ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Similar documents
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Maine Turnpike Authority

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16

Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018

County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total)

Maine Turnpike Authority

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

For Conduit Inspections

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008

Page 1 of KA

County of Los Angeles Department of Public Works BID SUMMARY

Federal Project No.: NHPP-967-7(083)

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

Items Unit Quantity Unit Price Total Unit Price Total

ADDENDUM No. 1 Prospective Bidders

County of Los Angeles Department of Public Works BID SUMMARY

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

Federal Project No.: HSIP-5A27(567)

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

STANDARD DRAWING INDEX

Mr. Dave Gertz Director of Engineering TrafFix Devices, Inc. 220 Calle Pintoresco San Clemente, California Dear Mr. Gertz:

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

MoDOT 2016 UNIT BID PRICES Northwest District

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT

Macomb County Department of Roads Bid Comparison

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

ROADWAY LIGHTING SYSTEMS (2545)

STREET IMPROVEMENTS PROPOSAL BID ITEMS

Plan Check Policies and Guidelines

San Antonio, Texas 78222

SPECIAL SPECIFICATION 6576 Solar Panel Power Supply System

Steese Rd - Curb & Sidewalk Improvement

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Plan Check Policies and Guidelines

TRAFFIC CONTROL PLAN ONE-LANE TWO-WAY TRAFFIC CONTROL TCP(1-2)-12 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS ONE LANE TWO-WAY CONTROL WITH FLAGGERS

Central Florida Regional Transportation Authority d.b.a.

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA

PORTABLE TRAFFIC SIGNALS

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

GARDEN STATE. 1 Active Work Zone When Flashing 36x36 W Advisory Speed 10 18x18 W Advisory Speed 15 18x18 W

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

Indianapolis Power & Light Company

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Work Zone Safety & New Interstate Resurfacing Provision

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: US 287 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

Maine Turnpike Authority

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

Maine Turnpike Authority

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

Recent Transportation Projects

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

SmartPole Meter for Service to Pole-Mounted Communication Equipment

4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED BELOW.

CITY OF SAN MARCOS ENGINEERING DIVISION

Federal Project No.: OC-095-1(348)

Maine Turnpike Authority

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013

SPECIAL SPECIFICATION 8676 Solar Panel Power Supply System

Table of Contents. Electrical Service Requirements. 1. General Requirements

Licensed Class C Virginia Contractor No.

SIGNAL HEADS. The LED signal indication must operate on a nominal 120 VAC power source.

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

- 1 - TRAFFIC CONTROL EQUIPMENT SPECIFICATIONS I. INTENT STATEMENT II. GENERAL EQUIPMENT CATEGORY SPECIFICATIONS

Installing or Rebuilding Your Electric Service

Application for Service Residential Subdivision / Development

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

OTTAWA COUNTY ROAD COMMISSION Bid Comparison

PORTABLE WEIGH-IN-MOTION FIELD EVALUATION. Minnesota Local Road Research Board

BL PIEZO ELECTRIC SENSOR

Project Book Worksheet for Cost Estimation

SPECIAL SPECIFICATION 1788 Surveillance Cabinet

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

The Traffi cade Way:

South Dock Replacement Prescott Park. This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement Prescott Park.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

Transcription:

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross Length Net Length Prepared By: 999 UN 999 H873601C 999-A-(436)T 16961 UNKNOWN CENTRAL 0 Rik Richter Highway Termini Location Work Description STATEWIDE VARIOUS LOCATIONS WEIGH-IN-MOTION INSTALLATIONS

