DESCRIPTION QUANTITY PRICE TOTAL

Project Book Worksheet for Cost Estimation

Steese Rd - Curb & Sidewalk Improvement

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Maine Turnpike Authority

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

Maine Turnpike Authority

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Patton Hill Road (Four Inch Main), Project No

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Maine Turnpike Authority

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Maine Turnpike Authority

MoDOT 2016 UNIT BID PRICES Northwest District

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

Licensed Class C Virginia Contractor No.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

Macomb County Department of Roads Bid Comparison

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

ENGINEERING & ENVIRONMENTAL

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

CT Consultants, Inc.

Bid Tabulation City of Coralville RE-BID Coral Ridge Ave, Phase II - Oakdale Blvd to Forevergreen Rd City of Coralville, IA Engineer's OPC

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

2, total unit $ total unit $ total unit $ total $

Federal Project No.: STP-5128(388)

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

Maine Turnpike Authority

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

Riverside County Transportation Department Summary of Bids

DELETE first sentence of first paragraph that reads: REPLACE with the following:

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

CITY OF STANDARD SPECIFICATIONS

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

The Tulalip Tribes of Washington

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

Wentzville Parkway South Phase 2 & 2A

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Oaks Commerce Center

Federal Project No.: OC-095-1(348)

Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006

METRO Magnolia Transit Center - Bid Tab

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Riverside County Transportation Department Summary of Bids

Kermon Environmental Services, Inc. (OC) TOTAL POINTS. D&J Enterprises, Inc. (OS) CrowderGulf, LLC (OS)

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

STREET IMPROVEMENTS PROPOSAL BID ITEMS

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:


PLEASE NOTE: BATCH TRUCK

365, , , A Total of Schedule I and II 530, , A 702, A

U:\0-PROJECT\Groton - sidewalk\main STREET\MAIN ST CONST-PLAN.dwg, 4/26/ :07:22 AM, AutoCAD PDF (General Documentation).pc3

Federal Project No.: HSIP-5A27(567)

City of Grand Island Tuesday, February 13, 2018 Council Session

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

PLEASE NOTE: BATCH TRUCK

CENTER LINE GROUND LINE EXISTING MANHOLE TRUE SCALE SEWER LINES & MANHOLES GAS WATER CULVERT PERMANENT REFERENCE MONUMENT P.R.M.

Federal Project No.: STP-5A27(380), STP-5A27(381)

Maine Turnpike Authority

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

Federal Project No.: NHFP-081-1(346)

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

MINI SKID STEER ATTACHMENT LITERATURE

CP #CP218 NAIL SOFT GROUND N= E= ELEV= GUY WIRE. + WV CP #CP175 Old Magnail N= E= ELEV=858.

Transcription:

November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed Improvements on an Annual Contract? A1. No, you do not have to be on the Watershed Improvements Pre-Qualification List to submit a proposal. Note attached pricing from the last contract Gwinnett County had for watershed improvements. These prices were obtained through a bid process vs. the request for proposal process. This addendum should be acknowleed on the Proposal Signature Form (Page 28) of the Proposal. Failure to do so may result in your bid being deemed non-responsive. Thank you, Shelley McWhorter Shelley McWhorter, CPPB Purchasing Associate III Attachment: Bid Pricing

