Furness Railway Wagon Co.

Similar documents
Furness Railway Wagon Co. Great Eastern Railway/LNER/BR Diagram 18 10ton 3 Plank General Merchandise Wagon Steel Under-Frame

Furness Railway Wagon Co. NBR/LNER 8ton 3PLK General Merchandise Wagon

Furness Railway Wagon Co. Glasgow & South Western Railway/LMS/BR 12ton Mineral Steel Under-Frame

Furness Railway Wagon Co. NER/LNER/BR Cattle Van

Furness Railway Wagon Co. NER/LNER/BR Box Van

Furness Railway Wagon Co. NER/LNER/BR C1 5ton Fitted Open Fish

Furness Railway Wagon Co. CR/HR/LMS/PO 8ton 4PLK General Merchandise Wagon

Furness Railway Wagon Co.

Furness Railway Wagon Co.

Furness Railway Wagon Co.

Furness Railway Wagon Co.

Furness Railway Wagon Co.

Furness Railway Coach Co.

Wheels, paint and transfers required to complete. Please note that to aid the folding of the various parts score all the halfetched fold lines.

(WW03f) BR PIPE WAGON 4 shoe brake

Welcome Wagons WW ton Mineral (2 & 4 shoe brake)

MKD 08 BR 21.5 TON FLYASH HOPPER. Wagon Kit To cover Vacuum (CSV) and air braked types (CSA)

Caley Coaches True Line kits in etched brass

WW03e Welcome Wagons 8 Shoe Brake Pipe Wagon

BRL-142/143 Class 142/143. Building Instructions

4mm scale 009 gauge Lodge Hill & Upnor railway Chattenden Drewry loco body kit.

Brake Blocks Product Code BB_7. Brake Blocks Product Code BB_7. A product from: A product from:

7mm Axleguards AX1_7 RCH/MR Standard Axleguards

Chopper Couplings. Assembly. Fitting

GWR 4 Wheel Parcel Van, Diagram W1

FINNEY7. 24 Jul 18 4 LNER A4. Fig 1. A4 GA Drawing

BRL CLASS 66 LOCOMOTIVE. Building Instructions

Rumney Models Price List July 2016

- 0 Gauge - Southern Railway Class 02 Chassis Construction & Parts Identification

MANNING WARDLE ex-penrhyn Quarry Railway Narrow Gauge `Jubilee mm Scale kit for 16.5mm or 14mm Gauge

Finney7 BEYER PEACOCK BUILT LOCOMOTIVE

RT Models. 4mm scale, 00/EM/P4 Manning Wardle, class K 0-6-0ST loco kit

FINNEY7. 24 Jul 18 A3-4 LNER A3. Fig 1. General Arrangement

NSWGR C30T LOCOMOTIVE AND TENDER KIT

3 mm wagon_parksidekits.doc 1 of 18

ALAN GIBSON, THE BUNGALOW CHURCH ROAD, LINGWOOD, NORWICH, NORFOLK. MIDLAND/L.M.S. Class 4F.

WARNING! 2 x Crossbars = 5kg

PARTS IDENTIFICATION AND ASSEMBLY INSTRUCTIONS

Dinorwic Quarry Hunslet `Alice Class with cab 7mm Scale kit for 16.5mm or 14mm Gauge

Factory Five Racing, Inc. 818 Kit Assembly manual revision 1i update

NM-NP Pajero Rhino Heavy Duty - Two Bar Trackmount System

Bowaters cab. Rear half of tropical cab frame. Cab door 82. Bend tags and solder to cab rear in open or closed position.

NSWGR Z Tank Locomotive

12T Covered Vans (XP Rated)

Brassmasters Scale Models

BRL-007 Detailing and Conversion Kit for NOVO/Triang Class 35 Hymek. Building Instructions

NM-NP Pajero Rhino Heavy Duty - Two Bar Trackmount System

ARIZ Model Aircrafters

CUMBRIAN RAILWAYS ASSOCIATION MODELLING CUMBRIAN RAILWAYS KITS AND ACCESSORIES 1

Finney7 PC May17 PRINCESS CORONATION. Fig 1. GA Curved Footplate

RTS518 - Rhino Heavy Duty 2 & 3 Crossbar System Hyundai iload, imax, i800, H-1.