Printed: 8/23/2017 Page 1 of 8 BID RESULTS FOR 2017021 Bid Opening Date : 7/28/2017, Prequalification Required, Engineer Specialist : Rik Richter Completion Date: 200 Working Days The proposed Weigh-In-Motion Installations project is located at 16 locations statewide. The proposed work consists of installing Weigh-in-Motion (WIM) systems that includes installation of loop detectors, quartz piezoelectric sensors, poles, cabinets, foundations, equipment and solar panels. The work also includes horizontal directional drilling of conduit, loop lead in cable, pull boxes, activation of the WIM systems,.and other related items. Bid Rank Department Estimate Bid Amount Contractor Extended Sum of s +% $2,060,000.00 DEPARTMENT ESTIMATE $2,060,000.00 1 +12.5% $2,318,270.00 2 +20.7% $2,486,942.00 3 +25.4% $2,584,246.80 4 +46.4% $3,015,838.94 ROADWAY ELECTRIC, LLC 2035 W. MOUNTAIN VIEW ROAD PHOENIX, AZ 85021 C S CONSTRUCTION, INC. 22023 N 20TH AVE SUITE A PHOENIX, AZ 85027 DIGITAL TRAFFIC SYSTEMS, INC. 11056 AIR PARK ROAD ASHLAND, VA 25005 N.G.U CONTRACTING, INC. 3820 W. Happy Valley Road, Ste. 141 #496 Glendale, AZ 85310 Winning Bidder is 12.5% Over Department Estimate (Difference = $258,270.00) $2,318,270.00 $2,486,942.00 $2,584,246.80 $3,015,838.94

Printed: 8/23/2017 Page 2 of 8 Measure Description Quantity Unit Price Extended Amount 7016030 EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER) Bid Rank Department Estimate 10,000.000 $0.300 $3,000.00 1 ROADWAY ELECTRIC, LLC $0.150 $1,500.00-50.0% 2 C S CONSTRUCTION, INC. $0.150 $1,500.00-50.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $1.190 $11,900.00 +296.7% 4 N.G.U CONTRACTING, INC. $0.250 $2,500.00-16.7% 7016031 EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES) Bid Rank Department Estimate 1,020.000 $0.750 $765.00 1 ROADWAY ELECTRIC, LLC $0.350 $357.00-53.3% 2 C S CONSTRUCTION, INC. $0.450 $459.00-40.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $3.570 $3,641.40 +376.0% 4 N.G.U CONTRACTING, INC. $0.590 $601.80-21.3% 7016032 EACH-DAY PORTABLE SIGN STANDS (RIGID) Bid Rank Department Estimate 172.000 $0.600 $103.20 1 ROADWAY ELECTRIC, LLC $0.650 $111.80 +8.3% 2 C S CONSTRUCTION, INC. $1.000 $172.00 +66.7% 3 DIGITAL TRAFFIC SYSTEMS, INC. $4.760 $818.72 +693.3% 4 N.G.U CONTRACTING, INC. $0.590 $101.48-1.7% 7016033 EACH-DAY PORTABLE SIGN STANDS (SPRING TYPE) Bid Rank Department Estimate 1,310.000 $0.800 $1,048.00 1 ROADWAY ELECTRIC, LLC $0.550 $720.50-31.2% 2 C S CONSTRUCTION, INC. $0.700 $917.00-12.5% 3 DIGITAL TRAFFIC SYSTEMS, INC. $4.760 $6,235.60 +495.0% 4 N.G.U CONTRACTING, INC. $0.590 $772.90-26.3% 7016035 EACH-DAY WARNING LIGHTS (TYPE A) Bid Rank Department Estimate 3,522.000 $0.200 $704.40 1 ROADWAY ELECTRIC, LLC $0.200 $704.40 +0.0% 2 C S CONSTRUCTION, INC. $0.200 $704.40 +0.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $0.600 $2,113.20 +200.0% 4 N.G.U CONTRACTING, INC. $0.170 $598.74-15.0% 7016037 EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 10,000.000 $0.300 $3,000.00 1 ROADWAY ELECTRIC, LLC $0.200 $2,000.00-33.3% 2 C S CONSTRUCTION, INC. $0.200 $2,000.00-33.3% 3 DIGITAL TRAFFIC SYSTEMS, INC. $0.600 $6,000.00 +100.0% 4 N.G.U CONTRACTING, INC. $0.170 $1,700.00-43.3%

