Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

Similar documents
Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013

GORT3056 WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS

Preparation and movement of trains

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook

Working of Trains - Rules 1 to 45

Section C MARSHALLING, MOVEMENT AND LOADING. Contents

ROADRAILER EQUIPMENT (ROADRAILER TRIPLE CROWN) AUTORAILER, and ALLRAILER)

SECTION 5 STANDARD TRAIN EXAMINATION PROCEDURES

Network Safeworking Rules and Procedures

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

BRISTOL SOCIETY OF MODEL & EXPERIMENTAL ENGINEERS ASHTON COURT ESTATE MINIATURE RAILWAY

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2.

Train Examination (Braking System) Addendum

Interface between Rail Vehicle Weights and Underline Bridges

Route Access Condition Notice

TOC Waiver. ARTC website

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

The Belt Railway Company of Chicago CORA Guide Revision

Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016

Terminology. Glossary of Railway. Glossary of Railway Terminology

The West Lancashire Light Railway OPERATING RULE BOOK

NZQA registered unit standard version 4 Page 1 of 5

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003

Mechanical Trainstop Systems

Railway Crane User s Manual Operation (Part-II)

Shunting and Marshalling

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32

GENERIC RISK ASSESSMENT - TRAVEL BY COACH

Authorised Inspection Scheme Fees

COPYRIGHT NOTICE This PDF file has been created from the original book with permission of BRB (Residuary) Ltd, who retains copyright in the original

TA20 ARTC Code of Practice for the Victorian Main Line Operations

PS 127 Abnormal / Indivisible Loads Policy

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

COPYRIGHT NOTICE This PDF file has been created from the original book with permission of BRB (Residuary) Ltd, who retains copyright in the original

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (Old to New) 12/8/2011

Personal Protective Equipment Standards

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011)

Study Group WAGON USERS Groupe d Etudes UTILISATEURS WAGONS Studiengruppe WAGENVERWENDER

E17M ROLLING STOCK BRAKES

Protecting Workers on the Track

CUSTOMS TARIFF - SCHEDULE 86 - i

A POCKET BOOK on DOs and DON Ts for Operation and Maintenance of Jamalpur/Gottwald 140T DH Crane (Old Design)

Operating Procedures Working of Trains - Procedures 1 to 23

Withdrawn Document. Contents

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Class 66 Diesel Locomotive Pack 02 Add-on

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology

Runaway and derailment of a locomotive, Toton sidings, Nottinghamshire, 30 October 2016

SYDNEY TRAMWAY MUSEUM

GO/GN3637. Guidance on Defective On-Train Equipment. Rail Industry Guidance Note for GO/RT3437. Published by: RSSB

Status: DRAFT Version: 01 Ref.: A I/ Original: EN Date:

Network Safeworking Rules and Procedures

Version / Status V 2.0 Date Author. Wagon Markings

PSSPO103 Drive shore based vehicles

RULE BOOK APPENDIX ISSUE 11/07

Diesel Locomotive Train Driver Performance Checklist

R O A D S A F E T Y E D U C A T I O N

Control, Safe Use and Operation of Road-Rail Plant

Network Safeworking Rules and Procedures

Minibus Policy. Reviewed: March Next Review: March Signed By Headteacher: Signed by Chair of Governors:

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012

SUPPLEMENTARY OPERATING INSTRUCTIONS

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130

Smartleasing Roadside Assistance

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology

Centralised Traffic Control System - Rules 1 to 17

Title: Lifting Operations Involving Crane or Gantry Offshore

Job: Switchman Description: Prepares the railcars and rail yard switches for movement in the

WTT NETWORK CONFIGURATION SYSTEM REQUIREMENTS (L1-CHE-MAN-011)

Activity. Briefing: The activity commences shortly after the arrival of W93 at Mt Victoria (11 55).

CPCS renewal test factsheet

State existing practical or management controls for this hazard

National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES

APPENDIX 16 TO THE GENERAL CONTRACT OF USE FOR WAGONS WAGON VEHICLE DATA

Trans Asian Railways.. A Rolling stock perspective. By Dwarika Prasad Senior Professor /Mechanical Engineering

(Non-legislative acts) DECISIONS

Track Circuit Assister Configuration for Rail Vehicles

Class 07 Diesel Locomotive BR Green

SECTION 11 INTERMODAL EQUIPMENT

Operating Manual. Pantographs. Version 05/12.

