D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

Similar documents
DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

2.0 Development Driveways. Movin Out June 2017

Re: 233 Armstrong Street Residential Condominium Traffic Brief

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

Traffic Generation November 28, Mr. Todd Baker Baker Properties, LLC 953 Islington Street Suite 23D Portsmouth, NH 03801

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

370 Queen Elizabeth Drive Transportation Overview

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

TECHNICAL MEMORANDUM. Part A: Introduction

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

The Re:Queen and Sparks Traffic Brief - Addendum #2

Purpose: General Provisions:

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

Prepared for: Ontario Inc. CHICKADEE GROVE COMMUNITY PROPOSED RESIDENTIAL DEVELOPMENT TOWN OF CALEDON TRANSPORTATION OPINION LETTER

This letter summarizes our observations, anticipated traffic changes, and conclusions.

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Village of Plainfield Downtown Parking Study. Committee of the Whole Meeting October 24, 2016

Re: Residential Development - Ogilvie/Cummings Transportation Overview

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

FIRE DEPARTMENT ACCESS Based on the 2012 edition of the International Fire Code

Appendix C. Traffic Study

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Lake County Building Department

Technical Memorandum

Attachment D Environmental Justice and Outreach

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

HUMC/Mountainside Hospital Redevelopment Plan

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

4 Circulation & Transportation

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

appendix 4: Parking Management Study, Phase II

2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes. Prepared By: Stantec Consulting Ltd. Version 2

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN

4/2/18 MP NORTHPOINT MALL GENERAL GROWTH PROPERTIES

Transportation & Traffic Engineering

71, 75 MONTREAL STREET PARKING STUDY

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

Re: Cyrville Road Car Dealership

Existing Traffic Conditions

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

TRANSPORTATION REVIEW

Construction Realty Co.

Downtown Lee s Summit Parking Study

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

November

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

11 October 12, 2011 Public Hearing APPLICANT:

Transportation Land Development Environmental S e r v i c e s

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

Proposed Hotel and Restaurant Development

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

886 March Road McDonald's Transportation Study

Travel Forecasting Methodology

RE: INNES / TRIM RETIREMENT RESIDENCE TRANSPORTATION OVERVIEW

TRAFFIC IMPACT ANALYSIS

Parks and Transportation System Development Charge Methodology

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

STAFF REPORT # CHANGE OF ZONING

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Applicant Submittal. October 19, Brady Giddens JAMP Enterprises N. Dallas Parkway, Suite 265 Dallas, TX Dear Mr.

4131 Chain Bridge Road

Lacey Gateway Residential Phase 1

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

RE: Traffic Impact Statement: Paper Mill Lake Subdivision

Traffic Impact Statement (TIS)

INDUSTRIAL DEVELOPMENT

Trip Generation and Parking Study New Californian Apartments, Berkeley

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

TRAFFIC PARKING ANALYSIS

Secured Market Rental 100 Project at 3070 Kingsway, Vancouver, BC Letter Report

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Environmental Noise Assessment Stonebridge Golf & Country Club Maintenance Facility. Nepean, Ontario

ORIGINAL AND REVISED DEVELOPMENT CONCEPTS

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT

Proposed Inn at Bellefield Traffic Impact Assessment

Transcription:

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers August 24, 2015 File: 115-622 Mr. R. Baumann, President The RGB Group 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 RE: RESIDENTIAL DEVELOPMENT 890 Greenbriar Avenue, Ottawa Transportation Overview Dear Mr. Baumann: This report will be examining the expected vehicular traffic which will be generated by the construction of nine townhouses at 890 Greenbriar Avenue in Ottawa. The location of the proposed development is shown in Figure 1. The following will be discussing the project and the impact the development will have on the surrounding neighbourhood. BACKGROUND The RGB Group has proposed the development of a parcel of land at 890 Greenbriar Avenue. The development will be replacing a single family house which currently occupies the property. In 2009 the owner had constructed a similar nine unit townhouse complex on the property adjacent to the east limit of the proposed site. Both properties will share the same access along the existing street of Montauk Private which exits onto the cul-de-sac at the east end of Greenbriar Avenue. The nine unit townhouse complex is expected to be constructed and ready for occupancy by 2016. Figure 2 shows a conceptual site plan of the proposed development and the existing development which was constructed in 2009. The number of site generated trips from the development is expected to be low and would not trigger the requirement for a transportation assessment study report as documented in the City of Ottawa Transportation Impact Assessment Guidelines, October 2006. Discussions with City of Ottawa staff established that a Transportation Overview report be prepared which would determine the expected site generated trips from the development, and the possible travel routes through the neighbourhood to the major roads. SITE GENERATED TRIPS The expected number of site generated trips was determined using the Institute of Transportation Engineers (ITE) document, Trip Generation, 9 th Edition. The analysis used the statistical data for a

D. J. Halpenny & Associates Ltd. Page 2 FIGURE 1 SITE LOCATION PLAN

D. J. Halpenny & Associates Ltd. Page 3 FIGURE 2 CONCEPTUAL SITE PLAN

D. J. Halpenny & Associates Ltd. Page 4 Residential Condominium/Townhouse land use, ITE Land Use Code 230, and the average trip rate to calculate the trips for the weekday peak AM and PM hour based on a development with 9 dwelling units. Table 1 shows the average trip rates used in the analysis. TABLE 1 TRIP GENERATION RATES LAND USE TRIP GENERATION RATE Peak AM Hr. Peak PM Hr. Residential Condominium/Townhouse 0.44 T/Dwelling Unit 0.52 T/Dwelling Unit The trip generation rates from Table 1 were applied to the 9 unit townhouse development, with the expected site generated trips shown in Table 2. TABLE 2 SITE GENERATED TRIPS LAND USE WEEKDAY PEAK AM HOUR WEEKDAY PEAK PM HOUR Total Enter Exit Total Enter Exit Residential Townhouses 4 1 (17%) 3 (83%) 5 3 (67%) 2 (33%) The number of new peak hour trips would be further reduced by 1 trip during both the peak AM and peak PM hour due to the use of public transit (20% transit use), and an additional 1 trip which would have been generated by the existing single family home being replaced by the development. TRIP ROUTE Following the examination of the employment areas and existing traffic, it was determined that approximately 20 percent of the trips destined to the south would travel along Greenbriar Avenue (local street) to Skeena Avenue (local street), from Skeena Avenue to Normandy Crescent (local street) and then east to Prince of Wales Drive (arterial road). Approximately 80 percent of the trips are expected to travel along Greenbriar Avenue to Claymor Avenue (collect road), then to Meadowlands Drive (major collector road) which would provide access in the north, east and west directions of Ottawa. The impact of an additional 4 or 5 vehicles during the peak hour along the local and collector roads would result in a minor impact on the operation of the roads.

D. J. Halpenny & Associates Ltd. Page 5 PARKING Each townhouse unit provides space for two vehicles, one in the garage and one in the driveway. The total complex of 18 units which comprises of the proposed 9 units and the existing 9 units built in 2009 (880 Greenbriar Avenue) provides visitor parking for 2 vehicles located along Montauk Private at Greenbriar Avenue. There is also sufficient space for an additional 4 vehicles on Greenbriar Avenue along the frontage of the 890 Greenbriar Avenue site. There are no parking restrictions along Greenbriar Avenue. The nine townhouse units proposed at 890 Greenbriar Avenue is expected to generate 4 or 5 vehicle trips during the peak AM and PM hours. The additional trips would have a minor impact on the operation of the surrounding roads. Yours truly David J. Halpenny, M. Eng., P. Eng.