Printed: 8/23/2017 Page 3 of 8 Measure Description Quantity Unit Price Extended Amount 7016050 EACH-DAY TRUCK MOUNTED ATTENUATOR Bid Rank Department Estimate 102.000 $600.000 $61,200.00 1 ROADWAY ELECTRIC, LLC $90.000 $9,180.00-85.0% 2 C S CONSTRUCTION, INC. $600.000 $61,200.00 +0.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $416.750 $42,508.50-30.5% 4 N.G.U CONTRACTING, INC. $760.020 $77,522.04 +26.7% 7016051 EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.) Bid Rank Department Estimate 172.000 $0.550 $94.60 1 ROADWAY ELECTRIC, LLC $0.400 $68.80-27.3% 2 C S CONSTRUCTION, INC. $0.500 $86.00-9.1% 3 DIGITAL TRAFFIC SYSTEMS, INC. $5.950 $1,023.40 +981.8% 4 N.G.U CONTRACTING, INC. $0.540 $92.88-1.8% 7016052 EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE) Bid Rank Department Estimate 1,310.000 $0.650 $851.50 1 ROADWAY ELECTRIC, LLC $0.400 $524.00-38.5% 2 C S CONSTRUCTION, INC. $0.500 $655.00-23.1% 3 DIGITAL TRAFFIC SYSTEMS, INC. $5.950 $7,794.50 +815.4% 4 N.G.U CONTRACTING, INC. $0.650 $851.50 +0.0% 7016061 EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate 28.000 $20.000 $560.00 1 ROADWAY ELECTRIC, LLC $21.000 $588.00 +5.0% 2 C S CONSTRUCTION, INC. $50.000 $1,400.00 +150.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $178.610 $5,001.08 +793.1% 4 N.G.U CONTRACTING, INC. $12.290 $344.12-38.6% 7016067 EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) Bid Rank Department Estimate 102.000 $35.000 $3,570.00 1 ROADWAY ELECTRIC, LLC $37.000 $3,774.00 +5.7% 2 C S CONSTRUCTION, INC. $50.000 $5,100.00 +42.9% 3 DIGITAL TRAFFIC SYSTEMS, INC. $238.140 $24,290.28 +580.4% 4 N.G.U CONTRACTING, INC. $38.410 $3,917.82 +9.7% 7016075 HOUR FLAGGING SERVICES (CIVILIAN) Bid Rank Department Estimate 256.000 $50.000 $12,800.00 1 ROADWAY ELECTRIC, LLC $52.000 $13,312.00 +4.0% 2 C S CONSTRUCTION, INC. $49.000 $12,544.00-2.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $67.360 $17,244.16 +34.7% 4 N.G.U CONTRACTING, INC. $41.280 $10,567.68-17.4%

Printed: 8/23/2017 Page 4 of 8 Measure Description Quantity Unit Price Extended Amount 7016080 HOUR FLAGGING SERVICES (DPS) Bid Rank Department Estimate 816.000 $65.260 $53,252.16 1 ROADWAY ELECTRIC, LLC $65.260 $53,252.16 +0.0% 2 C S CONSTRUCTION, INC. $65.260 $53,252.16 +0.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $65.260 $53,252.16 +0.0% 4 N.G.U CONTRACTING, INC. $65.260 $53,252.16 +0.0% 7310010 EACH POLE (TYPE A) Bid Rank Department Estimate 15.000 $850.000 $12,750.00 1 ROADWAY ELECTRIC, LLC $455.000 $6,825.00-46.5% 2 C S CONSTRUCTION, INC. $575.000 $8,625.00-32.4% 3 DIGITAL TRAFFIC SYSTEMS, INC. $1,382.420 $20,736.30 +62.6% 4 N.G.U CONTRACTING, INC. $983.270 $14,749.05 +15.7% 7310197 EACH BREAKAWAY BASE FOR LIGHTING POLE OR SIGNAL FLASHER Bid Rank Department Estimate 15.000 $400.000 $6,000.00 1 ROADWAY ELECTRIC, LLC $460.000 $6,900.00 +15.0% 2 C S CONSTRUCTION, INC. $540.000 $8,100.00 +35.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $244.700 $3,670.50-38.8% 4 N.G.U CONTRACTING, INC. $558.830 $8,382.45 +39.7% 7310200 EACH POLE FOUNDATION (TYPE A) Bid Rank Department Estimate 15.000 $750.000 $11,250.00 1 ROADWAY ELECTRIC, LLC $835.000 $12,525.00 +11.3% 2 C S CONSTRUCTION, INC. $800.000 $12,000.00 +6.7% 3 DIGITAL TRAFFIC SYSTEMS, INC. $1,572.000 $23,580.00 +109.6% 4 N.G.U CONTRACTING, INC. $1,386.480 $20,797.20 +84.9% 7320070 L.FT. ELECTRICAL CONDUIT (3") (PVC) Bid Rank Department Estimate 740.000 $15.000 $11,100.00 1 ROADWAY ELECTRIC, LLC $21.000 $15,540.00 +40.0% 2 C S CONSTRUCTION, INC. $10.000 $7,400.00-33.3% 3 DIGITAL TRAFFIC SYSTEMS, INC. $10.990 $8,132.60-26.7% 4 N.G.U CONTRACTING, INC. $18.390 $13,608.60 +22.6% 7320294 L.FT. ELECTRICAL CONDUIT (3") (HDPE) (DIRECTIONAL DRILL) Bid Rank Department Estimate 900.000 $37.000 $33,300.00 1 ROADWAY ELECTRIC, LLC $50.000 $45,000.00 +35.1% 2 C S CONSTRUCTION, INC. $27.500 $24,750.00-25.7% 3 DIGITAL TRAFFIC SYSTEMS, INC. $78.930 $71,037.00 +113.3% 4 N.G.U CONTRACTING, INC. $56.590 $50,931.00 +52.9%

