ADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019

Similar documents
County of Georgetown, South Carolina

Page 1 of 6 ADDENDUM NO. 1. January 11, Shuttle Bus Service RFP # H General

South Dock Replacement Prescott Park. This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement Prescott Park.

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

ADDENDUM No. 1 Prospective Bidders

ADVANCED CALCULATIONS

Eagle Mountain-Saginaw Independent School District REQUEST FOR COMPETITIVE SEALED PROPOSALS (RFCSP)

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

ADDENDUM NO. THREE (3) INSTALL BACKUP GENERATOR TERMINAL BUILDING SALISBURY-OCEAN CITY: WICOMICO REGIONAL AIRPORT SALISBURY, MARYLAND

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

Customer Requirements Downtown Secondary Network Service

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Solar Power Installation Application

Pretest Module 24 Three-phase Service Entrance

EDS FUSE RATINGS AT DISTRIBUTION SUBSTATIONS

THE CARMONY BUILDING ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED ELECTRICAL SYMBOLS AND ABBREVIATIONS

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

Australian Wiring Instructions:

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

1. Do the two Gillig 40 (2401H & 2402H) Hybrid have batteries, if so, what type? IPTC Response: Yes, I believe phosphate.

BID SPECIFICATIONS FOR (1) 300kW STANDBY GENERATOR

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

CITY OF SIDNEY EXECUTIVE ORDER COURTHOUSE SQUARE ELECTRICAL HOOKUP STANDARDS

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

INVITATION TO BID (ITB)

ADDENDUM NO. 1 INVITATION FOR BID FOR BUS ENGINE SUPPLY. IFB NO: 2018-FP-08 Date Issued: August 6, 2018

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

LIFT STATION 11 ONE-LINE DIAGRAM

ENGINEERING SPECIFICATION

Central Florida Regional Transportation Authority d.b.a.

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

Notice is hereby given of the following changes and questions and answers to the above referenced Bid:

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

ADDENDUM No. 2. Bid #: 13-B-016 Purchase of Solid Waste Trucks

ADDENDUM NO.1 IFB NO.V-1821 CUTAWAY BUS. July 3, 2018

FLORIDA DEPARTMENT OF TRANSPORTATION

Purchasing Services 4202 East Fowler Avenue, SVC 1073 Tampa, Florida (813) Addendum No. 1

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

Technical Specification for Pole Mounted Capacitor Rack

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

UTILITY CROSSING DETAIL

ANZI Transfer Switch and Generator Wiring Installation Addendum

HORRY COUNTY SOLID WASTE AUTHORITY, INC.

(ADDENDUM COVER SHEET)

INVITATION TO BID (ITB)

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

SECTION PANELBOARDS

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

PURCHASING DEPARTMENT

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

New Panelboard for Lot H, EV Charger Energization, Las Positas College. Scope of Work and Technical Specifications

Quik-Spec Coordination Panelboard Specifications

STAUNTON CITY SCHOOL BOARD STAUNTON, VIRGINIA

Please Refer to Attached Sample Form

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Washoe County PLAN SUBMITTAL

District-Wide Prop 39, Interior LED Lighting Upgrades Pre-Conference Meeting Re-Bid No January 9 at 10:00 AM Las Positas College

Application for Service Residential Subdivision / Development

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

EV Charging Station Submittal Requirements

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE

COMMERCIAL QUICK REFERENCE

Please find attached the Dealer Notification Preliminary Letter for Toyota Safety Recall 14V-312 on the following Toyota and Lexus vehicles:

Appendix Item Addendum

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Request for Proposals: (1) 2018 FORD TAURUS SEDAN SE (1) 2018 Ford F-150 XL Regular cab 4x4 (2) 2018 Ford F-150 XL 4x4 Crew Cab 4x4

REQUEST FOR BIDS (RFB) # (1) NEW X4-3/4 TON EXTENDED CAB PICKUP TRUCK WITH LIFT GATE POSTING DATE: MARCH 7, 2018

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

April 27, 2015 ADDENDUM #1. To the Plans and Specifications for: CENTRAL CAMPUS ELECTRICAL MODIFICATIONS PHASE II. for MIAMI UNIVERSITY.

