Description The APR SRS-CALKIT is a thermal calibration kit for the APR Scorpion Rework System. It is compatible with the following item numbers:

Similar documents
Scorpion. Rework System

4.1 Flow Rate Verification and Adjustment

Instruction of connection and programming of the VECTOR controller

RS MODEL 2030

Advanced Techniques US Inc.

PDR IR-E3 EVOLUTION SERIES. PDR Focused IR Rework Stations for Ultimate Performance for SMD/BGA/uBGA/QFN/LED Rework. Trusted by Experts

PDR IR-E3 Evolution Series SMD/BGA Rework Stations

PDR IR-E3 Evolution Series SMD/BGA Rework Stations

Digital III Fueling Vehicle Control System

PRODUCT REQUIREMENTS

Introduction to 3D Printing

CONTENTS 1.0 INTRODUCTION SAFETY... 5

PDR Product Datasheet

Title: M.I.L. ON DTC P3191, P3190, AND/OR P0A0F Models:

P08451 Prototype Thermoelectric Heat Exchanger

INSTALLATION MANUAL. Fendt VarioGuide Ready COM 3 Supported Models PN REV A

V PicoScope NVH Diagnostics Overview

BRAKE TESTER DECELEROMETER

FLEC AIR PUMP Operators Manual JULY QUI-1030 VERSION 1.2

CALIBRATION PROCEDURE FOR THE ALLEN-BRADLEY PLC TEMPERATURE CONTROLLER:

SERVICE MANUAL (DOMESTIC & INTERNATIONAL)

POWER. Switch opening. Enter/Exit Menu Menu Scroll Increase/Decrease Setpoint GCE SERIES MODEL 10AFE MODEL 20AFE

COMPLETE AND FLEXIBLE SMT SOLUTIONS. dispense ALL. Innovation and quality made in Germany

Installation Instructions ISOBUS Liquid ECU

Model 30GCE Low-Temp Oven POWER. Switch opening. View Setpoint Increase Setpoint Decrease Setpoint (3 sec.) Enter/Exit Menu Levels GCE SERIES

ONE YEAR LIMITED WARRANTY

PDR BGA REWORK STATIONS. Trusted by Experts

KTM 690 TTV UPGRADE INSTRUCTIONS

Impulse, Momentum, and Energy Procedure

INSTALLATION INSTRUCTIONS ALL JOHN DEERE SYSTEMS

6. Pre-print checks. 3D Touch

This reference document will help you navigate the new Electric Circuit application.

AUTOMATIC 12 WAY HEAT TREATMENT CONSOLE

Syslog Technologies Innovative Thoughts

INSTALLATION MANUAL HARLEY-DAVIDSON V-ROD DESTROYER DATA ACQUISITION SYSTEM (Part Number 200-KT-V300D)

2 Dynamics Track User s Guide: 06/10/2014

PARTS & SERVICE MANUAL

Lesson 8: A Compound Spur Gear Train

Manual Capristo Lambda Simulator Control Suite (basic version)

JGAURORA 3D PRINTER MODEL: A5 USER GUIDE

Part Number: kW 800 Incoloy Element kW 800 Incoloy Element With 4kW Titanium Element kW 800 Titanium Element

Ravaglioli TD1760WS Wheel Alignment System. Operational Procedures

Instruction of connection and programming of the OSCAR-N controller

testo Smart Probes The SMART world of Testo HVAC

DEVELOPMENTAL HALT Report R XSS S Power Supplies. Michael Farragher Engineering Test Technician Test Performed By

Product Range BGA Rework Stations

TAROT ZYX-S2 Three-axis Gyro User Manual

When you finish the running, power off the receiver BEFORE turning off the transmitter.

