CERTA-SET FIELD INSTALLATION GUIDE

Similar documents
Certa-Set Main Line Piping System

PRODUCT SPECIFICATION

3.2 DRIVE TORQUE HUB. Roll, Leak and Brake Testing SECTION 3 - CHASSIS & TURNTABLE. 3-2 JLG Lift

DT34 and DT54 Series Rotary Sprinklers

XL HYDROSTATIC TRANSAXLES

FRONT SEAT TRACK MOTOR. Removal

Extended Capacity Replacement Tanks for RAM Cummins Diesel Trucks

Tillage System Model 46 Assembly Manual

Instruction Manual for HSPA Take-Up Units

Keystone Figure 85/86 Check valves Installation and Maintenance Instructions

FIFTH WHEELS TROUBLESHOOTING AND REBUILD PROCEDURES. XA-71 Series Fifth Wheel Top Plates. XA-71-DA 2 SAE Kingpin (Rebuild Kit RK-65014)

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS

KEYSTONE. Check valves Figure 85/86 Installation & Maintenance Instructions. Figure 85. Figure 86.

Sofa Slideout Assembly OWNER'S MANUAL. Rev: Page 1 Sofa Slideout Owners Manual

Additions, Revisions, or Updates

Sentinel 250 Fire Hydrant

Transmission Overhaul Procedures-Bench Service

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

BX7460P Allure Tow Bar Operator Manual & Installation Instructions. ALLURE Tow Bar (10,000 lb) Pintle Coupler

INSTALLATION INSTRUCTIONS

ABOUT NORTH AMERICAN PIPE CORPORATION

Installation Manual TWM Performance Short Shifter Cobalt SS/SC, SS/TC, HHR SS, Ion Redline and Saab 9-3

Spare Tire Access Guide (2) Plastic Plugs for License Plate on Trailer Plug Bracket Trailer Plug Bracket

BX4330 Acclaim Tow Bar Operator Manual & Installation Instructions

Patriot. Aluminum and Steel 5spring. Step #1 Tarp Spool with Gear Motor (Includes Instructions for Optional Wind Deflector)

IMPORTANT: If you are experiencing slider issues, it may be due to a period of inactivity and an accumulation of debris in the mechanism.

: 1250 gpm in the deck mode : 800 gpm while operating in the ground base - Dual Inlet : 1000 gpm while operating in the ground base - Single Inlet

ALL AMERICAN BILLET. Front Drive System - Small Block Ford Installation Instructions

SERVICE GUIDE AGRICULTURAL TRACK REMOVAL INSTALLATION INSPECTION ALIGNMENT CPB-305

PORTABLE Q-CATCH 86 SERIES CHUTE, ALLEY & TUB PRODUCT MANUAL arrowquip.com

Rugby Manufacturing Hoist Cylinder Bulletin. Preface Technical Service Bulletin

DT35 and DT55 Series Rotary Sprinklers Installation & Service Instructions

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

XP-300 Series Sprinklers Installation & Service Instructions

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

SERVICE INSTRUCTIONS ASSEMBLY & DISASSEMBLY T50X DOUBLE ACTING HYDRAULIC SERIES ACTUATORS

PILLOWS DECK-MOUNT BATH FAUCET WITH FLUME SPOUT

Powerglide Automatic Floor Mount Shifter Installation Instructions

TH400 Automatic Trans Mount Shifter Installation Instructions

TH350 Automatic Trans Mount Shifter Installation Instructions

Installation Instructions

BXR6200 Super Ride 20K 5 th Wheel Hitch

DeZURIK 2 20" BOS BUTTERFLY VALVES

KEYSTONE OPTISEAL F14/16-15/17 AND BREWSEAL BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

COMMERCIAL. BV & BVM Series Installation Instructions 06/29/15

C WD 2 WHEEL LOW KIT FOR DODGE RAM 4WD VEHICLES

INSTALLATION INSTRUCTIONS

Installation Instructions for TCI Turbo 700R TCI Turbo 700R

General Information. Assembly Instructions. Dual Marker Option

Agricultural Track Service Procedures Removal, Installation, Inspection and Alignment