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

CUSTOMS TARIFF - SCHEDULE XVII - 1

N G 3 S p r i n g B r a k e s

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

(1) The location where the train is originally assembled ( initial terminal ); (2) A location where the train consist is changed other than by:

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

Train Order System - Rules 1 to 37

Working manual for rail staff handling and carriage of dangerous goods Issue 6.1

Lineside Signal Spacing and Speed Signage

INTRODUCTION Please read this manual before you use your jack and ensure you understand its operation and the safety procedures to be observed.

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

SD3-60 AIRCRAFT MAINTENANCE MANUAL. These procedures will be required by personnel engaged in manoeuvring the aircraft on the ground.

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

CPC (Certificate of Professional Competence)

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK

Adam Equipment LHS SERIES. (P.N , Revision A March 2012)

Transcription:

Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 E1 Authorised Vehicles E2 E2 Loads for which Special E3 Conditions have to be Applied E3 Vehicles Equipped with E6 Changeover Levers E4 Special Brake Testing E8 Instruction using the Enhanced Air Brake Pipe Continuity Test for Driver-only Run-rounds E5 Handbrake Operation E10 E6 Self-propelled On-track E13 Machines and Power-driven Rail Cranes Table Maximum Loads Permitted E14 E1 with Specific Brake Forces Working Manual for Rail Staff Freight Train Operations Page E1

E MOVEMENT OF FREIGHT TRAINS E1 Authorised Vehicles 1.1 Moving Unregistered Vehicles Before moving unregistered vehicles, special authorisation must be obtained from Network Rail. A form RT3973EXL identifying conditions of travel must be issued for each journey. Where a movement has been authorised the TOPS 18 comment line facility must be used by the train operating company to include the vehicles on the train document and also the name and position of the person in Network Rail who has authorised the movement. The train document must be amended to show:- details of these vehicles revised figures for length, weight and brake force any changes to the RA or maximum speed. Note 18 comment line details only remain active in TOPS during the validity of that train document. Working Manual for Rail Staff Freight Train Operations Page E2

E2 Loads for which Special Conditions have to be Applied Note Certain types of load must be specially examined and labelled before the traffic is dispatched, as shown in section K. Conditions will be determined as set out in section K. 2.1 Special Movement Conditions If no special movement conditions are required, the wagons are labelled with load examined labels. If special movement conditions are required such as movement being permitted only over a specified route or speed restrictions at specified locations, these will be identified on form RT3973EXL Advice to train crews of exceptional loads. This form must be issued to traincrews before the train departs. 2.2 Diversion from the Planned Route Diversions from the route identified on form RT3973EXL must be authorised by Network Rail. A revised form RT3973EXL must be issued to the traincrew for the diversionary route. Working Manual for Rail Staff Freight Train Operations Page E3

2.3 Load Examined and Exceptional Load Labels Where the restriction relates to the vehicle load, the vehicle must be examined and labelled with either load examined or exceptional load labels. The person carrying out the examination must complete and sign the labels, which must be placed on both sides of the vehicle. A train conveying a number of vehicles carrying the same or similar commodity, such as military vehicles, need not have labels affixed to every vehicle provided that:- all vehicles start and finish their journey as a train load the first and last vehicle in the train are labelled on each side clearly showing the numbers of all the vehicles conveyed under the load examined or exceptional load arrangement which have been inspected and declared safe to travel when an unlabelled vehicle requires detaching en route owing to a defect, arrangements are made to place load examined or exceptional load labels on the vehicle before it is moved when either of the first or last vehicles in the train requires detaching en route owing to a defect, the load examined or exceptional load labels are removed and placed on the adjacent vehicle in the train. The load examined or exceptional load labels must be placed on the defective vehicle before it is moved. Working Manual for Rail Staff Freight Train Operations Page E4

The following are examples of Load Examined and Exceptional Load labels. Working Manual for Rail Staff Freight Train Operations Page E5

