3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Future Power Supply Scenario

Agenda Note for 29 th meeting of the Standing Committee on Power System Planning of Northern Region

Subject: Project No MW wind farm at Village Badabagh, District Jaisalmer, Rajasthan.

No.1/9/06-SP&PA/ Dated: As per List enclosed-

POWER SYSTEM OPERATION CORPORATION LIMITED NATIONAL LOAD DESPATCH CENTRE B-9, QUTUB INSTITUTIONAL AREA NEW DELHI

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

भ त क Government of India ववद य त म त र लय Ministry of Power उत त क ष त र य ववद य त वमवत Northern Regional Power Committee. -sd-

Thereafter, the agenda items were taken up.

Evacuation system from Chamera III HEP (231 MW).

Standing Committee on Power System Planning in Northern Region

I. Operational Feedback from NLDC:

8.Director(Operation) Delhi Transco Ltd. Shakti Sadan,Kotla Marg, New Delhi (Fax )

BSES. Date 4" May 231C. Ref RA/ /01/N 19

MD, PTCUL welcomed the participants and expressed his happiness for the opportunity of holding the meeting of the Standing Committee in Uttrakhand.

Overview of Indian Power Sector. February 29, 2008

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Indian Power System Framework

Power evacuation system for RAPP Generating Units No. 5,6 (2x220 MW) and 7,8 (2x700 MW).

The Electric Power System

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

HVDC Systems in India

Minutes of meeting held on at SLDC, Conference Hall at 03.00PM to discuss about High Voltage problems existing in the Grid.

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

भ रत सरक र Government of India व द य त म त र लय Ministry of Power उत तर क ष त र य व द य त सवमवत Northern Regional Power Committee

1. Operational Feedback on Transmission Constraint: January 2015 & October Description of the. Antecedent constraints Conditions

List of Addresses. 1. Sh. V.Ramakrishna Member(Power system),cea, Sewa Bhawan, R.K. Puram, New Delhi 66

Government of India Central Electricity Authority SP&PA Division R.K. Puram, New Delhi

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

OPERATION & MAINTENANCE OF HVDC STATION

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

वव षय: उतर क त क वव द त पण र ल य जन पर सथ य सवमवत क 40 व ब ठक क क यरव त

List of the participants is enclosed at Annexure I.

No. 1/9/SP&PA-2013 / Dated:

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

SOLUTIONS FOR LARGE POWER SYSTEM INTERCONNECTIONS. V. Sitnikov D. Povh, D. Retzmann E. Teltsch

Petition for Determination of Average Pooled Purchase Cost for FY

S.No. Proposed Transmission System for Power Evacuation Scheme of Solar Power Projects in Rajasthan

Dietmar Retzmann From Blackout towards a Smart Grid more Reliability and Flexibility with Power Electronics

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

भ रतसरक र Government of India व द य तम त र लय Ministry of Power उत तरक ष त र यव द य तसवमवत Northern Regional Power Committee

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

POWER MAP OF EASTERN REGION Addtional Power Export to Bangladesh ALIPURDUAR - AGRA HVDC : 2000MW High Hydro - NER Surplus - Base Case

Role of System Operator in a Vibrant Power Market & Smart Grid

A Qualitative analysis of Power System Blackouts -Northern Grid Case Study

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

No. NRPC/OPR/107/01/2016/ Dated: फ स द श /FAX MESSAGE

Comparative Analysis of Grid Failures in Recent World History

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

Use of Advanced Solutions for UHV Transmission

Government Of India Ministry of Power Central Electricity Authority New Delhi

No. उ. क ष. व. स./प रच लन/106/01/2017/ द न क: स व म : प रच लन समन वय उपसममत क सदस य To: Members of OCC

List of Grid Disturbances above 10 MW. Page 1 of 8

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

FREQUENCY RESPONSE CHARACTER- ISTICS OF AN INTERCONNECTED POWER SYSTEM - A CASE STUDY OF REGIONAL GRIDS IN INDIA

Transmission Line Survey

Executive Summary on Power Sector. Jul-18

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

No.: NERPC/COM/CC_Min/2016/ Dated: 13 th January 2017

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Generation Projection (July Sep 2017)