Initial Start-Up. What We Will Cover

Low Profile Wrenches Operation and Maintenance Manual

Certa-Lok, Kwik-Set and Threaded Drop Pipe

TrailGator REAR BUMPER INSTALLATION INSTRUCTIONS Runner

GH-BETTIS OPERATING & MAINTENANCE INSTRUCTIONS DISASSEMBLY & ASSEMBLY FOR THE T80X-M4-S DOUBLE ACTING SERIES HYDRAULIC ACTUATORS

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Recommended BFV Installation, Maintenance & Repair Procedures Ultraflo 300 & 400 Series Valves

Pick-Up Broom (Includes Optional Gutter Brush)

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

FRP Ball Valves INSTALLATION & MAINTENANCE MANUAL

Crispin Valves Operating Guide. Crispin

INSTALLATION - MAINTENANCE MANUAL Severe Service Series M4 Ball Valve

1.28 ACCESSORY DRIVE. Accessory Drive Assembly Related Parts (Former Design) SERIES 60 SERVICE MANUAL. 1. Locknut 8. Drive Gear

SERVICE GUIDE AGRICULTURAL TRACK REMOVAL INSTALLATION INSPECTION ALIGNMENT CPB-316

FWS1 and FWS2 Series Fifth Wheels

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

Installation Instructions

Certa-Lok, KWIK-SET and Threaded Drop Pipe. PVC Well Products

INSTALLATION INSTRUCTIONS

Required tools General hand tools 21/64" drill bit Torque wrench Threadlocker Center punch

BR B Bike Rack Instructions

INSTALLATION INSTRUCTIONS 88029

BX7322 Adventurer Tow Bar Operator Manual & Installation Instructions. (5,000 lb) 2 Inch Coupler

Pick Up Broom OWNERS/OPERATORS MANUAL. Model Number. Serial Number. Date of Manufacture. To Serial # Phone:

The valves should be stored on a pallet or skid in a clean, dry warehouse. If the valves must be stored outside, the following apply:

SERVICE MANUAL L130B / L4130 Series Logstacker Drive Axle With Bolt-On Stub End Retainer

Owner s Manual & Safety Instructions

INSTALLATION INSTRUCTIONS

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

AVK SERIES 41 SWING CHECK VALVE FIELD MAINTENANCE AND INSTRUCTION MANUAL FOR SWING CHECK VALVES 3" - 12"

ONYX VALVE CO MODEL DAC-ADA Installation & Maintenance

PNEUMATIC SLIDING VALVE

Page 1 of 26 Oteco Inc. Houston, Texas

1 of 9 7/19/2016 5:35 PM

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

Wafer Butterfly Valves

Pick-Up Broom (Includes Optional Gutter Brush)

VALVE AND PLUMBING KIT 2409 LOADER CUB CADET & KIOTI TRACTORS

CAUTION. Fuel Injection Pump, In-Line, Spill Port Timing

DeZURIK M-SERIES MANUAL ACTUATOR

Pick-Up Broom (Includes Optional Gutter Brush)

Butterfly valves Figure 56 Installation & Maintenance Instructions

Series 820 AWWA Butterfly Valves

Pick-Up Broom (Includes Optional Gutter Brush)

CONTROLS RESILIENT SEATED BUTTERFLY VALVES 20/21, 22/23, 30/31, 3A/3AH, 31H, 31U, 32/33, 35/36, 36H. The High Performance Company

INSTALLATION, OPERATION AND MAINTENANCE MANUAL (IOM)

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

CENTER LINE. INSTALLATION and MAINTENANCE INSTRUCTIONS RESILIENT SEAT BUTTERFLY VALVES MANUAL AND AUTOMATED

HexPro Series Low Profile Wrenches

Transcription:

CERTA-SET FIELD INSTALLATION GUIDE

LATERAL PIPE ASSEMBLY & PREPARATION Certa-Set 3" Lateral Pipe Assembly General Notes: Certa-Set pipe is intended for pressure pipe applications involving irrigation water systems. Please refer to the Field Layout Best Practices for field options and potential irrigation ideas. For instructions regarding pipe handling and additional installation information, please visit http://www.northamericanpipe.com/products/ag_irrigation 1. Install an O-Ring in the back groove of each female end of the sled coupling. Note: The front groove is the spline groove. O-ring missing O-ring misaligned O-ring in spline grove O-ring properly installed 2. Apply lubrication to the O-ring on one side of the sled coupling. Lubricant Properly installed O-ring Applying lubricant 3. Lubricate the spigot end of the pipe. NOTES: 1. Avoid getting lubricant in the spline grooves. 2. Do not use excess lubricant. Lubricant Applying lubricant 2