BID TABULATION PAGE 1 OF 9 LABOR AND EQUIPMENT RATES 1 00 73 46 FOREMAN 200 HR $49.61 $9,000.00 2 00 73 46 LABORER 1000 HR $27.56 $25,000.00 3 00 73 46 SURVEYOR 200 HR $82.69 $15,000.00 4 01 54 00 HEAVY EQUIPMENT 4.A 01 54 00 TRACKED EXCAVATOR W/HYDRAULIC THUMB (30,000-50,000 LB) 16 HR $181.91 $2,640.00 4.B 01 54 00 MINI EXCAVATOR 40 HR $104.74 $3,800.00 4.C 01 54 00 RUBBER TIRE LOADER 16 HR $104.74 $1,520.00 4.D 01 54 00 SKID STEER LOADER (3,500 LB) 40 HR $104.74 $3,800.00 4.E 01 54 00 DUMP TRUCK (SINGLE AXLE) 8 HR $55.13 $400.00 4.F 01 54 00 DUMP TRUCK (MULTI AXLE) 8 HR $165.38 $1,200.00 4.G 01 54 00 TRACKED DUMP TRUCK 8 HR $110.25 $800.00 4.H 01 54 00 BOOM TRUCK CRANE (12 TON) 8 HR $11.03 $80.00 CONSTRUCTION FACILITIES 5 01 58 13 PROJECT SIGN 5.A 01 58 13 PROJECT SIGN LARGE 3 EA $661.50 $1,800.00 5.B 01 58 13 PROJECT SIGN - SMALL 20 EA $661.50 $12,000.00 5.C 01 58 13 INTERPRETATIVE 2 EA $826.88 $1,500.00 5.D 01 58 13 MITIGATION BANK BOUNDARY 10 EA $441.00 $4,000.00 REMOVAL S 6 02 41 13.13 SAW CUTS IN EXISTING PAVEMENT 100 LF $4.41 $400.00 7 02 41 13.23 REMOVAL OF EXISTING DRAINAGE STRUCTURES 5 EA $165.38 $750.00 8 02 41 13.23 REMOVE EXISTING PIPE, ALL TYPES AND SIZES 50 LF $1.65 $75.00 9 02 42 11 DEBRIS REMOVAL 20 LOAD $198.45 $3,600.00 CAST IN PLACE CONCRETE 10 03 30 00 CONCRETE STRUCTURES, CAST IN PLACE, INCLUDING REINFORCING STEEL 10.A 03 30 00 Class AAA (5000 psi) 5 CY $441.00 $2,000.00 10.B 03 30 00 Class AA1 (4500 psi) 5 CY $441.00 $2,000.00 10.C 03 30 00 Class A (3000 psi) 5 CY $385.88 $1,750.00 10.D 03 30 00 Class B (2200 psi) 5 CY $165.38 $750.00 11 03 30 00 CONCRETE STRUCTURES, CAST IN PLACE, WITHOUT REINFORCING STEEL 11.A 03 30 00 Class AAA (5000 psi) 5 CY $385.88 $1,750.00 11.B 03 30 00 Class AA1 (4500 psi) 5 CY $441.00 $2,000.00 11.C 03 30 00 Class A (3000 psi) 5 CY $385.88 $1,750.00 11.D 03 30 00 Class B (2200 psi) 5 CY $165.38 $750.00 12 03 62 00 GROUTING (NON-PRESSURE) 10 CY $303.19 $2,750.00

BID TABULATION PAGE 2 OF 9 CLEARING AND EARTHWORK 13.A 31 05 16 CLASSIFIED STONE 75 CY $55.13 $3,750.00 13.B 31 05 16 WELL GRADED RIP RAP 100 CY $62.84 $5,700.00 14 31 05 19.19 GEOGRID REINFORCEMENT 150 SY $2.21 $300.00 15 31 11 00 CLEARING AND GRUBBING -MULCH ON- 5 AC $4,961.25 $22,500.00 16 31 11 00 CLEARING AND GRUBBING -HAUL OFF 1 AC $9,371.25 $8,500.00 17 31 11 00 SELECTIVE TREE PRUNING 17.A 31 11 00 LIMBS < 8 HEIGHT 40 EA $18.19 $660.00 17.B 31 11 00 LIMBS > 8 HEIGHT 10 EA $49.61 $450.00 18 31 11 00 TREE REMOVAL 18.A 31 11 00 6-24 200 EA $551.25 $100,000.00 18.B 31 11 00 > 24 50 EA $992.25 $45,000.00 19 31 11 00 STUMP GRINDING 19.A 31 11 00 6-24 10 EA $55.13 $500.00 19.B 31 11 0.B > 24 10 EA $55.13 $500.00 20 31 13 11 ORANGE BARRIER FENCE 12000 LF $0.83 $9,000.00 21 31 13 11 TEMPORARY CHAIN LINK FENCE 100 LF $11.03 $1,000.00 22 31 23 00 EXCAVATION AND BACKFILLING 8000 CY $13.23 $96,000.00 23 32 23 00 IMPORTED FILL 2500 CY $11.03 $25,000.00 24 31 23 00 ADDITIONAL EXCAVATION COST WHERE DEPTH TO TOP OF PIPE IS GREATER THAN 10 24.A 31 23 00 10 15 DEPTH TO TOP OF PIPE 40 LF $22.05 $800.00 24.B 31 23 00 GREATER THAN 15 DEPTH TO TOP OF PIPE 40 LF $22.05 $800.00 25 31 23 00 ROCK EXCAVATION (0-100 CY/PROJECT) 20 CY $143.33 $2,600.00 26 31 23 00 SPOIL REMOVAL 3500 CY $13.78 $43,750.00 27 31 23 23.33 FLOWABLE FILL 3 CY $220.50 $600.00 28 31 23 34 NATURAL DRAINAGE SYSTEM (NDS) SOIL 150 CY $47.41 $6,450.00 EROSION AND SEDIMENT CONTROL 29 31 25 00 CONSTRUCTION EXIT 5 EA $937.13 $4,250.00 30 31 25 00 SILT FENCE TYPE C 2500 LF $3.31 $7,500.00 31 31 52 00 COFFERDAM 100 SF $49.61 $4,500.00 32 31 25 00 SILT BAG 2 EA $1,874.25 $3,400.00 33 31 25 00 ROCK FILTER DAM 10 CY $137.81 $1,250.00 34 31 25 00 ROCK CHECK DAM 10 CY $137.81 $1,250.00 35 31 25 00 INLET SEDIMENT TRAP 10 EA $82.69 $750.00 36 31 25 00 SWAMP MAT 10 EA $2,205.00 $20,000.00 37 31 25 00 COIR WATTLES 100 LF $11.58 $1,050.00 38 31 25 00 COIR ROLLS 100 LF $18.74 $1,700.00