Specifications for 6 locations have been revised. Please use the Revised Price Proposal section provided below for your bid submission.

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR CHILLER INSPECTION SERVICES ITB NO.: DMS-13/14-035

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

10 Commercial, Industrial, Agricultural Services

Public Review Draft Proposed Addendum cv to Standard , Energy Standard for Buildings Except Low-Rise Residential Buildings

(i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:-

UN-Priced Offers Due: Wednesday, April 25, 2018 at 10:00 a.m. Reverse Auction/Bid: Wednesday, May 9, 2018 starting at 11:00 a.m.

ROCKLIN UNIFIED SCHOOL DISTRICT ADDENDUM NUMBER 1 TO THE BID DOCUMENTS Amendment Date: January 25, 2019

ADDENDUM NO. 3. Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri 64108

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH NOTICE TO CUSTOMERS DOCKET NO. E-34, SUB 46 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

Electrical Depth. Mark W. Miller Sibley memorial Hospital Grand Oaks Washington, DC CURRENT SYSTEM

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

RFQ Fleet Vehicles. The City of Dawson Creek is requesting quotations for the supply and delivery of:

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Parkland Light & Water Co. ELECTRIC SERVICE REQUEST AND METER STANDARDS

NORTH CAROLINA SHERIFFS ASSOCIATION

STREAMLINED SOLAR CHECKLIST Owner Name:

CONFERENCE LOCATION EXHIBIT HOURS & EVENTS

705.12(D) The requirements pertaining to the connection. Unraveling the Mysterious. Load Side PV Connections. by John Wiles

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS

Solid Waste Management Division Landfill Compactor Procurement 2/2/10

Transcription:

Georgetown County, South Carolina 129 Screven Street, Suite 239 Post Office Drawer 421270 Georgetown, SC 29442-4200 (843) 545-3083 Fax (843) 545-3500 E-Mail purch@gtcounty.org Website http://www.gtcounty.org ADDENDUM #2 TO BID #18-085 BID NUMBER: 18-085 ISSUE DATE: Friday, January 18, 2019 OPENING DATE: Wednesday, January 23, 2019 OPENING TIME: 3:00 PM (Eastern NIST) Bid Opening Location: Georgetown County Courthouse, Suite #239, (Purchasing Conference Room) Pre-Bid Conference/Site Inspection: Voluntary-By Prior Appointment PROCUREMENT FOR: Emergency Generator Replacement at Georgetown County Landfill Commodity Code(s): 28539, 28579 This addendum will amend Bid #18-085, Emergency Generator Replacement at Georgetown County Landfill originally issued on Friday, January 4, 2019. This clarification is being provided to all known and registered correspondents in response to questions received. All addenda and original bid documents are also available online at: www.gtcounty.org, select Quick Links, Bid Opportunities and Current Bids. Question 1: I wanted to submit the attached informational submittal for confirmation that Caterpillar would be considered an approved equal for this project. I have several contractors asking me for pricing, if you can advise once the information is reviewed. Yes, we will accept the Caterpillar Diesel powered engine as equivalent. Question 2: The specifications do not call for a Service Entrance rated transfer switch, however, the drawing does not show a disconnect between the meter and the transfer switch. Will you be providing a disconnect before the transfer switch, or will the transfer switch need to be service entrance rated? The transfers switch will need to be service entrance rated. By code, there must be a means of disconnect at the service entrance (meter) of a building. If the transfer switch is fed directly from the meter, it must be service entrance rated (meaning, it will have a service disconnect breaker integrated in the switch gear). If it is not a service entrance rated transfer switch, then there must be a service disconnect (breaker or fused) between the meter and the transfer switch.