4. Press the sled coupling onto the spigot end of the pipe until the pipe has seated over the O-ring. The spline hole will align with the groove in the pipe when properly installed. Misaligned pipe and sled coupling Properly aligned pipe and sled coupling Push sled coupling onto pipe Push sled coupling onto pipe 5. Insert a spline at a low angle to the pipe until the insertion mark (raised dot) reaches the spline hole on the sled coupling. Insert pointed end of spline first Push spline into spline hole Push spline into spline hole Spline fully inserted 6. Sprinkler risers: ¾" Pre-assembled Certa-Set Riser or ½" Aluminum Assembled Riser A. ¾" Pre-assembled Certa-Set Risers 1. Insert the flanged O-ring into the riser. The larger ridge faces the riser cap; the smaller ridge faces the sled coupling. Do not use lubricant. Missing O-ring Incorrect O-ring positioning Correct O-ring positioning Correct O-ring positioning 3

2. After inserting the O-ring, screw the assembled riser onto the sled coupling by hand (clockwise). Hand tighten until it is seated. No tools are required. Do not overtighten. Position riser to align with sled coupling Hand tighten Hand tighten No tools required 3. Once riser and sled coupling are assembled, attach the sprinkler to the sprinkler end of the riser. Place [MRDC] [MR] or [MDC] onto riser first Hand tighten Place [MRDC] [MR] or [MDC] onto riser first Place sprinkler head onto [MRDC] [MR] or [MDC]; hand tighten Sprinkler head installed Do not install sprinkler head with [MRDC] [MR] or [MDC] B. ½" Aluminum Assembled Riser (manufactured by others) 1. The ½ riser consists of the following pieces: A ½" riser cap, chevron gasket and ½" assembled riser. Note: NAPCO does not manufacture or warranty ½" risers beyond the riser cap. Components to field assemble ½" riser 4

2. Insert chevron gasket into sled coupling open side down without lubricant. Screw ½" riser cap (clockwise) until it is hand tight and seated. In-correct gasket positioning Align gasket with the sled coupling before inserting the gasket into the top opening Correct gasket positioning Hand tighten riser cap 3. Insert ½" riser and turn until the hook is engaged against the stop. Hand tighten until it is seated. No tools are required. Do not overtighten. Align riser with riser cap Rotate riser Hook engaged with stop 4. Once riser and coupling are assembled, attach the sprinkler to the sprinkler end of the riser. Place [MRDC] [MR] or [MDC] onto riser first Place [MRDC] [MR] or [MDC] onto riser first Place sprinkler head onto [MRDC] [MR] or [MDC]; hand tighten NOTE: 1. Splines should be inserted the same direction to facilitate the removal of the splines when the pipe is removed from the field with the automatic pipe removal system. Please refer to the Field Layout Planning Guide and the Lateral Field Installation sections. 2. All 1/2" riser stubs below the quick disconnect hook must be a minimum of 2.25" in length to ensure full engagement of the coupling boss for proper riser support. Riser OD shaft specification 0.840 +/- 0.010". Maximum height for the riser is 36 inches when used with rotator sprinklers and 24 inches when used with impact sprinklers. When using a riser that is higher than the stated dimensions, it is recommended that stakes be utilized to stabilize the system. 7. Load the assembled 3" Certa-Set piping onto the trailer to transport to the field. Please refer to the Lateral Field Installation section for additional information. 5

LATERAL FIELD INSTALLATION Field Installation of Certa-Set 3" Lateral Pipe 1. Once Certa-Set Lateral Pipe is assembled and loaded on to a flatbed trailer, it is ready to transport to the field for final installation. 2. Before the pipe is removed from the flatbed trailer, inspect the sled couplings to ensure that the O-ring is inserted correctly and lubricate the O-ring in the female end of each sled coupling. O-ring missing O-ring misaligned O-ring in spline groove O-ring properly installed 3. While the pipe is still on the flatbed trailer, verify the male end of the pipe is clean and lubricated. NOTES: 1. Avoid getting lubricant in the spline grooves. 2. Do not use excess lubricant. Unclean pipe Lubricant Applying lubricant 4. Place roller tables in line with intended furrow. Note: The use of roller tables is preferred, but not required. Pipe roller table setup Pipe roller table setup Pipe roller table setup Pipe roller table setup 6