BID TABULATION PAGE 3 OF 9 39 31 25 00 TEMPORARY SEEDING 6 AC $330.75 $1,800.00 40 31 25 00 STRAW BALES 100 EA $7.72 $700.00 41 31 32 19.16 GEOTEXTILE WOVEN 200 SY $2.76 $500.00 42 31 32 19.16 GEOTEXTILE - NON-WOVEN 100 SY $3.86 $350.00 43 31 32 01 COIR BLANKET 12000 SY $9.10 $99,000.00 44 31 32 01 COIR MATTRESS 1500 SY $8.82 $12,000.00 STABILIZATION S 45 31 32 23 STABILIZATION 5 CY $192.94 $875.00 46 31 35 19.16 PERMANENT SOIL REINFORCING MAT 100 SY $4.69 $425.00 47 31 36 00 GABION STRUCTURES 20 CY $49.61 $900.00 48 31 37 00 STONE RIP RAP TYPE I, 24" IN PLACE 150 CY $58.43 $7,950.00 49 31 37 00 STONE RIP RAP TYPE III, 12" IN PLACE 700 CY $55.13 $35,000.00 50 31 37 00 STONE GROUTED RIP RAP, 12" IN PLACE 10 CY $77.18 $700.00 51 31 41 16.13 STEEL SHEET PILES 80 SF $143.33 $10,400.00 52 31 41 16.16 VINYL SHEET PILES 80 SF $132.30 $9,600.00 STREAM AND WETLAND CONSTRUCTION 53 32 80 02 LOG ON-SITE 6 EA $551.25 $3,000.00 54 32 80 02 LOG IMPORTED 54.A 32 80 02 12 FT - 24.9 FT 10 EA $882.00 $8,000.00 54.B 32 80 02 25 FT - 50 FT 5 EA $1,212.75 $5,500.00 55 31 80 02 FIELD STONE BOULDER 55.A 31 80 02 EXTRA LARGE 7 CY $248.06 $1,575.00 55.B 31 80 02 LARGE 9 CY $330.75 $2,700.00 55C 31 80 02 MEDIUM 9 CY $330.75 $2,700.00 55.D 31 80 02 SMALL 12 CY $330.75 $3,600.00 56 31 80 02 GRANITE QUARRY STONE BOULDER 56.A 31 80 02 EXTRA LARGE 3 CY $275.63 $750.00 56.B 31 80 02 LARGE 5 CY $275.63 $1,250.00 56.C 31 80 02 MEDIUM 5 CY $275.63 $1,250.00 56.D 31 80 02 SMALL 10 CY $275.63 $2,500.00 57 31 80 02 RIVER COBBLE 10 CY $220.50 $2,000.00 58 31 80 02 RIFFLE ROCK 8 CY $220.50 $1,600.00 59 31 80 02 RIVER PEBBLE 5 CY $143.33 $650.00 60 31 80 02 GROUT FOR INSTREAM STRUCTURES 25 CF $49.61 $1,125.00 61 31 80 03 STONE TOE PROTECTION & BENDWAY 800 CY $7.72 $5,600.00 62 31 80 05 ROOT WAD REVETMENT 25 LF $71.66 $1,625.00 63 31 80 06 CROSS-VANE 63.A 31 80 06 EXTRA LARGE 265 LF $289.96 $69,695.00 63.B 31 80 06 LARGE 415 LF $237.04 $89,225.00 63.C 31 80 06 MEDIUM 430 LF $253.58 $98,900.00 63.D 31 80 06 SMALL 300 LF $253.58 $69,000.00

