO, Nagaland 8. Project Manager, AGBPP, NEEPCO Ltd., No. III, Vill. Bokuloni, Dibrugarh, Assam. 9. Project Manager, AGTPP, NEEPCO Ltd., Ramchandranagar, Agartala, Tripura West- 799008. 10. Dy. G. M (Elect.), Kopili HEP, NEEPCO Ltd., Umrangso, N.C. Hills, Assam. 11. Supdt. Engr. (System Management) MeECL, Lumjingshai, Short Round Road, Shillong. 12. Supdt. Engr. (Commercial) Deptt. of Electricity, Govt.of Manipur, Keisampet, Imphal. 795001 13. Executive Engineer, MSLDC, P & E Dept., Chaltlang, Aizawl- 796012. 14. Supdt. Engr. Dimapur Sub-station Deptt. of Power, Govt.of Nagaland, Dimapur. 15. Dy. G. M. (Commercial) NERTS, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6. 16. Dy. General Manager (ER), POWERGRID, Boring Road, Alankar Place, Patna - 800 001 17. DGM (Comml), OTPC, 6 th Floor, IFCI Tower, 61 Nehru Place, New Delhi 110 019 18. DGM (Comml.), NTPC, 3 rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 19. AGM (Comml.), NTPC, Bongaigaon Thermal Power Project, P.O Salakati, Kokrajhar-783369 20. Addl. General Manager,Comml & Sys.Opn., TSECL,Banamalipur,Agartala.-799001. 21. Ex. Engr., SLDC, Deptt. of Power, Itanagar, Ar. Pradesh 791 111 22. CEO, NVVNLtd., 7 th Floor, Scope Complex, Lodhi Road, N.Delhi- 110 003 23. Power Trading Corpn. of India Ltd., 2 nd Floor, NBCC Tower, 15-Bhikaji Cama Place, New Delhi 66. 24. DGM (Power Trading),Adani Exports Ltd,13 Palam Marg,Vasant Vihar, New Delhi- 110057. 25. ED,TPTCL,Block A,34,Sant Tukaram Road,Carnac Bunder,Mumbai-400 009. 26. Member Secretary, NRPC,18-A,Shaheed Jeet Singh Marg,Katwaria Sarai, NewDelhi-110016. 27 Member Secretary, ERPC,14, Golf Club Road, Kolkata- 700 033. 28. Member Secretary, WRPC, Plot No F-3,MIDC Area, Opp Seepz,Marol,Andheri (E), Mumbai-400 093. 29. Member Secretary, SRPC, 29, Race Course Road, Bangalore- 560009. 30. Lanco Electric Utility Limited, LANCO House,141, Avenue,8, Banjara Hills, Hyderabad-500 034 31. Reliance Energy Trading Ltd., Reliance Energy Centre, Santa Cruz (E), Mumbai-400 055 32.Vice President, Indian Energy Exchange Limited, 10 th Floor, B Wing, Statesman House, Barakhamba Road, Connought Place, New Delhi - 110 001. 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon, Haryana 122 016. 34. RPTCL, Agrawal House, 2, St. George s Gate Road, 6 th Floor, Kolkata 700 022. एल. ब. म आनथ ग/ L.B.Muanthang अध ण अ भय त / Superintending Engineer व ण य / Commercial

A. HYDEL POWER STATIONS 1: KOPILI Station 1 Installed Capacity MW 200 2 Auxiliary Energy Consumption (AUX) in % 1 in % 79 4 Annual Design Energy (DE) GWh 1186.14 # 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 1043.803 7 Annual Fixed Charges in Cr. 120.2764 # 8 Energy Charge Rate (ECR) on ex-pp basis KWh 0.582 9 Scheduled energy (ex-bus) for the month kwh 104378750 10 Free Energy (ex-pp) of the month KWh 12525450 11 Saleable Energy (ex-pp) of the month KWh 91853300 12 Total Energy Charge payable for the month in 53455374 13 Cumulative scheduled energy including current month MWh 137226 14 Plant Availability Factor achieved during the month (PAFM) in % 85.04 15 Cumulative Plant Availability Factor achieved upto the month in % 82.60 16 Capacity charge inclusive of incentive payble for the month in 54983931 BILLING STATEMENT Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule of MWH Billing Schedule of MWH Energy Charge payable by beneficiaries in Ar. Pradesh 5.19100 2854215.83297 5424.18938 Assam 53.45500 29391660.05612 55770.11320 Manipur 7.39500 4066061.66149 7721.92413 Meghalaya 17.39500 9564454.71286 18159.79913 Mizoram 4.61000 2534759.19668 4811.86038 Nagaland 6.14700 3379862.20868 6412.90597 Tripura 5.80700 3192916.84493 6077.95783 HVDC 0.00000 0.00000 Total 100.00000 54983930.51374 104378.75000 # As per CERC order dated 13.01.2016 in petition No 46/GT/2015 5424.18938 49507.38820 7721.92413 11897.07413 4811.86038 6412.90597 6077.95783 0.00000 0.00000 91853.30000 3156686.47999 28811549.92684 4493886.88331 6923676.59855 2800332.64682 3732084.59167 3537156.60824 0.00000 53455373.73542 DATE: 6/25/2018 Page 1 of 14