5. Connect the Certa-Set 3" lateral pipe to the tractor via a pulling connection. Connecting to tractor hitch #1 Connecting to tractor hitch #2 Final connection Final connection Final connection (another option) Final connection (another option) Connecting pipe to tractor Connecting pipe to tractor 6. Remove pipe from flatbed trailer and insert the assembled lateral pipe into the female end of the sled coupling. Insert pipe into sled coupling Insert pipe into sled coupling Insert pipe into sled coupling 7. Insert the spline into the into the sled coupling. Note the importance of spline direction as it relates to pipe removal. Insert pointed end of spline first Push spline into the spline hole Spline not inserted in same direction Spline not fully inserted Correctly inserted splines 7

8. Repeat steps 6 and 7 continuously while the tractor pulls the pipe into the field until the desired lateral length is complete. Adjust tractor speed to match the speed of pipe assembly. 9. Connect lateral line to the rest of the system. (See the Field Layout and Main Line Pipe Assembly and Installation sections). Certa-Set pipe entirely installed in an H design pattern Certa-Set pipe entirely installed in a U design pattern Certa-Set pipe entirely installed in the field Certa-Set pipe installed in the field 10. Flush lateral lines and install the end plugs. Flush lateral pipe End plug Install end plug 8

MAIN LINE PIPE ASSEMBLY & INSTALLATION Certa-Set Main Line Pipe Assembly & Installation General Notes: Certa-Set main line pipe is intended for pressure pipe applications involving irrigation systems. Please refer to the Field Layout Planning Guide for field options and potential irrigation ideas. For instructions regarding pipe handling and additional installation information, please visit http://www.northamericanpipe.com/products/ag_irrigation 1. Inspect the female end of the coupling or tapped coupling, ensuring the O-Ring is properly seated in the rear groove and that the spline groove (front) is clean and free of dirt and debris. O-ring missing O-ring in spline groove O-ring misaligned O-ring properly installed Lubricant Applying lubricant Applying lubricant Avoid lubricant in spline groove 2. Lubricate the O-ring NOTES: 1. Avoid getting lubricant in the spline grooves. 2. Do not use excess lubricant. 9

3. Lubricate the spigot end of the pipe. Make sure it is clean and free of debris. Pipe with debris Lubricate spigot Lubricate spigot 4. Start at one end of the pipeline and assemble the pipe against a firm stop, such as lumber or a tractor tire. Tractor tire Backhoe 5. If installing over a shallow V-ditch, ensure that sufficient lumber for cribbing (raising the pipe above the floor of the V-ditch) is available. At minimum, a 4" x 4" block in good condition should be used. 6. Insert spigot end of pipe into coupling. Pipe and coupling must be aligned in order for pipe to seat properly against the O-Ring. Pipe should slide straight into the coupling without deflection. NOTES: Always push on a coupling surface and NOT on the end of a pipe Misaligned pipe and coupling Properly aligned pipe and coupling 10

Bar and block Bar and block Backhoe with a strap Strap NOTES: If digging bars are used for leverage, protect the pipe with at minimum, a 2" x 4" block in good condition. Never hammer on pipe that does not seat. Check alignment, then apply pressure with a digging bar again. In difficult situations where pipe is properly lubricated and aligned, use one digging bar to maintain pressure and a second bar to apply additional pressure. In most cases, when pipe is properly seated, you will feel/hear a slight pop. If the spline will not easily insert into the hole, then the pipe has not been seated properly. 7. Insert each spline(s) into the spline hole until there is a tail of the specified dimension below. Main line size Spline length Approximate length of spline extending out 6" 24" 1" 8" 32" 2 ¼" 10" Two ½ Splines 20" each 1 ½" 12" Two ½ Splines 24" each 2 ¼" Spline hole(s) Insert pointed end of spline first Push spline into the spline hole Push spline into the spline hole Push spline into the spline hole Splines fully inserted 8. Repeat as necessary. 11