Connection and programming manual for. controller. (also available in the diagnostic software and at

Dawson DSM170 Multi-Function Moisture Meter User s Manual

The Magnetic Field in a Coil. Evaluation copy. Figure 1. square or circular frame Vernier computer interface momentary-contact switch

Property of American Airlines

EPAS Desktop Pro Software User Manual

Connection and Programming Manual for

SITRANS FUE950 *085R9430* Energy calculator type SITRANS FUE950. Operating Manual Edition 09/ Revision 03

PowerView PV380-R2 Mechanical Configuration

Chevrolet Chevelle with Factory Air Control Panel Conversion Kit (473063)

Experiment P-16 Basic Electromagnetism

Dynojet Research, Inc. All Rights Reserved. Air Fuel Ratio Module Installation and User Guide.

ADTFM-im -issue INSTRUCTION MANUAL DIGITAL DIESEL METER ADTFM

IRDA-WELDER User Manual Model: TX-999DM

Product manual Oil Streak Sensor INTRODUCTION CONSTRUCTION. Master Sensor

SPEEDKEY KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 9. GEM e2, e4, e6, el XD

NTC Thermistor:TSM Series

PRODUCT REQUIREMENTS

INDEX 1 Introduction 2- Software installation 3 Open the program 4 General - F2 5 Configuration - F3 6 - Calibration - F5 7 Model - F6 8 - Map - F7

IGNITION TUNING GUIDE By (26-Apr-2012)

DI-377 SUPPLEMENTAL RESTRAINT SYSTEM DI58G-01 PRE-CHECK

TOYOTA im NAVIGATION UPGRADE Preparation

Multi-gauge configuration For software V101

Copyright 2017 Integrated Environmental Solutions Limited. All rights reserved.

Cirtix series Brushless Speed Controller manual For RS1/RS A/ Page - 1 -

Air Fuel Ratio Module and AFR-4 Pump Assembly Installation and User Guide.

What s Included. All items included. Please be familiar with the names of all the accessories listed here. NOTES:

User manual. Standard Modular Chiller HP 1/8 compressors with CAREL driver Application program for pco 1, pco 2, pco 3, pco C and pco XS.

CPTC Thermistor:TPM-P Type

Stress/Strain Apparatus AP-8214

PRE CHECK 1. SRS WARNING LIGHT CHECK

GE Panametrics Ultrasonic Flow Meter

Sony SH800 Cell Sorter

Bisnet Solutions for Tomorrow, Today! The Die Casting Process Planner. Users Manual. August 5, A Product By: Bisnet - 1 -

ROW PRO DOWN PRESSURE

REDUCTION OF IDLE-HUNTING IN DIESEL FUEL INJECTION PUMP

Attitude Instructions Ford 6.0 Powerstroke

C50254A PH3 AIR INTAKE SHUT-OFF VALVE DODGE 6.7L CUMMINS WITH POWERGUARD SMART OVERSPEED LIMITER

EC20 Pocket Conductivity Tester Instruction Manual

WANHAO Duplicator i3. User Manual V1.2. Wanhao USA

Manual Supplement. Manual Title: BT510 Users Supplement Issue: 1 Print Date: May 2014 Issue Date: 3/15 Revision/Date: Page Count: 7

Height Master Page 345. Check Master Page 349. Calibration Tools Page 354

TL RELAYS. TYPICAL APPLICATIONS Head lamp, Fog lamp, Fan motor, etc. ORDERING INFORMATION TYPES. High Load Relay for Smart Junction Box ACTL.

TABLE OF CONTENTS INTRODUCTION HARDWARE INSTALLATIONS MYSTYLE SOFTWARE. Table Of Contents INTRODUCTION...3 IMPORTANT NOTES...3 ABOUT THE EAS...

