APPENDICES C APPENDIX C: CALCULATION WORKSHEETS FOR FREEWAY SEGMENTS AND FREEWAY WEAVE ANALYSIS

Similar documents
Interchange Operations Study

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road

Interchange Operations Study MOT (I-75 & Austin Boulevard) ODOT District 7 PID 99213

Freeway Weaving and Ramp Junction Analysis

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

Appendix H: Construction Impacts H-2 Transportation

Chapter 6. CEE 320 Anne Goodchild. Spring 2008 CEE 320

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

JCE 4600 Basic Freeway Segments

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

Interstate 85 Widening Phase III Interchange Modification Report Exit 98 Frontage Road Off-Ramp. Cherokee County, SC

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

DRAFT FINAL REPORT THE FLORIDA DEPARTMENT OF TRANSPORTATION SYSTEMS PLANNING OFFICE. on Project. Estimation of Capacities on Florida Freeways

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

Low-Cost Improvements to Express-Highway Bottleneck Locations

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

Metro Highway Program

Westbound State Route 91 Improvement Project

Interstate 85 Widening Phase III Interchange Modification Report Exit 106 E. Cherokee Street. Cherokee County, SC

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants

Project Working Group Meeting #5

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

APPENDIX H. Transportation Impact Study

MaineDOT. I-295 Corridor Update. Scarborough to Brunswick. June 2018

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

APPENDIX A Interstate 26 Widening Traffic Analysis Report

MADERAS HOTEL TRANSPORTATION IMPACT ANALYSIS. LLG Ref Transportation Planner III & Jorge Cuyuch Transportation Engineer I

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

Traffic Impact Statement (TIS)

Congestion Management Program 2015 Monitoring Report


SR 3/SR 304 Bremerton Interchange Improvements. Feasibility Study

Metropolitan Freeway System 2013 Congestion Report

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Introduction Environmental Setting. Section 3.10 Transportation/Circulation Regional and Local Access

VILLASPORT ATHLETIC CLUB AND SPA Draft Environmental Impact Report. Volume I

What is ELToD and Why Use it? Toll Choice Key Concepts. ELToD Applications. SW 10 th Street. ELToD Future Enhancements

Craigieburn Employment Precinct North and English Street

SANTA BARBARA COUNTY ASSOCIATION OF GOVERNMENTS GOLETA RAMP METERING STUDY MAY 8, 2018 FINAL REPORT

MULTILANE HIGHWAYS. Highway Capacity Manual 2000 CHAPTER 21 CONTENTS

NEWS RELEASE November 8, 2017

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

Interchange Justification Report

Technical Feasibility Report

2016 Congestion Report

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013

APPENDIX E. Traffic Analysis Report

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT

Capacity and Level of Service for Highway Segments (I)

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

Section 5.0 ENVIRONMENTAL ANALYSIS

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

Appendix G Traffic Study Methodology

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

Evaluation of Renton Ramp Meters on I-405

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

3.0 Future (2040) Transportation

Appendix F. Capacity Analysis Worksheets No Build

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

Sacramento Intermodal Transportation Facility. Final Traffic and Transportation/Pedestrian and Bicycle Facilities Technical Report

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis

TRAFFIC IMPACT ANALYSIS FOR THE. PANORAMA PD Shasta County, California. Prepared For: Enplan 3179 Bechelli Lane, Suite 100 Redding, CA 96002

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

4.5 TRANSPORTATION AND CIRCULATION

2030 Multimodal Transportation Study

Transport Modes and Technologies A Walking Tour on Capacity, LOS. Urban Transportation Planning MIT Course 1.252j/11.

Traffic Impact Analysis Update

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

Metropolitan Freeway System 2007 Congestion Report

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

4.14 TRANSPORTATION AND CIRCULATION

FE Review-Transportation-II. D e p a r t m e n t o f C i v i l E n g i n e e r i n g U n i v e r s i t y O f M e m p h i s

STATE ROUTE 1 HOV LANE WIDENING PROJECT (FROM MORRISSEY BOULEVARD TO SAN ANDREAS ROAD)

Traffic Signal Timing Diamond Operation. Innovation for better mobility

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

Sepulveda Pass Corridor Systems Planning Study Update

CDOT SPF Development and 10 Years of Application. A Practical Approach...

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

Man O War Small Area Study Report

SRF No MEMORANDUM. Project Steering Committee. Steve Wilson, Principal John Hagen, Senior Associate SRF Consulting Group, Inc.