Printed: 8/23/2017 Page 5 of 8 Measure Description Quantity Unit Price Extended Amount 7320420 EACH PULL BOX (NO. 7) Bid Rank Department Estimate 36.000 $800.000 $28,800.00 1 ROADWAY ELECTRIC, LLC $575.000 $20,700.00-28.1% 2 C S CONSTRUCTION, INC. $1,050.000 $37,800.00 +31.3% 3 DIGITAL TRAFFIC SYSTEMS, INC. $846.100 $30,459.60 +5.8% 4 N.G.U CONTRACTING, INC. $693.240 $24,956.64-13.3% 7340030 EACH CONTROL CABINET (TYPE III) Bid Rank Department Estimate 15.000 $2,900.000 $43,500.00 1 ROADWAY ELECTRIC, LLC $1,130.000 $16,950.00-61.0% 2 C S CONSTRUCTION, INC. $1,050.000 $15,750.00-63.8% 3 DIGITAL TRAFFIC SYSTEMS, INC. $1,963.820 $29,457.30-32.3% 4 N.G.U CONTRACTING, INC. $3,077.130 $46,156.95 +6.1% 7350040 EACH LOOP DETECTOR (WIM) (6' X 9') Bid Rank Department Estimate 36.000 $1,000.000 $36,000.00 1 ROADWAY ELECTRIC, LLC $980.000 $35,280.00-2.0% 2 C S CONSTRUCTION, INC. $650.000 $23,400.00-35.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $1,320.530 $47,539.08 +32.1% 4 N.G.U CONTRACTING, INC. $1,237.930 $44,565.48 +23.8% 7350165 L.FT. LOOP DETECTOR LEAD-IN CABLE Bid Rank Department Estimate 1,440.000 $1.500 $2,160.00 1 ROADWAY ELECTRIC, LLC $0.750 $1,080.00-50.0% 2 C S CONSTRUCTION, INC. $1.000 $1,440.00-33.3% 3 DIGITAL TRAFFIC SYSTEMS, INC. $1.640 $2,361.60 +9.3% 4 N.G.U CONTRACTING, INC. $2.120 $3,052.80 +41.3% 9010001 L.SUM MOBILIZATION Bid Rank Department Estimate 1.000 $205,091.140 $205,091.14 1 ROADWAY ELECTRIC, LLC $264,817.340 $264,817.34 +29.1% 2 C S CONSTRUCTION, INC. $249,967.440 $249,967.44 +21.9% 3 DIGITAL TRAFFIC SYSTEMS, INC. $306,879.180 $306,879.18 +49.6% 4 N.G.U CONTRACTING, INC. $273,886.000 $273,886.00 +33.5% 9240011 L.SUM FORCE ACCOUNT WORK (PULLBOX AND CONDUIT RECONDITITIONING) Bid Rank Department Estimate 1.000 $3,500.000 $3,500.00 1 ROADWAY ELECTRIC, LLC $3,500.000 $3,500.00 +0.0% 2 C S CONSTRUCTION, INC. $3,500.000 $3,500.00 +0.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $3,500.000 $3,500.00 +0.0% 4 N.G.U CONTRACTING, INC. $3,500.000 $3,500.00 +0.0%