The Fischertechnik ACEs (Robo Starter Model kit)

Metal Oxide Varistor:TVM-B Series

1) Introduction to wind power

ASSEMBLY GUIDE. D-M-E Tubular Manifold & Components System

Yamaha Micro Prober MR612 (Type: MR612-M5)

HOLLEY VR2 FUEL PUMPS P/N & Installation Instructions 199R10975

THERMOCOUPLE CALIBRATOR Mode KM-CAL-710

SCTR SERIES ADJUSTABLE TENSION SAFE-T-CABLE

CHEVELLE WITH AC CONTROL PANEL CONVERSION KIT an ISO 9001: 2008 Registered Company

Transcription:

3651 WALNUT AVENUE, CHINO CA 91710 PHONE (909) 664-9980 APR-Rework.com SRS CALKIT Description The APR SRS-CALKIT is a thermal calibration kit for the APR Scorpion Rework System. It is compatible with the following item numbers: Item APR-1100-SRS APR-1200-SRS APR-1200-SRS-MOB APR-1200A-SRS APR-1200A-SRS-MOB Description Scorpion Rework System, with SmartPlace Scorpion Rework System, with SmartPlace & Precision Placement Scorpion Rework System, with Mobile SmartPlace & Precision Placement Scorpion Rework System, with SmartPlace & Automatic Precision Placement Scorpion Rework System, with Mobile SmartPlace & Automatic Precision Placement Packaging Qty Description Application 1 Thermal Calibration Fixture Top and bottom heater calibration 1 Thermocouple Simulator Top and bottom heater calibration 1 Thermocouple Probe Top and bottom heater calibration 1 Airflow Meter (Anemometer) Airflow measurement 1 Airflow Box Fixture, Pre-Heater Airflow measurement, pre-heater 1 NZA-SRS-CAL Airflow Nozzle Airflow measurement, top heater 1 NZA-490-490 Reflow Nozzle, 49.0 x 49.0 mm Top heater calibration Thermal Calibration Fixture Thermocouple Simulator Thermocouple Probe Airflow Meter (Anemometer) Airflow Box Fixture, Pre- Heater NZA-SRS-CAL Airflow Nozzle NZA-490-490 Reflow Nozzle Page 1 of 15 TB-10000

10.1 Airflow Calibration 10.0 Thermal Calibrations Note: The mouse scroll (center) wheel is used to increase or decrease airflow settings. 10.11 Reflow Head Materials & Equipment Needed: Testo Airflow Meter Part Number 5400-0020 Airflow Nozzle (with Bored Testo Hole) Part Number NZA-SRS-CAC Flashdrive 1. Go to the System Configuration Menu (see Image 57). 2. Attach the NZA-SRS-CAC 3. Place the Testo Airflow Meter in the Nozzle (see Image 41) with arrow at the end of rod pointing down (the Testo Airflow meter should be perpendicular to the reflow head). 4. Left mouse click ( on ) the Reflow Head Airflow icon (see Image 57, Row 2, A). 5. Right mouse click the Reflow Head Airflow icon (see Image 57, Row 2, A) until Low Setting is displayed. 6. Measure the Low Setting airflow with the Testo Airflow Meter (see Image 41). 7. Adjust voltage by rolling the center button of the mouse until Airflow value is 3.4 ± 0.2 m/s. Image 41. Reflow Head Airflow Measurement 8. Repeat step 4. 9. Left mouse click the Reflow Head Airflow icon (see Image 57, Row 2, A) until Medium Setting is displayed. 10. Measure the Medium Setting airflow with the Testo Airflow Meter (see Image 41). Page 2 of 15 TB-10000

11. Adjust voltage by rolling the center button of the mouse until Airflow value is 4.2 ± 0.2 m/s. 12. Repeat step 4. 13. Left mouse click the Reflow Head Airflow icon (see Image 57, Row 2, A) until High Setting is displayed. 14. Measure the High Setting airflow with the Testo Airflow Meter (see Image 41). 15. Adjust voltage by rolling the center button of the mouse until Airflow value is 5.0 ± 0.2 m/s. 16. Repeat step 4. 17. Left mouse click the Reflow Head Airflow icon (see Image 57, Row 2, A) until Cooling Setting is displayed 18. Adjust cooling zone until it is 0.5 v above the set voltage point of the high setting ( the voltage point of step 15) 10.12 Small Preheater Note: ONLY perform steps 1, 2, and 3 if the Preheater Funnel is not installed. 1. Remove the Preheater Screen (see Image 42). Image 42. Preheater Screen 2. Ensure that the Scorpion Funnel is placed flush in the bowl (Image 43). Page 3 of 15 TB-10000