2: KOPILI II Station 1 Installed Capacity MW 25 2 Auxiliary Energy Consumption (AUX) in % 1 in % 69 4 Annual Design Energy (DE) GWh 86.3 # 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 75.944 7 Annual Fixed Charges in Cr. 12.2577 # 8 Energy Charge Rate (ECR) on ex-pp basis KWh 0.815 9 Scheduled energy (ex-bus) for the month kwh 11240750 10 Free Energy (ex-pp) of the month KWh 1348890 11 Saleable Energy (ex-pp) of the month KWh 9891860 12 Total Energy Charge payable for the month in 8063587 13 Cumulative scheduled energy including current month MWh 14550 14 Plant Availability Factor achieved during the month (PAFM) in % 82.63 15 Cumulative Plant Availability Factor achieved upto the month in % 86.80 16 Capacity charge inclusive of incentive payble for the month in 6233775 BILLING STATEMENT Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule of MWH Billing Schedule of MWH Energy Charge payable by beneficiaries in Ar. Pradesh 5.99200 373527.77123 673.85338 673.85338 549307.76444 Assam 52.35500 3262445.91239 5883.39675 5208.95175 4246202.13685 Manipur 6.94500 432935.64272 780.87715 780.87715 636550.76531 Meghalaya 13.67500 852468.67014 1537.37963 862.93463 703441.88706 Mizoram 6.04000 376519.98301 678.94130 678.94130 553455.30871 Nagaland 5.73500 357506.97062 644.44995 644.44995 525338.85628 Tripura 9.25800 577122.84813 1041.85185 1041.85185 849290.56057 HVDC 0.00000 0.00000 0.00000 0.00000 0.00000 Total 100.00000 6233774.55316 11240.75000 9891.86000 8063587.27922 # As per CERC order dated 22.02.2016 in ORDER NO. 45/GT/2015 DATE: 6/25/2018 Page 2 of 14

3: KHANDONG Station 1 Installed Capacity MW 50 2 Auxiliary Energy Consumption (AUX) in % 1 in % 69 4 Annual Design Energy (DE) GWh 277.61 # 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 244.2968 7 Annual Fixed Charges in Cr. 40.4858# 8 Energy Charge Rate (ECR) on ex-pp basis KWh 0.837 9 Scheduled energy (ex-bus) for the month kwh 23145625 10 Free Energy (ex-pp) of the month KWh 2777475 11 Saleable Energy (ex-pp) of the month KWh 20368150 12 Total Energy Charge payable for the month in 17047918 13 Cumulative scheduled energy including current month MWh 26900 14 Plant Availability Factor achieved during the month (PAFM) in % 81.12 15 Cumulative Plant Availability Factor achieved upto the month in % 70.12 16 Capacity charge inclusive of incentive payble for the month in 20211335 BILLING STATEMENT Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule of MWH Billing Schedule of MWH Energy Charge payable by beneficiaries in Ar. Pradesh 4.19400 847663.38720 972.30746 972.30746 813810.66282 Assam 56.28500 11375949.86847 13019.31068 11630.57318 9734661.95583 Manipur 6.55500 1324853.00503 1518.19625 1518.19625 1270713.57997 Meghalaya 16.90500 3416726.17085 3913.76844 2525.03094 2113423.15075 Mizoram 3.94000 796326.59646 911.93762 911.93762 763281.77215 Nagaland 6.65300 1344660.11326 1538.88835 1538.88835 1288032.64032 Tripura 5.46800 1105155.79428 1271.21620 1271.21620 1063993.99183 HVDC 0.00000 0.00000 0.00000 0.00000 0.00000 Total 100.00000 20211334.93555 23145.62500 20368.15000 17047917.75369 # As per CERC order dated 13.01.2016 in petition No 42/GT/2015. DATE: 6/25/2018 Page 3 of 14