Tender for Consultancy of Grid connected Rooftop Solar PV Power Plant over PGCIL(5MW) & CPRI(800KW) Premises under CAPEX mode

SPECIFICATIONS OF SELF PROPELLED REAPER

Annexure. Technical Details Package 1

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

Renewable Energy Integration- Transmission an Enabler

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Report. the feasibility of

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Power Electronics Projects

Transmission System Planning under Uncertainty in Indian Context

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

Draft National Electricity Plan

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL REFERRED TO ENVIRONMENTAL RESOURCES AND ENERGY, FEBRUARY 6, 2017 AN ACT

BPCL,Bottling Plant, Solapur, Pune, Bhitoni, Verna, Jalgoan, Nagpur, Indore

The agenda of the meeting has been uploaded on SLDC, Delhi website ( You are requested to make it convenient to attend the meeting

Chapter 4. Electricity Supply and Transmission System. In India, there are five regions namely, Northern Region, North Eastern Region,

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

Sewa Bhawan, R. K. Puram, New Delhi As per List Enclosed-

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

Indian Energy Exchange December For Public Use

Delhi-NCR. Ambient Air Quality Data of AIR LABORATORY. For the Month of November, 2017

Effect of Load Variation on Available Transfer Capability

Press Release. Deepawali Monitoring Report: Monitoring of Ambient Air & Noise Monitoring conducted

Transcription:

