TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)

Similar documents
Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Gateway South Transmission Project

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Supplemental Report on the NCTPC Collaborative Transmission Plan

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Falcon-Midway 115 kv Line Uprate Project Report

Consulting Agreement Study. Completed for Transmission Customer

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

BC Hydro System 2011 Annual Progress Report

New 115 kv Disconnect Switches at Bloomsburg MTS

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Appendix D Black Hills Project Summary

West Station-West Cañon 115 kv Transmission Project

2013 ANNUAL PROGRESS REPORT

MILLIGAN SOLAR PROJECT

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Merger of the generator interconnection processes of Valley Electric and the ISO;

CUSTOMER/ TWIN ARROWS PROJECT

Black Hills Project Summary

Decision on Merced Irrigation District Transition Agreement

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

APPENDIX F: Project Need and Description

PUD ELECTRIC SYSTEM INTERCONNECTION

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION

Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

SunZia Southwest Transmission Project

Pacific Northwest/Canada To Northern California Transmission Feasibility Study

Interconnection System Impact Study Report Request # GI

15 Nelson-Marlborough Regional Plan

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Stability Study for the Mt. Olive Hartburg 500 kv Line

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

Q0044 interconnection at

PSE Attachment K Puget Sound Area Transmission Meeting

XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS

Overview of ISO New England and the New England Wholesale Power Markets

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Project #148. Generation Interconnection System Impact Study Report

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Interconnection Feasibility Study Report GIP-226-FEAS-R3

ISO on Background. Energy-efficiency forecast. Anne George. Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING DECEMBER 12, 2012

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

New Jersey State Report

March 7, Subject: Southern California Edison 2011 Annual Progress Report

SPS Planning Criteria and Study Methodology

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

2015 Grid of the Future Symposium

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross

Sub Regional RTEP Committee Mid-Atlantic

Western Alberta Transmission Line (WATL) HVDC Project

100 MW Wind Generation Project

Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

New Mexico Transmission Expansion Concepts For Wind Resources

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

15 Nelson-Marlborough Regional Plan

North Oregon Coast Area Study. Adam Lint

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Generating Unit Model Validation Policy

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

Small Generator Interconnection Program Interconnection Technical Requirements

SPP Notification to Construct

TRANSMISSION PLANNING CRITERIA

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Brion Energy Corporation

Sub-Regional RTEP Committee PJM South

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

City of Palo Alto (ID # 6416) City Council Staff Report

SERTP rd Quarter Meeting

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

5. Effective Date: On the first day of the first quarter, after applicable regulatory approval.

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV

SPP Notification to Construct

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Interconnection Feasibility Study

Pacific Gas and Electric Company s Revised 2016 Annual Progress

ABB POWER SYSTEMS CONSULTING

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

SERTP rd Quarter Meeting

Transcription:

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30) Submitted to TOT1A Stakeholders and TOT1A Interconnected Utilities And Western Electricity Coordinating Council June 6, 2013 Prepared by Susan Franklin

Introduction The intent of this document is to request an Expedited Path Rating Process for the relocation of a metering point for a component of the TOT1A, WECC Path 30. This document should serve as the Letter of Notification, the Comprehensive Progress Report, and the request for interest in joining a Project Review Group, if necessary. The TOT1A, WECC Path 30, is defined as the sum of flows on the Bears Ears- Bonanza 345 kv line, the Hayden-Artesia 138 kv line, and the Meeker-Rangely 138 kv line, shown in Figure 1, with the area of interest within the green circle. The metering for TOT1A is located at Bears Ears Substation, Rangely substation, and Hayden substation. The WECC Path 30 has an Existing Rating of 650 MW East to West. This document will address the impact of moving the existing meter point for the Bears Ears-Bonanza 345 kv line from Bears Ears substation to the Craig 345 kv substation, bypassing Bears Ears substation and creating the Craig-Bonanza 345 kv line. The transmission line distance from Bears Ears 345 kv substation to the Craig 345 kv substation is 0.6 miles and the transmission line distance from Bears Ears 345 kv substation to the Bonanza 345 kv substation is 102.0 miles. History of Bears Ears Substation and Description of Meter Relocation The Bears Ears substation was utilized previously as a 345 kv hub that contained three 345 kv lines, one to Craig substation, one to Bonanza substation, and one to Rifle substation. The 345 kv line to Rifle was converted to operate at 230 kv and sourced from the Craig 230 kv substation as part of the conversion. The Bears Ears substation has subsequently operated with two 345 kv lines and no load since the conversion.

Although it is anticipated that at some time in the future the Craig-Rifle 230 kv line will be converted back to operate at 345 kv and sourced again from Bears Ears Substation, it is beyond the five year horizon and will require extensive facility upgrades. The proposed rehab/maintenance costs at Bears Ears substation are prohibitive and a joint agreement by the Bears Ears owners has resulted in the decision to bypass Bears Ears substation and relocate the metering point to nearby Craig substation, 0.6 miles from Bears Ears substation. The existing metering at Craig substation on the Craig-Bears Ears 345 kv line is a revenue meter with a free standing CT and will not require modifications to provide accurate Craig-Bonanza 345 kv MW and MVAR line flows. The topology of TOT1A with Bears Ears substation bypassed is shown in Figure 2. Comprehensive Impact The impact of moving the Bears Ears meter to the Craig substation is negligible as the transmission line distance is 0.6 miles from Bears Ears to Craig substation and there are no other interconnections or loads at Bears Ears substation. The Craig-Bonanza 345 kv line will be 102.6 miles compared to Bears Ears-Bonanza 345 kv line which is 102.0 miles. Utilizing the WECC 2013 Heavy Summer operating case, reviewed by the Rocky Mountain Operational Study Group, this negligible impact can be seen by comparing the power flow one line diagrams of the TOT1A system with Bears Ears substation in-service, shown in Figure 3, and Bears Ears substation bypassed, shown in Figure 4.

As can be seen, there is only a 0.1 MVAR impact on TOT1A between the two cases of Bears Ears 345 kv substation in-service and Bears Ears 345 kv substation bypassed. Additionally, a comparison of the metering data at Bears Ears substation and Craig substation for the Craig-Bears Ears-Bonanza 345 kv line supports defining the impact of moving the metering from Bears Ears 345 kv substation to Craig 345 kv substation on TOT1A, as negligible. Conclusion The Bears Ears 345 kv substation has a 102.0 mile, 345 kv line to Bonanza and a 0.6 mile, 345 kv line to Craig substation. The Bears Ear-Bonanza 345 kv line is a component of TOT1A, WECC Path 30. TOT1A has an Existing Rating of 650 MW. Due to lack of load and interconnections at Bears Ears 345 kv substation, and the prohibitive proposed rehab/maintenance costs, the Bears Ears 345 kv substation owners have jointly agreed to bypass Bears Ears 345 kv substation indefinitely. This bypass necessitates the relocation of the meter for the Bears Ears-Bonanza 345 kv line component of TOT1A from Bears Ears 345 kv substation, to the Craig 345 kv substation, resulting in the 345 kv component of TOT1A being renamed the Craig-Bonanza 345 kv line. This meter relocation has negligible impact on TOT1A, supporting the request for an expedited WECC Path Rating process to change the 345 kv line component from Bears Ears-Bonanza 345 kv line, to Craig-Bonanza 345 kv line, with metering at Craig substation.