MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply

Similar documents
one parking space for each 145 m² of gross floor area; and (b) maximum of one parking space for each

1133 Melville Street Office Building Development REZONING APPLICATION SUBMISSION

TRANSPORTATION REVIEW

Secured Market Rental 100 Project at 3070 Kingsway, Vancouver, BC Letter Report

2.0 Development Driveways. Movin Out June 2017

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Transportation Review

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

TRAFFIC AND PARKING ASSESSMENT FOR PROPOSED MIXED USE DEVELOPMENT 2250 COMMERCIAL DRIVE, VANCOUVER

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Construction Staging Area 4 Avenue Road

Traffic Impact Assessment

The Re:Queen and Sparks Traffic Brief - Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

November

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

Construction Realty Co.

370 Queen Elizabeth Drive Transportation Overview

RE: INNES / TRIM RETIREMENT RESIDENCE TRANSPORTATION OVERVIEW

Re: Cyrville Road Car Dealership

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

Transportation Land Development Environmental S e r v i c e s

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

ANDERSON PROPERTY SITE ANALYSIS

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

City of Janesville Rock County, Wisconsin September 25, 2017

Costco Gasoline Fuel Station Transportation Characteristics

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Chevy Chase Lake. Preliminary Plan # B TRAFFIC STATEMENT. Prepared for: Chevy Chase Land Company & Bozzuto Development Company

Mercer Island Center for the Arts Parking Management Plan

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

Pearson Dogwood Master Plan Transportation Assessment

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

West 1 st Street North Vancouver, BC

MANHATTAN VILLAGE ENHANCEMENT PROJECT

First Baptist Property Master Plan Transportation Assessment

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Vancouver s Transient Parking Supply and Demand

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

Re: Residential Development - Ogilvie/Cummings Transportation Overview

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Clean Harbors Canada, Inc.

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

Appendix J Traffic Impact Study

Ingraham High School Parking and Traffic Analysis

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

TIS / TB/ CTS Check List

This letter summarizes our observations, anticipated traffic changes, and conclusions.

4 Circulation & Transportation

ENGINE COMPANY 42. Traffic Study. Chicago, Illinois. March 2018 FRIEDMAN PROPERTIES. Prepared for:

4/2/18 MP NORTHPOINT MALL GENERAL GROWTH PROPERTIES

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

King Soopers #116 Thornton, Colorado

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

Traffic Impact Statement (TIS)

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

PUBLIC INFRASTRUCTURE PROJECTS

appendix 4: Parking Management Study, Phase II

TRAFFIC IMPACT ANALYSIS

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY

TORONTO TRANSIT COMMISSION REPORT NO.

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study

STANDARD LIMITATIONS

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

ORIGINAL AND REVISED DEVELOPMENT CONCEPTS

Summary of Findings: Parking and Trip Generation Study For Coffee/Donut Shops with Drive-Through Window. District 5 Tennessee Section: Memphis, TN

Lacey Gateway Residential Phase 1

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

267 O Connor Street Residential Development

TRAFFIC PARKING ANALYSIS

Manotick Plaza, Manotick Main Street - Traffic Impact Brief

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Traffic Impact Study. Chicago, Illinois. May 2017 RETAIL UPPER N COLUMBUS US DRIVE. Parcel O, LLC. Prepared for: EXISTING SIDEWALK EXISTING PLA

Terminal Alternatives

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL

Attachment D Environmental Justice and Outreach

APPENDIX VMT Evaluation

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

Technical Memorandum

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

886 March Road McDonald's Transportation Study

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Downtown Lee s Summit Parking Study

150 OFF-STREET PARKING AND LOADING REGULATIONS

LEGAL DESCRIPTION REZONE PARCEL

Transportation & Traffic Engineering

Prince George CNG Operations and Maintenance Facility Project BC Transit

Transcription:

MEMO DATE: March 22, 2016 PROJECT O: 4241-44 PROJECT: 1550 Alberni Street SUBJECT: Transportation Design Rationale for Rezoning Application (Update with Design Package) TO: Dave Leung, 1550 Alberni Limited Partnership FROM: Christephen Cheng, P.Eng., Bunt Associates An updated Design package is being submitted to the City of Vancouver concerning a proposed rezoning application for a mixed-use tower at 1550 Alberni Street in Vancouver, BC. The following provides a transportation design rationale that supports the updated Design package. 1. SITE LOCATIO AD EXISTIG USE For the purpose of this memorandum, the Project orth is assumed to be aligned with Cardero Street. The development site is bounded by Cardero Street to the west, Alberni Street to the north, an adjacent residential building (1500 Alberni Street) to the east, and a public laneway to the south. The development site currently accommodates an office building, with parking access located off Alberni Street, approximately 10m from the Cardero Street Alberni Street intersection. The existing office building generates approximately 40 vehicle trips per hour during the Weekday morning and afternoon peak-hour periods. East of the development site, the residential building at 1500 Alberni Street has 69 residential units, with peak-hour vehicle trips observed to be 12 and 16 vehicle trips for the Weekday morning and afternoon peak-hour periods, respectively. Accordingly the vehicle trip generation rates worked out to be 0.18 (0.24) vehicle trips per hour for the Weekday morning (afternoon) peak-hour periods. In terms of passenger pick-up/drop-off demand, there was no more than one vehicle at any given 5-minute interval. 2. PROPOSED DEVELOPMET The existing office building on the development is proposed to be demolished and be replaced with a 42- storey tower with approximately 181 units and 504 m 2 of ground floor retail use. 2.1 Vehicle Access Access to the underground parking and on-site loading for the development is proposed to be located off the public laneway along the southern edge of the site. Exhibit 1 shows the upper ground level plan indicating the access location to the underground parking and the on-site loading. The parallel alignment of the parking ramp at the lane access point will require vehicle access to/from the ramp be orientated to the west toward the Cardero Street lane opening. The proposed parking ramp design has been reviewed using the AutoTurn software. Exhibit 2 illustrates the vehicle turning paths entering and exiting the parking ramp. In addition, to ensure the proposed ramp transitions will provide sufficient ground clearance for passenger cars when navigating the parkade ramp, a 3D analysis has also been prepared to confirm that the proposed ramp transitions will not result in any operational issues with the design passenger cars. The 3D analysis is included in Exhibit 3. 2.2 Vehicle Parking Vehicle parking for the development is planned to meet or exceed the minimum requirements outlined in the City s Parking By-law. Table 1 presents the number of parking stalls required based on the City s Bylaw, along with the proposed supply. Table 1: Vehicle Parking Requirements and Proposed Supply o. of By-law Minimum Requirements Stalls Required (Min.) Stalls Provided Parking Supply Ratio Residential 26,538 m 2 181 1 per 140 m 2 GFA 190 273 1.41 per unit Commercial (Retail, Coffee Shop, Japanese Restaurant) 504 m 2-1 per 145 m 2 GFA 3 4 0.76 per 100 m 2 GFA Total 194 277 ote: Residential includes Lobbies, Elevator Lobbies, Cores, Corridors, Services and Suite Areas. A total of 277 vehicle parking stalls are planned for the development, exceeding the City s Parking By-law minimums (194 stalls). 1550 Alberni Street: Transportation Design Rationale March 22, 2016 2 110