E3 Vehicles Equipped with Changeover Levers 3.1 Light/Load Changeover Levers Note Certain air-braked vehicles are fitted with manual equipment to vary the brake force in accordance with the total weight of the vehicle. A manual changeover lever with two settings loaded ( C, charge or bel on international vehicles) and empty ( V, vide or leer ) is fitted on each side of the vehicle. TOPS may indicate in the changeover lever column on a train document (CL loaded or CE empty) which position the lever should be in. Where the setting is not indicated by TOPS, the position of the lever must be assessed as follows. The lever plate will show a change-over weight below the lever. Weight figures will also be shown at the empty and loaded position. If the total weight of the vehicle exceeds the changeover weight, the lever must be placed in the loaded position. Otherwise the lever should remain in the empty position. It should be noted that although a vehicle may be loaded, it may not exceed the changeover weight and the lever must be in the empty position. Working Manual for Rail Staff Freight Train Operations Page E6

3.2 Goods/Passenger Changeover Levers Note Some vehicles are fitted with manual equipment to change the timing of the automatic brake distributor from goods ( G, I, M, march, marchandises or gut Z ) to passenger ( P, V, voyag, voyageurs or pers Z ) timings. Class 4 trains must use passenger brake distributor timings. All vehicles equipped with goods/passenger change over levers must have these levers in the passenger position. Vehicles that can only operate in goods brake distributor timings must not be marshalled in a class 4 train. Class 6, 7 and 8 trains should operate using the same brake distributor timings throughout the train, with all levers either in the passenger position or in the goods position. Where this is not possible, one of the two following arrangements may be applied. All vehicles with goods-timed brake distributors are marshalled ahead of those with passenger-timed brake distributors. This arrangement is limited to trains not exceeding 40 axles, excluding the locomotives. Not more than one in four vehicles with the brake distributor timing opposite to those on the rest of the train, subject to a maximum of ten vehicles with the brake distributor timing opposite to those on the rest of the train. No special marshalling requirements apply. Note A Cartic-4 (PJA or PJB) vehicle must be counted as one vehicle in these calculations. Working Manual for Rail Staff Freight Train Operations Page E7

E4 Special Brake Testing Instructions using the Enhanced Air Brake Continuity Test for Driver-only Run-rounds 4.1 Introduction These arrangements will apply at locations specified by train operators. 4.2 Attaching the Locomotive On the first occasion a locomotive is attached to a train an enhanced air brake continuity test must be carried out as follows. After the normal brake continuity test has been carried out, the person responsible for train preparation must advise the driver that an additional brake continuity test is required.this will test the application and release of the brakes on the first vehicle next to the locomotive. The driver must be instructed to make a full service brake application. When sure that the brakes have applied, the person responsible for train preparation must instruct the driver to raise the brake pipe pressure and must then observe that the brakes release. The driver must overcharge the brake pipe when continuity has been proved. The person responsible for train preparation must then complete and sign an enhanced air brake continuity test slip and hand it to the driver. The slip must be countersigned by the driver and handed to any relieving driver who must also countersign it. Working Manual for Rail Staff Freight Train Operations Page E8

4.3 Enhanced Brake Continuity Tests A further enhanced brake continuity test must be carried out when the formation of the train is altered in any way, except for a change of locomotive, or when the locomotive runs round the train at a location authorised in local instructions. The person responsible for train preparation must then complete and sign an enhanced air brake continuity test slip and hand it to the driver. 4.4 Applying Handbrakes for a Locomotive Run-round Movement Wagon handbrakes must be applied before the locomotive is detached to run-round the train if there are ten wagons or fewer in the train, or the run-round movement will take more than one hour to complete. 4.5 Exhausting the Train Brake The driver must completely exhaust the train brake before the locomotive is detached. In addition, the person responsible for train preparation must open the air brake cock on the first wagon next to the locomotive to ensure that the train brake has been exhausted. 4.6 Local Instructions Applying to Gradients At locations where local instructions apply due to gradients, handbrakes must be applied after the locomotive is attached to a loaded train, and before carrying out the simple air brake test. The number of handbrakes to be applied will be shown in the local instructions. 4.7 Poor Adhesion Conditions In conditions of exceptionally poor wheel/rail adhesion or where the run-round movement will not be completed in the permitted time, additional handbrakes may need to be applied to loaded or empty trains. Working Manual for Rail Staff Freight Train Operations Page E9