I. Regional Availability/Demand: Evening Peak (20:00 Hrs) MW Off Peak (03:00 Hrs) MW Day Energy (Net MU) Demand Met Shortage Requirement Freq* (Hz) Demand Met Shortage Requirement Freq* (Hz) Demand Met Shortage 52981 1090 54071 49.94 50904 222 51125 49.99 1229.55 12.31 * Half hourly (two 15 minutes block--one block each before and after the designated time) average frequency II. A. 's Load Details (At s periphery) in MUs: Thermal Hydro Gas/Naptha/ Diesal Wind Other (/ Small hydro/ Co-Generation etc.) Total UI [OD:(+ve), UD: (-ve)] Drawal Schedule Actual Drawal UI Consumption Shortages * (Net MU) (Net MU) (Net MU) (Net MU) (MU) Punjab 85.66 14.99 4.49 1.75 106.88 140.07 139.93-0.14 246.82 Haryana 32.92 0.76 0.16 1.08 34.92 153.32 155.06 1.74 189.99 Rajasthan 92.71 0.18 3.18 6.27 20.52 0.21 123.07 60.96 62.11 1.15 185.18 Delhi 6.71 15.73 0.66 23.10 88.79 86.38-2.41 109.48 UP 174.56 16.80 2.30 2.40 196.06 184.04 186.24 2.20 382.30 2.20 Uttarakhand 19.74 0.72 20.46 20.32 21.09 0.77 41.55 HP 18.40 4.77 23.17-0.92 3.31 4.23 26.48 J & K 25.58 25.58 19.85 16.85-3.00 42.43 10.11 Chandigarh 5.83 5.34-0.49 5.34 Total 392.55 96.45 18.91 13.95 20.52 10.87 553.24 672.26 676.31 4.05 1229.55 12.31 * Shortage furnished by the respective constituent.$ Others include UP Co-generation and JK Diesel II. B. 's Demand Met in MWs: Evening Peak (20:00 Hrs) MW Demand Met Shortage UI प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम) उत तर क ष त र य भ र प र षण क द र CIN: U40105DL2009GOI188682 Power Supply Position in Northern Region for 15.07.2018 Date of Reporting : 16.07.2018 's Control Area Generation (Net MU) Off Peak (03:00 Hrs) MW STOA/PX transaction Demand Met Shortage UI STOA/PX transaction UI/OA/PX [OD/Import: (+ve), UD/Export: (-ve) Punjab 10493 0 9 2230 9601 0-81 2232 10878 22 0 Haryana 8056 0-71 2131 8205 0 63 2164 8782 22 0 Rajasthan 7290 0 289 184 7832 0 27 275 8405 24 0 Delhi 4406 0-232 440 4625 0-33 593 5760 24 0 UP 17557 540 287 1775 16423 0-93 2179 18084 23 0 Uttarakhand 1887 0 71 334 1669 0 54 275 1915 21 0 HP 836 0-10 -1768 1087 0 219-1785 1257 10 0 J&K 2200 550 212-604 1256 222-241 -1077 2334 21 584 Chandigarh 256 0-6 0 206 0-22 -25 282 23 0 Total 52981 1090 550 4721 50904 222-107 4829 56388 23 464 * STOA figures are at sellers boundary & PX figures are at regional boundary. # figures may not be at simultaneous hour. Diversity is 1.02 III. Regional Entities : UI [OG:(+ve), UG: (-ve)] / Inst. Capacity Declared Peak MW Off Peak MW Energy Average Schedule Constituent (Effective) MW Capacity(MW) (Gross) (Gross) (Net MU) Sentout(MW) Net MU A. NTPC Singrauli STPS (5*200+2*500) 2000 1200 1339 1289 28.90 1204 27.83 Rihand I STPS (2*500) 1000 880 998 887 19.54 814 19.44 Rihand II STPS (2*500) 1000 943 991 1009 22.16 924 21.95 Rihand III STPS (2*500) 1000 943 998 911 