Printed: 8/23/2017 Page 6 of 8 Measure Description Quantity Unit Price Extended Amount 9240014 L.SUM FORCE ACCOUNT WORK (LANDSCAPE REPAIRS) Bid Rank Department Estimate 1.000 $3,500.000 $3,500.00 1 ROADWAY ELECTRIC, LLC $3,500.000 $3,500.00 +0.0% 2 C S CONSTRUCTION, INC. $3,500.000 $3,500.00 +0.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $3,500.000 $3,500.00 +0.0% 4 N.G.U CONTRACTING, INC. $3,500.000 $3,500.00 +0.0% 9240015 L.SUM FORCE ACCOUNT WORK (QUARTZ SENSOR INSTALLATION AND TRAINING) Bid Rank Department Estimate 1.000 $25,000.000 $25,000.00 1 ROADWAY ELECTRIC, LLC $25,000.000 $25,000.00 +0.0% 2 C S CONSTRUCTION, INC. $25,000.000 $25,000.00 +0.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $25,000.000 $25,000.00 +0.0% 4 N.G.U CONTRACTING, INC. $25,000.000 $25,000.00 +0.0% 9240100 L.SUM MISCELLANEOUS WORK (RECORD DRAWING DOCUMENTATION) Bid Rank Department Estimate 1.000 $3,500.000 $3,500.00 1 ROADWAY ELECTRIC, LLC $14,560.000 $14,560.00 +316.0% 2 C S CONSTRUCTION, INC. $2,000.000 $2,000.00-42.9% 3 DIGITAL TRAFFIC SYSTEMS, INC. $28,134.540 $28,134.54 +703.8% 4 N.G.U CONTRACTING, INC. $52,898.430 $52,898.43 +1411.4% 9240121 EACH MISCELLANEOUS WORK (QUARTZ SENSOR, 1.75M 40M CABLE AND GROUT) Bid Rank Department Estimate 120.000 $8,000.000 $960,000.00 1 ROADWAY ELECTRIC, LLC $7,440.000 $892,800.00-7.0% 2 C S CONSTRUCTION, INC. $8,950.000 $1,074,000.00 +11.9% 3 DIGITAL TRAFFIC SYSTEMS, INC. $7,732.710 $927,925.20-3.3% 4 N.G.U CONTRACTING, INC. $9,903.430 $1,188,411.60 +23.8% 9240122 EACH MISCELLANEOUS WORK (QUARTZ SENSOR, 1.75M 100M CABLE AND GROUT) Bid Rank Department Estimate 24.000 $8,500.000 $204,000.00 1 ROADWAY ELECTRIC, LLC $8,400.000 $201,600.00-1.2% 2 C S CONSTRUCTION, INC. $9,000.000 $216,000.00 +5.9% 3 DIGITAL TRAFFIC SYSTEMS, INC. $8,430.590 $202,334.16-0.8% 4 N.G.U CONTRACTING, INC. $11,035.240 $264,845.76 +29.8% 9240133 EACH MISCELLANEOUS WORK (INSTALL CABINET EQUIPMENT, TEST AND CALIBRATE) Bid Rank Department Estimate 16.000 $6,000.000 $96,000.00 1 ROADWAY ELECTRIC, LLC $855.000 $13,680.00-85.8% 2 C S CONSTRUCTION, INC. $2,100.000 $33,600.00-65.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $654.980 $10,479.68-89.1% 4 N.G.U CONTRACTING, INC. $2,436.870 $38,989.92-59.4%