4: RANGANADI Station 1 Installed Capacity MW 405 2 Auxiliary Energy Consumption (AUX) in % 1 in % 85 4 Annual Design Energy (DE) GWh 1509.69# 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 1328.5272 7 Annual Fixed Charges in Cr. 272.6449# 8 Energy Charge Rate (ECR) on ex-pp basis KWh 1.037 9 Scheduled energy (ex-bus) for the month kwh 96075750 10 Free Energy (ex-pp) of the month KWh 11529090 11 Saleable Energy (ex-pp) of the month KWh 84546660 12 Total Energy Charge payable for the month in 87631086 13 Cumulative scheduled energy including current month MWh 145195 14 Plant Availability Factor achieved during the month (PAFM) in % 99.44 15 Cumulative Plant Availability Factor achieved upto the month in % 99.43 16 Capacity charge inclusive of incentive payble for the month in 135451508 BILLING STATEMENT Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule of MWH Billing Schedule of MWH Energy Charge payable by beneficiaries in Ar. Pradesh 18.46200 25007057.46389 17809.73503 6280.64503 6509775.11560 Assam 43.32800 58688429.51985 41276.87770 41276.87770 42782738.11550 Manipur 8.37300 11341354.79066 8085.37098 8085.37098 8380340.96242 Meghalaya 11.50500 15583696.03088 11097.04523 11097.04523 11501886.92002 Mizoram 5.70000 7720735.97358 5476.31775 5476.31775 5676104.42433 Nagaland 5.33500 7226337.96825 5082.11108 5082.11108 5267516.32659 Tripura 7.29700 9883896.56126 7248.29225 7248.29225 7512723.98485 HVDC 0.00000 0.00000 0.00000 0.00000 0.00000 Total 100.00000 135451508.30838 96075.75000 84546.66000 87631085.84930 # As per CERC order dated 05.01.2016 and corrigendum 07.03.2016 in petition No.40/GT/2015. DATE: 6/25/2018 Page 4 of 14

5: DOYANG Station 1 Installed Capacity MW 75 2 Auxiliary Energy Consumption (AUX) in % 1 in % 73 4 Annual Design Energy (DE) GWh 227.24# 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 199.9712 7 Annual Fixed Charges in Cr. 108.4121# 8 Energy Charge Rate (ECR) on ex-pp basis KWh 2.738 9 Scheduled energy (ex-bus) for the month kwh 15326450 10 Free Energy (ex-pp) of the month KWh 1839174 11 Saleable Energy (ex-pp) of the month KWh 13487276 12 Total Energy Charge payable for the month in 36929154 13 Cumulative scheduled energy including current month MWh 23557 14 Plant Availability Factor achieved during the month (PAFM) in % 38.73 15 Cumulative Plant Availability Factor achieved upto the month in % 35.82 16 Capacity charge inclusive of incentive payble for the month in 24426257 BILLING STATEMENT Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule of MWH Billing Schedule of MWH Energy Charge payable by beneficiaries in Ar. Pradesh 6.85200 1673687.14543 1052.11537 1052.11537 2880769.29300 Assam 43.80800 10700654.76752 6704.59148 6704.59148 18357664.76607 Manipur 7.86500 1921125.13118 1206.62416 1206.62416 3303825.71439 Meghalaya 11.45500 2798027.76575 1756.84371 1756.84371 4810367.33868 Mizoram 5.25000 1282378.50460 804.63863 804.63863 2203159.75696 Nagaland 17.96700 4388665.63660 2752.53325 913.35925 2500844.81370 Tripura 6.80300 1661718.27939 1049.10342 1049.10342 2872522.33860 HVDC 0.00000 0.00000 0.00000 0.00000 0.00000 Total 100.00000 24426257.23046 15326.45000 13487.27600 36929154.02140 # As per CERC order dated 13.01.2016 and corrigendum dtd. 07.03.16 in petition No 43/GT/2015. DATE: 6/25/2018 Page 5 of 14