Machine elements. Pneumatic stamping unit. Toggle-lever presses

Product & Price List

RTS510 Rhino Heavy Duty Track Mount System - MITSUBISHI TRITON MK

Rotary heat exchanger EURA split rotor, sizes 50 53

DAVE S GUIDE TO THE BR MARK 1 COACH

Mamod SL1K Locomotive Assembly Instructions

2002 Convertible Cloth Sleeve Convertible Cloth Attachment

Brassmasters Scale Models

Build your own THUNDERBIRD 2

NORTHERN FINE SCALE. Kit Ready to Run Coke Rail Wagons No Transfers

Jerry O Reilly describes how he produced a variety of GWR passenger stock in

Z-Gate Universal Shifter

0.50 RAGSTONE MODELS Web: ragstonemodels.co.uk

Instructions: Pullman-Standard PS-3 Coal Hopper Kit Tangent Part Numbers: through /2015

2 Door Assembly - Includes an aluminum door with two huck riveted galvanized door

Installation Instructions Z-Gate Shifter

COMPONENTS AND ACCESSORIES FOR VAN AND CONTAINERS

Stephenson's Valve Gear: 7mm cast white-metal kit 19 th Century swing-link version - non-working, cosmetic only. Instructions

RTS507 NISSAN Navara Dual Cab Track Mount System

RTS524 MITSUBISHI Challenger - Two Cross Bar Track Mount System - With or without roof rails -

Houstoun Gate Locomotive Works Gordon 4-Wheel Drive Chassis Assembly Instructions

Pickup Truck Parts

D40C HINGE # x Support Plate x M8 Bolt 8 x M8 Washer 6 x M6 20mm Bolts 6 x M6 Washers 19 x Screws

SAN FELIPE: Step by Step Pack 8

RAGSTONE MODELS. 7mm Scale. Kit and Ready to Run Price List. Web: ragstonemodels.co.uk

1994 Ford Pickup F250. STEERING COLUMN - EXCEPT STRIPPED CHASSIS 1994 STEERING Ford Motor Co. - Steering Columns - Except Stripped Chassis

UES-LL End Termination Kit

AR77.31-P-1001QA Remove/install soft top canvas MODEL 209.4

1:8 scale Koban Model Documentation

HiBoy Maverick/Commander Doors Part # HiBoy4 Maverick/Commander Doors Black

NSWGR C LOCOMOTIVE AND TENDER KIT

Armor How-To KITBASHING DRAGON S T-34/85M

AR77.31-P-1001QA Remove/install soft top canvas MODEL 209.4

In area - A -, a proper seal must be made against the top of the window glass.

Installation Instructions. QuickSilver Shifter. Fits: GM, Ford, Chrysler Transmissions See Application Guide for Specific Applications Part # 80683

Mechanical equipment Pneumatic stamping-unit Hand-toggle-lever presses

INSTALLATION MANUAL FORD PI SEDAN PRISONER TRANSPORT SEAT WITH OS-BELT SEATBELTS (PI02) Required Tools:

INSTALLATION INSTRUCTIONS

Installation Instructions Unimatic Shifter

Bachmann. Climax. Phoenix Sound Systems, Inc West Liberty Road Ann Arbor MI

TCI FastGate Shifter Installation Instructions

Instructions: PRR Sam Rea Shops X58 Class Box Car Kit Tangent Part Numbers: XX through XX 9/2015

fix AA-82160?? AA TRUCK TALK AA FLOOR BOARDS & MATS By Neil Wilson of Boulder, Colorado April 2007

Rumney Models Price List September 2017

ALLDATA Online Jaguar Vanden Plas L6-3980cc 4.0L DOHC - Service and Rep...

Hornby 8F detailing/upgrade kit

James Aircraft. INDUCTION SYSTEM, CARBURETED Please read all instructions prior to starting

Light Truck MegaShifter

Installation Instructions Right Hand Drive Megashifter

Transcription:

Furness Railway Wagon Co. Great Eastern Railway/LNER/BR 1900 Diagram 7 10ton Cattle Van Steel Under-Frame Wheels, paint and transfers required to complete. Please note that to aid the folding of the various parts score all the halfetched foldlines that are to be folded. The Parts. Part 15 Part 4 Part 13 Part 12 Part 11 Part 1 Part 8 Part 7 Part 18 Part 17 Part 9 Part 10 Part 19 Part 2 Part 3 Part 16 Part 14 Part 5 Part 6 1 16/08/2015

Chassis Construction. 1. Remove chassis (part 1) from the etch and fold up the bottom of the buffer beam between parallels as shown. Fold Lines 2. Next fold up the buffer beam completely as shown. Make sure that the resulting U shape is square so as to fit the sole bars. Repeat for the other end of the chassis. 3. Remove the sole-bars (part 2) and punch out the rivets. Next fold up the bottom of the sole-bars between two parallels. Make sure that the resulting shape is square. 4. Click one of the sole-bars in to the half etch slot that runs between the two buffer beams. Solder into position using 188C solder. Make sure that the solebars are actually soldered inside the buffer beam. Repeat for the other sole-bar. 2 16/08/2015