Citizens Committee for Facilities

Lecture 4: Capacity and Level of Service (LoS) of Freeways Basic Segments. Prof. Responsável: Filipe Moura

4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS

Intersection Control Evaluation

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Project 2: Traffic and Queuing (updated 28 Feb 2006)

Shoppes at Pine Meadow BPUD DeBary, Florida. Traffic Impact Analysis

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Transcription:

APPENDICES C APPENDIX C: CALCULATION WORKSHEETS FOR FREEWAY SEGMENTS AND FREEWAY WEAVE ANALYSIS Public Review Draft Existing Conditions Report Page C-1 October 2015

SIA PLAN UPDATE This page was intentionally left blank. Page C-2 Public Review Draft Existing Conditions Report October 2015

Basic Segment Analysis

Merge-Diverge Analysis Merge Analysis AM Peak Hour Merge Analysis PM Peak Hour Diverge Analysis AM Peak Hour Diverge Analysis PM Peak Hour

file:///c:/users/vkiattikomol/appdata/local/temp/s2k13a3.tmp AM Peak /Dir of Travel SR-65 NB Weaving Segment Location Twelve Bridges to Old Hwy 65 1700ft free-flow speed, FFS V FF 705 0.85 13 2 1.5 1.2 0.9 1.00 887 V RF 224 0.92 5 2 1.5 1.2 0.972 1.00 251 V FR 516 0.92 5 2 1.5 1.2 0.972 1.00 577 V RR 12 0.92 5 2 1.5 1.2 0.972 1.00 13 V NW 900 V = 1728 V W 828 VR 0.479 2 lc Minimum weaving lane changes, LC 828 lc/h 1057 lc/h 529 lc/h 1586 lc/h 153 Weaving Segment Speed, Density, of Service, and Capacity 1647 veh/h Weaving intensity factor, W 0.214 4685 veh/h 62.5 mph Weaving segment v/c ratio 0.2 63.8 mph 9.2 pc/mi/ln Average non-weaving speed, S NW 61.3 mph of Service, LOS A Maximum weaving length, L MAX 7584 ft Chapter 13, " Merge and Diverge Segments". Copyright 2014 University of Florida, All Rights Reserved HCS 2010 TM Version 6.65 Generated: 9:07 PM

file:///c:/users/vkiattikomol/appdata/local/temp/s2kfae6.tmp PM Peak /Dir of Travel SR-65 NB Weaving Segment Location Twelve Bridges to Old Hwy 65 1700ft free-flow speed, FFS V FF 1226 0.94 13 2 1.5 1.2 0.9 1.00 1394 V RF 295 0.92 5 2 1.5 1.2 0.972 1.00 330 V FR 924 0.92 5 2 1.5 1.2 0.972 1.00 1033 V RR 16 0.92 5 2 1.5 1.2 0.972 1.00 18 V NW 1412 V = 2775 V W 1363 VR 0.491 2 lc Minimum weaving lane changes, LC 1363 lc/h 1592 lc/h 634 lc/h 2226 lc/h 240 Weaving Segment Speed, Density, of Service, and Capacity 2647 veh/h Weaving intensity factor, W 0.280 4571 veh/h 58.8 mph Weaving segment v/c ratio 0.579 62.4 mph 15.7 pc/mi/ln Average non-weaving speed, S NW 55.7 mph of Service, LOS B Maximum weaving length, L MAX 7723 ft Chapter 13, " Merge and Diverge Segments". Copyright 2014 University of Florida, All Rights Reserved HCS 2010 TM Version 6.65 Generated: 9:30 PM

file:///c:/users/vkiattikomol/appdata/local/temp/s2k79e4.tmp AM Peak /Dir of Travel SR-65 SB Weaving Segment Location Old Hwy 65 to Twelve Bridges 2000ft free-flow speed, FFS V FF 1932 0.94 13 2 1.5 1.2 0.9 1.00 2197 V RF 740 0.92 5 2 1.5 1.2 0.972 1.00 828 V FR 286 0.92 5 2 1.5 1.2 0.972 1.00 320 V RR 39 0.92 5 2 1.5 1.2 0.972 1.00 44 V NW 2241 V = 3389 V W 1148 VR 0.339 2 lc Minimum weaving lane changes, LC 1148 lc/h 1400 lc/h 968 lc/h 2368 lc/h 448 Weaving Segment Speed, Density, of Service, and Capacity 3213 veh/h Weaving intensity factor, W 0.258 5877 veh/h 58.4 mph Weaving segment v/c ratio 0.547 62.8 mph 19.4 pc/mi/ln Average non-weaving speed, S NW 56.3 mph of Service, LOS B Maximum weaving length, L MAX 6003 ft Chapter 13, " Merge and Diverge Segments". Copyright 2014 University of Florida, All Rights Reserved HCS 2010 TM Version 6.65 Generated: 9:31 PM