6: LOKTAK Station 1 Installed Capacity MW 105 2 Auxiliary Energy Consumption (AUX) in % 1 in % 85 4 Annual Design Energy (DE) GWh 448.00# 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 394.24 7 Annual Fixed Charges in Cr. 150.2829# 8 Energy Charge Rate (ECR) on ex-pp basis KWh 1.925 9 Scheduled energy (ex-bus) for the month kwh 68469250 10 Free Energy (ex-pp) of the month KWh 8216310 11 Saleable Energy (ex-pp) of the month KWh 60252940 12 Total Energy Charge payable for the month in 116001054 13 Cumulative scheduled energy including current month MWh 94372 14 Plant Availability Factor achieved during the month (PAFM) in % 100.98 15 Cumulative Plant Availability Factor achieved upto the month in % 100.52 16 Capacity charge inclusive of incentive payble for the month in 75815995 BILLING STATEMENT Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule of MWH Billing Schedule of MWH Energy Charge payable by beneficiaries in Ar. Pradesh 4.94000 3745310.12842 3387.78117 3387.78117 6522274.00876 Assam 29.44500 22324019.58123 20147.04501 20147.04501 38787791.03206 Manipur 42.50800 32227862.94308 29106.53560 20890.22560 40218588.12467 Meghalaya 0.00000 0.00000 0.00000 0.00000 0.00000 Mizoram 5.02000 3805962.92402 3440.34017 3440.34017 6623462.42653 Nagaland 6.43500 4878759.24623 4400.23593 4400.23593 8471487.09714 Tripura 11.65200 8834079.67942 7987.31213 7987.31213 15377450.82392 HVDC 0.00000 0.00000 0.00000 0.00000 0.00000 Total 100.00000 75815994.50241 68469.25000 60252.94000 116001053.51309 # As per CERC order dated 18.09.2015 in Order no. 228/GT/2014 DATE: 6/25/2018 Page 6 of 14

7: PARE Station 1 Installed Capacity MW 110 2 Free Energy for Home State (FEHS) in % 12 3 Scheduled energy (ex-bus) for the month kwh 11717590 4 Free Energy (ex-pp) of the month KWh 1406111 5 Saleable Energy (ex-pp) of the month KWh 10311479 6 Cumulative scheduled energy including current month MWh 11718 7 Plant Availability Factor achieved during the month (PAFM) in % 24.05 8 Cumulative Plant Availability Factor achieved upto the month in % 12.22 BILLING STATEMENT Share allocation for the current month (%) Drawal Schedule of MWH Billing Schedule of MWH Ar. Pradesh Assam Manipur Meghalaya Mizoram Nagaland Tripura 18.87250 40.51000 8.35500 13.33000 5.76500 5.40000 7.76750 2214.14742 808.03662 4733.55392 4733.55392 980.61950 980.61950 1563.56960 1563.56960 675.51906 675.51906 631.13501 631.13501 919.04549 919.04549 HVDC 0.00000 0.00000 0.00000 Total 100.00000 11717.59000 10311.47920 DATE: 6/25/2018 Page 7 of 14

B. THERMAL POWER STATIONS DATE: 6/25/2018 Page 8 of 14

1: AGBPP Station 1 Plant Availability Factor for current month in % 64.58 2 Cum. Plant Availability Factor upto current in % 54.76 in % 72.00 4 Plant Load Factor for current month in % 62.28 5 Cum. Plant Load Factor upto current month in % 52.78 6 NAPLF in % 85.00 Wt. Schedule Energy for current Cum. Schedule Energy upto current Unrequisitioned Energy for current Cum. Unrequisitioned Energy upto current Ar. Pradesh 5.694000 7742.654863 Assam 56.503000 72758.650862 12928.979457 18.296800 18.296800 72758.650862 4281.017135 7742.252279 Manipur 8.105000 9907.664565 9907.664565 1140.822090 1489.302554 Meghalaya 11.815000 15760.144855 15760.144855 345.710847 345.710847 Mizoram 5.410000 7360.908123 7360.908123 13.853750 13.853750 Nagaland 5.805000 7471.123829 7471.123829 442.115514 442.115514 Tripura 6.668000 8260.465052 8260.465052 894.906716 1832.186921 HVDC 0.000000 0.000000 0.000000 0.000000 0.000000 Total 100.000000 129261.612148 215628.672585 7136.722853 11883.718665 DATE: 6/25/2018 Page 9 of 14