19.79 825 19.42 Dadri I STPS (4*210) 840 769 738 424 11.85 494 11.99 Dadri II STPS (2*490) 980 929 787 558 15.68 653 14.81 Unchahar I TPS (2*210) 420 382 356 319 6.27 261 6.99 Unchahar II TPS (2*210) 420 191 189 160 3.01 125 3.36 Unchahar III TPS (1*210) 210 191 185 120 2.96 123 3.01 Unchahar IV TPS(1*500) 500 ISTPP (Jhajjhar) (3*500) 1500 948 856 560 14.88 620 15.77 Dadri GPS (4*130.19+2*154.51) 830 0 129 116 4.11 171 2.95 Anta GPS (3*88.71+1*153.2) 419 Auraiya GPS (4*111.19+2*109.30) 663 Dadri (5) 5 1 0 0 0 0.02 Unchahar (10) 10 2 0 0 0 Singrauli (15) 15 3 0 0 0.07 3 KHEP(4*200) 800 872 866 806 19.32 805 19.01 Sub Total (A) 12612 8252 8432 7159 169 7023 167 B. NPC NAPS (2*220) 440 378 414 424 9.03 376 9.07 RAPS- B (2*220) 440 355 392 401 8.53 355 8.52 RAPS- C (2*220) 440 408 450 452 9.67 403 9.78 Sub Total (B) 1320 1141 1256 1277 27.22 1134 27.37 C. NHPC Chamera I HPS (3*180) 540 534 540 540 10.36 432 10.15 Chamera II HPS (3*100) 300 297 302 304 7.20 300 7.12 Chamera III HPS (3*77) 231 229 242 242 5.67 236 5.48 Bairasuil HPS(3*60) 180 86 181 118 2.20 92 2.07 Salal-HPS (6*115) 690 659 693 575 16.06 669 15.82 Tanakpur-HPS (3*31.4) 94 85 95 95 2.24 93 2.05 Uri-I HPS (4*120) 480 472 472 472 11.35 473 11.33 Uri-II HPS (4*60) 240 240 244 244 5.81 242 5.77 Dhauliganga-HPS (4*70) 280 278 289 275 6.82 284 6.64 Dulhasti-HPS (3*130) 390 361 0 0 8.65 361 8.65 Sewa-II HPS (3*40) 120 120 130 127 1.13 47 1.10 Parbati 3 (4*130) 520 117 372 121 2.80 117 2.80 Kishanganga(3*110) 330 7 0 22 0.20 8 0.17 Sub Total (C ) 4395 3485 3559 3135 81 3354 79 D.SJVNL NJPC (6*250) 1500 1605 1621 1623 38.41 1600 38.49 Rampur HEP (6*68.67) 412 442 442 444 10.73 447 10.60 Sub Total (D) 1912 2047 2063 2067 49.14 2048 49.09 E. THDC Tehri HPS (4*250) 1000 664 668 138 5.42 226 5.42 Koteshwar HPS (4*100) 400 92 202 91 2.27 94 2.21 Sub Total (E) 1400 756 870 229 7.68 320 7.63 F. BBMB Bhakra HPS (2*108+3*126+5*157) 1379 636 954 459 15.31 638 15.26 Dehar HPS (6*165) 990 598 825 565 14.44 602 14.36 Pong HPS (6*66) 396 130 192 96 3.18 132 3.11 Sub Total (F) 2765 1364 1971 1120 32.93 1372 32.73 G. IPP(s)/JV(s) Allain DuhanganHPS(IPP) (2*96) 192 0 193 114 2.93 122 3.17 Karcham Wangtoo HPS(IPP) (4*250) 1000 0 1100 1100 26.39 1099 26.08 Malana Stg-II HPS (2*50) 100 0 105 80 2.14 89 2.00 Shree Cement TPS (2*150) 300 0 147 73 2.30 96 2.21 Budhil HPS(IPP) (2*35) 70 0 76 76 1.81 75 1.65 Sainj HPS (IPP) (2*50) 100 0 2.53 Sub Total (G ) 1762 0 1621 1444 35.56 1482 35.11 H. Total Regional Entities (A-G) 26167 17045 19772 16431 401.59 16733 397.73 Demand Met (MW) and Time(Hrs) UI Net MU 1.07 0.10 0.21 0.37-0.14 0.87-0.72-0.35 - -0.89 1.16-0.02-0.02 0.31 1.90-0.04 0.01-0.11-0.15 0.21 0.08 0.19 0.13 0.24 0.19 0.02 0.04 0.18 0.03 0.03 1.35-0.08 0.13 0.06 0.08 0.07 0.20-0.24 0.31 0.14 0.09 0.16 0.45 3.86 Shortage (MW)