Image 43. Flush Preheater Funnel 3. Reinstall the Preheater Screen. 4. Power the Scorpion on. 5. Go to the System Configuration Menu (see Image 57). 6. Left mouse click the Small Preheater icon (Image 57, Row 2, B). 7. Right click icon until normal setting is displayed. 8. Place NZA-SRS-CAC into the hole in the preheat screen 9. Insert the Airflow Testo Meter into the hole on the nozzle with the arrow on the back of the shaft pointing up 10. Make sure the meter is flush against the backside of the nozzle hole and perpendicular to the reflow head (see image 44). Image 44. Small Preheater Airflow Measurement 11. Adjust voltage accordingly until Airflow Testo Meter reads 6.0 ± 0.1. 12. Left click small preheater icon until cooling setting is displayed. Page 4 of 15 TB-10000

13. Adjust cooling zone until it is 0.5 v above the set voltage point of the normal setting (0.5V above the voltage point of step 11) 10.13 Large Preheater 1. Place the metal disk over the funnel opening (see Image 45). Image 45. Small Preheater Disk Cover 2. Place the Preheater Airflow fixture over the funnel with the fitting attached (see Image 46). Image 46. Preheater Fixture Setup 3. Go to the System Configuration Menu (see Image 14). 4. Left mouse click the Large Preheater icon on (see Image 17, Row 2, C). 5. Right click until normal setting is displayed. 6. Place the Testo Airflow Meter into the fixture (see Image 47) with the arrow on the end of the shaft pointing up perpendicular to reflow head. Page 5 of 15 TB-10000

Image 47. Testo Meter & Large Preheater Measurement 7. Adjust voltage accordingly until Airflow Testo Meter reads 2.0 ± 0.1. 8. Left click the Preheater icon until the cooling setting is displayed. 9. Adjust cooling zone until it is 0.5 v above the set voltage point of the normal setting (0.5V above the voltage point of step 7). 10.2 Thermocouple (TC) Calibrations Materials & Equipment Needed: TC Simulator Part Number 5300-0019 Warning: TC Calibration must be performed prior to Thermal Calibrations and Verifications 10.21 TC1, TC2, TC3, IR Calibration 1. Obtain the K-Type Thermocouple Tester. 2. Set the K-Type Thermocouple tester to 250 C. 3. Go to the System Configuration screen (see Image 14). 4. Left click the thermocouple calibration icon (see Image 17, Row 3, D). Note: The current temperature of the TC will be displayed. 5. Plug the TC lead into the external TC socket. (see Image 48) Page 6 of 15 TB-10000

Image 48. TC connected to a TC socket 6. Inject 250 C into the TC by a single right click on the TC Calibration icon. 7. Left click the thermocouple calibration icon to navigate to the next TC Note: The software will indicate that the TC Temperature is saved 8. Repeat steps 4 through 6; calibrate all four TCs. 9. Plug the K-Type TC Tester into the corresponding external TC socket and confirm the reading is as injected. 10.3 Heater Calibrations & Verifications Warnings: 1) TC Calibration must be performed PRIOR TO Heater Calibrations & Verifications. 2) Airflow Calibrations must be performed prior to Heater Calibrations & Verifications Materials & Equipment Needed: NZA-490-490 Reflow Head Heater Nozzle SRS-CALKIT Scorpion Heater Calibration Kit 10.31 Reflow Head Calibration 1. Obtain the Scorpion Heater Calibration Plate (see Image 49) Image 49. Scorpion Calibration Plate & Probe Page 7 of 15 TB-10000