E5 Handbrake Operation Note Vehicles are fitted with lever or wheel-operated handbrakes which can be operated from the side of the vehicle. On some international vehicles a handbrake, which may be an additional handbrake, is located on a platform situated at one end of the vehicle with access steps up to the platform provided on both sides of the vehicle. 5.1 Bogie Vehicles On some bogie vehicles a handbrake is provided on each bogie and where application of the handbrake is required then both handbrakes must be applied. 5.2 Operating Handbrakes with the Automatic Brake Applied In normal circumstances, unless specially authorised, handbrakes must not be operated after the automatic brake has been applied. Note This could cause excessive strain on the brake gear when the automatic brake is released. When vehicles are fitted with lever handbrakes there is a risk of injury when a subsequent attempt is made to release the handbrake. 5.3 Vehicles Left Secured by Handbrakes When vehicles are to be left secured by handbrakes, the person responsible for stabling the vehicles must carry out any local instructions that are in force to ensure that the vehicles are immobilised and unable to run away. Working Manual for Rail Staff Freight Train Operations Page E10

5.4 Uncoupling a Locomotive The following procedure must be carried out before a locomotive is uncoupled. Unless local instructions state otherwise, the driver must apply the straight air brake on the locomotive and then release the automatic brake on the train. After checking that the automatic brake has been released the shunter or other nominated person must ensure that all buffers are not compressed. Handbrakes must then be applied in accordance with local instructions before the locomotive is uncoupled. 5.5 Prior to Moving a Vehicle All handbrakes must be fully released before a vehicle is moved. Staff must visually ensure that the brake has fully released, by checking:- indicators, where fitted that the brake rigging is slack the wheel or lever is fully released. 5.6 Releasing the Handbrake To release a handbrake that has been applied when the train was held by the automatic brake, one of the following procedures must be adopted. Applying the automatic brake and releasing the handbrake lever or wheel. Holding the handbrake lever down with a brake stick and then gradually releasing the brake ensuring that on each occasion it is necessary to reposition the brake stick, the brake lever is pinned down. Working Manual for Rail Staff Freight Train Operations Page E11

5.7 Light/Load Devices On vehicles fitted with light/load devices the handbrake operates through the automatic brake rigging and the lever will adopt a position depending on the vehicle load and the state of the automatic brake when the handbrake was applied, as follows. In the case of an empty vehicle or a vehicle loaded before the automatic brake had been created, the lever will not be more than half way down the guide. In the case of a vehicle loaded after the automatic brake had been created, the lever will not be more than four holes below the mid position. In the case of a vehicle loaded after the automatic brake has been applied, the lever will be at the bottom of the guide. 5.8 Release of Wheel-operated Handbrakes Staff must ensure that they are fully aware of the correct method of releasing wheel operated handbrakes. Handbrakes must be fully released before a vehicle is moved. 5.9 Handbrake Interlocking Device Certain vehicles have been fitted with an interlocking device, which prevents the automatic brake from being created until all handbrakes have been fully released. If difficulties are experienced in creating the automatic brake on a vehicle fitted with a handbrake interlocking device, a check must be carried out to ensure that all handbrakes are fully released. Working Manual for Rail Staff Freight Train Operations Page E12

E6 Self-propelled On-track Machines and Power-driven Rail Cranes 6.1 Machine Operator s Duties The machine operator will:- ensure before a locomotive or vehicle is attached to it, that the machine is secured to prevent it moving, for example by use of handbrake or, scotches define the maximum gradient on which a machine can be safely coupled to a train ensure that any part of the machine equipment, for example a jib or lifting gear, is safely secured for movement. Working Manual for Rail Staff Freight Train Operations Page E13