Effective Installed I. Entities Average(Sentout Capacity Peak MW Off Peak MW Energy(MU) (MW) MW) Punjab Guru Gobind Singh TPS (Ropar) (6*210) 1260 320 370 8.05 335 Guru Nanak Dev TPS(Bhatinda) (2*110+2*120) Guru Hargobind Singh TPS(L.mbt) (2*210+2*250) Goindwal(GVK) (2*270) Rajpura (2*700) Talwandi Saboo (3*660) 460 0 0-0.02-1 920 220 252 5.26 219 540 200 200 4.82 201 1400 1320 1320 31.57 1316 1980 1540 1540 35.98 1499 6560 3600 3682 85.66 3569 1000 672 543 14.99 625 303 0 0 1.75 73 859 0 0 4.49 187 1162 0 0 6.24 260 8722 4272 4225 106.88 4453 Total Punjab Haryana Panipat TPS (2*210+2*250) 920 399 456 10.37 432 DCRTPP (Yamuna nagar) (2*300) 600 464 538 11.78 491 Faridabad GPS (NTPC)(2*137.75+1*156) 432 0 0 0 RGTPP (khedar) (IPP) (2*600) 1200 383 490 10.76 448 Magnum Diesel (IPP) 25 0 0 0 Jhajjar(CLP) (2*660) 132 4497 1246 1484 32.92 1372 62 24 26 0.76 32 106 0 0 1.08 45 50 0 0 0.16 7 156 0 0 1.24 52 Total Haryana 4715 1270 1510 34.92 1455 Rajasthan kota TPS (2*110+2*195+3*210) 1240 656 650 15.67 653 suratgarh TPS (6*250) 1500 928 888 20.59 858 Chabra TPS (4*250) 1000 950 991 21.91 913 Chabra TPS (1*660) 66 Dholpur GPS (3*110) 33 Ramgarh GPS(1*37.5 + 1*35.5 +2*37.5 +1*110 +1*50) 271 138 137 3.18 132 RAPS A (NPC) (1*100+1*200) 30 Barsingsar (NLC) (2*125) 250 101 99 2.28 95 Giral LTPS (2*125) 25 Rajwest LTPS (IPP) (8*135) 1080 461 443 11.82 492 VS LIGNITE LTPS (IPP) (1*135) 135 0 0 0 Kalisindh Thermal(2*600) 1200 394 394 9.86 411 Kawai(Adani) (2*660) 1320 447 425 10.59 441 9536 4075 4027 95.89 3995 550 0 0 0.18 7 Wind power 4292 769 1661 20.52 855 102 9 9 0.21 9 1995 21 0 6.27 261 Renewable/Others (Total) 6389 799 1670 27.00 1125 Total Rajasthan 16475 4874 5697 123.07 5128 UP Anpara TPS (3*210+2*500) 1630 1298 1308 30.80 1283 Obra TPS (2*50+2*94+5*200) 1194 512 515 10.70 446 Paricha TPS (2*110+2*220+2*250) 1160 885 818 16.80 700 Panki TPS (2*105) 21 Harduaganj TPS (1*60+1*105+2*250) 665 527 505 10.70 446 Tanda TPS (NTPC) (4*110) 440 263 294 5.46 227 Roza TPS (IPP) (4*300) 1200 546 295 9.20 383 Anpara-C (IPP) (2*600) 1200 1105 1087 23.90 996 Bajaj Energy Pvt.Ltd(IPP) TPS (10*45) 450 401 223 6.30 263 Anpara-D(2*500) 1000 664 946 17.90 746 Lalitpur TPS(3*660) 1980 862 684 23.90 996 Bara(3*660) 1980 895 737 18.90 788 13109 7958 7412 174.56 7273 Vishnuparyag HPS (IPP)(4*110) 440 326 296 7.40 308 Alaknanada(4*82.5) 330 350 346 8.30 346 Other Hydro 527 48 48 1.10 46 Cogeneration 1360 100 100 2.40 100 26 0 0 0 472 0 0 2.30 96 498 0 0 2.30 96 Total UP 16264 8782 8202 196.06 8169 Uttarakhand Other Hydro 1250 823 803 19.74 822 Total Gas 45 127 0 0 0 100 0 0 0.72 30 Small Hydro (< 25 MW) 18 407 0 0 0.72 30 Total Uttarakhand 2107 823 803 20.46 853 Delhi Rajghat TPS (2*67.5) 135 0 0 0 Delhi Gas Turbine (6x30 + 3x34) 282 67 68 1.69 70 Pragati Gas Turbine (2x104+ 1x122) 330 261 263 5.98 249 Rithala GPS (3*36) 95 0 0 0 Bawana GPS (4*216+2*253) 1370 285 442 8.06 336 Badarpur TPS (NTPC) (3*95+2*210) 705 305 310 6.71 280 2917 918 1083 22.44 935 16 21 27 0.66 28 2 0 0 0 18 21 27 0.66 28 Total Delhi 2935 939 1110 23.10 963