file:///c:/users/vkiattikomol/appdata/local/temp/s2k3a84.tmp PM Peak /Dir of Travel SR-65 SB Weaving Segment Location Old Hwy 65 to Twelve Bridges 2000ft free-flow speed, FFS V FF 1539 0.90 13 2 1.5 1.2 0.9 1.00 1828 V RF 602 0.92 5 2 1.5 1.2 0.972 1.00 673 V FR 164 0.92 5 2 1.5 1.2 0.972 1.00 183 V RR 32 0.92 5 2 1.5 1.2 0.972 1.00 36 V NW 1864 V = 2720 V W 856 VR 0.315 2 lc Minimum weaving lane changes, LC 856 lc/h 1108 lc/h 890 lc/h 1998 lc/h 373 Weaving Segment Speed, Density, of Service, and Capacity 2578 veh/h Weaving intensity factor, W 0.226 5933 veh/h 60.7 mph Weaving segment v/c ratio 0.434 63.6 mph 14.9 pc/mi/ln Average non-weaving speed, S NW 59.5 mph of Service, LOS B Maximum weaving length, L MAX 5742 ft Chapter 13, " Merge and Diverge Segments". Copyright 2014 University of Florida, All Rights Reserved HCS 2010 TM Version 6.65 Generated: 9: PM

file:///c:/users/vkiattikomol/appdata/local/temp/s2kc085.tmp AM Peak /Dir of Travel SR-65 SB Weaving Segment Location Blue Oaks to Pleasant Grove ft free-flow speed, FFS V FF 2829 0.94 13 2 1.5 1.2 0.9 1.00 3217 V RF 828 0.92 5 2 1.5 1.2 0.972 1.00 926 V FR 558 0.92 5 2 1.5 1.2 0.972 1.00 624 V RR 44 0.92 5 2 1.5 1.2 0.972 1.00 49 V NW 3266 V = 4816 V W 1550 VR 0.322 2 lc Minimum weaving lane changes, LC 1550 lc/h 1830 lc/h 1396 lc/h 3226 lc/h 784 Weaving Segment Speed, Density, of Service, and Capacity 4564 veh/h Weaving intensity factor, W 0.285 6000 veh/h 54.2 mph Weaving segment v/c ratio 0.761 62.2 mph 29.6 pc/mi/ln Average non-weaving speed, S NW 51.1 mph of Service, LOS D Maximum weaving length, L MAX 5819 ft Chapter 13, " Merge and Diverge Segments". Copyright 2014 University of Florida, All Rights Reserved HCS 2010 TM Version 6.65 Generated: 9:45 PM

file:///c:/users/vkiattikomol/appdata/local/temp/s2keb8b.tmp PM Peak /Dir of Travel SR-65 SB Weaving Segment Location Blue Oaks to Pleasant Grove ft free-flow speed, FFS V FF 2695 0.90 13 2 1.5 1.2 0.9 1.00 3201 V RF 883 0.92 5 2 1.5 1.2 0.972 1.00 988 V FR 518 0.92 5 2 1.5 1.2 0.972 1.00 579 V RR 46 0.92 5 2 1.5 1.2 0.972 1.00 51 V NW 3252 V = 4819 V W 1567 VR 0.325 2 lc Minimum weaving lane changes, LC 1567 lc/h 1847 lc/h 1393 lc/h 3240 lc/h 780 Weaving Segment Speed, Density, of Service, and Capacity 4568 veh/h Weaving intensity factor, W 0.286 5994 veh/h 54.2 mph Weaving segment v/c ratio 0.762 62.2 mph 29.6 pc/mi/ln Average non-weaving speed, S NW 51.0 mph of Service, LOS D Maximum weaving length, L MAX 5855 ft Chapter 13, " Merge and Diverge Segments". Copyright 2014 University of Florida, All Rights Reserved HCS 2010 TM Version 6.65 Generated: 9:47 PM