TABLE E1 MAXIMUM LOADS PERMITTED WITH SPECIFIC BRAKE FORCES Actual Brake Force Available (Tonnes) Maximum Speed (mph) 35 40 45 50 55 60 65 70 75 Load (Tonnes) 5 30 25 20 20 15 15 15 10 10 10 60 50 45 40 35 30 30 25 25 15 90 80 70 60 55 50 45 40 35 20 125 105 95 85 75 65 60 55 50 25 155 135 115 105 95 80 75 65 60 30 185 160 140 130 115 100 90 80 75 40 250 215 190 170 150 135 120 110 100 50 310 270 240 210 190 170 150 135 125 60 375 325 285 255 230 200 180 165 150 70 435 380 330 295 270 235 215 190 175 80 500 430 380 340 305 270 245 220 200 90 560 485 430 385 345 305 275 245 225 100 625 540 475 425 385 340 305 275 250 110 685 595 525 470 420 370 335 300 275 120 750 650 570 510 460 405 365 330 300 130 810 700 620 550 500 440 395 355 325 140 875 755 670 595 535 475 425 385 350 150 935 810 715 640 575 510 455 410 375 160 1000 865 765 680 615 540 485 435 400 170 1060 920 810 720 650 575 515 465 425 180 1125 970 860 765 690 610 545 495 450 190 1185 1025 905 805 730 645 575 520 475 200 1250 1080 955 850 765 680 605 550 500 Working Manual for Rail Staff Freight Train Operations Page E14

TABLE E1 Actual Brake Force Available (Tonnes) MAXIMUM LOADS PERMITTED WITH SPECIFIC BRAKE FORCES Maximum Speed (mph) 35 40 45 50 55 60 65 70 75 Load (Tonnes) 210 1310 1135 1000 890 805 710 635 575 525 220 1375 1190 1045 935 840 745 665 600 550 230 1435 1245 1095 975 880 780 695 630 575 240 1500 1295 1140 1020 920 810 725 655 600 250 1560 1350 1190 1060 955 845 755 685 625 260 1625 1405 1235 1105 995 880 790 710 650 270 1685 1460 1285 1145 1035 915 820 740 675 280 1750 1515 1335 1190 1070 945 850 765 700 290 1810 1565 1380 1230 1110 980 880 795 725 300 1875 1620 1430 1265 1150 1015 910 820 750 310 1935 1675 1475 1315 1185 1050 940 850 775 320 2000 1730 1525 1360 1225 1080 970 875 800 330 2060 1785 1575 1400 1265 1115 1000 905 825 340 2125 1835 1620 1445 1300 1150 1030 930 850 350 2185 1890 1670 1490 1345 1185 1060 955 875 360 2250 1945 1720 1530 1380 1220 1090 985 900 370 2310 2000 1765 1575 1420 1250 1120 1015 925 380 2375 2055 1810 1615 1460 1285 1150 1040 950 390 2435 2110 1860 1660 1500 1320 1180 1070 975 400 2500 2160 1905 1700 1540 1355 1210 1095 1000 450 2810 2430 2145 1910 1735 1525 1360 1230 1125 500 3125 2700 2385 2125 1925 1695 1510 1370 1250 550 3435 2970 2620 2335 2120 1865 1660 1510 1375 Working Manual for Rail Staff Freight Train Operations Page E15

TABLE E1 MAXIMUM LOADS PERMITTED WITH SPECIFIC BRAKE FORCES Actual Brake Force Available (Tonnes) Maximum Speed (mph) 35 40 45 50 55 60 65 70 75 Load (Tonnes) 600 3750 3245 2860 2545 2315 2035 1810 1645 1500 650 4060 3515 3100 2760 2505 2205 1960 1780 1625 700 4375 3785 3340 2980 2700 2370 2110 1920 1750 750 - - 3580 3190 2900 2545 2260 2060 1875 800 - - 3815 3400 3090 2715 2410 2200 2000 850 - - 4050 3620 3280 2880 2560 2335 2110 900 - - 4290 3830 3480 3050 2710 2475 2230 950 - - 4530 4040 3670 3220 2860 2610 2350 1000 - - 4770 4250 3860 3390 3010 2750 2470 Note For trains running at a maximum speed of less than 35 mph, the column headed Maximum Speed of 35 mph must be used. Working Manual for Rail Staff Freight Train Operations Page E16