2. Place the TC probe end into the Scorpion Heater Calibration Plate, center the probe tip TC in the opening and tighten the thumbscrew (see Images 50 & 51). Image 50. TC of Probe Centered Image 51. TC Probe thumbscrew 3. Set and lock the TC Scorpion Heater Calibration Plate (with the centered Probe) in the center of the PCB Board Holder over the Preheater Funnel. 4. Connect the Scorpion Heater Calibration Plate Probe TC lead into TC1 on the Scorpion (see Image 52). Image 52. TC1 and Fixture Probe Connection 5. Attach the NZA-490-490 Nozzle to the Reflow Head. 6. Close the window on the calibration fixture 7. Press the Reflow Head Z-axis button and lower the Reflow Head/Nozzle into position flush against the Scorpion Heater Calibration Plate nozzle cutout. Note: Center the Nozzle to the Calibration Fixture Page 8 of 15 TB-10000

8. Start the Reflow Calibration Profile by left clicking the Calibration Profile Icon (see Image 17, Row 3, A). 9. Go to the Profile Screen (see Image 13) and wait for the calibration to complete. 10. Check profile to make sure it is ±5 C on reflow 10.32 Reflow Head Verification 1. Place the Scorpion Heater Calibration Plate in the PCB Holder in same position as during calibration. 2. Center the Scorpion Heater Calibration Plate probe TC to the center hole of the plate and tighten the setscrew (see Images 50 & 51). 3. Lock the PCB Holder into position over the Small Preheater funnel. 4. Connect the probe thermocouple lead into TC1. 5. Attach the NZA-490-490 Nozzle to the Reflow Head. 6. Close the window on the calibration fixture 7. Lower the Reflow Head flush with the Scorpion Heater Calibration Plate in the square cutout. 8. Navigate to the Profile screen (see Image 13) and create the following profile settings (4 zones): a. Z1: 150 C/180 seconds b. Z2: 200 C /180 seconds c. Z3: 250 C /180 seconds d. Z4: 300 C /180 seconds 9. In each zone, click approximately 2 seconds before the 180 second interval lines to create new dashed lines 10. Drag the small and large preheater lines (green and blue) to the bottom of the graph. 11. Run the profile by left clicking the top right corner icon (see image 53). Page 9 of 15 TB-10000

Image 53. Run profile 12. Save a screenshot (with markers at every zone) by left clicking the bottom left icon (see image 54) and save it to a flash drive with the following naming convention: a. [mmyyddrhcalverif] Image 54. Screen shot 13. Ensure that the temperature is stable through the end of the zones and that it is ±5 C of the target temp. 14. Ensure that the fixture cools to less than 40 C (approx. 20 minutes) before starting another profile. 15. Remove calibration fixture 16. Create 1 zone that ranges from 0 to 300 seconds. 17. Create and run a Reflow Head profile with the heater set to 350 C 18. Ensure that the temperature is stable through the end of the zones and reaches 350 C by 100 seconds. 19. Save a screenshot (with the marker at 100 seconds) with the following naming convention: a. [mmyyddrh400cverif] Page 10 of 15 TB-10000

10.33 Small Preheater Calibration 1. Go to the System Configuration screen (see Image 14). 2. Place the TC Probe end into the Scorpion Heater Calibration Plate, center the probe tip TC in the opening and tighten the setscrew (see Images 50 & 51). 3. Set and lock the TC Heater Scorpion Heater Calibration Plate (with the centered Probe) in the center of the PCB Board Holder, over the Preheater Funnel with the center hole open (see image 55). 4. Insert TC connecter into TC1. 5. Start the Small Preheater Calibration by left clicking the Small Preheater icon (see Image 17, Row 3, B). 6. Go to the Profile Screen (see Image 13) and wait for the calibration to complete. Image 55. Preheat board with open hole 10.34 Small Preheater Verification 1. Place the Scorpion Heater Calibration Plate in the PCB Holder in the same orientation as during calibration. 2. Center the Scorpion Heater Calibration Plate probe TC to the center hole of the fixture and tighten the set screw. Lock the PCB Holder into position over the Small Preheater funnel. 3. Connect the probe thermocouple lead to TC1. 4. Navigate to the Profile screen and set the following profile settings (4 zones): a. Z1: 100 C/180 seconds b. Z2: 150 C/180 seconds c. Z3: 200 C/180 seconds d. Z4: 250 C/180 seconds Page 11 of 15 TB-10000