Printed: 8/23/2017 Page 7 of 8 Measure Description Quantity Unit Price Extended Amount 9240134 EACH MISCELLANEOUS WORK (DATA RECORDER) Bid Rank Department Estimate 16.000 $13,000.000 $208,000.00 1 ROADWAY ELECTRIC, LLC $38,100.000 $609,600.00 +193.1% 2 C S CONSTRUCTION, INC. $35,175.000 $562,800.00 +170.6% 3 DIGITAL TRAFFIC SYSTEMS, INC. $38,069.670 $609,114.72 +192.8% 4 N.G.U CONTRACTING, INC. $44,000.000 $704,000.00 +238.5% 9240135 EACH MISCELLANEOUS WORK (COMMUNICATION EQUIPMENT) Bid Rank Department Estimate 16.000 $1,000.000 $16,000.00 1 ROADWAY ELECTRIC, LLC $1,080.000 $17,280.00 +8.0% 2 C S CONSTRUCTION, INC. $1,050.000 $16,800.00 +5.0% 3 DIGITAL TRAFFIC SYSTEMS, INC. $1,338.730 $21,419.68 +33.9% 4 N.G.U CONTRACTING, INC. $1,506.740 $24,107.84 +50.7% 9240136 EACH MISCELLANEOUS WORK (40 WATT - 12 VOLT SOLAR PANEL MODULE) Bid Rank Department Estimate 14.000 $220.000 $3,080.00 1 ROADWAY ELECTRIC, LLC $240.000 $3,360.00 +9.1% 2 C S CONSTRUCTION, INC. $225.000 $3,150.00 +2.3% 3 DIGITAL TRAFFIC SYSTEMS, INC. $319.900 $4,478.60 +45.4% 4 N.G.U CONTRACTING, INC. $389.070 $5,446.98 +76.8% 9240171 EACH MISCELLANEOUS WORK (90 WATT - 12 VOLT SOLAR PANEL MODULE) Bid Rank Department Estimate 2.000 $300.000 $600.00 1 ROADWAY ELECTRIC, LLC $360.000 $720.00 +20.0% 2 C S CONSTRUCTION, INC. $325.000 $650.00 +8.3% 3 DIGITAL TRAFFIC SYSTEMS, INC. $435.390 $870.78 +45.1% 4 N.G.U CONTRACTING, INC. $601.280 $1,202.56 +100.4% 9240172 EACH MISCELLANEOUS WORK (TOP OF POLE MOUNT WITH 4" WELDED GIMBAL) Bid Rank Department Estimate 16.000 $110.000 $1,760.00 1 ROADWAY ELECTRIC, LLC $665.000 $10,640.00 +504.5% 2 C S CONSTRUCTION, INC. $45.000 $720.00-59.1% 3 DIGITAL TRAFFIC SYSTEMS, INC. $141.290 $2,260.64 +28.4% 4 N.G.U CONTRACTING, INC. $2,122.160 $33,954.56 +1829.2% 9240173 EACH MISCELLANEOUS WORK (12 VOLT 6 AMP CHARGE CONTROLLER WITH LVD) Bid Rank Department Estimate 16.000 $60.000 $960.00 1 ROADWAY ELECTRIC, LLC $345.000 $5,520.00 +475.0% 2 C S CONSTRUCTION, INC. $625.000 $10,000.00 +941.7% 3 DIGITAL TRAFFIC SYSTEMS, INC. $741.400 $11,862.40 +1135.7% 4 N.G.U CONTRACTING, INC. $502.250 $8,036.00 +737.1%

Printed: 8/23/2017 Page 8 of 8 Measure Description Quantity Unit Price Extended Amount 9240175 EACH MISCELLANEOUS WORK (100 AMP HOUR 12 VOLT SEALED LEAD ACID BATTERIES) Bid Rank Department Estimate 16.000 $200.000 $3,200.00 1 ROADWAY ELECTRIC, LLC $300.000 $4,800.00 +50.0% 2 C S CONSTRUCTION, INC. $375.000 $6,000.00 +87.5% 3 DIGITAL TRAFFIC SYSTEMS, INC. $480.640 $7,690.24 +140.3% 4 N.G.U CONTRACTING, INC. $502.250 $8,036.00 +151.1%