HP Baspa HPS (IPP) (3*100) 300 330 330 7.92 330 Malana HPS (IPP) (2*43) 86 87 68 1.84 76 Other Hydro (>25MW) 372 388 382 8.64 360 Small Hydro (< 25 MW) 486 238 205 4.77 199 486 238 205 4.77 199 Total HP 1244 1044 986 23.17 965 J & K Baglihar HPS (IPP) (3*150+3*150) 900 885 885 21.24 885 Other Hydro/IPP(including 98 MW Small Hydro) 308 187 179 4.34 181 Gas/Diesel/Others 19 Small Hydro (< 25 MW)Included in Other Hydro Abov 98 0 0 0 98 0 0 0 Total J & K 1398 1072 1064 25.58 1066 Total Control Area Generation 53860 23076 23596 553.24 23052 J. Net Inter Regional Exchange [Import (+ve)/export (-ve)] 15030 13110.77 293.97 12249 Total Regional Availability(Gross) 80027 57877 53138 1248.80 52033 IV. Generation: Regional Entities Hydro Control Area Hydro Total Regional Hydro V. Total Renewable Generation: Regional Entities Renewable Control Area Renewable Total Regional Renewable 12564 10727 8652 222.83 9209 7468 4359 4112 96.45 4248 20032 15086 12763 319.28 13457 30 0 0 0.07 3 9214 1058 1902 42.93 1789 9244 1058 1902 43.01 1792 VI(A). Inter Regional Exchange [Import (+ve)/export (-ve)] [Linkwise] Element Peak(20:00 Hrs) Off Peak(03:00 Hrs Interchange (MW) Energy (MU) Net Energy MW MW Import Export Import Export MU Vindhychal(HVDC B/B) 100 100 100 0 2.41 2.41 765 KV Gwalior-Agra (D/C) 2342 2390 2725 0 55.03 55.03 400 KV Zerda-Kankroli 75 66 198 145 1.26 1.26 400 KV Zerda-Bhinmal 88-64 229 174 0.92 0.92 220 KV Auraiya-Malanpur 47 49 0 4 1.13-1.13 220 KV Badod-Kota/Morak -8 24 94 0 1.49 1.49 Mundra-Mohindergarh(HVDC Bipole) 1401 1001 1506 0 24.82 24.82 400 KV RAPPC-Sujalpur 266 247 460 0 6.66 6.66 400 KV Vindhyachal-Rihand 946 861 0 958 19.90-19.90 765 kv Phagi-Gwalior (D/C) 1255 1265 1631 0 32.72 32.72 +/- 800 kv HVDC Champa-Kurushetra 2500 1500 2000 0 33.90 0 33.90 765KV Orai-Jabalpur 1402 1405 1818 0 33.39 0 33.39 765KV Orai-Satna 1581 1538 1645 0 36.74 0 36.74 765KV Orai-Gwalior 429 375 0 444 10-9.75 Sub Total WR 12425 10757 229.33 30.78 198.55 400 kv Sasaram - Varanasi -109-116 123 0 3.62 3.62 400 kv Sasaram - Allahabad 35 35 63 0 1.01 1.01 400 KV MZP- GKP (D/C) 630 578 828 0 16.09 16.09 400 KV Patna-Balia(D/C) X 2 707 691 0 918 19.24 19.24 400 KV B'Sharif-Balia (D/C) 230 226 0 419 7.51 7.51 765 KV Gaya-Balia 384 308 0 534 8.70 8.70 765 KV Gaya-Varanasi (D/C) -402-310 660 0 10.80 10.80 220 KV Pusauli-Sahupuri 161 163 189 0 3.87 3.87 132 KV K'nasa-Sahupuri 0.48-0.48 132 KV Son Ngr-Rihand 0.43-0.43 132 KV Garhwa-Rihand 0.00 765 KV Sasaram - Fatehpur -97-101 73 116 0.55-0.55 400 KV Motihari -GKP (D/C) -189-270 0 274 5.86-5.86 400 kv B'Sharif - Varanasi (D/C) -45-50 226 0 3.40 3.40 +/- 800 KV HVDC Alipurduar-Agra 700 500 700 0 13.19 13.19 Sub Total ER 2005 1654 87.42 7.32 80.10 +/- 800 KV HVDC BiswanathCharialli-Agra 600 700 700 15.32 15.32 Sub Total NER 600 700 15.32 15.32 Total IR Exch 15030 13111 332.08 38.10 293.97 VI(B). Inter Regional Schedule & Actual Exchanges [Import (+ve)/export (-ve)] [Corridor wise] ISGS/LT Schedule (MU) Bilateral Schedule (MU) Power Exchange Shdl (MU) Wheeling (MU) ER Bhutan Total Through ER Through WR Through ER Through WR Through ER Through WR 50.01 3.74 53.75 29.71 63.36 8.05 1.29 Total IR Schedule (MU) Through ER Through WR Inclds Mndra Total Total IR Actual (MU) Through ER(including NER) Through WR Total Through ER (including NER) Through WR Total 87.77 209.64 297.41 95.42 198.55 293.97 7.65-11.09-3.44 VI(C). Inter National Exchange with Nepal [Import (+ve)/export (-ve)] [Linkwise] Element 132 KV Tanakpur - Mahendarnagar Peak(20:00 Hrs) Off Peak(03:00 Hrs Interchange (MW) Energy (MU) Net IR UI (MU) Net Energy MW MW Import Export Import Export MU 23-18 0 30 0 0-0.46 VII. Frequency Profile <-------------------------------------------------- % of Time Frequency --------------------------------------------------> <49.2 <49.7 <49.8 <49.9 <50.0 49.9-5 5-50.10 50.10-50.20 >50.20 >50.50 4.50 52.60 86.00 9.40 0.50 <------------------------- Frequency (Hz) -------------------------> Average Frequency Frequency in 15 Min Block Frequency Variation Std. Dev. MAX MIN Freq Dev Index (% of Time) Freq Time Freq Time Hz Index (Hz) (Hz) 50.14 15.07 49.82 19.30 49.99 0.024 0.049 50.09 49.89 14.00