111 S:\PROJECTS\CC\4241-44 1550 Alberni St Transportation Review\5.0 Deliverables\6.2 Final Report\Graphics\EXH 1.cdr March 2016 4241.44 Upper Level Plan Exhibit 1 Scale: TS

112 File ame 4241.44 March 22, 2016 Scale TS Parkade Entry Vehicle Path Exhibit 2 Site Plan Received from Merrick Architecture (March 22, 2016); Design Vehicle: Passenger Car; Red dash lines represent 0.5m clearance from vehicle body. bun t

S:\PROJECTS\CC\4241-44 1550 Alberni St Transportation Review\4.0 Analysis Design\4.1 ACAD\20160218_3d_ramp_analysis_v03 Exhibit 3 Parking Ramp 3D Analysis and Ground Clearance Check 4241.44 February 18, 2016 Scale TS b u n t 113

2.3 Loading Table 2 summarizes the off-street loading space requirements based on the City s By-law along with the proposed supply. Table 2: Off-street Loading Space Requirements and Proposed Supply By-law Requirements Required Loading Provided Loading Residential 26,538 m 2 181 1 Class B space for 100 to 299 units. 1 Class B Commercial (Coffee Shop, Japanese Restaurant, Retail) 504 m 2-1 Class B space for the first 465 m 2 GFA, plus 1 Class B for any portion of the next 1,860 m2. 2 Class B 2 Class B, 2 Class A Total 3 Class B 2 Class B, 2 Class A The development proposes to provide a total of 2 Class B loading spaces to be shared between the residential and commercial uses. In addition, 2 Class A loading spaces will be provided in the underground parkade to accommodate small vehicle deliveries and maintenance vehicles for the building. 2.4 Bicycle Parking Bicycle parking for the development is planned to be provided to meet the City s By-law minimum requirements. Table 3 summarizes the bicycle parking requirements based on the City s By-law. Table 3: Bicycle Parking Requirements By-law Requirements Required Bicycle Parking Class A Class B Residential 26,538 m 2 181 Class A: 1.25 spaces for every unit; Class B: 6 spaces for any development containing a minimum of 20 units. 226 6 Commercial (Coffee Shop, Japanese Restaurant, Retail) 504 m 2 - Class A: 1 space for each 500 sq m GFA. Class B: 6 spaces for any development containing a minimum of 1,000 sq m GFA. 1 6 Total - 227 12 A total of 227 Class A and 12 Class B bicycle parking spaces are required for the development. There needs to be 1 locker for each gender to be provided for the required commercial Class A bicycle space. However, no shower facility or washing closet would be required. 1550 Alberni Street: Transportation Design Rationale March 22, 2016 6 2.5 et Change in Vehicle Trips In terms of the net change in vehicle trips from the proposed development, using the observed vehicle trip rates form the adjacent residential building at 1500 Alberni Street, the residential units proposed for the development is expected to generate approximately 35 to 45 vehicle trips per hour during the Weekday AM and PM peak-hour periods. Vehicle trips associated with the proposed retail use are anticipated to occur mostly outside of the peak-hour periods. Comparing to the vehicle trip generation from the existing office building on-site (40 vehicle trips in the peak-hour periods), the proposed development is anticipated to generate a negligible increase in vehicle trips so it will have no material impact to the traffic operation of the street network. 3. SUMMARY The proposed vehicle access for the development is proposed to be located off the public laneway along the southern edge of the site. The proposed development provides vehicle and bicycle parking that meets or exceeds the City s Parking By-law minimum requirements. Loading supply for the development is 1 Class B space short from the By-law minimums. However, 2 additional Class A loading spaces are planned in the underground parkade to accommodate small vehicle deliveries and maintenance vehicles. In terms of vehicle impact, the development will result in negligible increase in vehicle trips comparing to the vehicle trips observed from the existing office building on-site and therefore will have no material impact to the traffic operation of the street network. 1550 Alberni Street: Transportation Design Rationale March 22, 2016 7 114