5. Next remove the buffer beam reinforcing plates (part 3) and punch out the half etched rivets and tin the back of each piece with 188C solder. Now sweat the plates onto the half etched square in the front of the buffer beam. Buffer beam reinforcing plates Final Assembly of van. 1. First solder wire in to the half etched slots in the roof (part 4). 2. Next take one of both the etched brake and brake overlay (Parts 5 and 6) punch out the rivets and solder together. 3. Wash and Clean up the castings making sure that the casting fit together before gluing. The sides (part7) have to have all excess flash removed as shown. 4. Next having consulted a photograph drill the upright beams and the ends so to allow the fitting of the wire later. NB this must be done at this stage as there will be no access later. 5. Fit one of sides (parts 7) to the floor (part 8), making sure that the ends of the sides line up with the floor and are square with the chassis. Next fit the ends (Parts 9) of the to the sides and floor, as shown. Then fit the last side to complete the box. 3 16/08/2015

6. Next punch out the half etched rivets on the strapping etch (Part 11) and fit as show. NB the ends of the hinges for the drop door fit into the slots in the half round section these may need to be trimmed. 7. Next fit the micro strip the top of the door and to on side as shown this the spacer for the partition. 8. Position the top of the wagon in the middle of the chassis then glue the chassis to the top. 9. Next pinch out the rivets and fold up the L section end supports and fit as shown. 10. Next make up the door balancer as shown. 4 16/08/2015

11. Next push the coupling assemblies (part 12) (Hooks and links) into the chassis then push over the spring and secure. Then fix the four buffers (part 13) into the holes in the buffer beam using two part epoxy. 12. Next attach the brake V hanger to the inside of the sole bar (part 14) so that it lines up with the rivet detail. 13. Place the brake gear assembly against the inside of chassis and slide down into the chassis until the holes line up and you can feed a piece of wire in. Position the casting with care centrally between the rivets on the sole-bar. 14. Drill out the w-iron castings to suit the bearings of your chosen wheels. Assemble a wheel set, 2 x W-iron s (part 15), 2 x bearing s and 1 x wheel/axle unit, do not glue the bearings into the W-irons at this stage. Again using two part epoxy resin, glue the assembled wheel set onto the sole-bars so that they are square and line up with the rivets as shown in the drawing. 5 16/08/2015

15. Repeat for the other wheel set. Use a straight edge across the back of the wheels to aid getting these parallel and square to the chassis. 16. Next fix the brake lever (part16) and ratchet casting (part 17) to the sole-bar as shown below. 17. Next fit the brake safety bars (Part 18). 18. Finally fit the wire in to the pre drilled holes, the partition (Part 19) and the roof, making sure that it is square. Paint the model in the livery of your choice. 6 16/08/2015

History of the Wagon Between 1900 and 1909, the Great Eastern Railway Company ordered a total of 800 10ton large cattle vans from the company s own wagon works at Temple mills. The vans were built with outside frames and mounted on a steel under-frame. 25 of the vans built with automatic braking to allow them to run with passenger trains. The vans were used to convey livestock to and from East Anglia although some of the wagons where photographed as far away as northern Scotland and south west England. Known running numbers were26001-26750, All 800 of these wagons were absorbed into the LNER. These would have been renumbered by adding 600,000. 25 of these vans managed to last into early British Railways. In Great Eastern Railway days the wagons would have been painted: Slate grey but would have gained a liberal coat of white wash once they had been used. Red Oxide/Dark Red outer panels on the Ends (Pre 1912) or Light French grey with a large V in Red Oxide/Dark Red painted on the Ends for Vacuum fitted stock. All had White/light grey roof and everything below the sole-bars and the buffers in black. LNER Under the LNER the vans would have also been painted grey, with the fitted wagons being painted bauxite. In British Railways days, the wagons would have probably not repainted unless there was a change in use. 7 16/08/2015

Liveries Great Eastern Railway LNER early Circ 1923-36 LNER Late Circ 1936-47 8 16/08/2015

Furness Railway Wagon Co. Great Eastern Railway/LNER/BR 1900 Diagram 7 10ton Cattle Van Steel Under-Frame 1. Construction Manual, 2. One Brass chassis etch, 3. One rolled etched brass roof. 4. One Brass Strapping etch 5. One brake lever ratchet casting, 6. Four W-iron/axle box castings, 7. Two wagon side casting (resin), 8. Two wagon Outside end casting (resin), 9. One wagon floor Casting (resin), 10. One wagon partition Casting (resin), 11. Four buffer assemblies, 12. Two coupling hook springs, 13. Six coupling hook links. 14. Two lengths of 0.7mm brass wire. We recommend Slaters 3 1 split spoke wheels for this kit. Transfers are available from POWsides. 9 16/08/2015