VIII(A). Voltage profile 400 kv Voltage Voltage (in % of Time) Voltage Level (kv) Deviatio Voltage(KV) Time Voltage (KV) Time <380 kv <390 kv >420 kv >430 kv n Index Rihand 400 406 10:40 399 19:45 0.0 0.0 0.0 0.0 0.0 Gorakhpur 400 416 6:04 388 21:57 0.0 0.8 0.0 0.0 0.0 Bareilly(PG)400kV 400 414 7:57 389 22:49 0.0 0.0 0.0 0.0 0.0 Kanpur 400 418 7:50 400 22:49 0.0 0.0 0.0 0.0 0.0 Dadri 400 417 7:57 398 21:07 0.0 0.0 0.0 0.0 0.0 Ballabhgarh 400 418 7:52 395 22:49 0.0 0.0 0.0 0.0 0.0 Bawana 400 417 7:57 395 22:48 0.0 0.0 0.0 0.0 0.0 Bassi 400 418 7:53 400 22:18 0.0 0.0 0.0 0.0 0.0 Hissar 400 412 7:50 391 21:05 0.0 0.0 0.0 0.0 0.0 Moga 400 408 7:49 390 20:28 0.0 0.0 0.0 0.0 0.0 Abdullapur 400 415 8:01 397 22:48 0.0 0.0 0.0 0.0 0.0 Nalagarh 400 412 7:56 401 21:10 0.0 0.0 0.0 0.0 0.0 Kishenpur 400 409 3:45 399 20:29 0.0 0.0 0.0 0.0 0.0 Wagoora 400 402 1:37 389 11:47 0.0 0.1 0.0 0.0 0.0 Amritsar 400 408 7:45 394 20:27 0.0 0.0 0.0 0.0 0.0 Kashipur 400 402 0:00 402 0:00 0.0 0.0 0.0 0.0 0.0 Hamirpur 400 407 3:48 396 20:30 0.0 0.0 0.0 0.0 0.0 Rishikesh 400 412 7:56 390 22:46 0.0 0.0 0.0 0.0 0.0 VIII(B). Voltage profile 765 kv Voltage Voltage (in % of Time) Voltage Level (kv) Deviatio Voltage(KV) Time Voltage (KV) Time <728 kv <742 kv >800 kv >820 kv n Index Fatehpur 765 777 7:58 747 21:06 0.0 0.0 0.0 0.0 0.0 Balia 765 787 7:58 749 22:21 0.0 0.0 0.0 0.0 0.0 Moga 765 794 7:55 751 20:31 0.0 0.0 0.0 0.0 0.0 Agra 765 796 8:00 756 21:06 0.0 0.0 0.0 0.0 0.0 Bhiwani 765 803 7:56 763 20:31 0.0 0.0 0.8 0.0 0.8 Unnao 765 767 7:58 737 22:22 0.0 9.2 0.0 0.0 0.0 Lucknow 765 792 6:52 752 22:48 0.0 0.0 0.0 0.0 0.0 Meerut 765 817 8:00 764 14:39 0.0 0.0 8.5 0.0 8.5 Jhatikara 765 799 7:56 755 22:47 0.0 0.0 0.0 0.0 0.0 Bareilly 765 kv 765 791 7:57 747 22:47 0.0 0.0 0.0 0.0 0.0 Anta 765 800 7:52 774 22:49 0.0 0.0 0.0 0.0 0.0 Phagi 765 804 7:52 770 21:07 0.0 0.0 1.3 0.0 1.3 Note : "0" in Max / Min Col -> Telemetry Outage IX. Reservior Parameters: Name of Parameters Present Parameters Last Year Last day Reservior FRL (m) MDDL (m) Level (m) Energy (MU) Level (m) Energy (MU) Inflow (m 3 /s) Usage (m 3 /s) Bhakra 513.59 445.62 461.29 145.41 485.20 593.99 937.94 566.34 Pong 426.72 384.05 391.30 72.04 401.20 244.95 359.62 272.41 Tehri 829.79 740.04 760.90 128.02 774.35 255.66 483.44 169.00 Koteshwar 612.50 598.50 610.22 4.69 610.02 4.69 169.00 149.35 