BID TABULATION PAGE 4 OF 9 64 31 80 07 J-HOOK VANE 64.A 31 80 07 EXTRA LARGE 100 LF $224.91 $20,400.00 64.B 31 80 07 LARGE 140 LF $154.35 $19,600.00 64.C 31 80 07 MEDIUM 150 LF $170.89 $23,250.00 64.D 31 80 07 SMALL 110 LF $176.40 $17,600.00 65 31 80 07 BOULDER VANE 65.A 31 80 07 EXTRA LARGE 8 LF $289.96 $2,104.00 65.B 31 80 07 LARGE 16 LF $237.04 $3,440.00 65.C 31 80 07 MEDIUM 10 LF $237.04 $2,150.00 65.D 31 80 07 SMALL 20 LF $237.04 $4,300.00 66 31 80 08 J-HOOK LOG VANE 66.A 31 80 08 EXTRA LARGE 125 LF $151.04 $17,125.00 66.B 31 80 08 LARGE 180 LF $136.71 $22,320.00 66.C 31 80 08 MEDIUM 175 LF $198.45 $31,500.00 66.D 31 80 08 SMALL 115 LF $220.50 $23,000.00 67 31 80 08 LOG VANE 67.A 31 80 08 EXTRA LARGE 10 LF $0.00 $1,240.00 67.B 31 80 08 LARGE 12 LF $122.38 $1,332.00 67.C 31 80 08 MEDIUM 14 LF $122.38 $1,554.00 67.D 31 80 08 SMALL 8 LF $122.38 $888.00 68 31 80 09 STEP POOL VANE 68.A 31 80 09 EXTRA LARGE 140 LF $312.01 $39,620.00 68.B 31 80 09 LARGE 220 LF $297.68 $59,400.00 68.C 31 80 09 MEDIUM 240 LF $297.68 $64,800.00 68.D 31 80 09 SMALL 160 LF $297.68 $43,200.00 69 31 80 10 LOG SILL 69.A 31 80 10 EXTRA LARGE 12 LF $104.74 $1,140.00 69.B 31 80 10 LARGE 14 LF $104.74 $1,330.00 69.C 31 80 10 MEDIUM 8 LF $104.74 $760.00 69.D 31 80 10 SMALL 15 LF $104.74 $1,425.00 70 31 80 11 CONSTRUCTED RIFFLE - WITH SILLS 8 CY $457.54 $3,320.00 71 31 80 11 CONSTRUCTED RIFFLE 510 CY $154.35 $71,400.00 72 31 80 12 TOE WOOD PROTECTION 10 SY $33.08 $300.00 73 31 80 14 LIVE FASCINE 125 LF $13.78 $1,562.50 74 31 80 15 STONE CASCADE 74.A 31 80 15 EXTRA LARGE 8 SY $383.67 $2,784.00 74.B 31 80 15 LARGE 10 SY $369.34 $3,350.00 74.C 31 80 15 MEDIUM 18 SY $369.34 $6,030.00 74.D 31 80 15 SMALL 6 SY $369.34 $2,010.00 75 31 80 17 SOIL ENCAPSULATED LIFTS (SEL) 1900 LF $25.36 $43,700.00