5. In each zone, click approximately 2 seconds before the 180 second interval lines to create new dashed lines 6. Drag the reflow and large preheater lines (red and blue) to the bottom of the graph. 7. Run the profile by left clicking the top right corner icon (see image 53). 8. Ensure that the temperature stable through the end of the zones and +/- 10 C of the target temperature. 9. Save a screenshot (with markers at every zone) to the Flashdrive stick with the following naming convention: a. [mmyyddsphcalverif] 10. Ensure that the fixture cools to less than 40 C (approx. 20 minutes) before starting another profile. 11. Remove calibration fixture and create 1 zone from 0 to 400 sec and a second zone from 400-500 sec. 12. Create and run a Small Preheater profile with the heater set to 350 C for 400 seconds. 13. Ensure that Small Preheater reaches 350 C within 100 sec. 14. Save a screenshot (with the marker at 100seconds) with the following naming convention: a. [mmyyddsph350cverif] 10.35 Large Preheater 1. Go to the System Configuration screen (see Image 14). 2. Place the TC Probe end into the Scorpion Heater Calibration Plate, center the probe tip TC in the opening and tighten the setscrew (see Images 50 & 51). 3. Set and lock the TC Heater Scorpion Heater Calibration Plate (with the centered Probe) in the center of the PCB Board Holder, over the Preheater Funnel with the center whole open (see image 55). 4. Move the board holder to the bottom left corner of the Preheater Bowl making sure the TC probe is over the inside edge of the large heater bowl (see image 56). 5. Insert TC probe into TC1. 6. Start the Large Preheater Calibration by left clicking the large Preheater icon (see Image 17, Row 3, C). Page 12 of 15 TB-10000

7. Go to the Profile Screen (see Image 13) and wait for the calibration to complete. Image 56. Probe at bottom left area over the Large pre heater 10.36 Large Preheater Verification 1. Place the Scorpion Thermal Cal Kit Fixture in the PCB Holder in the same position as in calibration. 2. Center the Scorpion Heater Calibration Plate probe to the center hole of the fixture and tighten the set screw. Lock the PCB Holder into the lower left corner of the PCB Board with the center window open. 3. Connect the probe thermocouple lead to TC1. 4. Navigate to the Profile screen and set the following: a. Z1: 100 C/180 seconds b. Z2: 150 C/180 seconds c. Z3: 200 C/180 seconds d. Z4: 250 C/180 seconds 5. In each zone, click approximately 2 seconds before the 180 second interval lines to create new dashed lines 6. Drag the reflow and small preheater lines (red and green) to the bottom of the graph. 7. Run the profile by left clicking the top right corner icon (see image 53). 8. Ensure that the temperature stable through the end of the zones and ±10 C of the target temperature. Page 13 of 15 TB-10000

9. Save a screenshot (with markers at every zone) to the Flashdrive stick with the following naming convention: a. [mmyyddsphcalverif] 10. Ensure that the fixture cools to less than 50 C (approx. 20 minutes) before starting another profile. 11. Remove calibration fixture and create 1 zone from 0 to 400 sec and a second zone from 400-500 sec. 12. Create and run a Large Preheater profile with the heater set to 350 C for 400 seconds. 13. Ensure the Large Preheater reaches 350 C within 100 seconds. 14. Save a screenshot (with the marker at 100seconds) with the following naming convention: a. [mmyyddsph350cverif] Page 14 of 15 TB-10000

Functional Checks 9.1 Blower Operation Checks Image 57. System Configuration Menu Note: Image 57 rows, letters, names ONLY labeled here for Production Test. Page 15 of 15 TB-10000