Question 3: In the proposed Power Riser diagram, it does not show the new generator feeding the new Environmental Services Administration Building. Will this building need to be backed up by the generator as well as the Scale House? And if this building also needs to be fed from the new generator, the Proposed Riser Diagram does not show a sub-panel after the transfer switch to feed the (2) different loads. Yes the NEW Environmental Services Administration Building as well as the Scale house will be hooked to the generator. The Current Administration building is NOT to be connected to this generator. See attached for revised Proposed Riser Diagram. Question 4: For the Scale House, will we be reusing the existing feeders between the generator and the scale house, or will the feeders need to be replaced? Use the existing feeders between the generator and the scale house. Question 5: There is currently a pole that feeds the Admin Building. Will there be a new feed from the existing pole or pedestal to our 200 amp meter already installed? Is everything going to be installed by others up to the meter prior to this project starting? Yes, everything up to the meter is already installed. Question 6: It states that County is providing the Pedestal and conduit from the Pedestal to the Admin Building. Please confirm this also means the County is having that conduit installed by others prior to the start of this project. The Proposed Power Riser Diagram does not show the Admin Building being included in this scope. Yes, the conduit is installed by others prior to the project start. The New Admin Building (under construction) is to be connected to the Generator (the old/current building will not be connected, that building is being removed). Question 7: The Scale house is fed from a different pole than the existing generator. Do we need to demolish this and do away with the existing meter? The contractor does not need to do anything with the existing pole or meter. Question 8: If we are not able to remove the existing conductors or pull back a conduit piston/rat. Will a change order be allowed to replace the entire amount of conduit in the damaged run? We do not see the need to remove the existing conductors at this time. Question 9: Out of the two buildings one will not work without two transfer switches. You can leave the scale house on manual and the office on an auto transfer switch.

We do not believe this is accurate, we have a 150 amp breaker on the pedestal to feed the scale house from the automatic transfer switch. [THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK]

GEORGETOWN COUNTY ENVIRONMENTAL SERVICES OFFICE & WEIGHT STATION 60 KW DIESEL STANDBY GENERATOR - 120/208 VOLT DELTA 200 AMP - NEMA 3R AUTOMATIC TRANSFER SWITCH (ATS) 200 AMP, 3 PHASE, 4 WIRE SERVICE ENTRANCE ALL A.C. POWER WIRING - COPPER CONDUCTORS ALL D.C. CONTROLS - STRANDED COPPER CONDUCTORS EXISTING POWER RISER 75 kva Utility XFMR 120/240 D S.E.C METER 320 AMP MANUAL TRANSFER SWITCH DPDT OFFICE MAIN PANEL 200 AMP 120/240 1 PH 60 KW DIESEL GENERATOR 120/240 VD SCALE MAIN PANEL 200 AMP 120/240 1 PH (REVISED) PROPOSED POWER RISER UPDATE S.E.C METER 200 AMP 3PH (already Installed) AUTOMATIC TRANSFER SWITCH 200 AMP 60 KW DIESEL GENERATOR 120/208 VD 3PH SCALE HOUSE DISCONNECT 150AMP 1 PH ADMIN Building MAIN PANEL 200 AMP 120/240 3 PH (installed already by county)

Schematic Diagram (not to scale) Existing Power Generator Meter Pedestal Manual Transfer Scalehouse Admin Building

Schematic Diagram (not to scale) Proposed Power Junction Meter Automatic Transfer Generator Pedestal 150 disconnect New Admin Building 200 amp (existing) Scalehouse

ADDENDUM ACKNOWLEDGEMENT Bid #18-085 Emergency Generator Replacement at Georgetown County Landfill Mandatory Submittal Form To be returned with the final proposal submission to Georgetown County. COMPANY NAME: Addendum #1 Received Date: Addendum #2 Received Date: Addendum #3 Received Date: Addendum #4 Received Date: Addendum #5 Received Date: Addendum #6 Received Date: If your Bid submission has already been mailed, acknowledgment may be provided by faxing this form to (843)545-3500, or attaching a digital scan and sending by e-mail. [THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK]