Tri-State December 2013 Board Meeting

Similar documents
Proposed New Construction for

Black Hills Project Summary

Appendix D Black Hills Project Summary

West Station-West Cañon 115 kv Transmission Project

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO DIRECT TESTIMONY AND EXHIBITS OF CHRISTOPHER E. PINK TABLE OF CONTENTS

Public Service Company of Colorado Transmission Projects Status. CCPG August 18, 2016

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

APPENDIX F: Project Need and Description

PUBLIC SERVICE COMPANY OF COLORADO SENATE BILL DESIGNATION OF ENERGY RESOURCE ZONES AND TRANSMISSION PLANNING REPORT PROCEEDING NO.

Falcon-Midway 115 kv Line Uprate Project Report

Consulting Agreement Study. Completed for Transmission Customer

100 MW Wind Generation Project

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

2012 LOCAL TRANSMISSION PLAN:

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Minnesota Biennial Transmission. Zone Meeting 8

Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources

New Mexico Transmission System Overview TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE

Verde Transmission, LLC. Verde Project. System Impact Study Report

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

VERMONT ELECTRIC POWER COMPANY (VELCO)

Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting

New Mexico Transmission Expansion Concepts For Wind Resources

Burlington Lamar 345/230 kv Impact and 2013 Post TPL Assessment Study

MEETING AGENDA. Western Area Power Administration Rocky Mountain Region. Transmission Planning Stakeholder Meeting

2011 LOCAL TRANSMISSION PLAN:

2016 SDG&E Grid Assessment Results

WestConnect Regional Planning Update

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

SPS Planning Criteria and Study Methodology

Meeting Policy Objectives Transmission: A Path to Compliance

Merger of the generator interconnection processes of Valley Electric and the ISO;

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Electric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask. Gerald Deaver Manager Regional Transmission Policy

Interconnection System Impact Study Report Request # GI

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

15 Nelson-Marlborough Regional Plan

Interconnection System Impact Study Final Report February 19, 2018

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Overview of ISO New England and the New England Wholesale Power Markets

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

System Impact Study Report

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

TransWest Express Project

South Dakota 890 Study

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

Sub Regional RTEP Committee Western Region ATSI

2020 & 2024 Draft LCR Study Results SDG&E Non-Bulk System. Frank Chen - Regional Transmission Engineer Lead Stakeholder Meeting March 14, 2019

15 Nelson-Marlborough Regional Plan

Chapter 7: Corridor Visions

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Western Area Power Administration

EIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Arizona Transmission Challenges

Eyre Peninsula electricity supply options investigation

Updates and Modifications to Report

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

Gateway South Transmission Project

GENERATOR INTERCONNECTION REQUEST. BHCT-G11 Interconnection System Impact Restudy PREPARED BY BLACK HILLS CORPORATION TRANSMISSION PLANNING

Transmission Expansion Advisory Committee

The Capital Grid Project:

California Independent System Operator. Memorandum

SERTP rd Quarter Meeting

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

PSE Attachment K Puget Sound Area Transmission Meeting

Interconnection Feasibility Study Report Request # GI

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power

Illinois State Report

Minnesota Biennial Transmission. Zone Meeting 8

Transmission Planning for Wind Energy Resources in the Eastern United States. Dale Osborn

NRECA Cooperative Research Network. Modern Grid Initiative Southeast Summit August 10, 2006 Nashville, TN

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Sub-Regional RTEP Committee PJM South

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Decision on Merced Irrigation District Transition Agreement

PREPARED DIRECT TESTIMONY

Sub Regional RTEP Committee Mid-Atlantic

Energy Technical Memorandum

Capital Investment Plan

Michigan Renewable Energy Case Study

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

Four Corners Queue Transmission Interconnection Study

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross

Transcription:

1

For more information Tri-State webpage: www.tristategt.org click Operations then Transmission Planning (http://www.tristategt.org/transmissionplanning/puc3627_trans missionprojects.cfm) Email: (transmissionplanning@tristategt.org) CCPG (for Colorado projects): (http://regplanning.westconnect.com/ccpg_stakeholder_opport unities.htm) 2

This Meeting Tri-State is committed to an open and transparent transmission planning process and welcomes meaningful input from all stakeholders. These efforts may be supplemented by additional stakeholder outreach activities in connection with individual transmission projects or overall programmatic needs, as necessary. Colorado Coordinated Planning Group (CCPG) Voluntary, open transmission planning forum. Membership is open to all interested stakeholders. Includes all Colorado transmission utilities http://regplanning.westconnect.com/ccpg.htm 3

Who is Tri-State? Founded in 1952, Tri-State is a not-for-profit, wholesale power supplier owned by 43 electric cooperatives and public power districts serving a population of approximately 1.4 million people. Tri-State's mission is to provide our member systems a reliable, cost-based supply of electricity in accordance with cooperative principles. 4

Transmission System 5

Statistics Approximately 5,500 miles of transmission in which Tri- State has an ownership or capacity interest: 1220 miles - 345 kv 1001 miles - 230 kv 184 miles - 138 kv 2942 miles - 115 kv 49 miles - 69 kv Over 220 Transmission Substations TS 2016 Peak (July 10 th ) = 2,802 MW 6

Planning Considerations Tri-State endeavors to conduct transmission planning with the goal of achieving best-cost solutions that balance numerous factors and result in optimal transmission projects: Load projections Project partnership opportunities Regional congestion Transportation corridors Transmission corridors City and county zoning Geographic features Societal and environmental impacts Operational and maintenance requirements Consistency with short term and long term planning opportunities Initial construction cost 7

Project Status Developing Some objectives and needs have been identified. Some alternatives have or are being considered, but stakeholder propose alternatives are also requested. Planned Objectives and needs are clear. Alternative(s) has been decided. Project drivers have sufficient certainty. Conceptual Objectives and needs are clear. Alternative(s) has been decided. Project drivers have less certainty than planned projects. Under-Construction Board approved project. Project has started accruing costs due to design, routing, permitting, regulatory activities, or actual construction. In-Service Cancelled 8

Projects: Wyoming 9

Badwater Sawmill Creek 230kV Line Casper 10

Badwater Sawmill Creek 230kV Line Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Construct new 230 kv line from the existing Badwater Substation to the planned Sawmill Creek Substation. 230 kv 117 miles Line. Planned. 2022 Load Serving. 11

Southeast Wyoming Transmission Project Casper 12

Southeast Wyoming Transmission Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Sectionalize Dave Johnston Laramie River Station 230kV at the new Sawmill Creek substation; Build a new Hammond substation near the existing Belle Fourche substation; Construct new 115 kv line from Sawmill Creek Substation to Hammond Substation. 115 kv 50 miles Line and Substation. Under Construction. 2018 Reliability; Load Serving. 13

Wayne Child Phase II Cheyenne 14

Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Wayne Child Phase II Sectionalize Laramie River Station (LRS) Story 345kV line at the existing Wayne Child substation. 345 kv 0 miles Substation. Under Construction. 2019 Load Serving, increased transfer capabilities. 15

Wind River 115kV Reliability Upgrade Project Casper 16

Wind River 115kV Reliability Upgrade Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Construct a new 115kV line from the existing Wind River Tap to the existing Wyopo Substation. 115 kv 17 miles Line. Planned. 2022 Reliability. 17

Projects: Colorado 18

19

Burlington (TS) Burlington (KC) 115 kv Craig Burlington Montrose Lamar Pueblo 20

Burlington (TS) Burlington (KC) 115 kv Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Rebuild with 795 ACSR. 115 kv 1.94 miles Line. Developing. 2018 Accommodate distribution system load shifting. 21

Burlington Lamar 230 kv Transmission Project Craig Burlington Montrose Lamar Pueblo 22

Burlington Lamar 230 kv Transmission Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Construct a 230 kv transmission line from Burlington to Lamar. 230 kv 107 miles Line. Under Construction. 2020 Reliability, improve load-serving capability, remove generation operating restrictions, and support renewable resource development in eastern Colorado. 23

Big Sandy - Calhan Craig Burlington Montrose Lamar Pueblo 24

Big Sandy - Calhan Description: Voltage: Length: Type: Status: Planned ISD: Purpose: New 230 kv line between Big Sandy and Calhan Substations. 230 kv 55 miles Line. Planned. 2022 Support Member load around Colorado Springs. 25

Boone Walsenburg 230 kv Line Craig Burlington Montrose Lamar Pueblo 26

Boone Walsenburg 230 kv Line Description: Construct a 230 kv transmission line from Boone Substation to Walsenburg Substation. Voltage: 230 kv Length: 69 miles Type: Line. Status: Conceptual. Planned ISD: To be determined Purpose: Reliability eliminate the need for the existing Walsenburg Remedial Action Scheme (RAS). 27

Burlington Wray 230 kv Line Craig Burlington Montrose Lamar Pueblo 28

Burlington Wray 230 kv Line Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Construct new 230 kv line from the existing Burlington Substation to the existing Wray Substation. 230 kv 72 miles Line. In-Service. 2016 Improve load-serving capability, remove generation operating restrictions and support renewable resource development in eastern Colorado. 29

Falcon Paddock Calhan 115 kv Craig Burlington Montrose Lamar Pueblo 30

Falcon Paddock Calhan 115 kv Description: Voltage: Length: Type: Status: Planned ISD: Purpose: New 115 kv and 69 kv rebuilds to 115 kv. 115 kv 25 miles Line. Developing. 2024 Accommodate increased loads and improve reliability. FALCON 31

Falcon Midway 115 kv Line Uprate Project Craig Burlington Montrose Lamar Pueblo 32

Falcon Midway 115 kv Line Uprate Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Planned uprate of existing 115 kv line between Falcon and Midway. 115 kv 27 miles Distribution. Planned. 2024 Increase conductor thermal rating. 33

Lamar Boone 230 kv Line Craig Burlington Montrose Lamar Pueblo 34

Lamar Boone 230 kv Line Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Construct a 230 kv transmission line from Boone Substation to Lamar Substation. 230 kv 100 miles Line. Conceptual. To be determined Accommodate potential increased resource injection at Lamar. Subset of Lamar Front Range. 35

Lamar Front Range Project Craig Burlington Montrose Lamar Pueblo 36

Lamar Front Range Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Two high voltage transmission paths from Lamar Substation to Pueblo area and a second path from Lamar to substations near Brush and/or Deer Trail. 345 kv 300 350 miles Line. Conceptual. To be determined. Tri-State reliability, system load-serving connectivity as regional power provider and future resources. Xcel Senate Bill07-100 and reliability. 37

Lost Canyon Main Switch 115 kv Project Craig Burlington Montrose Lamar Pueblo 38

Lost Canyon Main Switch 115 kv Description: Voltage: Length: Type: Status: Planned ISD: Purpose: New transmission line between Lost Canyon and Main Switch. 115kV 20 miles Line. Planned. 2022 Increase load serving capability. 39

Pueblo West Tap Line Uprate Craig Burlington Montrose Lamar Pueblo 40

Pueblo West Tap Line Uprate Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Upgrade existing 115 kv line conductor. 115 kv 0.3 miles Line. In-Service. 2016 Reliability, eliminate overloading of existing line for NERC Category B contingency. 41

San Juan Basin Energy Connect Project Craig Burlington Montrose Lamar Pueblo 42

San Juan Basin Energy Connect Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: New 230 kv transmission line between existing WAPA Shiprock Substation in New Mexico to a new 230 kv Iron Horse Substation. New 230 kv Kiffen Canyon Substation will also be required. 230 kv 70 miles Line. Conceptual. To be determined. Reliability for loss of Hesperus 345 kv source and to serve approximately 100 MW of new industrial load in SW Colorado. 43

San Luis Valley Poncha 230 kv Project Craig Burlington Montrose Lamar Pueblo 44

San Luis Valley Poncha 230 kv Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Construct approximately 60 mile 230 kv transmission line from the San Luis Valley to Poncha 230 kv. 230 kv 60 miles Line. Planned. 2022 Reliability. 45

Southwest Weld Expansion Project Craig Burlington Montrose Lamar Pueblo 46

Southwest Weld Expansion Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Construct approximately 49 aggregated miles of 115 kv and 230 kv transmission lines with six potential load-serving substations and/or line taps. 115/230 kv 49 miles Line Under Construction. 2021 Load Serving. 47

Sunshine Telluride 115 kv Craig Burlington Montrose Lamar Pueblo 48

Sunshine Telluride 69 kv to 115 kv Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Remove 115/69 transformer at Sunshine. Operate Sunshine Telluride at 115 kv. 115 kv 5 miles Line. Developing. 2018 Additional space at Sunshine for 115/24.9 kv mobile and increased load serving at Telluride. 49

Western Colorado Transmission Upgrade Project Craig Burlington Montrose Lamar Pueblo 50

Western Colorado Transmission Upgrade Project Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Upgrade existing transmission line and facilities from Montrose Substation to Cahone Substation from 115 kv operation to 230 kv. 230 kv 80 miles Line Under Construction. 2019 Reliability eliminate need for existing Nucla Remedial Action Scheme and replace failing structures. Load serving. 51

Projects: New Mexico 52

53

Escalante Gallup 115kV Line Uprate 54

Escalante Gallup 115kV Line Uprate Description: Uprate existing 115 kv line to 100ºC. Voltage: Length: Type: Status: Planned ISD: Purpose: 115 kv 42 miles Line. Under Construction. 2017 Reliability. 55

NENM Transmission Improvements Phase I 56

NENM Transmission Improvements Phase I Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Construct a second 115kV line from the existing Springer Substation to the existing Gladstone Substation. 115 kv 32 miles Line. Planned. 2022 Reliability; Load Serving. 57

NENM Transmission Improvements Phase II 58

NENM Transmission Improvements Phase II Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Sectionalize Gladstone Bravo Dome West (Hess) at the new Antelope Springs Substation; Sectionalize Clapham Bravo Dome 115kV at the new Mosquero Substation; Construct a new 115kV line from the planned Antelope Springs Substation to the planned Mosquero Substation; Convert Gladstone Antelope Springs 115kV to 230kV. 115 kv 29 miles Line. Planned. 2022 Reliability; Load Serving. 59

Torreon Project 60

Description: Voltage: Length: Type: Status: Planned ISD: Purpose: Torreon Project Sectionalize La Jara San Ysidro 115kV line to source the new Torreon substation. 115 kv 2 miles Line and Substation. Under Construction. 2017 Load Serving. 61

For more information Tri-State webpage: www.tristategt.org click Operations then Transmission Planning (http://www.tristategt.org/transmissionplanning/puc3627_trans missionprojects.cfm) Email: (transmissionplanning@tristategt.org) CCPG (for Colorado projects): (http://regplanning.westconnect.com/ccpg_stakeholder_opport unities.htm)