2: AGTCCPP Station 1 Plant Availability Factor for current month in % 51.38 2 Cum. Plant Availability Factor upto current in % 50.93 in % 85.00 4 Plant Load Factor for current month in % 49.45 5 Cum. Plant Load Factor upto current month in % 48.99 6 NAPLF in % 85.00 Wt. Schedule Energy for current Cum. Schedule Energy upto current Unrequisitioned Energy for current Cum. Unrequisitioned Energy upto current Ar. Pradesh 6.702000 3210.393150 Assam 43.720000 19117.023983 Manipur 8.225000 3787.589003 Meghalaya 12.633000 6014.730829 Mizoram 6.000000 2907.270000 Nagaland 5.737000 2761.904500 Tripura 16.983000 7597.463692 HVDC 0.000000 0.000000 Total 100.000000 45396.375157 6296.336640 36.992800 36.992800 37651.538311 2066.674417 3680.543469 7508.507628 197.869747 264.491797 11832.352207 106.758721 106.758721 5670.316500 0.000000 0.000000 5403.810490 17.697600 17.697600 14656.912222 659.841558 1420.626616 0.000000 0.000000 0.000000 89019.773998 3085.834843 5527.111002 DATE: 6/25/2018 Page 10 of 14

3: PALATANA Station 1 Plant Availability Factor for current month in % 68.49 2 Cum. Plant Availability Factor upto current in % 68.33 in % 76.00 4 Plant Load Factor for current month in % 67.52 5 Cum. Plant Load Factor upto current month in % 67.68 6 NAPLF in % 85.00 Wt. Schedule Energy for current Cum. Schedule Energy upto current Unrequisitioned Energy for current Cum. Unrequisitioned Energy upto current Ar. Pradesh 3.030303 10751.429849 Assam 33.057851 116009.274898 21173.767714 75.352954 82.118269 228753.121346 2101.083281 3369.271834 Manipur 5.785124 20151.540191 Meghalaya 10.881543 38280.154476 Mizoram 3.030303 10448.331370 Nagaland 3.719008 13145.423440 Tripura 26.997245 95405.487924 HVDC 0.000000 0.000000 Total 86.501377 304191.642149 39876.278491 517.772758 703.140841 75705.823669 597.839779 622.133412 20870.669235 378.451433 385.216748 25936.473674 141.991007 150.293893 187041.639653 1051.304648 2328.981560 0.000000 0.000000 0.000000 599357.773781 4863.795860 7641.156558 DATE: 6/25/2018 Page 11 of 14

4: BGTPP NTPC Station 1 Plant Availability Factor for current month in % 84.82 2 Cum. Plant Availability Factor upto current in % 86.25 in % 85.00 4 Plant Load Factor for current month in % 72.28 5 Cum. Plant Load Factor upto current month in % 72.88 6 NAPLF in % 85.00 Wt. Schedule Energy for current Cum. Schedule Energy upto current Unrequisitioned Energy for current Cum. Unrequisitioned Energy upto current Ar. Pradesh 5.132500 13940.607096 Assam 57.420000 127716.295048 Manipur 7.505000 7621.994914 Meghalaya 11.480000 0.000000 Mizoram 5.415000 14586.576783 Nagaland 4.930000 7774.655608 Tripura 7.617500 14316.647369 HVDC BNC 0.500000 841.647259 REG. MEG 0.000000 32347.508475 28489.742354 522.560454 523.664489 260733.130914 34789.918577 65003.280055 20181.334847 13525.374686 22243.086716 0.000000 0.000000 0.000000 29937.665048 670.970892 672.145421 21256.892313 6115.390367 6611.020968 29979.555785 7170.204731 13160.395934 1646.157526 567.175241 1180.233099 64894.227031 0.000000 0.000000 Total 100.000000 219145.932551 457118.705818 63361.594949 109393.826682 DATE: 6/25/2018 Page 12 of 14

C. SHARE ALLOCATIONS % IN CS STATIONS FROM EASTERN REGION Sl No. Farakka I & II Farakka III Kahalgaon I Kahalgaon II Talcher 1 Ar.Pradesh 0.191917 0.000000 0.191747 0.000000 0.196898 2 Assam 2.455737 0.000000 5.093479 5.093479 2.095419 3 Manipur 0.000000 0.000000 0.000000 0.000000 0.000000 4 Meghalaya 0.000000 0.000000 0.000000 0.000000 0.000000 5 Mizoram 0.141736 0.000000 0.141610 0.000000 0.141736 6 Nagaland 0.429803 0.000000 0.424460 0.000000 0.424823 7 Assam (NVVN Coal Power) 0.091912 0.091912 0.091912 0.091912 0.091912 DATE: 6/25/2018 Page 13 of 14

CONCLUDED DATE: 6/25/2018 Page 14 of 14