9. Install valve at tapped coupling. Tapped coupling Threaded adapter Tapped coupling Nelson valve assembly Nelson valve installed onto tapped coupling Secure Nelson valve installed onto tapped coupling with spline Nelson valve NOTES: 1. The Certa-Set main line piping and couplings can be disassembled and reused. See Main Line Disassembly. 2. Tapped couplings can be easily stripped if threads are not aligned properly. Take precautionary steps to prevent cross threading. BEST PRACTICES: Turn the pipe backward so the female end drops in, then tighten. This eliminates stripped threads. 12

LATERAL PIPE FIELD REMOVAL Certa-Set Lateral Pipe Field Removal Guide Typically, the pipe is removed from the field using an AIM Pipe Retriever. There are two models, the Valley Machine and the Salinas Machine. Alternately, some growers choose to pull the pipe in full lengths into adjacent fields for use or storage. Field Removal of Certa-Set using the AIM Pipe Retriever 1. Survey field conditions and decide on retrieval direction. Considerations should be taken for pipeline length, spline direction and work area limitations (roads, headland sizes, ditches) 2. Disconnect pipe from the main line connection. Remove swing joints (19 foot 3" Certa-Set lateral) and transition fittings. Note: the transition fitting (Tee or elbow) should be at 90 degrees so that the outlet is facing up. 3. Follow all operating procedures and safety precautions as instructed by the pipe retriever manufacturer. The illustrations and notes below are general guidelines, and all safety and operating requirements from the pipe retriever manufacturer and Occupational Safety and Health Administration (OSHA) shall take precedence. Swing joints are on both sides of the Nelson valve Nelson valve with burried main line Elbows connecting lateral pipe runs Tees 4. Disconnect 3" Certa-Set end plugs and drain line completely. Failure to drain lines will result in damage to the pipe and will void the warranty. End plug to be removed Remove spline Remove end plug Drain piping 13

5. Prior to using the AIM Machine, pull each pipeline with a tractor and strap to break it free from any accumulated silt and entwined foliage. Silt and foliage surrounding sled coupling Connecting to tractor to break pipe free for removal 6. Drive the AIM Pipe Retriever into position parallel with the head of the field. Using a spotter, align both ramps of the machine with the pipeline, ensuring almost perfect alignment across the machine. 7. Place an extra section of pipe in the AIM Machine and CLOSE the drive wheels. 8. Connect the pipe in the machine to the first coupling of the pipeline. 14

9. Begin pulling the pipe with BOTH DRIVE LEVERS pointing to the outboard direction. 10. When the first sled coupling reaches the center of the machine, bump the outboard drive lever inboard to relieve the tensile pressure off of the coupling. The machine operator will then remove the spline and place it in a bucket. 11. Pull the outboard lever to the outboard direction first, separating the pipe from the coupling. 12. Repeat Steps 8-10 until the entire pipeline is removed. Leave the last piece of pipe in the machine to facilitate the connection to the next lateral pipe run to be removed. 13. Repeat steps 7-11 until the pipe is clear of the field. 15

Pulling the 3" Certa-Set lateral lines into an adjacent field 1. Survey field conditions and decide on retrieval direction. Considerations should be taken for pipeline length, spline direction and work area limitations (roads, headland sizes, ditches). 2. Disconnect pipe from the main line connection. Remove swing joints (19 foot 3" Certa-Set lateral pipe) and transition fittings. Swing joints are on both sides of the Nelson valve Nelson valve with buried main line Elbows connecting lateral pipe runs Tees 3. Disconnect 3" Certa-Set end plugs and drain line completely. Failure to drain lines will result in damage to the pipe and will void the warranty End plug to be removed Remove spline Remove end plug Drain piping 4. Connect the pipeline to the tractor using a pulling connection. Position tractor Connect pipe to tractor hitch Insert spline Final connection to tractor to remove/move pipe 5. Slowly pull the pipeline, ensuring that it is not binding up on any obstruction. 6. Tow pipe into place in next field and reconnect as necessary. 855-624-7473 North American Pipe Corporation 2801 Post Oak Blvd., Suite 600, Houston, TX 77056 A Westlake Company Copyright 2017 North American Pipe Corporation. All rights reserved. Printed in the U.S.A. AG-BR-002 0217