BID TABULATION PAGE 5 OF 9 76 31 80 17 SOIL ENCAPSULATED LIFTS (SEL) WITH COIR FIBER BLOCK 110 LF $25.36 $2,530.00 77 31 80 19 STORMWATER OUTFALL STEPS 20 LF $251.37 $4,560.00 SITE RESTORATION AND LANDSCAPING S ASPHALT PAVING RESURFACING 78 32 12 16 (INCLUDING MILLING) 200 SY $24.81 $4,500.00 79 32 16 13 CURB RESTORATION 79.A 32 16 13 NEW 6" X 24" X 12" HIGH BACK 50 LF $22.05 $1,000.00 79.B 32 16 13 NEW 6" X 30" X 12" HIGH BACK 10 LF $22.05 $200.00 79.C 32 16 13 NEW 6" X 24" X 10" ROLL BACK 10 SY $22.05 $200.00 80 32 16 13 SIDEWALK RESTORATION 10 SY $55.13 $500.00 81 32 31 00 CHAIN LINK FENCE 81.A 32 31 00 4 HEIGHT 160 LF $13.78 $2,000.00 81.B 32 31 00 6 HEIGHT 110 LF $17.09 $1,705.00 81.C 32 31 00 8 HEIGHT 30 LF $19.29 $525.00 82 32 31 00 SPLIT RAIL FENCE 82.A 32 31 00 2 RAIL FENCE 120 LF $14.06 $1,530.00 82.B 32 31 00 3 RAIL FENCE 120 LF $15.71 $1,710.00 83 32 31 00 WOODEN PRIVACY FENCE 83.A 32 31 00 6 HEIGHT 200 LF $15.44 $2,800.00 83.B 32 31 00 8 HEIGHT 80 LF $18.74 $1,360.00 84 32 31 00 DECORATIVE FENCE 84.A 32 31 00 6 HEIGHT 40 LF $165.38 $6,000.00 84.B 32 31 00 8 HEIGHT 10 LF $187.43 $1,700.00 85 32 32 23 SEGMENTAL WALL (FACE) 85.A 32 32 23 MODULAR BLOCK 60 LF $23.15 $1,260.00 85.B 32 32 23 PERMANENT FIELDSTONE 60 LF $20.95 $1,140.00 86 32 91 13 HAND GRADING 1500 SY $1.10 $1,500.00 87 32 91 13 SAND FILL 150 CY $88.20 $12,000.00 88 32 91 13 SOIL AMENDMENT 10000 SY $0.44 $4,000.00 89 32 91 13 TOPSOIL 100 CY $20.95 $1,900.00 90 32 92 00 SODDING 800 SY $8.82 $6,400.00 91 32 94 00 CONTAINER PLANTING 91.A 32 94 00 1 GALLON 250 EA $9.37 $2,125.00 91.B 32 94 00 3 GALLON 250 EA $27.56 $6,250.00 91.C 32 94 00 5 GALLON 250 EA $49.61 $11,250.00 92 32 94 00 LIVE PLANTING 92.A 32 94 00 PLUG 75 SY $44.10 $3,000.00 92.B 32 94 00 BARE ROOT 80 SY $44.10 $3,200.00 93 32 94 00 2 TREE 145 EA $242.55 $31,900.00 94 32 94 00 UPLAND SEEDING 5 AC $220.50 $1,000.00

BID TABULATION PAGE 6 OF 9 95 32 94 00 WETLAND SEEDING 1 AC $551.25 $500.00 96 32 94 00 WOOD MULCH 96.A 32 94 00 BARK NUGGETS 850 SY $2.76 $2,125.00 96.B 32 94 00 SHREDDED BARK 210 SY $2.76 $525.00 97 32 94 00 LIVE STAKING 600 EA $2.21 $1,200.00 98 32 94 00 LIVE WHIP 400 EA $5.51 $2,000.00 99 32 94 00 LIVE POLE 200 EA $4.69 $850.00 100 32 94 00 PLANT PROTECTION 145 EA $14.06 $1,848.75 101 32 94 00B INVASIVE SPECIES CONTROL PHYSICAL REMOVAL 1 AC $6,394.50 $5,800.00 102 32 49 00B INVASIVE SPECIES CONTROL CHEMICAL TREATMENT 1 AC $4,299.75 $3,900.00 DRAINAGE STRUCTURES 103 33 31 00 PLAIN PVC SCH 80, IN PLACE, (0'-10' DEPTH TO TOP OF PIPE) 103.A 33 31 00 4" PVC PIPE 25 LF $36.66 $831.25 103.B 33 31 00 6" PVC PIPE 25 LF $46.31 $1,050.00 103.C 33 31 00 8" PVC PIPE 25 LF $61.74 $1,400.00 104 33 31 00 PERFORATED PVC SCH 80, IN PLACE, (0'-10' DEPTH TO TOP OF PIPE) 104.A 33 31 00 4" PVC PIPE 25 LF $38.31 $868.75 104.B 33 31 00 6" PVC PIPE 25 LF $47.41 $1,075.00 104.C 33 31 00 8" PVC PIPE 25 LF $63.06 $1,430.00 105 33 41 13 ASP, 16 GAUGE,IN PLACE, (0'-10' DEPTH TO TOP OF PIPE) 105.A 33 41 13 18" - 36" ASP 20 LF $110.25 $2,000.00 105.B 33 41 13 42" - 72" ASP 20 LF $176.40 $3,200.00 105.C 33 41 13 78" - 96" ASP 20 LF $209.48 $3,800.00 106 33 41 13 RCP PIPE ANY CONFIGURATION 106.A 33 41 13 18 24 IN 3 INCREMENTS 20 LF $27.56 $500.00 106.B 33 41 13 30 36 IN 3 INCREMENTS 20 LF $44.10 $800.00 106.C 33 41 13 42 48 IN 3 INCREMENTS 20 LF $47.68 $865.00 106.D 33 41 13 54 60 IN 3 INCREMENTS 20 LF $52.92 $960.00 107 33 41 13 HDPE, IN PLACE, (0'-10' DEPTH TO TOP OF PIPE) 107.A 33 41 13 4" - 8" HPDE PIPE (PLAIN) 20 LF $16.54 $300.00 107.B 33 41 13 4" - 8" HPDE PIPE (PERFORATED OR SLOTTED) 40 LF $17.64 $640.00 107.C 33 41 13 18" - 24" HDPE PIPE 20 LF $40.79 $740.00 107.D 33 41 13 30" - 36" HDPE 20 LF $66.15 $1,200.00 107.E 33 41 13 42" - 48" HDPE 20 LF $99.23 $1,800.00

BID TABULATION PAGE 7 OF 9 107.F 33 41 13 54" - 60" HDPE 20 LF $160.97 $2,920.00 108 33 47 28 FISH STOCKING 460 LBS $17.64 $7,360.00 109 33 49 13 CONCRETE FLUME 15 CY $441.00 $6,000.00 110 33 49 13 CONCRETE FLUME WITH STONE INLAY 15 CY $551.25 $7,500.00

BID TABULATION PAGE 8 OF 9 111 33 49 13 HEADWALL, VARIOUS PIPE SIZES 111.A 33 49 13 PRECAST HEADWALL FOR 18" - 36" PIPE 1 EA $937.13 $850.00 111.B 33 49 13 PRECAST HEADWALL FOR 42" - 72" PIPE 1 EA $1,874.25 $1,700.00 111.C 33 49 13 BRICK HEADWALL FOR 18" - 36" PIPE 1 EA $1,984.50 $1,800.00 111.D 33 49 13 BRICK HEADWALL FOR 42" - 72" PIPE 1 EA $2,425.50 $2,200.00 111.E 33 49 13 ROCK HEADWALL FOR 18" - 36" PIPE 1 EA $2,425.50 $2,200.00 111.F 33 49 13 ROCK HEADWALL FOR 42" - 72" PIPE 1 EA $3,417.75 $3,100.00 112 33 49 13 BRICK CATCH BASIN 112.A 33 49 13 GROUP 1 (GADOT 1033 / 1034) 10 VF $275.63 $2,500.00 112.B 33 49 13 GROUP 2 (GADOT 1033 / 1034) 10 VF $347.29 $3,150.00 113 33 49 13 PRECAST CATCH BASIN 113.A 33 49 13 GROUP 1 (GADOT 1033 / 1034) 10 VF $253.58 $2,300.00 113.B 33 49 13 GROUP 2 (GADOT 1033 / 1034) 10 VF $308.70 $2,800.00 114 33 49 13 REPLACEMENT TOP FOR 1033/1034 10 VF $771.75 $7,000.00 115 33 49 13 BRICK MANHOLE, TYPE 1 (GADOT 1011A) 10 VF $253.58 $2,300.00 116 33 49 13 BRICK MANHOLE, TYPE 2 (GADOT 1011A) 10 VF $297.68 $2,700.00 117 33 49 13 PRECAST MANHOLE, TYPE 1 (GADOT 10 VF $237.04 $2,150.00 118 33 49 13 PRECAST MANHOLE, TYPE 2 (GADOT 10 VF $281.14 $2,550.00 119 33 49 13 MANHOLE COVERS 10 EA $727.65 $6,600.00 120 33 49 13 BRICK DROP INLET, GROUP 1 (GADOT 1019A) 10 VF $248.06 $2,250.00 121 33 49 13 BRICK DROP INLET, GROUP 2 (GADOT 1019A) 10 VF $297.68 $2,700.00 122 33 49 13 BRICK DROP INLET, GROUP 1 (GWINNETT P&D 610) 10 VF $251.37 $2,280.00 123 33 49 13 BRICK DROP INLET, GROUP 2 (GWINNETT P&D 610) 10 VF $297.68 $2,700.00 124 33 49 13 BRICK DROP INLET, GROUP 1 (GADOT 9031S/9031D) 10 VF $799.31 $7,250.00 125 33 49 13 BRICK DROP INLET, GROUP 2 (GADOT 9031S/9031D) 10 VF $837.90 $7,600.00 126 33 49 13 PRECAST DROP INLET, GROUP 1 (GADOT 1019A) 10 VF $264.60 $2,400.00 127 33 49 13 PRECAST DROP INLET, GROUP 2 (GADOT 1019A) 10 VF $297.68 $2,700.00 128 33 49 13 PRECAST DROP INLET, GROUP 1 (GWINNETT P&D 610) 10 VF $264.60 $2,400.00 129 33 49 13 PRECAST DROP INLET, GROUP 2 (GWINNETT P&D 610) 10 VF $297.68 $2,700.00

BID TABULATION PAGE 9 OF 9 130 33 49 13 PRECAST DROP INLET, GROUP 1 (GADOT 9031S/9031D) 10 VF $264.60 $2,400.00 131 33 49 13 PRECAST DROP INLET, GROUP 2 (GADOT 9031S/9031D) 10 VF $297.68 $2,700.00 132 33 49 13 REPLACEMENT TOP FOR DI 610, W\RING & COVER 1 EA $826.88 $750.00 133 33 49 13 REPLACEMENT TOP FOR DI 1019A, W\FRAME & GRATE 1 EA $920.59 $835.00 134 33 49 13 REPLACEMENT TOP FOR DI 9031S/9031D, W\ STEEL PLATE 1 EA $1,212.75 $1,100.00 ROADWAY RESTORATION 135 34 71 10 STREET CUT 135.A 34 71 10 DETAIL A 41 SY $50.72 $1,886.00 135.B 34 71 10 DETAIL B 41 SY $59.54 $2,214.00 135.C 34 71 10 DETAIL C 17 SY $51.82 $799.00 135.D 34 71 10 DETAIL D 11 SY $22.05 $220.00 136 34 71 10 DRIVEWAY RESTORATION 136.A 34 71 10 6" CONCRETE 49 SY $82.69 $3,675.00 136.B 34 71 10 8" CONCRETE 18 SY $104.74 $1,710.00 TOTALS $1,897,657.25 Will vendor hold pricing firm? Renewal Option 1 Will vendor hold pricing firm? Renewal Option 2 Will vendor hold pricing firm? Renewal Option 3 Will vendor hold pricing firm? Renewal Option 4 Recommended Vendor: Attn: Jason Freeland 871 Old Peachtree Road NW Lawrenceville, GA 30043 P: 770-513-4558 F: 770-513-4740 jason.freeland@dickersongroup.net 5% 5% 5% 5%