Chamera-I 76 748.75 751.94 254.33 281.60 Rihand 268.22 252.98 RPS 352.80 343.81 Jawahar Sagar 298.70 295.78 RSD 527.91 487.91 506.73 4.68 517.92 8.53 272.64 182.02 * NA: Not Available X(A). Short-Term Open Access Details: Off- Peak Hours (03:00 Hrs) Peak Hours (20:00 Hrs) Day Energy (MU) Bilateral (MW) IEX (MW) PXIL (MW) Bilateral (MW) IEX (MW) PXIL (MW) Bilateral (MU) IEX / PXIL (MU) Total (MU) Punjab 2232 0 0 2230 0 0 53.54 53.54 Delhi 1048-455 0 938-498 0 24.35-9.75 14.60 Haryana 2053 112 0 2131 0 0 41.51 1.40 42.91 HP -1708-151 74-1852 10 74-40.39-0.43-40.82 J&K -1153 76 0-1153 549 0-27.68 11.09-16.59 CHD 0-25 0 0 0 0-0.22-0.22 Rajasthan 223 52 0 223-38 0 5.34 0.93 6.27 UP 2140 39 0 1775 0 0 44.44 1.10 45.54 Uttarakhand -123 397 0-256 590 0-3.73 10.62 6.89 Total 4710 45 74 4035 612 74 97.38 14.74 112.12 X(B). Short-Term Open Access Details: Bilateral (MW) IEX (MW) PXIL (MW) Punjab 2233 2221 0 0 0 0 Delhi 1214 849-55 -881 0 0 Haryana 2262 1473 508-492 0 0 HP -1526-2030 206-202 74 74 J&K -1153-1154 707 56 0 0 CHD 0 0 20-35 0 0 Rajasthan 223 222 272-627 0 0 UP 2180 1748 545-84 0 0 Uttarakhand -123-256 590 359 0 0 XI. System Reliability Indices(Violation of TTC and ATC): (i)%age of times N-1 Criteria was violated in the inter - regional corridors WR % ER % Simultaneous 1.04% (ii)%age of times ATC violated on the inter-regional corridors WR % ER % Simultaneous 8.33% (iii)%age of times Angular Difference on Important Buses was beyond permissible limits(40 deg.)

Rihand - Dadri % XII. Zero Crossing Violations No. of violations( 8 in a day) number of continuous blocks without sign change Punjab 0 11 Haryana 1 16 Rajasthan 1 13 Delhi 4 31 UP 0 10 Uttarakhand 6 53 HP 3 15 J & K 3 21 Chandigarh 3 19 XIII.System Constraints: XIV. Grid Disturbance / Any Other Significant Event: XV. Weather Conditions For 15.07.2018 : XVI. Synchronisation of new generating units : XVII. Synchronisation of new 220 / 400 / 765 KV lines and energising of bus / /substation : XVIII. Tripping of lines in pooling stations : XIX. Complete generation loss in a generating station : Note: Data(regarding drawal,generation, shortage, inter-regional flows and reservoir levels)of the constituents filled in the report are as per last furnished data by the respective state/constituent to NRLDC. Report for : 15.07.2018 प र प रभ र असभय त / SHIFT CHARGE ENGINEER